Sol_140P2024R0059_Amd_0003.pdf

PDF 82 KB Posted

Attached to
PEVI-272171 Rehabilitate Failing Upper Plaza
Solicitation number
140P2024R0059
Issued by

About this file

This document is an amendment to Solicitation Number 140P2024R0059 for the PEVI-272171 Rehabilitate Failing Upper Plaza project. The amendment provides questions and answers received to date. The period of performance is from 09/01/2024 to 11/15/2027. The purpose of the project is to restore the structure supporting the upper plaza and the associated waterproofing membrane at Perry's Victory and International Peace Memorial. Interior spaces below the upper plaza will also be modified to meet current needs and improve functionality. Offers must acknowledge receipt of this amendment prior to the specified due date.

View the file

Other files

File Type Posted
B09_Amendment_03_Questions_3_0003.pdf PDF
Sol_140P2024R0059_Amd_0002.pdf PDF
B09_Amendment_02_Questions_2_0002.pdf PDF
B09_Amendment_01_Questions_Extension_Changes_4_16_24_0001.pdf PDF
Sol_140P2024R0059_Amd_0001.pdf PDF
B08_Attachment_09_Milner_Design_Analysis_-_1978.pdf PDF
B08_Attachment_08_Milner_Final_Construction_Drawings_-1978.pdf PDF
B08_Attachment_15_Upper_Plaza_Temporary_Repairs_AS-built_Drawings-2013.pdf PDF
B08_Attachment_17_Survey-2020.pdf PDF
B08_Attachment_12_Investigation_and_Stabilization_-_2008.pdf PDF
B08_Attachment_13_Upper_Plaza_Temp_Repairs-2011.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_1-1983.pdf PDF
B08_Attachment_21_Conceptual_Space_Program_Diagram-2023.pdf PDF
B08_Solit_Clauses_Construction_4_3_24.pdf PDF
B08_Attachment_22_Wage_Determination.pdf PDF
B08_Attachment_5_Construction_Contract_Administration.pdf PDF
B08_Attachment_20_Geotechnical_Report-2022.pdf PDF
B08_Attachment_3__Solit_PSP_Vol_I_Propsoal_Submission_Section_L.pdf PDF
B08_Attachment_2_Letter_of_Comm__Design_Build.pdf PDF
B08_Attachment_16_CLR___EA_November-2018.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2bb-1983.pdf PDF
B08_Attachment_1_Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_14_Foundation_Document-2012.pdf PDF
B08_Attachment_4_Solit_PSP_Vol_II_Proposal_Submission_Section_L.pdf PDF
B08_Attachment_11_Condition_Assessment-1996.pdf PDF
B08_Attachment_6_NPS_272171_PEVI_DB-RFP.docx DOCX document
B08_Attachment_07_Historic_Structure_Report-1976.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2ab-1983.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2aa-1983.pdf PDF
Sol_140P2024R0059.pdf PDF
B08_Attachment_19_Regulated_Materials_Survey-2022.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2ba-1983.pdf PDF
B08_Attachment_18_Existing_Conditions_Plan_-_2022.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0059 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

04/29/20240003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/03/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

a) Provide questions and answers received to date.

Period of Performance: 09/01/2024 to 11/15/2027

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Joseph Halter

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

File details come from the government source that posted it. Updated .