This document is Amendment 3 to Solicitation 140P2024R0059, providing questions and answers related to the "PEVI-272171 Rehabilitate Failing Upper Plaza" contract opportunity.
The solicitation is for a construction project to restore the structure supporting the upper plaza and the associated waterproofing membrane at the Perry's Victory and International Peace Memorial. Key details include:
- The period of performance is 09/01/2024 to 11/15/2027.
- For the Phase 1 - Step 1 proposal, only one volume (Technical) is required. Resumes are required but offerors may use their own format. Project descriptions should be limited to 1 page per project and involve construction that is at least 50% complete within the last 5 years.
- The solicitation has been amended to extend the Phase 1 proposal deadline by one week.
- The National Park Service will provide two potential staging areas on NPS land for the contractor's use.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2024R0059 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
04/29/20240003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/03/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
a) Provide questions and answers received to date.
Period of Performance: 09/01/2024 to 11/15/2027
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Joseph Halter
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
140P2024R0059 Restore Failing Upper Plaza at Perry's Victory & International Peace Memorial
PEVI272171
Question No. Sheet or Reference Question Response Date
Answered
1 Please confirm that only 1 proposal volume (Technical) is required under the Phase 1- Step 1 Proposal. Yes 4/16/2024
2 In the Phase 1-Step 1 Proposal, are we required to submit the SF 1442? If so, where should it be included?
Yes, please submit with Phase I, offerors can acknowlege Amendments on 1442 or on individual
SF-30's.
4/16/2024
3 Under Factor 2, the solicitation references that we use the "attached SF 330 Form" but no document under this name was included, will the NPS provide a revised document?
SF330's are not required, offeror's may use any means to provide information. 4/16/2024
4 When the solicitation references using the "attached SF 330 Form" are we actually meant to use the B08_Attachment_1_Key_Personnel_Resume_Form? SF 330's are not required. Key Personnel Form is. 4/16/2024
Factor 3 asks us to submit PPQs based on the same projects submitted under Factor 1 but Factor 1 - Technical Approach is a narrative section. Should the reference to Factor 1 projects be Factor 2 projects in this instance?
Yes, Please submit PPQ's based on projects associated with Factor 2. 4/16/2024
Question No. Sheet or Reference Question Response Date
Answered
Under Factor 2, are we to complete a revised SF 330 Form to showcase project experience or the Project Experience Form included in B808_Attachment_3_Solit_PSP_Vol_I-Proposal_Submission_Section_L?
SF 330's are not required. Offerors may use any means to demonstrate offerors past experience. 4/16/2024
The current submission deadline is May 6, 2024 - our team could use some additional time to compile the requested information and ensure we have a complete submittal.
Would it be possible to get a 2 week time extension?
Phase I deadline will be extended by one week. 4/16/2024
8 Are PEQ's and PPQ's only required for the GC and AE Lead Designer/Engineer of Record or are Key Consultants also required to submit this information? GC and AE Lead Designer/Engineer of Record 4/22/2024
If we utilize two firms to compile our AE team (one engineering and one architectural) are we limited to a total of 5 projects between the two firms or are both firms expected to submit 3-5 projects each?
Offerors are limited to a total of 3-5 projects. 4/22/2024
FILE B08_Solit_Clauses_Construction_4_3_24 (Page 53): The document states: “Each Offeror shall complete and provide the attached standard form 330 for the AE and GC on the DB team and documentation sufficient to demonstrate the extent of the Offeror’s past experience for at least three (3) but no more than five (5) projects.” Question: Is the intent of NPS to have each member of the DB Team submit 3-5 projects; that is, a DB Team of three companies might collectively submit 9-15 projects? OR, does the term
“Offeror” mean the member companies collectively, and that the entire submittal in total should have no more than 3-5 projects spread among the team members of the DB
Team?
SF 330's are not required. Offerors may use any means to demonstrate offerors past experience. 3-5 projects each team team member and DB.
4/22/2024
Answered
FILE B08_Solit_Clauses_Construction_4_3_24 (Page 53-54): We are unsure when reading references to “projects” as to whether the intent is to describe requirements for
Project Descriptions (what might be found in Section F of an SF330) that will be reflected in the attached Project Experience Questionnaire; or if the reference is to the projects listed in the Personnel Resumes that will be presented on Attachment 1 (a version of the form typically found in Section E of an SF330).
Project descriptions for Project Experience Questionnaire 4/22/2024
Question: Should both Project Descriptions and Personnel Resumes present projects less than 5 years old and involving construction that is at least 50% complete? Or is the
50% construction completed requirement only for one or the other?
Both. See revised answer below 4/22/2024
13 Should both Project Descriptions be limited to 3-5 projects for the entirety of the submission, or per each Team Member? Entirety of the submission 4/22/2024
14 Should both Personnel Resumes be limited to 3-5 projects per resume; or the 3 slots on the supplied form; or the 5 slots typically found on an SF330 Section E form? 3-5 Projects per resume 4/22/2024
FILE B08_Solit_Clauses_Construction_4_3_24 (Page 53): The document states “If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer or by the team member.” Does that mean that if the DB team has an legal entity called, for example, ‘Fantastic AE Firm USA’ and presents a project executed by another legal entity called ‘Fantastic AE Firm Americas’ , the project will not be considered?
Offerors shall demonstrate that the team proposed has worked on projects identified in the proposal. 4/22/2024
16 If we are required to complete the B08_Attachment_1_Key_Personnel_Resume_Form as part of the Phase 1-Step 1 Proposal Effort, how should box #6 and #7 be filled in?
Key Personnel Resume not required for Phase 1 See amendment 3 for revised answer 4/22/2024
Answered
Does "Employer" listed in box #6 of the
B08_Attachment_1_Key_Personnel_Resume_Form mean "the offeror" or the "owner/client of project"?
Key Personnel Resume not required for Phase 1 See amendment 3 for revised answer 4/22/2024
Box #7 indicates "phone number" on the
B08_Attachment_1_Key_Personnel_Resume_Form, is NPS requesting an internal company reference contact or a client reference?
Key Personnel Resume not required for Phase 1 See amendment 3 for revised answer 4/22/2024
On page 56 of 67 it indicates "At a minimum, resumes for the following personnel will be included in the standard form 330." Previous responses to RFIs have indicated that the SF 330 form is not required. Question: Are resumes required to be submitted under Phase 1, Factor 2: TECHNICAL QUALIFICATIONS AND SPECIALIZED
EXPERIENCE?
Yes. 4/25/2024
If resumes are required for Phase I, we request that QA response #12 be amended to require only Project Descriptions to present projects where construction is at least 50% complete and not Personnel Resumes, at least for the AE Design Firm member of the
DB team, as the requirement greatly limits the relevant projects an AE Design Firm can present on their personnel's resumes. || If not, we request a deadline extension of 1 week because this clarification came quite late, and we must reconvene with multiple key personnel to amend and revise their resumes. This time is also necessary to contact clients whose phone number is in Block 7 of the resumes and ensure they are willing to act as a reference (see also previous Question 18).
Resumes are required, but offerors may use any format they wish. 4/25/2024
21 The B08_Attachment_1_Key_Personnel_Resume_Form was provided as an attachment in Phase 1. Is this attachment required under Factor 2 for the phase 1 submission?
Resumes are required, but offerors may use any format they wish. 4/25/2024
22 Are our Project Experience writeups limited to 1 page? Yes, please limit project experience write ups to one page per project 4/25/2024
Answered
23 Please clarify the responses to questions 16, 17 and 18 that do not answer the questions asked. See revised answers below. 4/25/2024
24 Please confirm if resumes are not required until Phase 2 as the responses to 16, 17 and 18 state, which seems to differ from the RFP page 56.
Resumes are required, in phase I. See revised answers below. 4/25/2024
Question 12 states that key peoples' projects presented in the key resumes should be
"less than 5 years old." For the AE firm, does that mean the design portion or construction itself?
Projects where construction was completed within the last five years may be used. 4/25/2024
Question: Should both Project Descriptions and Personnel Resumes present projects less than 5 years old and involving construction that is at least 50% complete? Or is the
50% construction completed requirement only for one or the other?
This is a revision to answer 12. The 50% completed requirement applies to project descriptions only. 4/25/2024
27 If we are required to complete the B08_Attachment_1_Key_Personnel_Resume_Form as part of the Phase 1-Step 1 Proposal Effort, how should box #6 and #7 be filled in?
This is a revision to answer 16. Filling out the B01_Attachment_1_Key_Personnel_Resume_Form is at the discretion of the proposer. To reiterate, Standard Form 330s are not required and offerors may use their own resume format.
4/25/2024
Does "Employer" listed in box #6 of the
B08_Attachment_1_Key_Personnel_Resume_Form mean "the offeror" or the "owner/client of project"?
This is a revision to answer 17. The offerors shall follow the instructions on the form. Box 6 Employer is meant to list which company the employee worked for while working on that project. To reiterate, Standard Form 330s are not required and offerors may use their own resume format.
4/25/2024
Answered
Box #7 indicates "phone number" on the
B08_Attachment_1_Key_Personnel_Resume_Form, is NPS requesting an internal company reference contact or a client reference?
This is a revision to answer 18. This phone number is for the employer. 4/25/2024
30 Please confirm that we will be able to set up a concrete batch plant on NPS property on the island for the project.
The park has two potential staging areas on NPS land available for contractor use. A 0.8 acre lot
South of Bayview Ave and west of Toledo Ave and an approximately 2.25 acre grassy area on the east side of the memorial. The area west of the memorial to the visitor's center will not be available for contractor staging use.
4/25/2024