This is a Quote Price Schedule and Statement of Work (SOW) for a federal pavement repair and overlay project on the Headwaters Forest Road Trail in Northern California, managed by the Department of the Interior Bureau of Land Management.

The project encompasses nine specific tasks: Mobilization, Full Depth Repairs (4,000 SF), Surface Preparation (56,940 SF), Tack Coat application (56,940 SF), Pavement Conformance testing at HEC Barn, HMA Overlay installation using 3/8" NMAS PG64-10 asphalt in two 0.1 ft compacted lifts (56,940 SF), Shoulder Backing with 3" compacted Class II base and two-foot tapers (5,694 LF), Quality Control, and Site Restoration/Demobilization. The contractor must submit pricing for nine Contract Line Items (CLINs) including unit prices and extended totals, along with a GANTT chart showing concurrent and overlapping task schedules. The materials estimate indicates requirements for approximately 750 tons of 3/8" HMA PG6410, 600 gallons of tack coat, 150 tons of Class II base material, and 2,500 pounds of crack sealant. Compaction testing is specified at one test per mile per lift (8 total test events). Contractors must provide detailed pricing, technical proposals, contingency plans, and emergency response procedures as part of their offer submittal package.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C, UNIFORM CONTRACT FORMAT (UCF)

DESCRIPTION / SPECIFICATION / STATEMENT OF WORK (SOW)

Schedule of Work Deliverables Contractor will fill out and submit in Quote Package along with Technical Proposal, Quote Price Schedule, Contingency and Emergency Response Plan. Contractor will also submit GANTT chart/calendar view of Schedule of Work Deliverables to better represent concurrent and/or overlapping tasks.

SPECIFIC TASK DELIVERABLE
START DATE
END DATE

Task 1 – Mobilization

Task 2 – Full Depth Repairs

Task 3 – Surface Preparation

Task 4 – Tack Coat

Task 5 – Pavement Conformance at HEC Barn

Task 6 – HMA Overlay 3/8” NMAS, PG64-10, placed in two lifts at 0.1 ft compacted thickness per lift

Task 7 – Shoulder backing

Task 8 – Quality Control

Task 9 – Site Restoration and Demobilization

Quote Price Schedule Contractor shall complete and elaborate on this format as is appropriate for their Offeror Submittal Package.

CLIN
Description
Unit
Estimated Quantity
Unit Price
Total Price
0001
Mobilization
EA
1
0002
Full Depth Repairs
SF
4000
0003
Surface Preparation
SF
56940
0004
Tack Coat
SF
56940
0005
HMA Overlay, 3/8 inch NMAS, PG 64-10, two lifts at 0.10 ft compacted thickness per lift
SF
56940
0006
Shoulder Backing

· 3” compacted Class II base

· Two feet taper on either side of finished paved surface

· Includes both sides

LF
5,694
0007
Compaction Testing

· 1 per ¼ mile

· Per lift

EA
8
0008
Site restoration, cleanup, demobilization
EA
1
-
TOTAL PRICE
---------------------------------------------

Materials Estimate

Item
Unit
Planning Quantity
Notes
3/8” HMA PG6410
ton
750
Includes full-depth repair HMA and two 0.10 ft overlay lifts
Tack Coat
gallon
600
Layer between existing surface and new overlay
Class II base
ton
150
Includes full depth repair base and tapered shoulder backing (3” at edge, 2-ft taper)
Crack Seal
lb
2500
To be applied on cracks ≥ 1/4 inch on areas not marked for Full Depth Repair

SOW Page 2