This document is a 100% Final Construction Specifications package for the rehabilitation of masonry at Congress Hall within Independence National Historical Park in Philadelphia, Pennsylvania.
The project encompasses three primary line items plus two optional items: (1) reinforcing two chimneys and repointing six chimneys with internal flue repairs using light-weight cast-in-place cementitious lining methods; (2) priority masonry, gutters, flashing, and roofing repairs including jack arch reconstruction and repointing; (3) internal grouting of four additional chimneys; and optional items for additional masonry repointing and unit-price internal grouting services. Work requires masonry cleaning per Section 04 01 10, brick masonry restoration per Section 04 01 20.91, and stone masonry restoration per Section 04 01 40.91, performed by qualified historic preservation specialists. All work must comply with the Secretary of the Interior Standards for Historic Preservation and NPS standards, with extensive submittal requirements including Quality Control Plans, Historic Preservation Treatment Plans, mock-ups, and daily reporting. The contract demands Davis-Bacon wage compliance, adherence to OSHA silica standards, comprehensive environmental management (Indoor Air Quality, noise control, pollution prevention, waste management at 75% diversion minimum), strict temperature restrictions for masonry work (40°F to 90°F ambient), and specialized testing and documentation protocols. Performance period is estimated at 458 calendar days from notice to proceed, with work generally restricted to 7 AM–5 PM Monday through Friday, excluding July 4th week and Memorial Day to Labor Day 2026. The solicitation is a competitive Total Small Business set-aside (NAICS 238140, $19M size standard) with estimated project magnitude between $1,000,000 and $5,000,000, using a firm-fixed-price contract awarded via Lowest Price Technically Acceptable Process.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENCE NATIONAL HISTORICAL PARK
CONGRESS HALL
REHABILITATE CONGRESS HALL MASONRY
INDE PMIS No. 320146B GWWO Project No. 24012
100% FINAL CONSTRUCTION DOCUMENTS
SPECIFICATIONS
NATIONAL PARK SERVICE (NPS)
DENVER SERVICE CENTER (DSC)
Prepared by GWWO, Inc. / Architects
December 19, 2024
LY VS AN NN IE AP
AD E RR CE HT ITSI EG CE TRJO
H
N RIED GREGG NO.R
A41
12/19/2024
This page is intentionally left blank.
INDE - 320146B 00 01 10 - 1
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 10 - TABLE OF CONTENTS
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 11 00 – SUMMARY OF WORK
01 26 01 – CONTRACT MODIFICATION PROCEDURES
01 27 00 – DEFINITION OF WORK ITEMS & PROPOSAL ALTERNATES
01 31 00 – PROJECT MANAGEMENT AND COORDINATION
01 32 16 – CONSTRUCTION SCHEDULE
01 32 33 – PHOTO DOCUMENTATION
01 33 23 – SUBMITTAL PROCEDURES
01 33 23A – SUBMITTAL REGISTER
01 33 23B – TRANSMITTAL FORM
01 35 23 – SAFETY REQUIREMENTS
01 35 23A – INDE HOT WORK POLICY
01 35 91 – HISTORIC PRESERVATION TREATMENT PROCEDURES
01 40 00 – QUALITY REQUIREMENTS
01 42 00 – REFERENCE STANDARDS
01 50 00 – TEMPORARY FACILITIES AND CONTROLS
01 57 19.11 – INDOOR AIR QUALITY MANAGEMENT
01 57 19.12 – NOISE AND ACCOUSTICS MANAGEMENT
01 57 23 – UNDER-AN-ACRE POLLUTION PREVENTION
01 67 00 – PRODUCT REQUIREMENTS
01 73 40 – EXECUTION
01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 74 19A – PROJECT WASTE MANAGEMENT PLAN WORKSHEET
01 74 19B – STANDARD SOLID WASTE CONVERSIONS
01 77 00 – CLOSEOUT PROCEDURES
01 78 23 – OPERATION AND MAINTENANCE DATA
DIVISION 02 -- EXISTING CONDITIONS
02 41 00 – SELECTIVE DEMOLITION
INDE-320146B 00 01 10 - 2
DIVISIONS 03 – CONCRETE (NOT USED)
DIVISION 04 -- MASONRY
04 01 10 – MASONRY CLEANING
04 01 20.91 – BRICK MASONRY RESTORATION
04 01 40.91 – STONE MASONRY RESTORATION
04 51 00 – FLUE LINER MASONRY
DIVISION 05 -- METALS
05 12 00 – STRUCTURAL STEEL FRAMING
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 01 05 – WOOD REPAIR AND PATCHING
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 01 60.91 – SHEET METAL ROOFING AND FLASHING RESTORATION
DIVISION 08 -- OPENINGS (NOT USED)
DIVISION 09 -- FINISHES
09 01 10.15 – PAINT & COATING REMOVAL
09 91 00 – PAINTING & FINISHING
DIVISION 10 -- SPECIALTIES (NOT USED)
DIVISION 11 -- EQUIPMENT (NOT USED)
DIVISION 12 -- FURNISHINGS (NOT USED)
DIVISIONS 13 THRU 14 (NOT USED)
DIVISION 21 -- FIRE SUPPRESSION (NOT USED)
DIVISION 22 -- PLUMBING (NOT USED)
DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) (NOT USED)
DIVISION 26 -- ELECTRICAL (NOT USED)
DIVISION 27 -- COMMUNICATIONS (NOT USED)
DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY (NOT USED)
INDE-320146B 00 01 10 - 3
DIVISION 31 -- EARTHWORK (NOT USED)
DIVISION 32 -- EXTERIOR IMPROVEMENTS (NOT USED)
DIVISION 33 -- UTILITIES (NOT USED)
APPENDICES
APPENDIX A CHIMNEY FLUE VIDEO INSPECTION REPORT
APPENDIX B MORTAR ANALYSIS REPORT
APPENDIX C NPS FORMS
IR1 HIRING REQUEST FORM
OF 306 FORM AUGUST
END OF SECTION 00 01 10
INDE - 320146B 01 11 00 - 1
112723 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Work Under Other Contracts
3. Government-Furnished Materials
4. Construction Contractor Use of Site
5. Public Use of Site
6. Occupancy Requirements for Buildings
7. Conduct of Operations
8. Work Restrictions
9. Special Construction Requirements
10. Additional Reports
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Independence National Historical Park, Congress Hall, S 6th Street and Chestnut Street, Philadelphia, PA 19106.
B. The Work consists of:
1. Line Item 1: Reinforce Two Chimneys and Repoint Six Chimneys. This project will include the following but is not limited to performing chimney scoping assessment of flues at Chimney 1 and 2. Removal and reinstallation of chimney caps.
Reinforcing Chimney 1 and Chimney 2, performing internal flue repairs to stabilize the existing masonry below the roofline utilizing light-weight cast-in-place cementitious flue lining methods for Chimney 1 and 2. Assume base grouting depth to be seven (7) feet below the roofline. Adding vent tubes to all six chimneys, and repointing all six chimneys.
Work on east side of the building to be performed with scaffolding. Work on west side of the building to be performed with a lift.
2. Line Item 2: Priority Masonry, Gutters, Flashing and Roofing Repair. This project will include the following but is not limited to resoldering joints at flashing and gutters and removing debris from gutters. Performing a probe to confirm the existing installed configuration of the gutters. This will involve removing wood shakes and reinstalling them. Rebuilding portion of damaged jack arch in two different locations.
Repointing mortar joints, cleaning efflorescence from surface, and replacing bricks previously patched with composite patching mortar located around damaged jack arch.
Providing epoxy repair to area of damaged wood repairing and painting entire element after repair is complete. Work on east side of the building to be performed with scaffolding.
Work on west side of the building to be performed with a lift.
INDE - 320146B 01 11 00 - 2
3. Line Item 3: Internal Grouting Four Chimneys. This project will include the following but is not limited to performing chimney scoping assessment of flues at Chimney 3, 4, 5 and
6. Removal and reinstallation of chimney caps. Performing internal flue repairs to stabilize the existing masonry below the roofline utilizing light-weight cast-in-place cementitious flue lining methods for Chimneys 3, 4, 5 and 6. Assume base grouting depth to be five (5) feet below the roofline. Work on east side of the building to be performed with scaffolding. Work on west side of the building to be performed with a lift
4. The following work will be Options:
a. Line Item 4 – Option 1: Additional Masonry Repair. This item consists of providing additional repointing in areas of damaged mortar in brick masonry, removing existing mortar back to sound mortar and providing new mortar. Assume 5% repointing of total sf or 894 SF. Work to be performed with a lift.
b. Line Item 5 – Option 2: Unit Price for Internal Grouting. Offerors shall provide unit price per linear foot of internal grouting as additional grouting below or reduced grouting above the base grouting depth in CLIN 1 and CLIN 3 once the chimney scoping assessment has been performed.
C. Project will be constructed under a single prime contract.
1.3 WORK UNDER OTHER CONTRACTS
A. General: Cooperate with separate Construction Contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate
Work of this Contract with work performed under separate contracts.
B. Preceding Work: Government has awarded separate contract(s) for the following construction operations at Project site. Those operations are scheduled to be substantially complete before work under this Contract begins.
1. Congress Hall HVAC replacement.
C. Concurrent Work: Government will award separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract.
1. Congress Hall fire suppression system and security system installation.
1.4 CONSTRUCTION CONTRACTOR USE OF SITE
A. General: Construction Contractor shall have limited use of site for construction operations. Limit use of premises to work in areas indicated in the Drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to within the property lines. Work completed within the public right-of-way and sidewalks shall be coordinated with the City of
INDE - 320146B 01 11 00 - 3
Philadelphia. Contractor shall obtain necessary permits required for sidewalk and lane closures.
2. Sidewalks adjacent to Congress Hall shall be maintained and remain clear throughout construction. Provide clear pedestrian access. Visitor access door to remain unobstructed.
Provide overhead protection. When scaffolding is utilized, the contractor shall provide clear pedestrian access and protection and include signage for sidewalk and lane closures throughout the duration of the construction. Scaffolding shall include protection preventing the public from climbing or gaining access to the scaffolding throughout construction.
B. Storage of Materials: Confine storage of materials to staging/storage area shown on the Drawings.
Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site
C. Stockpiling: Confine stockpiling to staging/storage area shown on the Drawings. Confine stockpiling to be limited to area identified within the Contract Documents. Protect existing trees and associated roots to remain.
D. Pedestrian Shed: Should pedestrian sheds be utilized, coordinate location with the CO and provide security, prevent public access, and provide lighting throughout construction. Remove pedestrian shed before substantial completion.
E. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repair or replace damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
F. Driveways and Entrances: Keep driveways accessible ramps/entrances, maintenance entrances serving premises, pedestrian walkways, sidewalks and entrances serving premises clear and available to Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
3. No parking on Park property.
4. Ramp at south side of building to remain open and accessible throughout construction.
G. Sidewalks: Keep sidewalks along Sixth Street clear at all times. Coordinate sidewalk closures with the CO and City of Philadelphia before interruptions.
1. Schedule deliveries to minimize use of sidewalk and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
INDE - 320146B 01 11 00 - 4
3. Protect existing sidewalks.
H. Construction Camp: Establishment of a camp within park will not be permitted.
I. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Construction Contractor of liability for damage which may result from moving of equipment.
1.5 PUBLIC USE OF SITE
A. Construction Contractor shall conduct operations to ensure the least inconvenience to public.
Building and road closures may be permitted, when required, upon specific approval of
Contracting Officer.
1.6 OCCUPANCY REQUIRMENTS FOR BUILIDINGS
A. Existing Buildings
1. Full Government Occupancy: Government will occupy buildings under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Contracting Officer.
b. Maintain existing building in weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and occupants during construction period.
1.7 CONDUCT OF OPERATIONS
A. Construction Contractor shall conduct operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed unless stated in the Work Restrictions below or without prior consent from the Contracting Officer. Submit requests forty eight (48) hours in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
INDE - 320146B 01 11 00 - 5
1.8 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7 A.M. to 5 P.M., Monday through Friday, except when otherwise indicated.
1. No work will be permitted the week before or during July 4th.
2. No work will be permitted from Memorial Day to Labor Day 2026.
3. No access will be permitted to the Contractor during these designated time periods. No
Contractor activity is permitted on site during this time period. All equipment and vehicles remaining on site during this time period shall be located within the fenced construction area. Deliveries, only if unavoidable, shall be made only by prior arrangement with the Contracting Officer with not less than 2 work days’ notice. The Contractor will secure the site against vandalism, theft and damage.
B. Temperature Work Restrictions for Masonry Cleaning
1. Use of Water: Do not perform masonry cleaning work that will wet masonry materials or cause them to be wet when ambient temperature is below 40 deg F or when temperature of air or masonry is expected to drop below 40 deg F within 72 hours as predicted for
Philadelphia by AccuWeather the National Weather Service. Do not begin work when any part of wall or any materials are frozen or subject to freezing. See Section 04 01 10
MASONRY CLEANING.
C. Temperature Work Restrictions for Masonry Restoration
1. Cold Weather Brick Masonry Restoration: Cold weather brick masonry restoration shall adhere to following requirements for work, performed in ambient temperatures indicated.
Work shall not be permitted when temperature of air or wall is below 40 deg F or when temperature of air or wall is predicted to be below 40 deg F in Project location within 48 hours of work by AccuWeather the National Weather Service without Contracting
Officer’s prior written approval. No work shall begin when any part of wall or materials in use are frozen or subject to freezing temperatures. See Section 04 01 20.91 BRICK
MASONRY RESTORATION.
2. Hot Weather Brick Masonry Restoration: Hot weather brick masonry restoration shall adhere to following requirements for work, performed in ambient temperatures indicated.
Work shall not be permitted when temperature of air or wall is above 90 deg F or when temperature of air or wall is predicted to be above 90 deg F in Project location within 48 hours of work by AccuWeather the National Weather Service without Contracting
Officer’s prior written approval. See Section 04 01 20.91 BRICK MASONRY
RESTORATION
D. Temperature Work Restrictions for Stone Restoration
1. Cold Weather Stone Masonry Restoration: Cold weather stone masonry restoration shall adhere to following requirements for work, performed in ambient temperatures indicated.
Work shall not be permitted when temperature of air or wall is below 40 deg F or when temperature of air or wall is predicted to be below 40 deg F in Project location within 48 hours of work by AccuWeather the National Weather Service without Contracting
Officer’s prior written approval. No work shall begin when any part of wall or materials in use are frozen or subject to freezing temperatures. See Section 04 01 40.91 STONE
MASONRY RESTORATION
2. Hot Weather Stone Masonry Restoration: Hot weather stone masonry restoration shall adhere to following requirements for work, performed in ambient temperatures indicated.
Work shall not be permitted when temperature of air or wall is above 90 deg F or when temperature of air or wall is predicted to be above 90 deg F in Project location within 48
INDE - 320146B 01 11 00 - 6
hours of work by AccuWeather the National Weather Service without Contracting
Officer’s prior written approval. See Section 04 01 40.91 STONE MASONRY
RESTORATION.
E. Temperature Work Restrictions for Flue Liner Masonry
1. Provide work plan, outlining protection and any additive or modifications to placement when air temperature is below 40 deg F. See Section 04 51 00 FLUE LINER MASONRY.
F. Access to Independence Square for the delivery of materials is via the ramp from Sixth Street.
Access is strictly controlled and monitored. All arrangements need to be made at least 24 hours in advance. All vehicles and personnel will be thoroughly searched prior to access being permitted.
1. Unloading and loading of material, tools and equipment must be arranged by permit from the Independence National Historical Park, Office of Visitor and Resource Protection, 143
S. Third Street for each delivery. Notice is required at least 24 hours in advance. Contact the Contracting Officer to accompany you to this office to obtain permit.
G. The cobblestone driveway serving Independence Square will be kept clean and available to the
NPS, NPS employees, and emergency vehicles at all times.
1. It will not be used for parking or storage of materials.
2. Schedule deliveries to minimize use of driveways and entrances.
3. Deliveries of material will not be permitted between the hours of 8:30 AM and 5:30 PM unless prior arrangements are made with the Contracting Officer at least 24 hours in advance.
4. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
H. Existing Utilities
1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
2. Construction Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
I. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than two (2) business days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
3. Hours and length of Utility Shutdowns: No shutdowns are expected.
J. Nonsmoking Building/Tobacco Use/Vaping: Smoking is not permitted within building or within
25 feet of entrances, operable windows, or outdoor air intakes.
INDE - 320146B 01 11 00 - 7
1.9 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Management and Communication Software: Software administered by NPS shall be used to manage communication and document sharing during construction.
1. See Section 01 31 00 "Project Management and Coordination" for requirements on using
NPS project management and communication software.
B. Historic Status and Review Notice:
1. Congress Hall is a contributing structure to the Independence Hall World Heritage Site and on the List of Classified Structures. The Contractor is advised of the following:
a. The work to be performed on this building will meet the highest standards of preservation and building craftsmanship.
b. The Contractor will be intimately familiar with the Secretary of the Interior
Standards and Guidelines for Historic Preservation Projects, specifically standards for preservation and rehabilitation.
c. Proper attention shall be given during construction to ensure that there is no loss of significant or historic fabric during construction activities.
d. Maintain existing building in a weather-tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
C. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the NPS.
1. Provide temporary barriers to protect existing trees and plants and root zones.
2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with the Contracting Officer and remove agreed-on roots and branches that interfere with construction (only after written approval).
3. Do not fasten ropes, cables, or guys to trees.
D. Prior to start of work, the Contractor shall examine work site with Contracting Officer or designated representative to determine exact limits of work and the conditions under which this work will be performed.
E. All vehicles including high lifts, operating on paved areas shall comply with the following requirements:
1. All vehicles are required to use pneumatic tires.
2. The Contractor will be held responsible for the protection of the brick sidewalks, and will be held accountable for any damage that occurs as a direct result of the work. Any vehicles that exceed a gross weight of 10,000 pounds must use the protection described below.
Using this method does not relieve the Contractor of responsibility to protect the walkways from damage.
a. Two layers of ¾” plywood, with a layer of 2” Styrofoam paneling in between, laid in such a manner that the surface of the paved area is covered to all extents of its surface.
b. When the styrofoam has compressed to a height that is less than half its original thickness, or to an extent that the styrofoam is not protecting the paving, it is to be replaced as described above.
3. Post signage to route pedestrians around construction as recommended by the Contracting
Officer.
INDE - 320146B 01 11 00 - 8
4. Protect pedestrian traffic by guardrails or fences.
5. Cover pipes, hoses, and power lines crossing sidewalks and walkways with troughs using beveled edge boards.
6. Removal: Completely remove barriers no longer needed and when approved by
Contracting Officer.
1.10 BACKGROUND CHECK REQUIRMENTS
A. Prior to mobilization, contractor superintendent who will monitor work on site will need to undergo and pass a background check through NPS. Non-federal workers [Contractors] who will require unsupervised building access will need a Tier 1 investigation. Once background check has been complete, superintendent will need to make an appointment to receive park ID badge and building keys. A contractor staff member who has passed a background check is required to be on site any time contractor personnel will be present.
1. Required forms (IR1 and OF 306) are contained in Appendices.
B. Contractor personnel who do not go through the background check process will need to contact
NPS Dispatch prior to entering secure zone and be scanned by NPS Ranger at the 6th Street ramp.
An alternate method is to go through public screening (when available) between East Wing and
Old City Hall.
1.11 ADDITIONAL REPORTS
A. The report Mortar Analysis Report, August 28, 2024 prepared by Building Conservation
Associates, Inc. is an appendix with this package.
B. The report Chimney Flue Video Inspection Report, September 6, 2024 prepared by D.J. Cross, Inc. is an appendix with this package.
C. In case of conflict between report and drawings or specifications, drawings and specifications govern.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
INDE - 320146B 01 26 01 - 1
012721 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager (PM), Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
INDE - 320146B 01 26 01 - 2
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation – Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
INDE - 320146B 01 26 01 - 3
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.
Include as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: Covers the contractor’s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government’s form.
http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm
INDE - 320146B 01 26 01 - 4
3. Requests for extensions of contract time as a result of change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 "Construction Schedule", for time impact analysis requirements. TIA and associated costs shall be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer (CO) upon request.
5. Contractor shall review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing hours required for each craft directly engaged in modification work. Any work proposed requiring overtime work or premium pay shall be itemized separately. Rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, Federal Insurance Contributions Act (FICA), FUTA, and other direct costs resulting from Federal, state or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. Labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. Estimated cost for materials shall include quotes from multiple sources. Material prices shall include applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for work being performed.
2. Do not include costs for "miscellaneous tools and equipment", in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 shall be broken out separately.
3. Regardless of ownership, rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. United States (U.S.) Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
INDE - 320146B 01 26 01 - 5
4. Estimated equipment rates shall include operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per Federal Acquisition Regulation (FAR) 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate full rate for equipment only for duration that equipment will be utilized to accomplish work of the modification.
6. Standby unit rates used in accordance with paragraph 1.3, D, 2, above. If the U.S. Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then 1/2 of equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, established standby rate shall apply from the first day of the delay.
8. Equipment not used and on job site for up to five consecutive days may be classified at standby rates, provided the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work.
Equipment still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………10% Profit……………………8%
2. Total aggregate limit of markup (OH&P) for Contractor and Subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If Contractors form a partnership, partnership may only receive home office overhead and profit in same amount as an individual Contractor (refer to paragraph 1.3,E,1 above). It is the responsibility of the partners to decide on division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, overhead and profit mark-ups are required on net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
INDE - 320146B 01 26 01 - 6
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 012601
INDE - 320146B 01 27 00 - 1
012721 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of work, include costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Line Item Number 1: Reinforce Two Chimneys and Repoint Six Chimneys.
1. This item consists of performing chimney scoping assessment of flues at Chimney 1 and
2. Removal and reinstallation of chimney caps.
2. Reinforcing Chimney 1 and Chimney 2, performing internal flue repairs to stabilize the existing masonry below the roofline utilizing light-weight cast-in-place cementitious flue lining methods for Chimney 1 and 2. Assume base grouting depth to be seven (7) feet below the roofline.
3. Adding vent tubes to all six chimneys and repointing all six chimneys.
4. Work on east side of the building to be performed with scaffolding. Work on west side of the building to be performed with a lift.
5. Measurement for payment will be percentage complete of line item per scheduled value.
6. Payment will be made at the contract lump sum price.
B. Line Item Number 2: Priority Masonry, Gutters, Flashing and Roofing Repair.
1. This item consists of resoldering joints at flashing and gutters and removing debris from gutters.
2. Performing a probe to confirm the existing installed configuration of the gutters. This will involve removing wood shakes and reinstalling them.
3. Rebuilding portion of damaged jack arch in two different locations.
4. Repointing mortar joints, cleaning efflorescence from surface, and replacing bricks previously patched with composite patching mortar located around damaged jack arch.
5. Providing epoxy repair to area of damaged wood repairing and painting entire element after repair is complete.
6. Work on east side of the building to be performed with scaffolding. Work on west side of the building to be performed with a lift.
7. Measurement for payment will be percentage complete of line item per scheduled value.
8. Payment will be made at the contract lump sum price.
INDE - 320146B 01 27 00 - 2
012721 DEFINITION OF CONTRACT LINE ITEMS
C. Line Item Number 3: Internal Grouting Four Chimneys.
1. This item consists of perform chimney scoping assessment of flues at Chimney 3, 4, 5 and
6. Removal and reinstallation of chimney caps.
2. Performing internal flue repairs to stabilize the existing masonry below the roofline utilizing light-weight cast-in-place cementitious flue lining methods for Chimneys 3, 4, 5 and 6. Assume base grouting depth to be five (5) feet below the roofline.
3. Work on east side of the building to be performed with scaffolding. Work on west side of the building to be performed with a lift.
4. Measurement for payment will be percentage complete of line item per scheduled value.
5. Payment will be made at the contract lump sum price.
CI. Line Item Number 4: Option 1- Additional Masonry Repair.
1. This item consists of providing additional repointing in areas of damaged mortar in brick masonry, removing existing mortar back to sound mortar and providing new mortar.
Assume 5% repointing of total sf or 894 SF. Work to be performed with a lift.
2. Measurement for payment will be percentage complete of line item per scheduled value.
3. Payment will be made at the contract lump sum price.
CII. Line Item Number 5: Option 2- Unit Price for Internal Grouting.
1. This item consists of providing a unit price per linear foot of internal grouting as additional grouting below or reduced grouting above the base grouting depth in CLIN 1 and CLIN 3 once the chimney scoping assessment has been performed.
2. Measurement for payment will be percentage complete of line item per scheduled value.
3. Payment will be made at the unit price per linear foot.
4.
END OF SECTION 01 27 00
INDE - 320146B 01 31 00 - 1
112723 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination
3. Submittals
4. Coordination Drawings
5. Requests for Information (RFIs)
6. NPS Project Management and Communication Software
7. Project Meetings
8. Environmental Coordination
9. Permits
B. Related Requirements:
1. Section 01 32 16 "Construction Schedule" for preparing and submitting Construction
Contractor�s construction schedule.
2. Section 01 73 40 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.
1.2 DEFINITIONS
A. Agency with Jurisdiction
B. Construction Permits � Contractor Provided
C. Government Furnished Permits
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other Construction Contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make provisions to accommodate items scheduled for later installation.
INDE - 320146B 01 31 00 - 2
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of components.
5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as notices, reports, and list of attendees at meetings.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other Construction Contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to:
1. Preparation of Construction Contractor Construction Schedule
2. Preparation of the Schedule of Values
3. Installation and removal of temporary facilities and controls
4. Delivery and processing of submittals
5. Progress meetings
6. Permit requirements
7. Pre-installation conferences
8. Project closeout activities
1.4 SUBMITTALS
A. Division 1 documents:
1. Letter designating Project Superintendent
2. Construction Schedule
3. A Comprehensive Schedule of Values
4. Accident Prevention Plan
5. A List of Subcontractors for this project
6. Written statements from Subcontractors certifying compliance with applicable labor standard clauses.
7. Certificates of Insurance and Standard Form SF1413 for Contactor and all Subcontractors
8. Waste Management Plan
9. Quality Control Plan
10. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP)
11. Indoor Air Quality (IAQ) Management Plan
12. Historic Preservation Treatment Plan (HPTP)
13. List of Required Construction Permits. Include the following information for each permit:
a. Name of Permit
b. Agency(ies) issuing the permit(s)
c. Information required from Government to complete permit application
B. Provide items listed to Contracting Officer at least one week prior to Pre-Construction
Conference, or as directed by Contracting Officer.
1. Failure to submit items may result in:
INDE - 320146B 01 31 00 - 3
a. Construction conference may be cancelled, Notice to Proceed may not be issued, and Contracting Officer will consider other contractual remedies.
b. Work shall not commence until written Notice to Proceed has been issued and
Certificates of Insurance and SF1413 documents are received for Construction
Contractor and all Subcontractors.
1.5 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of
Contract Documents, Construction Contractor shall prepare and submit an RFI utilizing form created on NPS project management and communication software.
1. Contracting Officer will not respond to RFIs submitted by other entities controlled by
Construction Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. Content of RFI: Include detailed, legible description of item needing information or interpretation and the following:
1. RFI number, numbered sequentially
2. Date
3. RFI subject
4. Specification Section number and title and related paragraphs, as appropriate.
5. Drawing number and detail references, as appropriate.
6. Field dimensions and conditions, as appropriate.
7. Construction Contractor's suggested resolution: If suggested resolution impacts Contract
Time or Contract Sum, Construction Contractor shall state impact in RFI.
8. Construction Contractor's signature
9. Requested date for response
10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. Contracting Officer�s Action: Contracting Officer will review each RFI, determine action required, and respond. Contracting Officer will determine critical nature of each RFI and issue response accordingly.
1. The following are not considered to be RFIs and will receive no action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Construction Contractor's means and methods.
d. Requests for coordination information already indicated in Contract Documents.
e. Requests for adjustments in Contract Time or Contract Sum.
f. Requests for interpretation of Architect's actions on submittals.
g. Incomplete RFIs or inaccurately prepared RFIs.
INDE - 320146B 01 31 00 - 4
2. Contracting Officer's action may include a request for additional information; time for response will date from time of receipt of additional information.
3. Contracting Officer's action on RFIs may result in need for a change to Contract Time or
Contract Sum. All contract changes will be processed following terms and conditions of contract.
1.6 PROJECT MANAGEMENT AND COMMUNICATION SOFTWARE
A. Use to manage project communication and document sharing during contract period on:
1. Project directory
2. Project correspondence
3. Meeting agendas and minutes
4. Contract modifications forms and logs
5. RFI form and processing
6. Task and issue management
7. Photo documentation
8. Baseline schedule, schedule updates and calendar management
9. Submittal form and processing
10. Payment coordination documentation
11. Reminder and tracking functions
12. Archiving functions
13. Notification of submittal and RFI statuses and current responsible party
14. Permits and addendums
B. Some documents are not suitable to be shared using NPS project management and communication software. Documents containing Personal Identifying Information (PII) (i.e. certified payrolls) shall not be shared and shall be coordinated with project team as appropriate.
1.7 PROJECT MEETINGS
A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Construction Contractor. Meeting agenda will include the following as a minimum:
1. Roles & Responsibilities / Lines of Authority
2. Park rules and regulations
3. Jobsite Safety
4. Resolution of comments on required Division 1 documents
5. Coordination of Subcontractors
6. Labor law application
7. Modifications
8. Payments to Construction Contractor
9. Payroll reports
10. Contract time
11. Liquidated damages
12. Construction Contractor Performance Evaluation
13. Display of Hotline posters
14. Notice to proceed
INDE - 320146B 01 31 00 - 5
15. Correspondence procedures
16. NPS project management and communication software
17. Acceptance/rejection of work
18. Progress meetings
19. Submittal procedures
20. NPS Final Accessibility Inspection
21. Environmental requirements
22. Permit requirements
23. As-constructed drawings/operation and maintenance (O&M) manuals.
24. Saturday, Sunday, holiday and night work.
25. Reference materials
26. Value engineering
27. Schedule of Values
B. Progress Meetings: Contracting Officer will schedule weekly meetings with Construction
Contractor.
1. Attendees: In addition to Government Representatives, each Construction Contractor, Subcontractor, supplier, and other entity…