This is a Price Schedule template for a firm-fixed price federal construction contract related to masonry repair work at Independence Hall. The contract, solicitation number 140P4226R0005, is a competitive Total Small Business set-aside acquisition under NAICS code 238140 (Masonry Contractors) with an estimated magnitude between $1,000,000 and $5,000,000. The work involves three base contract line items: (1) reinforcing two chimneys and repointing six chimneys; (2) priority masonry, gutters, flashing, and roofing repairs; and (3) internal grouting of four chimneys. Each base item is priced as a lump-sum job. The scope includes removing and replacing damaged bricks, performing internal flue repairs using lightweight cast-in-place cementitious flue lining, complete repointing with natural hydraulic lime mortar, debris removal from gutters, solder joint repairs, and roofing material removal and reinstallation for probing.

The contract includes two optional line items: Option 1 provides a unit price for additional masonry repointing (not to exceed 894 square feet) and Option 2 provides a unit price for internal grouting (not to exceed 250 linear feet). Offerors must submit pricing for all base and optional line items, with unit prices and extended totals required for unit-priced items and total prices only for lump-sum items. The contract will be performed over an estimated 458 calendar days from notice to proceed under Davis-Bacon wage rates for Philadelphia County, Pennsylvania (Wage Decision PA20250003). An organized site visit was scheduled for June 15, 2026 at 1:00 PM with points of contact Holly Boyer and Wendy DeLeon. The work is being procured by the National Park Service Northeast Region using a lowest price technically acceptable evaluation process.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line item Breakdown

Base Scope of Work
Reinforce Two Chimneys and Repoint Six ChimneysPriority Masonry, Gutters, Flashing, and Roofing RepairInternal Grouting Four Chimneys
DescriptionCostDescriptionCostDescriptionCost
General ConditionsGeneral ConditionsGeneral Conditions
MobilizationScaffoldingScaffolding
DemobilizationLiftLift
ScaffoldingRemove damaged bricks from Jack Arch, rebuild portion of Jack Arch with new bricks to match existingChimney 3,4,5.6 - Perform internal flue repairs to stabilize the existing masonry below the roofline and utilize light-weight cast-in-place cementitious flue lining methods
LiftRemove patched bricks and replace with new bricks to match existing
Chimney 1 & 2: Perform internal flue repairs to stabilize the existing masonry below the roofline and utilize light-weight cast-in-place cementitious flue lining methods with internal HSSRemove damaged mortar back to sound mortar and provide new mortar at joints in brick

masonry

All 6 chimneys - add vent tubeRemove efflorescence from brick surfaces
All 6 Chimneys - complete 100% repointing, cut out joints to sound mortar and repoint with natural hydraulic lime mortar to match existing in color and textureProvide epoxy repair to area of damaged wood, prepare and paint entire element after repair is

complete

Remove debris from all of the gutters
Remove excess solder, prepare, and resolder failed solder joints
Remove a portion of the existing roofing materials to allow for probe to be completed.

Reinstall when completed.

Probe the existing gutter to confirm the installation method, document results

SUBTOTALSUBTOTALSUBTOTAL
Overhead ____%Overhead ____%Overhead ____%
Profit ____%Profit ____%Profit ____%
Bonds ____%Bonds ____%Bonds ____%
TOTAL$ 0.00TOTAL$ 0.00TOTAL$ 0.00
Option 1: Additional Masonry RepairOption 2: Unit Price for Internal Grouting
DescriptionPrice per SFDescriptionPrice per LF
Provide additional repointing in areas of damaged mortar in brick masonry, cut out joints to sound mortar and repoint with natural hydraulic lime mortar to match existing in color and texture. Not to Exceed 894 SFThis item consists of providing a unit price per linear foot of internal grouting as additional grouting below or reduced grouting above the base grouting depth in CLIN 1 and CLIN 3 once the chimney scoping assessment has been performed. Not to Exceed 250 LF
SUBTOTALSUBTOTAL
Overhead ____%Overhead ____%
Profit ____%Profit ____%
Bonds ____%Bonds ____%
Price each$ 0.00Price each$ 0.00
Quantity (SF)894Quantity (LF)250
TOTAL$ 0.00TOTAL$ 0.00

Total Base plus Options

Contract Price Schedule Template
National Park Service (NPS) - Denver Service Center (DSC) | 4/25-18
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF
MEASURETOTAL PRICE
10Reinforce Two Chimneys and Repoint Six Chimneys1Job$0.00
20Priority Masonry, Gutters, Flashing, and Roofing Repair1Job$0.00
30Internal Grouting Four Chimneys1Job$0.00
TOTAL BASE PRICE (Contract Line Item Number 10 through 40) ------------------------------------$0.00
40Optio 1: Additional Masonry Repair894SF$0.00
50Option 2: Unit Price for Internal Grouting250LF$0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 40 ---------------------------------------------------$0.00

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 10 through 80) $0.00

File details come from the government source that posted it. Updated .