B08_Attachment_15_Upper_Plaza_Temporary_Repairs_AS-built_Drawings-2013.pdf

PDF 3 MB Posted

Attached to
PEVI-272171 Rehabilitate Failing Upper Plaza
Solicitation number
140P2024R0059
Issued by

About this file

This document appears to be a set of as-built drawings for the Basement Level related to the federal contract opportunity "PEVI-272171 Rehabilitate Failing Upper Plaza". The contract opportunity is a solicitation issued by the Department of the Interior National Park Service National Office to restore the structure supporting the upper plaza and associated waterproofing membrane at the Perry's Victory and International Peace Memorial. The project will also modify interior spaces below the upper plaza to meet current needs and improve functionality. The as-built drawings provide detailed information about the existing basement level conditions that will need to be addressed as part of the rehabilitation efforts.

View the file

Other files

File Type Posted
Sol_140P2024R0059_Amd_0003.pdf PDF
B09_Amendment_03_Questions_3_0003.pdf PDF
Sol_140P2024R0059_Amd_0002.pdf PDF
B09_Amendment_02_Questions_2_0002.pdf PDF
B09_Amendment_01_Questions_Extension_Changes_4_16_24_0001.pdf PDF
Sol_140P2024R0059_Amd_0001.pdf PDF
B08_Attachment_09_Milner_Design_Analysis_-_1978.pdf PDF
B08_Attachment_08_Milner_Final_Construction_Drawings_-1978.pdf PDF
B08_Attachment_17_Survey-2020.pdf PDF
B08_Attachment_12_Investigation_and_Stabilization_-_2008.pdf PDF
B08_Attachment_13_Upper_Plaza_Temp_Repairs-2011.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_1-1983.pdf PDF
B08_Attachment_21_Conceptual_Space_Program_Diagram-2023.pdf PDF
B08_Solit_Clauses_Construction_4_3_24.pdf PDF
B08_Attachment_22_Wage_Determination.pdf PDF
B08_Attachment_5_Construction_Contract_Administration.pdf PDF
B08_Attachment_20_Geotechnical_Report-2022.pdf PDF
B08_Attachment_3__Solit_PSP_Vol_I_Propsoal_Submission_Section_L.pdf PDF
B08_Attachment_2_Letter_of_Comm__Design_Build.pdf PDF
B08_Attachment_16_CLR___EA_November-2018.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2bb-1983.pdf PDF
B08_Attachment_1_Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_14_Foundation_Document-2012.pdf PDF
B08_Attachment_4_Solit_PSP_Vol_II_Proposal_Submission_Section_L.pdf PDF
B08_Attachment_11_Condition_Assessment-1996.pdf PDF
B08_Attachment_6_NPS_272171_PEVI_DB-RFP.docx DOCX document
B08_Attachment_07_Historic_Structure_Report-1976.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2ab-1983.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2aa-1983.pdf PDF
Sol_140P2024R0059.pdf PDF
B08_Attachment_19_Regulated_Materials_Survey-2022.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2ba-1983.pdf PDF
B08_Attachment_18_Existing_Conditions_Plan_-_2022.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basement Level