These are 100% Final Construction Documents dated December 19, 2024, for the Rehabilitate Congress Hall Masonry project at Independence National Historical Park in Philadelphia, Pennsylvania (PMIS 320146B, Project 0102). The project involves structural rehabilitation of six chimneys at Congress Hall through masonry repair, reinforcement, and lining work.
The construction documents include site plans, structural general notes, roof key plans, and detailed chimney elevation sheets (S2.1-S2.6) with survey data and heat maps showing chimney deflections. Key structural work involves installing cast-in-place light-weight cementitious chimney linings (UL 1777 compliant) with stainless steel ribbed liners or HSS reinforcement, grouting flues with approximately 5-7 feet of grout material, installing temporary bracing and shoring systems, and applying retrofit girder tiedown anchors to existing roof framing. Exterior restoration work includes mortar joint repointing (estimated 894 SF), damaged brick replacement, gutter reconstruction, biological growth removal, and flashing repairs. The project requires contractor-designed shoring and scaffolding systems with sealed calculations by a licensed professional engineer, coordination of MEP system disconnection/reconnection around chimneys, and work performed in accordance with the Secretary of Interior's Standards for Preservation and applicable building codes (2024 IEBC/IBC). Design loads include ultimate wind speed of 114 mph with +44/-59 psf design pressure on chimneys. Prime architect is GWWO, Inc. (Baltimore, MD); structural engineer is Keast & Hood Co. (Philadelphia, PA); and conservator is Building Conservation Associates, Inc. (Philadelphia, PA).
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PROJECT
CONGRESS HALL
Mark Sheet REVISION Date InitialA/E FIRM - 24013 QUALITY DESIGN CERTIFICATION Prepared in Accordance with Design
Development (Title I)
OR
Variance from Design Development (Title I)
Approved by Superintendent on
OR
Construction Drawing Not Preceded by Design Development (Title I)
Drawing No.
Date
Project Manager Date
UNITED STATES
TITLE OF DRAWING
DEPARTMENT OF THE INTERIOR
LOCATION WITHIN PARK
NAME OF PARK
REGION COUNTY STATE
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
CONSERVATOR:
BUILDING CONSERVATION
ASSOCIATES, INC.
PHILADELPHIA, PA
STRUCTURAL:
KEAST & HOOD CO.
PHILADELPHIA, PA
:5 :5
A M
N P ro j\ R e v it
IN
D E
C o n g re s s
H a ll .r v t
100% FINAL
CONSTRUCTION DOCUMENTS
DENVER SERVICE CENTER
REHABILITATE CONGRESS HALL MASONRY
CONGRESS HALL
INDEPENDENCE NATIONAL HISTORICAL PARK
NORTHEAST PHILADELPHIA PA
190326
320146B
1 15
SHEET SUB SHEET TITLE OF SHEET
1 G1.0 COVER SHEET
2 AS1.0 SITE PLAN
3 S0.0 GENERAL NOTES - STRUCTURE
4 S1.3 OVERALL ROOF KEY PLAN
5 S1.4 PARTIAL EAST ELEVATION
6 S2.1 CHIMNEY 1
7 S2.2 CHIMNEY 2
8 S2.3 CHIMNEY 3
9 S2.4 CHIMNEY 4
10 S2.5 CHIMNEY 5
11 S2.6 CHIMNEY 6
12 S3.0 CHIMNEY REINFORCEMENT
BASIC DATA: BOUNDARY MAP 391/92,000; PARK
MINI FOLDER 1989; REVISED & REDRAWN 1/95.
UPDATED 11/98. SGS.
DECEMBER 19, 2024
100% FINAL CONSTRUCTION DOCUMENTS
PMIS 320146B
LY VS AN NN IE AP
AD E RR CE HT ITSI EG CE TRJO
H
N RIED GREGG NO.R
A41
12/19/2024 hboyer Snapshot
TS
TS
INFO
CONTRACTOR ACCESS RAMP
EXISTING
SECURITY
GATE
PROVIDE TREE
PROTECTION
PROVIDE TREE
PROTECTION
VISITOR ACCESS DOOR TO
REMAIN UNOBSTRUCTED.
PROVIDE OVERHEAD PROTECTION.
SIDEWALKS TO BE MAINTAINED AND
REMAIN CLEAR THROUGHOUT
CONSTRUCTION. PROVIDE CLEAR
PEDESTRIAN ACCESS. PROVIDE
OVERHEAD PROTECTION.
CONSTRUCTION AREA ONLY
CHESTNUT STREET
T H
S T R E E T
CONGRESS HALL
WEST WING
INDEPENDENCE HALL
APPROX. STAGING AREA LOCATION
APPROX. AREA FOR LIFT USE
CONTRACTOR VEHICLE ACCESS
(AVAILABLE OUTSIDE OF 9AM TO 5PM)
CONSTRUCTION LIMIT LINE
LEGEND
APPROX. AREA FOR SCAFFOLDING
INSTALLATION
GENERAL NOTES
1. Contractor shall meet the requirements of all codes, rules, and regulations governing this project as set by Federal, State, and local codes, building department agencies, and the Owner.
2. Contractor shall meet the requirements of the applicable accessibility guidelines for all aspects of this project.
3. The information included in these drawings with regards to the existing building is based on previous documentation provided to the Architect as well as what is readily observable at the project site.
Destructive investigation techniques have not been used to verify information that is not readily observable.
4. Contractor shall coordinate disconnection of mechanical, electrical, and plumbing systems before starting work on the chimneys and reconnection after the work is complete.
A/E FIRM - 24013
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REVISIONS:SEAL:
:3 :4
A M
N P ro j\ R e v it
IN
D E
C o n g re s s
H a ll .r v t
SITE PLAN
INDEPENDENCE NATIONAL HISTORICAL PARK
190326
320146B
2 15
AS1.0
IAG
IAG
JRG
12/19/24
REHABILITATE CONGRESS HALL MASONRY
NO SCALEAS1.0
1 SITE PLAN
NO. DATE DESCRIPTION
LY VS AN NN IE AP
AD E RR CE HT ITSI EG CE TRJO
H
N RIED GREGG NO.R
A41
12/19/2024 hboyer Text Box
OPTIONAL LINE ITEM
SYMBOLS
SLOPE ARROW
(E) GRID LINE
APPROXIMATE
TEMPORARY SHORE
LOCATION
DIMENSION. DOT SNAPS TO CL
OR GRIDS. TICK SNAPS TO EDGE
OR FACE OF OBJECT.
GENERAL
1. These notes highlight but do not replace the specifications contained in the Project
Manual.
2. The applicable building code is 2024 IEBC, 2024 IBC as amended by the Denver
Service Center Design Standards.
3. Refer to the Design Loads and Factors table, this sheet for code required loads for the project.
4. Contractor shall be responsible for the proper and safe design of shoring systems for trenches and excavations.
5. Notify Contracting Officer in case of discrepancies between drawings, and these notes, and Project Manual before proceeding with the work.
6. If conditions disclosed during demolition reveal unforeseen conditions, promptly request direction from Contracting Officer before proceeding.
7. Do not scale drawings.
8. Sections and details shown, while drawn for specific locations, are intended to establish the general types of details to be used throughout.
9. The SEOR's review of a submittal shall not relieve the Contractor of their responsibility to follow the intent of the contract drawings.
DELEGATED DESIGN ITEMS
1. Employ or retain a licensed professional engineer in the project jurisdiction to design and detail the following performance specified structural components:
A. Shoring / Scaffolding
2. See individual material sections for additional requirements.
EXISTING BUILDING/STRUCTURE NOTES
1. Verify all existing dimensions and elevations before beginning work.
2. Utmost care shall be exercised at all times when working on existing structural members and masonry bearing walls to avoid impairing the carrying capacity of the existing structure.
A. Should the Contracting Officer determine that the carrying capacity of the existing structure has been impaired by, or as a result of, the operations of the Contractor, or is otherwise not in conformance with the contract documents, appropriate remedial work shall be required.
B. Any damage resulting from the operations of the Contractor shall be repaired as directed by the Contracting Officer at no additional cost to the Contracting Officer.
3. Notify the Contracting Officer before cutting or removal of any part of the existing structure not indicated to be modified or demolished.
4. Burning or welding in the building is strictly prohibited.
5. Definitions:
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and store.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Remove and Replace: Detach items from existing construction and replace in kind.
E. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
F. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces;
disposing of items unless indicated to be salvaged or reinstalled.
6. Work shall be completed in a manner consistent with the Secretary of Interior’s Standard for Preservation.
7. The Contractor is responsible to provide protection of open chimneys after caps are removed and until they are replaced from water, dust, and debris.
STRUCTURAL STEEL
1. Detail, fabricate, and erect structural steel in accordance with AISC 360 and AISC 303
“Code of Standard Practice”.
2. The structural steel detailer shall develop all elevations, plans, and sections without reproducing same from the design drawings. Detailer shall adequately cross reference the structural drawings to the satisfaction of the SEOR. All shop drawings shall be submitted for review and review comments incorporated prior to fabrication.
3. Materials shall conform to the following:
A. Hollow Structural Sections (HSS) - ASTM A500, Gr C (Fy = 50 ksi) B. Plates 4” thickness or less - ASTM A572, Gr 50 (Fy = 50 ksi) C. Welding Electrodes - AWS A5.1 E70XX
4. Field cutting or burning of structural steel is prohibited.
5. Galvanize all steel in accordance with ASTM A-123. Repair scratched or abraded galvanized surfaces with zinc-rich coating. After galvanizing, straighten members to meet AISC standard mill tolerances.
CAST-IN-PLACE LINER
1. All installers of chimney lining system shall be properly trained, equipped, and certified by manufacturer.
2. Cast-in-place cement lining material to be tested/listed to the UL 1777 standards.
3. Provide light-weight cementitious lining material with aggregates conforming to ASTM
C332 with f'c = 2000 psi per ASTM C495.
4. Submit product data sheets for all components of system prior to use.
SHORING/SCAFFOLDING
1. The contractor shall submit shoring/scaffolding shop drawings and calculations, prepared and sealed by a professional engineer licensed in the state of the project, for the following:
A. Building/structure support shoring.
B. Scaffolding.
2. Shoring and scaffolding shall comply with O.S.H.A. regulations.
3. The SEOR will review shoring/scaffolding submittals only for loads transmitted to the building structure. Submittals shall clearly indicate the location and magnitude of all loads applied to the building or structure. The contractor is responsible for design and performance of the shoring/scaffold system.
ABV Above ADDL Additional ADH Adhesive ADJ Adjacent, Adjustment AESS Architecturally Exposed
Structural Steel AFF Above Finished Floor AGG Aggregate ALT Alternate ANCH Anchor APRX Approximate AR Anchor Rod ARCH Architect(ural) BOT, B Bottom B/ Bottom of B-B Back-to-Back BAL Balance BCE Bot Chord Extension BEL Below BF Braced Frame BLDG Building BLK(G) Block(ing) BM Beam BP Base Plate BR Brace(ing) BRDG Bridging BRG Bearing BRK Brick BRKT Bracket BS Both Sides BSMT Basement BT Bent BTWN Between BYD Beyond CANT Cantilever CAP. Capacity C-C Center-to-Center CE Concrete Encased CFMF Cold-Formed Metal Framing CHAM Chamfer CI Cast Iron CIP Cast In Place CJ Control/Contraction Joint CL Centerline CLG Ceiling CLIN Contract Line Item Number CLR Clear CM Construction Manager CMU Concrete Masonry Unit COL Column COMB. Combined COMP Composite CONC Concrete COND Condition CONN Connection CONST Construction CONT Continuous CONTR Contractor COORD Coordinate COV Cover CP Cap Plate CSIA Chimney Safety Inst. of America CSK Countersunk CTR Center(ed) CY Cubic Yard DBL Double DEMO, (D) Demolition/Demolish DEPR Depress(ed)/Depression DET(S) Detail(s) DEV Develop/Development
DIA, ∅ Diameter
STANDARD ABBREVIATIONS
DIAG Diagonal DIM(S). Dimension(s) DIR Direction DK Deck DL Dead Load DN Down
do. Ditto DP Deep DS Drilled Shaft, Drag Strut DWG(S) Drawing(s) DWL Dowel
(E) Existing EA Each EE Each End EF Each Face EJ Expansion Joint EL Elevation ELEC Electrical ELEV Elevator EMBED Embedment/Embedded ENGR Engineer EOD Edge Of Deck EOS Edge Of Slab EQ Equal EQP Equipment ES Each Side EXCAV Excavate/Excavation EXP Expansion EXT Exterior EW Each Way F/ Face of FAB Fabricate FDN Foundation FIN. Finish(ed) FL Floor FLG Flange FP Fireproofing FRMG Framing FRP Fiber-Reinforced Polymer FS Far Side FT Feet FTG Footing FUT Future GA Gage GALV Galvanize(d) GC General Contractor GR Grade GYP Gypsum HDR Header HEF Horizontal Each Face HGR Hanger HI. High HIF Horizontal Inside Face HK Hook(ed) HOF Horizontal Outside Face HORIZ Horizontal HP High Point HSS Hollow Strucutral Steel HT Height H&V Horizontal & Vertical HVAC Heating, Ventilating, & Air Conditioning I.D. Inside Diameter I.F. Inside Face INFO Information INSTL Install/Installation INSUL Insulation INT Interior JST(S) Joist(s)
JT Joint k Kip (thousand pounds) KB Knee Brace LB, # Pound LDGR Ledger (board) LEN Length LG Long LI Linear Inch LL Live Load LLBB Long Legs Back to Back LLH Long-Leg Horizontal LLV Long-Leg Vertical LOCN Location LONGIT Longitudinal LP Low Point LSH Long Side Horizontal LSL Long-Slotted Hole, Laminated Strand Lumber LSV Long Side Vertical LVL Laminated Veneer Lumber LW Long Way LWC Light Weight Concrete M Moment MAS Masonry MATL Material MAX Maximum MECH Mechanical MFR Manufacturer MIN Minimum MISC Miscellaneous MO Masonry Opening MONO Monolithic MTL Metal NIC Not In Contract NO. Number NOM Nominal NS Near Side NTS Not To Scale NWC Normal Weight Concrete OC On Centers OD Outside Diameter O.F. Outside Face O-O Out-to-Out OPG Opening OPP Opposite OSB Oriented Strand Board OSL Outstanding Leg, Oriented Strand Lumber OVS Oversized-Hole PAF Powder Actuated Fastener PC Precast Concrete, Piece PCF Pounds per Cubic Foot PED Pedestal PERP Perpendicular PREFAB Prefabricate(d) PL Plate PLF Pounds per Lineal Foot PLYWD Plywood PMF Premolded Filler PROJ Project(ion) PROV Provide PSF Pounds per Square Foot PSI Pounds per Square Inch PSL Parallel Strand Lumber PT Preservative-Treated, Post-Tensioned PVC Polyvinyl Chloride QTY Quantity R Radius RCMU Reinforced Concrete
Masonry Unit
RD Roof Drain RDK Roof Deck REF Reference REINF Reinforce(d)/ Reinforcement REQ(D) Require(d) RET Retaining REV Revise(d)/Revision RO Rough Opening RQMT(S) Requirement(s) RXN Reaction SC Slip-Critical (connection) SCHED Schedule SECT Section SEOR Structural Engineer of Record SF Square Foot SFRM Spray-Applied Fire Resistant
Material SHRG Shoring SHTHG Sheathing SIM Similar SL Slope(d) SLBB Short Legs Back to Back SLV Sleeve SOD Slab On Deck SOG Slab On Grade SPA Space(s)/Spacing SPEC(S) Specification(s) SQ Square SS Stainless Steel SSD Saturated Surface-Dry SSL Short-Slotted Hole STD Standard STIFF Stiffener STIR. Stirrup STL Steel STRUC Structural SUPT Support SW Short Way SYM Symmetrical T Top T/ Top of T&B Top and Bottom TC Terra Cotta TCE Top Chord Extension TEMP Temporary, Temperature T&G Tongue and Groove THD Thread(ed) THK Thick(ness) TLS Tension Lap Splice TRANS Transverse TYP Typical UNO Unless Noted Otherwise U-P Underpinning V Shear VAR Varies VB Vapor Barrier VEF Vertical Each Face VERT Vertical VIF Vertical Inside Face, Verify In Field VOF Vertical Outside Face VR Vapor Retarder w/ With w/o Without WD Wood WI Wrought Iron WP Work Point, Waterproofing WT Weight WWF Welded Wire Fabric XS Extra Strong XXS Double Extra Strong ± Exist Dim or El (VIF)
MATERIAL LEGEND
DEMO (D) EXISTING (E) NEW
CONSTRUCTION NOTATION
WORK INDICATED IS NEW UNLESS NOTED AS
(E) = EXISTING CONSTRUCTION TO REMAIN.
(D) = DEMOLISH EXISTING CONSTRUCTION.
(R) = REPLACE EXISTING CONSTRUCTION WITH _____.
CONC BM BELOW
STEEL BEAM/ COL
(ANY MATL) BEL
BEARING WALL
CMU
STONE
BRICK
CONCRETE
UNDERPINNING
FOUNDATION
JOIST
STRUCTURAL DESIGN LOADS AND FACTORS
DESIGN CODE: IBC 2024 ED
ASCE 7-22
WIND LOAD DATA
ULTIMATE WIND SPEED (Vult) (MPH)
RISK CATEGORY II
WIND EXPOSURE
INTERNAL PRESSURE COEFFICIENT
NOMINAL WIND SPEED (Vasd) (MPH)
C
± 0.18
NOTES:
1. NO CHANGES TO LIVE OR SUPERIMPOSED DEAD LOAD FOR STRUCTURE.
2. WIND LOADING CONTROLS LATERAL LOAD ON AREAS OF SCOPE.
DESIGN WIND PRESSURE ON CHIMNEY +44psf/-59psf
STRUCTURAL DRAWINGS LIST
SHEET
NUMBER DRAWING TITLE 10
0% D es ig n D ev el op m en t 2
4-
-0
0%
C on st ru ct io n D oc um en ts
-1
1-
0%
F in al C on st ru ct io n
D oc um en ts
4-
-1
S0.0 GENERAL NOTES - STRUCTURE ● ● ●
S1.3 OVERALL ROOF KEY PLAN ● ● ●
S1.4 PARTIAL EAST ELEVATION ● ●
S2.1 CHIMNEY 1 ● ● ●
S2.2 CHIMNEY 2 ● ● ●
S2.3 CHIMNEY 3 ● ● ●
S2.4 CHIMNEY 4 ● ● ●
S2.5 CHIMNEY 5 ● ● ●
S2.6 CHIMNEY 6 ● ● ●
S3.0 CHIMNEY REINFORCEMENT ● ● ●
A/E FIRM - 24013
STRUCTURAL ENG:
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
NO SCALE
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
GENERAL NOTES -
STRUCTURE
3 515
S0.0
CJK
K&H
JRD
12/19/2024
NO. DATE DESCRIPTION
S3.0
CHIMNEY 6
SEE S2.6 FOR SURVEYED
DEFLECTIONS
(Work Item #3)
CHIMNEY 5
SEE S2.5 FOR SURVEYED
DEFLECTIONS
(Work Item #3)
CHIMNEY 4
SEE S2.4 FOR SURVEYED
DEFLECTIONS
(Work Item #3)
CHIMNEY 1
SEE S2.1 FOR SURVEYED
DEFLECTIONS
(Work Item #1)
CHIMNEY 2
SEE S2.2 FOR SURVEYED
DEFLECTIONS
(Work Item #1)
CHIMNEY 3
SEE S2.3 FOR SURVEYED
DEFLECTIONS
(Work Item #3)
S3.0
S1.4
ASSUMED FLUE LOCATION
TO BE VERIFIED DURING
INITIAL SCOPING
ASSUMED FLUE LOCATION
TO BE VERIFIED DURING
INITIAL SCOPING
S3.0
ASSUMED FLUE LOCATION
TO BE VERIFIED DURING
INITIAL SCOPING
ASSUMED FLUE LOCATION
TO BE VERIFIED DURING
INITIAL SCOPING
SIM
TYP BOTH
FLUES
TYP BOTH
FLUES
S3.0
TYP BOTH
FLUES
S3.0
TYP BOTH
FLUES
S3.0 TYP BOTH
FLUES
S3.0
PROVIDE TEMP
PROTECTION OF MEP
SHAFT IN FLUE
PROVIDE TEMP
PROTECTION OF MEP
SHAFT IN FLUE
8 0 8 16
SCALE OF FEET
A/E FIRM - 24013
STRUCTURAL ENG:
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
OVERALL ROOF KEY PLAN
4 15
S1.3 Designer
Author
Checker
12/19/2024
SCALE AS1.3
ROOF OVERALL KEY PLAN1
NO. DATE DESCRIPTION
S3.0
S3.0
S3.0
S3.0
S3.0
S3.0
TYPICAL GROUT REPAIR
@ FLUE.
(E) CHIMNEY TO BE REPAIRED
SEE OTHERS DRAWINGS FOR INFO
(E) FIREBOX BEYOND
(E) FLUE BEYOND
LOCATION SHOWN IS BASED ON
HABS DRAWINGS DATED 1959,
FLUES TO BE SCOPED PRIOR TO
WORK STARTING
TYPICAL REINFORCEMENT
@ FLUE.
(E) CHIMNEY TO BE REINFORCED
SEE OTHERS DRAWINGS FOR INFO
(E) FIREBOX BEYOND
(E) FLUE BEYOND
LOCATION SHOWN IS BASED ON
HABS DRAWINGS DATED 1959,
FLUES TO BE SCOPED PRIOR TO
WORK STARTING
TYPICAL REINFORCEMENT
@ FLUE.
(E) CHIMNEY TO BE REINFORCED
SEE OTHERS DRAWINGS FOR INFO
(E) FIREBOX BEYOND(E) FLUE BEYOND
LOCATION SHOWN IS BASED ON
HABS DRAWINGS DATED 1959,
FLUES TO BE SCOPED PRIOR TO
WORK STARTING
SIM
SECTION OF FLUE IS USED AS A RETURN
DUCT. DUCT TO REMAIN AND BE
PROTECTED DURING ADJACENT FLUE
GROUTING
S3.0
S3.0
S3.0
2 6
SCALE OF FEET
0 2 4
A/E FIRM - 24013
STRUCTURAL ENG:
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
PARTIAL EAST ELEVATION
5 15
S1.4 Designer
Author
Checker
12/19/2024
SCALE AS1.4
ELEVATION @ CHIMNEY 1, CHIMNEY 2, & CHIMNEY 31
A/E FIRM - 24013
STRUCTURAL ENG:
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
CHIMNEY 1
6 15
S2.1
BNF
DL
JRD
12/19/2024
NO. DATE DESCRIPTION
2"
5"
2"
4"
2"
2"
2"
8"
32"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
26"x48"
26"x48"
26 3 8"x48 1 2"
26 3 8"x48 1 2"
26 3 8"x48 3 8"
26 18"x48 3 8"
METAL FLASHING
BRICK BAND
CAP STONE
RE
FE
RE
NC
E L
INE
SOUTH ELEVATION EAST ELEVATION
2" 6"
5 1 4"
54"
4"
4"
4"
5"
4"
4"
4"
2"
2"
RE
FE
RE
NC
E L
INE
K&H SURVEY MEASUREMENTS
S2.2
HEAT MAP WEST FACE
S2.1
NTS
HEAT MAP SOUTH FACE
S2.1
NTS
HEAT MAP EAST FACE
S2.1
NTS
HEAT MAP NORTH FACE
S2.1
NTS
HEAT MAP LEGEND
THE COLOR CODED HEAT MAPS ARE A VISUAL
REPRESENTATION OF MEASURED HORIZONTAL
DEVIATION OF THE CHIMNEY FACE AWAY (+) AND
TOWARD (-) THE VIEWER. THE REFERENCE
"ZERO" PLANE IS AN IDEALIZED PLUMB PLANE
EXTENDING VERTICALLY FROM A RANDOM POINT
SELECTED BY THE MAPPING SOFTWARE. THE
VALUES SHOWN ARE FROM THE 3D LASER SCAN
AND WERE USED TO VERIFY THE HAND
MEASUREMENTS SHOWN IN SECTION 1: "KH
SURVEY MEASUREMENT
NOTE:
KH SURVEY MEASUREMENTS WERE PREFORMED
FROM A TRACKING ARTICULATING BOOM LIFT, A
PLUMB BOB WAS TIED AROUND THE CHIMNEY'S
LIGHTNING RODS AND DROPPED DOWN TO THE
ROOF BELOW IN TWO DIRECTIONS. THE VALUES
SHOWN ARE HOW FAR OUT THE CHIMNEY WAS
FROM PLUMB. DIRECT DIMENSIONS LASER
SURVEY WAS DONE USING A RT360 LiDAR LASER
SCANNER FROM THE GROUND. KH
MEASUREMENTS DIFFER FROM LASER SURVEY
DUE TO A VARIETY OF FACTORS INCLUDING:
HUMAN ERROR, BOOM STABILITY, WIND ACTING
ON THE PLUMB LINE, EASE OF MEASUREMENT,
ETC.
S2.1 hboyer
NTS
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
CHIMNEY 2
7 15
S2.2
BNF
DL
JRD
12/19/2024
NO. DATE DESCRIPTION
2"
4"
2"
2"
8"
7"
4"
8"
4"
4"
3" 2"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
1'- 81 2"
1'- 43 4"
METAL FLASHING
BRICK BAND
CAP STONE
RE
FE
RE
NC
E
LIN
E
SOUTH ELEVATION EAST ELEVATION
4'-6"
26 1 2"x48"
26 1 2"x48 3 8"
26 3 8"x48"
26"x47 7 8"
26"x48"
26 1 8"x48"
1"
32"
2"
2"
2"
2"
2"
4"
RE
FE
RE
NC
E
LIN
E
K&H SURVEY MEASUREMENTS
S2.2
HEAT MAP WEST FACE
S2.2
NTS
HEAT MAP SOUTH FACE
S2.2
NTS
HEAT MAP EAST FACE
S2.2
NTS
HEAT MAP NORTH FACE
S2.2
NTS
HEAT MAP LEGEND
THE COLOR CODED HEAT MAPS ARE A VISUAL
REPRESENTATION OF MEASURED HORIZONTAL
DEVIATION OF THE CHIMNEY FACE AWAY (+) AND
TOWARD (-) THE VIEWER. THE REFERENCE
"ZERO" PLANE IS AN IDEALIZED PLUMB PLANE
EXTENDING VERTICALLY FROM A RANDOM POINT
SELECTED BY THE MAPPING SOFTWARE. THE
VALUES SHOWN ARE FROM THE 3D LASER SCAN
AND WERE USED TO VERIFY THE HAND
MEASUREMENTS SHOWN IN SECTION 1: "KH
SURVEY MEASUREMENT
NOTE:
KH SURVEY MEASUREMENTS WERE PREFORMED
FROM A TRACKING ARTICULATING BOOM LIFT, A
PLUMB BOB WAS TIED AROUND THE CHIMNEY'S
LIGHTNING RODS AND DROPPED DOWN TO THE
ROOF BELOW IN TWO DIRECTIONS. THE VALUES
SHOWN ARE HOW FAR OUT THE CHIMNEY WAS
FROM PLUMB. DIRECT DIMENSIONS LASER
SURVEY WAS DONE USING A RT360 LiDAR LASER
SCANNER FROM THE GROUND. KH
MEASUREMENTS DIFFER FROM LASER SURVEY
DUE TO A VARIETY OF FACTORS INCLUDING:
HUMAN ERROR, BOOM STABILITY, WIND ACTING
ON THE PLUMB LINE, EASE OF MEASUREMENT,
ETC.
hboyer
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
CHIMNEY 3
8 15
S2.3
BNF
DL
JRD
12/19/2024
NO. DATE DESCRIPTION
2"
2"
3"
4"
4"
2'-7 12"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
25 12"x42"
METAL FLASHING
BRICK BAND
CAP STONE
RE
FE
RE
NC
E L
INE
SOUTH ELEVATION EAST ELEVATION
2"
2"
58"
2"
2"
2"
4"
8"
3"
2"
2"
2"
4"
4"
RE
FE
RE
NC
E L
INE
K&H SURVEY MEASUREMENTS
S2.3
HEAT MAP WEST FACE
S2.3
NTS
HEAT MAP SOUTH FACE
S2.3
NTS
HEAT MAP EAST FACE
S2.3
NTS
HEAT MAP NORTH FACE
S2.3
NTS
HEAT MAP LEGEND
THE COLOR CODED HEAT MAPS ARE A VISUAL
REPRESENTATION OF MEASURED HORIZONTAL
DEVIATION OF THE CHIMNEY FACE AWAY (+) AND
TOWARD (-) THE VIEWER. THE REFERENCE
"ZERO" PLANE IS AN IDEALIZED PLUMB PLANE
EXTENDING VERTICALLY FROM A RANDOM POINT
SELECTED BY THE MAPPING SOFTWARE. THE
VALUES SHOWN ARE FROM THE 3D LASER SCAN
AND WERE USED TO VERIFY THE HAND
MEASUREMENTS SHOWN IN SECTION 1: "KH
SURVEY MEASUREMENT
NOTE:
KH SURVEY MEASUREMENTS WERE PREFORMED
FROM A TRACKING ARTICULATING BOOM LIFT, A
PLUMB BOB WAS TIED AROUND THE CHIMNEY'S
LIGHTNING RODS AND DROPPED DOWN TO THE
ROOF BELOW IN TWO DIRECTIONS. THE VALUES
SHOWN ARE HOW FAR OUT THE CHIMNEY WAS
FROM PLUMB. DIRECT DIMENSIONS LASER
SURVEY WAS DONE USING A RT360 LiDAR LASER
SCANNER FROM THE GROUND. KH
MEASUREMENTS DIFFER FROM LASER SURVEY
DUE TO A VARIETY OF FACTORS INCLUDING:
HUMAN ERROR, BOOM STABILITY, WIND ACTING
ON THE PLUMB LINE, EASE OF MEASUREMENT,
ETC.
hboyer
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
CHIMNEY 4
9 15
S2.4
BNF
DL
JRD
12/19/2024
NO. DATE DESCRIPTION
2"
2"
2"
4"
4"
2"
4"
2'-8"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
25 12"x42"
METAL FLASHING
BRICK BAND
CAP STONE
RE
FE
RE
NC
E
LIN
E
RE
FE
RE
NC
E L
INE
SOUTH ELEVATION EAST ELEVATION
4"
2"
2"
2"
2"
8"
2"
4'-0"
4"
4"
2"
2"
K&H SURVEY MEASUREMENTS
S2.4
HEAT MAP WEST FACE
S2.4
NTS
HEAT MAP SOUTH FACE
S2.4
NTS
HEAT MAP EAST FACE
S2.4
NTS
HEAT MAP NORTH FACE
S2.4
NTS
HEAT MAP LEGEND
THE COLOR CODED HEAT MAPS ARE A VISUAL
REPRESENTATION OF MEASURED HORIZONTAL
DEVIATION OF THE CHIMNEY FACE AWAY (+) AND
TOWARD (-) THE VIEWER. THE REFERENCE
"ZERO" PLANE IS AN IDEALIZED PLUMB PLANE
EXTENDING VERTICALLY FROM A RANDOM POINT
SELECTED BY THE MAPPING SOFTWARE. THE
VALUES SHOWN ARE FROM THE 3D LASER SCAN
AND WERE USED TO VERIFY THE HAND
MEASUREMENTS SHOWN IN SECTION 1: "KH
SURVEY MEASUREMENT
NOTE:
KH SURVEY MEASUREMENTS WERE PREFORMED
FROM A TRACKING ARTICULATING BOOM LIFT, A
PLUMB BOB WAS TIED AROUND THE CHIMNEY'S
LIGHTNING RODS AND DROPPED DOWN TO THE
ROOF BELOW IN TWO DIRECTIONS. THE VALUES
SHOWN ARE HOW FAR OUT THE CHIMNEY WAS
FROM PLUMB. DIRECT DIMENSIONS LASER
SURVEY WAS DONE USING A RT360 LiDAR LASER
SCANNER FROM THE GROUND. KH
MEASUREMENTS DIFFER FROM LASER SURVEY
DUE TO A VARIETY OF FACTORS INCLUDING:
HUMAN ERROR, BOOM STABILITY, WIND ACTING
ON THE PLUMB LINE, EASE OF MEASUREMENT,
ETC.
hboyer
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
CHIMNEY 5
10 15
S2.5
BNF
DL
JRD
12/19/2024
NO. DATE DESCRIPTION
3"
3"
8"
8"
8"
3"
3"
8"
3"
2'-8" 2'-
0" 2'-
0" 2'-
0" 2'-
0" 2'-
0" 2'-
0" 2'-
0"
25 12"x42"
METAL FLASHING
BRICK BAND
CAP STONE
RE
FE
RE
NC
E L
INE
SOUTH ELEVATION EAST ELEVATION
8"
8"
3"
3"
3"
3"
3"
2"
4'-0"
RE
FE
RE
NC
E L
INE
K&H SURVEY MEASUREMENTS
S2.5
HEAT MAP WEST FACE
S2.5
NTS
HEAT MAP SOUTH FACE
S2.5
NTS
HEAT MAP EAST FACE
S2.5
NTS
HEAT MAP NORTH FACE
S2.5
NTS
HEAT MAP LEGEND
THE COLOR CODED HEAT MAPS ARE A VISUAL
REPRESENTATION OF MEASURED HORIZONTAL
DEVIATION OF THE CHIMNEY FACE AWAY (+) AND
TOWARD (-) THE VIEWER. THE REFERENCE
"ZERO" PLANE IS AN IDEALIZED PLUMB PLANE
EXTENDING VERTICALLY FROM A RANDOM POINT
SELECTED BY THE MAPPING SOFTWARE. THE
VALUES SHOWN ARE FROM THE 3D LASER SCAN
AND WERE USED TO VERIFY THE HAND
MEASUREMENTS SHOWN IN SECTION 1: "KH
SURVEY MEASUREMENT
NOTE:
KH SURVEY MEASUREMENTS WERE PREFORMED
FROM A TRACKING ARTICULATING BOOM LIFT, A
PLUMB BOB WAS TIED AROUND THE CHIMNEY'S
LIGHTNING RODS AND DROPPED DOWN TO THE
ROOF BELOW IN TWO DIRECTIONS. THE VALUES
SHOWN ARE HOW FAR OUT THE CHIMNEY WAS
FROM PLUMB. DIRECT DIMENSIONS LASER
SURVEY WAS DONE USING A RT360 LiDAR LASER
SCANNER FROM THE GROUND. KH
MEASUREMENTS DIFFER FROM LASER SURVEY
DUE TO A VARIETY OF FACTORS INCLUDING:
HUMAN ERROR, BOOM STABILITY, WIND ACTING
ON THE PLUMB LINE, EASE OF MEASUREMENT,
ETC.
hboyer
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
CHIMNEY 6
11 15
S2.6
BNF
DL
JRD
12/19/2024
NO. DATE DESCRIPTION
3"
8"
4"
4"
2"
2"
2"
4"
2"
2'-8"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
2'- 0"
25 12"x47 14"
METAL FLASHING
BRICK BAND
CAP STONE
RE
FE
RE
NC
E L
INE
SOUTH ELEVATION EAST ELEVATION
2"
2"
4'-6"
3"
3"
3"
3"
3"
4"
5"
RE
FE
RE
NC
E L
INE
K&H SURVEY MEASUREMENTS
S2.6
HEAT MAP WEST FACE
S2.6
NTS
HEAT MAP SOUTH FACE
S2.6
NTS
HEAT MAP EAST FACE
S2.6
NTS
HEAT MAP NORTH FACE
S2.6
NTS
HEAT MAP LEGEND
THE COLOR CODED HEAT MAPS ARE A VISUAL
REPRESENTATION OF MEASURED HORIZONTAL
DEVIATION OF THE CHIMNEY FACE AWAY (+) AND
TOWARD (-) THE VIEWER. THE REFERENCE
"ZERO" PLANE IS AN IDEALIZED PLUMB PLANE
EXTENDING VERTICALLY FROM A RANDOM POINT
SELECTED BY THE MAPPING SOFTWARE. THE
VALUES SHOWN ARE FROM THE 3D LASER SCAN
AND WERE USED TO VERIFY THE HAND
MEASUREMENTS SHOWN IN SECTION 1: "KH
SURVEY MEASUREMENT
NOTE:
KH SURVEY MEASUREMENTS WERE PREFORMED
FROM A TRACKING ARTICULATING BOOM LIFT, A
PLUMB BOB WAS TIED AROUND THE CHIMNEY'S
LIGHTNING RODS AND DROPPED DOWN TO THE
ROOF BELOW IN TWO DIRECTIONS. THE VALUES
SHOWN ARE HOW FAR OUT THE CHIMNEY WAS
FROM PLUMB. DIRECT DIMENSIONS LASER
SURVEY WAS DONE USING A RT360 LiDAR LASER
SCANNER FROM THE GROUND. KH
MEASUREMENTS DIFFER FROM LASER SURVEY
DUE TO A VARIETY OF FACTORS INCLUDING:
HUMAN ERROR, BOOM STABILITY, WIND ACTING
ON THE PLUMB LINE, EASE OF MEASUREMENT,
ETC.
hboyer
RESET EXISTING
CHIMNEY CAP
VENTILATION TUBES
CHIMNEY GROUT
EXISTING ROOF RAFTER
EXISTING BRICK FLUE
S3.0
(3) 1/2"x1/2"x0'-3" BAR 'LUGS'
@ 24" VERT. WELDED TO
FACE OF HSS
T Y
P
2' -0
6" 6"
STOP GROUT @ BOTTOM
OF THE BRICK BAND
COURSE
LOCATE HSS SUCH
THAT A MIN. OF 2"
CLEAR IS ON ALL SIDES
INSTALL A TEMP PLUG
PRIOR TO GROUTING
FLUE
B E
LO
W
R O
O F
L
IN
E
'-0
O F
G R
O U
T
VERIFY THAT NO MEP, FIRE
PROTECTION, OR ELECTRICAL
RUNS INTERFERE WITH
PROPOSED GROUT LOCATION.
5/8"Ø F1554 THREADED ROD
WITH A NUT ON EACH END
RETROFIT GIRDER TIEDOWN
ANCHOR, 7 GA, w/ (16) 1/4"
HIGH-STRENGTH STRUCTURAL
WOOD SCREW FASTENERS
INTO WOOD
MIN. 4" EMBED
EXISTING PLASTER CEILING
HSS 7x.25 x 24" LONG
@ SPLICE LOCATION
w/ (9) 5/8" BOLTS PER
SIDE, INSTALLED INTO
THREADED HOLES
3" 3"
3"
S3.0
A
(E) BRICK CHIMNEY
S3.0
GROUT
HSS 7.5x0.25 (GALV)
WELDED LUGS
(E) RAFTERS
(E) WALL BELOW
RETROFIT GIRDER TIEDOWN ANCHOR
w/ THREADED ROD
(E) RAFTERS
Suggested Procedure for Chimney Lining:
1. Provide top access to every flue at every chimney. Removal of stone cap is required. Salvage removed caps for reinstallation.
2. Scope all flues at every chimney to check for breaches, blockages, and/or structural bearing. See SPEC for work plans and info.
3. Perform necessary exterior masonry repairs to create continuous envelope including resetting or replacing bricks and repointing chimneys.
4. Cleaning and Inspection of flue systems is to be performed by a CSIA certified chimney sweep. Testing And Approval Of Workers is required. Clean flue interior with rotary brush or pneumatic whip. Do not damage brick.
5. Install temporary plug at predetermined point.
6. Remove debris or residual soot deposits and loose mortar.
7. Install ties to roof framing where indicated.
8. Install stainless steel spring spacers to be wrapped around HSS or stainless liner to ensure adequate thickness of cast-in-place lining material.
9. Wet flue interior to SSD prior to installing cast-in-place chimney lining material.
10. Pour/pump cast-in-place light-weight cementitious chimney lining material that has been tested and listed to the UL1777 standard into annular space between chimney walls and flue lining system to stabilize and reinforce masonry chimney structure.
11. Advance lining material equally in adjacent flues in no greater than 12" lifts so as to minimize uneven liner wall pressures. Consolidate and vibrate lining material throughout process.
12. Upon completion of casting and after a minimum of 72 hours, complete work at chimney exterior including repointing.
RESET EXISTING
CHIMNEY CAP
VENTILATION TUBES
CHIMNEY GROUT
EXISTING ROOF RAFTER
EXISTING BRICK FLUE
STAINLESS STEEL RIBBED
LINER
STOP GROUT @ BOTTOM OF
THE BRICK BAND COURSE
INSTALL A TEMP PLUG
PRIOR TO GROUTING
FLUE
VERIFY THAT NO MEP, FIRE
PROTECTION, OR ELECTRICAL
RUNS INTERFERE WITH
PROPOSED GROUT LOCATION.
EXISTING PLASTER CEILING
B E
LO
W
R O
O F
L
IN
E
5'
-0
O F
G R
O U
T
S3.0 A
S3.0
RESET EXISTING
CHIMNEY CAP
VENTILATION TUBES (14) PER CHIMNEY
(4) ALONG THE LONG SIDES & (3)
ALONG THE SHORT SIDES
STAINLESS STEEL RIBBED
LINER OR HSS
STOP GROUT @ BOTTOM OF
THE BRICK BAND COURSE
(E) BRICK CHIMNEY
S3.0
GROUT
STAINLESS STEEL
RIBBED LINER
(E) RAFTERS
(E) WALL BELOW
(E) RAFTERS
12 12
SCALE OF INCHES
6 0
12 12
SCALE OF INCHES
6 0
2 0 2 4
SCALE OF FEET
A/E FIRM - 24013
STRUCTURAL ENG:
KEAST & HOOD
PHILADELPHIA, PA
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SCALE B
SCALE C
REVISIONS:SEAL:
C 2024 KEAST & HOOD
John R. Davis, P.E.
Penna. Professional Engineer No. PE055730
190326
320146B
REHABILITATE CONGRESS HALL MASONRY
INDEPENDENCE NATIONAL HISTORICAL PARK1
:4 :0
P M
C U s e rs c k ro n e n w e tt e r\ D o c u m e n ts B
C o n g re s s
H a ll
C h im n e y
R c k ro n e n w e tt e rA F Z K K .r v t
CHIMNEY REINFORCEMENT
12 15
S3.0
CJK
DL
JRD
12/19/2024
SCALE AS3.0
SECTION @ CHIMNEY 1 & CHIMNEY 21
SCALE AS3.0
PARTIAL PLAN3
SCALE AS3.0
SECTION @ CHIMNEYS 3, 4, 5, & 62
SCALE CS3.0
DETAIL SECTIONA
SCALE AS3.0
PARTIAL PLAN4
04-02
141 SF
04-02
141 SF
04-02
141 SF
(ENTIRE CHIMNEY)
(ENTIRE CHIMNEY)
(ENTIRE CHIMNEY)
SCALE AR3.1
1 WEST ELEVATION
8 0 8 16
SCALE OF FEET
A/E FIRM - 24013
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
PRIME/ARCH:
GWWO� INC.
BALTIMORE� MD
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
REVISIONS:SEAL:
:1 :3
P M
N P
TQ
L> R G
XK
V>
IN
D E
C Q P I
TG
UU
H C
NN.
TX
V
WEST ELEVATION
SELECT EXTERIOR
RESTORATION
INDEPENDENCE NATIONAL HISTORICAL PARK
190326
320146B
13 15
R3.1
DGUKIPGT
AWVJQT
CJGEMGT
12/19/2024
REHABILITATE CONGRESS HALL MASONR;
NO. DATE DESCRIPTION
EXTERIOR GENERAL NOTES
1. REMOVE 100% OF DEBRIS IN GUTTERS. WORK ITEM 2
2. PERFORM PROBE AT GUTTER ON EACH ELEVATION TO
CONFIRM INSTALLED CONFIGURATION. REMOVE
SHAKES AND REINSTALL OR REPLACE AS NECESSARY.
WORK ITEM 2
EXTERIOR TREATMENT NOTES
04-01 REMOVE DAMAGED BRICKS FROM JACK ARCH.
REBUILD PORTION OF JACK ARCH WITH NEW BRICKS
TO MATCH ADJACENT.
OPTIONAL LINE ITEM 5
04-02 REMOVE EXISTING DETERIORATED MORTAR BACK TO
SOUND MORTAR AND PROVIDE NEW MORTAR AT
JOINTS IN BRICK MASONRY. SEE DETAILS 1/R3.1 AND
2/R3.1.
WORK ITEMS 1 & 2
OPTIONAL LINE ITEM 5
04-03 REMOVE PATCHED BRICKS AND REPLACE WITH NEW
BRICKS TO MATCH ADJACENT.
WORK ITEM 2
04-04 REMOVE EFFLORESCENCE FROM BRICK SURFACES. WORK ITEM 2
04-05 PROVIDE ADDITIONAL SPOT REPOINTING IN AREAS
OF DAMAGED MORTAR IN BRICK MASONRY.
REMOVE EXISTING MORTAR BACK TO SOUND
MORTAR AND PROVIDE NEW MORTAR. ASSUME 5%
REPOINTING OF TOTAL SF OF BUILDING OR 894 SF.
OPTIONAL LINE ITEM 5
04-06 REMOVE BIOLOGICAL GROWTH FROM BRICK
SURFACES.
WORK ITEM 2
06-01 PROVIDE EPOXY REPAIR TO AREA OF DAMAGED
WOOD. PREPARE AND PAINT ENTIRE ELEMENT
SECTION AFTER REPAIR IS COMPLETE.
WORK ITEM 2
07-01 REMOVE EXCESS SOLDER, PREPARE, AND RESOLDER
FAILED SOLDER JOINTS.
WORK ITEM 2
04-01
6 UNITS04-01
8 UNITS 04-03
8 UNITS
04-02
15 SF
04-04
25 SF
04-02
141 SF
04-03
3 UNITS
04-02
141 SF
04-03
1 UNIT
04-02
141 SF
07-01
6 LI
06-01
8 SF
06-01
4 SF
04-02
40 SF
(ENTIRE CHIMNEY)
(ENTIRE CHIMNEY)
(ENTIRE CHIMNEY)
04-05
(SEE EXTERIOR
TREATMENT
NOTE)
04-06
40 SF
OPTIONAL LINE
ITEM 1
:1 :5
P M
N P ro j\ R e vi t\
IN
D E
C o n g re ss
H a ll.
rv t
EAST ELE8ATION
SELECT E:TERIOR
RESTORATION
INDEPENDENCE NATIONAL HISTORICAL PARK
190326
320146B
14 15
R3.2 Designer
Author
Checker
12/19/2024
REHABILITATE CONGRESS HALL MASONRY
SCALE AR3.2
1 EAST ELE8ATION
NO. DATE DESCRIPTION
EXTERIOR GENERAL NOTES
1. REMOVE 100% OF DEBRIS IN GUTTERS. WORK ITEM 2
2. PERFORM PROBE AT GUTTER ON EACH ELEVATION TO
CONFIRM INSTALLED CONFIGURATION. REMOVE
SHAKES AND REINSTALL OR REPLACE AS NECESSARY.
WORK ITEM 2
EXTERIOR TREATMENT NOTES
04-01 REMOVE DAMAGED BRICKS FROM JACK ARCH.
REBUILD PORTION OF JACK ARCH WITH NEW BRICKS
TO MATCH ADJACENT.
OPTIONAL LINE ITEM 5
04-02 REMOVE EXISTING DETERIORATED MORTAR BACK TO
SOUND MORTAR AND PROVIDE NEW MORTAR AT
JOINTS IN BRICK MASONRY. SEE DETAILS 1/R3.1 AND
2/R3.1.
WORK ITEMS 1 & 2
OPTIONAL LINE ITEM 5
04-03 REMOVE PATCHED BRICKS AND REPLACE WITH NEW
BRICKS TO MATCH ADJACENT.
WORK ITEM 2
04-04 REMOVE EFFLORESCENCE FROM BRICK SURFACES. WORK ITEM 2
04-05 PROVIDE ADDITIONAL SPOT REPOINTING IN AREAS
OF DAMAGED MORTAR IN BRICK MASONRY.
REMOVE EXISTING MORTAR BACK TO SOUND
MORTAR AND PROVIDE NEW MORTAR. ASSUME 5%
REPOINTING OF TOTAL SF OF BUILDING OR 894 SF.
OPTIONAL LINE ITEM 5
04-06 REMOVE BIOLOGICAL GROWTH FROM BRICK
SURFACES.
WORK ITEM 2
06-01 PROVIDE EPOXY REPAIR TO AREA OF DAMAGED
WOOD. PREPARE AND PAINT ENTIRE ELEMENT
SECTION AFTER REPAIR IS COMPLETE.
WORK ITEM 2
07-01 REMOVE EXCESS SOLDER, PREPARE, AND RESOLDER
FAILED SOLDER JOINTS.
WORK ITEM 2
� 0 � 16
SCALE O( (EET
A/E (IRM - 24013
TITLE O( SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
O(
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
S7B SHEET NO.DESIGNED:
CADD:
TECH. RE8IEW:
DATE:
SCALE A
RE8ISIONS:SEAL:
CHIMNEY 1 CHIMNEY 2 CHIMNEY 3
CHIMNEY 6 CHIMNEY 5 CHIMNEY 4
07-01
64 LI
(TOTAL AT
WEST GUTTER)
07-01
64 LI
(TOTAL AT
EAST GUTTER)
SCALE AR3.3
1 ROO( PLAN
� 0 � 16
SCALE O( (EET
A/E (IRM - 24013
TITLE O( SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
O(
PRIME/ARCH:
GWWO, INC.
BALTIMORE, MD
S7B SHEET NO.DESIGNED:
CADD:
TECH. RE8IEW:
DATE:
SCALE A
RE8ISIONS:SEAL:
:4 :2
P M
N P ro j\ R e vi t\
IN
D E
C o n g re ss
H a ll.
rv t
ROO( PLAN
SELECT E:TERIOR
RESTORATION
INDEPENDENCE NATIONAL HISTORICAL PARK
190326
320146B
15 15
R3.3 Designer
Author
Checker
12/19/24
REHABILITATE CONGRESS HALL MASONRY
NO. DATE DESCRIPTION
EXTERIOR GENERAL NOTES
1. REMOVE 100% OF DEBRIS IN GUTTERS. WORK ITEM 2
2. PERFORM PROBE AT GUTTER ON EACH ELEVATION TO
CONFIRM INSTALLED CONFIGURATION. REMOVE
SHAKES AND REINSTALL OR REPLACE AS NECESSARY.
WORK ITEM 2
EXTERIOR TREATMENT NOTES
04-01 REMOVE DAMAGED BRICKS FROM JACK ARCH.
REBUILD PORTION OF JACK ARCH WITH NEW BRICKS
TO MATCH ADJACENT.
OPTIONAL LINE ITEM 5
04-02 REMOVE EXISTING DETERIORATED MORTAR BACK TO
SOUND MORTAR AND PROVIDE NEW MORTAR AT
JOINTS IN BRICK MASONRY. SEE DETAILS 1/R3.1 AND
2/R3.1.
WORK ITEMS 1 & 2
OPTIONAL LINE ITEM 5
04-03 REMOVE PATCHED BRICKS AND REPLACE WITH NEW
BRICKS TO MATCH ADJACENT.
WORK ITEM 2
04-04 REMOVE EFFLORESCENCE FROM BRICK SURFACES. WORK ITEM 2
04-05 PROVIDE ADDITIONAL SPOT REPOINTING IN AREAS
OF DAMAGED MORTAR IN BRICK MASONRY.
REMOVE EXISTING MORTAR BACK TO SOUND
MORTAR AND PROVIDE NEW MORTAR. ASSUME 5%
REPOINTING OF TOTAL SF OF BUILDING OR 894 SF.
OPTIONAL LINE ITEM 5
04-06 REMOVE BIOLOGICAL GROWTH FROM BRICK
SURFACES.
WORK ITEM 2
06-01 PROVIDE EPOXY REPAIR TO AREA OF DAMAGED
WOOD. PREPARE AND PAINT ENTIRE ELEMENT
SECTION AFTER REPAIR IS COMPLETE.
WORK ITEM 2
07-01 REMOVE EXCESS SOLDER, PREPARE, AND RESOLDER
FAILED SOLDER JOINTS.
WORK ITEM 2
hboyer Snapshot hboyer Snapshot hboyer Polygon hboyer Polygon hboyer Polygon hboyer Polygon hboyer Rectangle hboyer Text Box Areas of gutters to be reconstructed to correct slope. 1/8" per foot minimum. Gutter reconstruction requires reworking of expansion joints and downspout outlets to achieve correct slope.
hboyer Length Measurement 96'-1/2"
| G1.0 COVER SHEET - INDE |
| AS1.0 SITE PLAN |
| Structural |
| S0.0 - GENERAL NOTES - STRUCTURE |
| S1.3 - OVERALL ROOF KEY PLAN |
| S1.4 - PARTIAL EAST ELEVATION |
| S2.1 - CHIMNEY 1 |
| S2.2 - CHIMNEY 2 |
| S2.3 - CHIMNEY 3 |
| S2.4 - CHIMNEY 4 |
| S2.5 - CHIMNEY 5 |
| S2.6 - CHIMNEY 6 |
| S3.0 - CHIMNEY REINFORCEMENT |
| R1-1 |
| R1-2 |
| R3-1 |
| R3-2 |
| R3-3 |
| R3-4 |
File details come from the government source that posted it. Updated .