This file is a comprehensive set of architectural and engineering design drawings for the Castillo de San Marcos National Monument Seawall Rehabilitation Project located in St. Augustine, Florida. The project involves extensive marine structural repairs, including demolition and reconstruction of approximately 650 linear feet of historic seawall along the Matanzas River, with work spanning the North Wall, North Transition Wall, Center Wall, South Wall, and South Transition Wall. Key technical elements include installing steel sheet pile walls, reconstructing granite block coursing, repairing historic tabby concrete surfaces, creating new wood walkways and stairs, and implementing environmental mitigation measures such as mangrove plantings and oyster habitat relocation.
The design documents specify complex marine construction techniques with significant environmental considerations, including temporary cofferdams, turbidity control, oyster and wetland preservation, and careful handling of historic masonry elements. The project is funded by the National Park Service, with a planned construction date in September 2025. Environmental permits will be required from the U.S. Army Corps of Engineers and Florida Department of Environmental Protection, and the construction must adhere to strict preservation and ecological protection standards. The total project involves multiple technical disciplines including structural engineering, marine construction, historic preservation, and environmental restoration, with an estimated service life design of 50 years for the new marine infrastructure.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
GENERAL EROSION AND TURBIDITY CONTROL NOTES
1. FURNISH, INSTALL, AND MAINTAIN TURBIDITY AND EROSION CONTROL MEASURES AND
MAINTAIN TURBIDITY AND EROSION CONTROL MEASURES AROUND THE LIMITS OF
CONSTRUCTION IN ORDER TO PREVENT ANY EROSION OR SEDIMENTATION IN ADJACENT
WETLANDS AND OTHER SURFACE WATERS.
2. FURNISH, INSTALL, AND MAINTAIN TURBIDITY BARRIERS IN ALL PERMANENT BODIES OF WATER
REGARDLESS OF WATER DEPTH AROUND THE WORK AREA DURING ALL CONSTRUCTION
ACTIVITIES. THE CONTRACTOR HAS THE OPTION TO ENCLOSE THE ENTIRE WATERSIDE OF THE
SITE, WITHIN THE LIMITS OF DISTURBANCE, OR TO INSTALL AND MOVE THE TURBIDITY
BARRIERS IN STAGES.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR RECEIVING APPROVAL OF
TURBIDITY CONTROL PLAN FROM THE APPLICABLE REGULATORY AGENCIES. REFER TO THE
PROJECT PERMIT APPROVALS AND PERMIT CONDITIONS FOR AGENCIES REQUIRING SUCH
REVIEW AND APPROVAL. QUESTIONS CONCERNING APPROPRIATE TECHNIQUES SHOULD BE
ADDRESSED TO THOSE AGENCIES AND/OR DISCUSSED WITH THE CONTRACTING OFFICER.
4. THE APPROPRIATE TURBIDITY AND EROSION CONTROL METHODOLOGIES SELECTED BY THE
CONTRACTOR FOR THIS PROJECT SHOULD BE MADE FOLLOWING ASSESSMENT OF THE PLANS
AND PROJECT SITE SPECIFIC FACTORS AND AFTER CONSULTATIONS AS NEEDED WITH THE
CONTRACTING OFFICER AND APPROPRIATE AGENCIES. THE CONTRACTOR WILL BE
RESPONSIBLE FOR OBTAINING ANY AND ALL NECESSARY PERMITS FOR SUCH ACTIVITY;
SEVERAL FACTORS TO CONSIDER ARE LISTED BELOW:
A. AMBIENT GROUND WATER LEVELS
B. ACTUAL RAINFALL AMOUNTS AND TIME OF YEAR RELATIVE TO NORMAL RAINY SEASON
C. PROXIMITY TO WETLANDS, WATER BODIES, OR OFFSITE PROPERTIES
D. CLASS DESIGNATION OF RECEIVING WATER BODY (OUTSTANDING FLORIDA WATERS,
SHELLFISH HARVESTING AREAS, ETC.)
E. DENSITY, TYPE, AND PROXIMITY OF UPLAND VEGETATION TO BE RETAINED DURING
CONSTRUCTION (FOR USE AS POSSIBLE FILTRATION AREAS)
F. EXISTING TOPOGRAPHY AND DIRECTIONS OF SURFACE FLOW
G. TYPE OF EQUIPMENT USED
H. PROJECT TYPE
I. DURATION OF CONSTRUCTION ACTIVITIES
J. AMBIENT QUALITY OF SURFACE AND GROUNDWATER
K. TEMPORARY STOCKPILE LOCATIONS AND DIMENSIONS
5. AT THE ONSET OF CONSTRUCTION, THE CONTRACTOR, AS THE PARTY RESPONSIBLE FOR
IMPLEMENTATION OF THE EROSION AND SEDIMENT CONTROL PLAN, MUST ASSESS THE ABOVE
CONDITIONS AND FACTORS AND SELECT THE APPROPRIATE METHODS OF PROTECTION.
CONSTRUCTION SEQUENCING SHOULD BE PLANNED PRIOR TO INITIATION TO PROVIDE
ADEQUATE PROTECTION OF WATER QUALITY.
6. ADDITIONAL EROSION AND TURBIDITY CONTROL MEASURES OTHER THAN THOSE PRESENTED
MAY BE REQUIRED DUE TO CONSTRUCTION SEQUENCING AND UNFORESEEN WEATHER
CONDITIONS. THESE ADDITIONAL EROSION AND TURBIDITY CONTROL MEASURES, INCLUDING
EXTRAS FOR MATERIALS AND LABOR, MUST BE PROVIDED BY THE CONTRACTOR.
7. COORDINATE THE INSTALLATION OF TEMPORARY EROSION CONTROL BARRIERS WITH THE
CONSTRUCTION OF PERMANENT EROSION CONTROL FEATURES TO THE EXTENT NECESSARY
TO ASSURE EFFECTIVE AND CONTINUOUS CONTROL OF EROSION AND WATER QUALITY
THROUGHOUT THE LIFE OF THE CONSTRUCTION PHASE.
8. THE TYPE OF EROSION CONTROL BARRIERS USED MUST BE GOVERNED BY THE NATURE OF
THE CONSTRUCTION OPERATION AND SOIL TYPE THAT WILL BE EXPOSED. SILTY AND CLAYEY
MATERIAL MAY REQUIRE SOLID SEDIMENT BARRIERS TO PREVENT TURBID WATER DISCHARGE,
WHILE SANDY MATERIAL MAY NEED ONLY SILT SCREENS OR HAY BALES TO PREVENT EROSION.
DIVERSION DITCHES OR SWALES MAY BE REQUIRED TO PREVENT TURBID STORMWATER
RUNOFF FROM BEING DISCHARGED TO WETLANDS OR SURFACE WATERS. IT MAY BE
NECESSARY TO EMPLOY A COMBINATION OF BARRIERS, DITCHES, AND OTHER
EROSION/TURBIDITY CONTROL MEASURES IF CONDITIONS WARRANT.
9. SHEET FLOW OF NEWLY FILLED OR SCRAPED AREAS MAY BE CONTROLLED OR CONTAINED BY
THE USE OF BRUSH BARRIERS, DIVERSION SWALES, INTERCEPTOR DITCHES OR LOW BERMS.
FLOW SHOULD BE DIRECTED TOWARD AREAS WHERE SEDIMENTS CAN SUFFICIENTLY SETTLE
OUT.
10. STABILIZE EXPOSED SOILS AS SOON AS POSSIBLE, ESPECIALLY SLOPES LEADING TO
WETLANDS. STABILIZATION METHODS INCLUDE SOLID SOD, SEEDING AND MULCHING OR
HYDROMULCHING TO PROVIDE A TEMPORARY OR PERMANENT GRASS COVER MULCH
BLANKETS, FILTER FABRICS, ETC., CAN BE EMPLOYED TO PROVIDE VEGETATIVE COVER.
11. IMPLEMENT STORM DRAIN INLET PROTECTION (HAY BALES OR GRAVEL) TO LIMIT
SEDIMENTATION WITHIN THE STORMWATER SYSTEM. PERFORM INSPECTIONS AND PERIODIC
CLEARING OF SEDIMENTS THAT WASH OUT INTO THE STREETS UNTIL ALL SOIL IS STABILIZED.
12. RESTRICT WATER DISCHARGE VELOCITIES FROM IMPOUNDED AREAS AND TEMPORARY
SEDIMENTATION BASINS TO AVOID SCOURING IN RECEIVING AREAS.
13. VEHICLE OR EQUIPMENT WASHDOWN AND FUELING AREAS WILL BE SUFFICIENTLY REMOVED
FROM WETLANDS OR OFFSITE AREAS.
14. FUGITIVE DUST CONTROLS (PRIMARILY BY USING WATER SPRAY TRUCKS) SHALL BE
EMPLOYED AS NEEDED TO CONTROL WINDBORN EMISSIONS.
15. ONGOING INSPECTIONS AND PERIODIC MAINTENANCE BY THE CONTRACTOR SHALL OCCUR
THROUGHOUT CONSTRUCTION AS NECESSARY TO ENSURE THE ABOVE METHODS ARE
WORKING SUITABLY. THIS MAY BE NEEDED DAILY, IF CONDITIONS SO WARRANT. THE
CONTRACTOR IS ENCOURAGED TO OBTAIN AND THOROUGHLY REVIEW THE FLORIDA
DEVELOPMENT MANUAL: A GUIDE TO SOUND LAND AND WATER MANAGEMENT, WHICH WAS
DEVELOPED BY THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION IN
1988 AND PROVIDES DISCUSSIONS OF RECOMMENDED TECHNIQUES AND DESIGN AND
TECHNICAL STANDARDS.
16. THE CONTRACTOR WILL PERFORM DAILY INSPECTIONS OF ALL ON-SITE WETLANDS WITHIN THE
CONSTRUCTION AREA TO ENSURE THAT WATER LEVELS WITHIN THOSE WETLANDS ARE NOT
EXCESSIVELY IMPOUNDED PRIOR TO THE TIME WHEN THE PERMITTED CONTROL STRUCTURE
OR OUTFALL IS BUILT. WATER LEVELS SIGNIFICANTLY ABOVE NORMAL SHOULD BE
CORRECTED AT A FREQUENCY THAT PREVENTS A CHANGE IN THE VEGETATIVE CHARACTER
OR HEALTH OF ANY WETLANDS.
17. CONTRACTOR NEEDS TO FULLY COMPLY WITH THE U.S. ARMY CORPS OF ENGINEERS AND THE
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION "SEA TURTLE AND SMALLTOOTH
SAWFISH CONSTRUCTION CONDITIONS".
18. ADHERE TO FFWCC STANDARDS FOR MANATEE CONDITIONS AND SMALLTOOTH SAWFISH FOR
IN-WATER WORK.
GENERAL NOTES
1. ALL WORK MUST CONFORM TO THE REQUIREMENTS OF BOTH THESE PLANS AND THE PROJECT
SPECIFICATIONS. NOTES BELOW ARE NOT INTENDED TO REPLACE SPECIFICATIONS. SEE
SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO GENERAL NOTES, FOR ANY CONFLICTING
REQUIREMENTS BETWEEN DOCUMENTS, THE MOST STRINGENT REQUIREMENT WILL APPLY.
2. SITE VERIFICATION: PRIOR TO BEGINNING CONSTRUCTION, VERIFY THE SITE CONDITIONS AND NOTIFY THE CONTRACTING OFFICER IN WRITING OF ANY DISCREPANCIES IN DIMENSIONS OR SITE
CONDITIONS. DO NOT BEGIN CONSTRUCTION IN ANY SUCH AFFECTED AREA UNTIL THE
DISCREPANCY HAS BEEN RESOLVED BY THE CONTRACTOR AND APPROVED BY THE
CONTRACTING OFFICER.
3. ALL SAFETY REGULATIONS ARE TO BE STRICTLY FOLLOWED. METHODS OF DEMOLITION,
CONSTRUCTION, AND ERECTION OF STRUCTURAL MATERIAL ARE THE RESPONSIBILITY OF THE
CONTRACTOR.
4. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF EXISTING STRUCTURES AND FACILITIES
AND NEW WORK FROM DAMAGE AND/OR DISPLACEMENT. PROVIDE SHORING, BRACING AND FALSE
WORK AS NECESSARY TO PROTECT EXISTING AND NEW WORK FROM DAMAGE AND
DISPLACEMENT. CONTRACTOR MUST REPAIR ANY DAMAGE TO EXISTING AND NEW WORK TO THE
SATISFACTION OF THE CONTRACTING OFFICER AT HIS OWN EXPENSE.
5. PLACE CONSTRUCTION DEBRIS CONTROL DEVICES, BOOMS, TARPAULINS, FLOATS, STAGING, AND
OTHER DEVICES AS NECESSARY TO PREVENT CONSTRUCTION DEBRIS FROM ENTERING THE
WATER AND AIR BORNE MATERIALS FROM LEAVING THE IMMEDIATE VICINITY OF THE SITE. THE
CONTRACTOR IS RESPONSIBLE FOR CLEAN-UP OF ANY MATERIALS DEPOSITED OUTSIDE THE
WORK AREA OR IN THE WATER. IMMEDIATELY REMOVE ANY DEBRIS OR MATERIALS THAT ENTER
THE WATERWAY.
6. ABIDE BY ALL APPLICABLE LOCAL ENVIRONMENTAL PROTECTION STANDARDS, LAWS, AND
REGULATIONS.
7. ALL ELEVATIONS SHOWN REFER TO NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) IN
FEET.
8. THE FOLLOWING TIDAL DATUM RELATIONSHIP IS BASED ON NOAA STATION 8720587, ST.
AUGUSTINE BEACH FL,1983-2001 TIDAL EPOCH. COORDINATES REFERENCED TO PROJECT DATUM.
TIDAL INFORMATION AS FOLLOWS:
TIDAL DATA
MEAN HIGHER HIGH WATER (MHHW) +2.01' NAVD88
MEAN HIGH TIDE LINE (MHTL) +2.01' NAVD88
MEAN HIGH WATER (MHW) +1.64' NAVD88
NORTH AMERICAN VERTICAL DATUM 0.00' NAVD88
MEAN SEA LEVEL (MSL) -0.70' NAVD88
MEAN LOW WATER (MLW) -2.97' NAVD88
MEAN LOWER LOW WATER (MLLW) -3.13' NAVD88
9. HORIZONTAL CONTROL REFERENCED TO NORTH AMERICAN DATUM OF 1983, STATE PLANE
COORDINATE SYSTEM, FLORIDA EAST ZONE, IN FEET.
10. EXISTING SITE SURVEY DATA PREPARED BY SURVTECH SOLUTIONS, INC., COLLECTED FEBRUARY
2024. PROVIDE PRE-CONSTRUCTION TOPOGRAPHIC SURVEY PERFORMED BY A LICENSED
SURVEYOR PRIOR TO COMMENCING WORK.
11. EXISTING HYDROGRAPHIC SURVEY PREPARED BY SURVTECH SOLUTIONS, INC., COLLECTED
FEBRUARY 2024.
12. SOILS INFORMATION OBTAINED FROM THE GEOTECHNICAL REPORT PREPARED BY ANDERSON
ANDRE CONSULTING, INC., COLLECTED JUNE 2024.
13. BENTHIC SURVEY PERFORMED BY DIAL CORDY ENVIRONMENTAL CONSULTANTS, INC. DATED
MARCH 18, 2024.
15. DIMENSIONS AND CONSTRUCTION OF EXISTING SOUTH TRANSITION WALL DEVELOPED FROM
FDOT RECORD DRAWINGS "STATE JOB NO. 78010-3114-01-24" DECEMBER 1957.
16. REMOVE ALL BARGES, WORK BOATS, STAGING, AND OTHER TEMPORARY PLATFORMS AND/OR
AREAS IF NEEDED AT THE COMPLETION OF WORK.
17. CONSIDER AND PLAN FOR, ON A DAILY BASIS, THE EFFECT OF TIDAL FLUCTUATIONS IN THE
EXECUTION OF THE WORK.
18. THE PROJECT SITE IS LOCATED IN AN ACTIVE WATERWAY. CONSIDER AND PLAN FOR THE
EFFECTS OF PASSING VESSELS.
19. THERE IS A PLANNED SEAWALL REPLACEMENT PROJECT SPONSORED BY THE FLORIDA
DEPARTMENT OF TRANSPORTATION (FDOT) BY OTHERS AT THE SOUTHERN END OF THE PROJECT.
TIE-IN / COORDINATION DETAILS ARE SHOWN ON SM505.
1. PROPOSED COFFERDAMS ARE TEMPORARY ENCLOSURES, INSTALLED AT THE CONTRACTOR’S OPTION, TO KEEP EXCAVATIONS FREE FROM EARTH, AND WATER AND PERMIT THE WORK TO BE COMPLETED IN A DRY ENVIRONMENT AND PROTECT WORKERS. THE FOLLOWING NOTES ARE MINIMUM REQUIREMENTS
FOR COFFERDAM DESIGN, INSTALLATION, MAINTENANCE, AND REMOVAL.
2. THE ENCLOSED AREA DEPICTED IN THE CONTRACT PLANS IS THE AREA PERMITTED TO BE DEWATERED BY ENVIRONMENTAL AGENCIES BUT IS NOT EXPLICITLY REQUIRED BY THESE PLANS FOR COMPLETION OF THE WORK. ELEVATIONS MAY BE LOWER THAN THE PLANNED BOTTOM OF FOOTING EXCAVATION DUE
TO AN UNDERCUT.
3. NO INDIVIDUAL COFFERDAM MAY BE CLOSED TO NATURAL WATER FLOW FOR MORE THAN 120
CONSECUTIVE CALENDAR DAYS.
4. COFFERDAM PILING MUST BE STEEL IN SUFFICIENT CONDITION, SHAPES, AND GRADES TO WITHSTAND
THE ANTICIPATED LOADS FOR THE DURATION OF THE WORK.
5. CONSTRUCT COFFERDAMS TO KEEP AN EXCAVATION FREE FROM EARTH, WATER, ICE OR SNOW, AND TO
PERMIT EXCAVATION TO THE ELEVATIONS REQUIRED FOR WALL CONSTRUCTION. DESIGN AND
CONSTRUCT COFFERDAMS TO PREVENT FLOODING UNDER NORMAL WATER CONDITIONS EXPECTED
DURING THE COURSE OF CONSTRUCTION.
6. ENSURE THAT A PUMP OF ADEQUATE SIZE IS USED TO ENSURE THAT ANY WATER SEEPING IN WILL BE
REMOVED DURING FOUNDATION CONSTRUCTION. THE PLACEMENT OF FOUNDATION CONCRETE
SHOULD NOT BE IMPEDED BY WATER STANDING OR FLOWING WITHIN THE COFFERDAM.
7. WATER THAT IS PUMPED FROM THE COFFERDAM MUST BE TREATED WITH A SEDIMENT REMOVAL
SYSTEM BEFORE BEING RELEASED BACK TO THE BODY OF WATER AND SHALL NOT CONTRAVENE
WATER QUALITY STANDARDS.
8. CONCRETE LEACHATE OR WATER THAT HAS BEEN IN CONTACT WITH FRESH CONCRETE SHALL BE
PUMPED TO AN UPLAND AREA AND NOT ALLOWED TO RETURN TO THE WATERBODY.
9. PROVIDE SEALS/CONNECTIONS TO STRUCTURES TO REMAIN THAT WILL NOT DAMAGE EXISTING
FEATURES.
10. CONTRACTOR IS RESPONSIBLE FOR DESIGNING AND MAINTAINING THE PROPOSED DEWATERING
SYSTEM. SUBMIT A COMPREHENSIVE COFFERDAM WORK PLAN INCLUDING DRAWINGS, PROPOSED
EQUIPMENT/MATERIALS, DEWATERING PROCEDURES, AND ENVIRONMENTAL MONITORING PROTOCOL IN
COMPLIANCE WITH ALL PERMIT AND STATE, FEDERAL, AND LOCAL REGULATIONS
11. COFFERDAM WATER LEVEL MUST BE MAINTAINED AT LEAST 2 FEET BELOW THE EXCAVATION BOTTOM UNTIL DIGGING, GRAVITY WALL CONSTRUCTION, AND PLACEMENT AND COMPACTION OF FILL AND
BACKFILL SOILS HAS BEEN COMPLETED.
12. CLOSE OFF / SEAL COFFERDAM WORK AREA USING METHODS AND MATERIALS THAT WILL NOT DAMAGE
EXISTING HISTORIC STRUCTURES TO REMAIN.
13. DECOMMISSIONING OF DEWATERING SYSTEMS AND TEMPORARY COFFERDAMS MUST BE ADDRESSED IN
THE CONTRACTOR’S COFFERDAM WORK PLAN SUBMITTAL.
14. EXCAVATED SOILS MUST BE STOCKPILED TO PROMOTE POSITIVE DRAINAGE AND LIMIT WETTING OF THE
SOILS.
15. EXCAVATED MATERIALS SHOULD NOT BE STOCKPILED AT THE EDGE OF THE EXCAVATION WITHIN A
HORIZONTAL DISTANCE EQUAL TO THE EXCAVATION DEPTH.
16. THE COFFERDAM AND COFFERDAM REMOVAL DESIGN SUBMITTAL MUST BE DESIGNED AND SEALED BY A
LICENSED PROFESSIONAL ENGINEER IN THE STATE OF FLORIDA.
a. THE SUBMITTAL DESIGN MUST INCORPORATE THE FOLLOWING:
i. SPECIFIED TOP OF COFFERDAM.
ii. CALCULATIONS STATIC WATER PRESSURE.
iii. SHOP DRAWINGS INDICATION MATERIALS AND METHODS TO BE USED IN CONSTRUCTION AND
OPERATION OF THE COFFERDAM.
b. THE SUBMITTAL MUST CONFORM TO THE FOLLOWING:
i. RELEVANT PROVISIONS AND REQUIREMENTS OF GOVERNING PROJECT PERMITS.
ii. FEDERAL, STATE, AND LOCAL LAW AND SAFETY REGULATIONS.
iii. FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION.
COFFERDAM NOTES:
RSV/LRB
RAW
JJL
09/05/2025 080
GENERAL MARINE NOTES
(1 OF 2)GM001
ENVIRONMENTAL PERMITS
1. THE FOLLOWING PERMITS ARE ISSUED FOR THIS PROJECT AND SCOPE OF WORK:
a. UNITED STATES ARMY CORPS OF ENGINEERS (USACE) - XXXXX.
b. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) - XXXXX.
0.0 NAVD88
EXIST WATERSIDE
FACE OF WALL
EL+10.5'
MHTL EL +2.01'
MLW EL -2.97'
MUDLINE AT NORTH ENDCIP CONCRETE
CAP AND FASCIA
DRIVEN STEEL
SHEET PILE
3'-0" MIN
OFFSET
MHW EL +1.64'
BACKFILL TO
MATCH EXISTING
MANGROVE
BEDDING
ELEVATIONS
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 081
GENERAL MARINE
NOTES (2 OF 2)GM002
Ø o
ABBREVIATIONS
ACI = AMERICAN CONCRETE INSTITUTE
ABA = ARCHITECTURAL BARRIERS ACT
ADA = AMERICAN DISABILITIES ACT
AISC = AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
APPROX = APPROXIMATE
ASTM = AMERICAN SOCIETY FOR
TESTING MATERIALS
AWG = AMERICAN WIRE GAUGE
AWS = AMERICAN WELDING SOCIETY
BL = BASELINE
BLDG = BUILDING
BOC = BOTTOM OF CONCRETE
BOTT = BOTTOM
CIP = CAST IN PLACE
CJ = CONSTRUCTION JOINT
CF = CUBIC FEET
CL = CENTERLINE
CLIN = CONTRACT LINE ITEM NUMBER
CLR = CLEAR
CO = CONTRACTING OFFICER
COMMS = COMMUNICATIONS
CONC = CONCRETE
CONST = CONSTRUCTION
CONT = CONTINUOUS
CTS = CENTERS
CY = CUBIC YARDS
DBL = DOUBLE
DET = DETAIL
DISCONT = DISCONTINUOUS
E = EAST
EA = EACH
EF = EACH FACE
EL = ELEVATION
ELEV = ELEVATION
EQ = EQUAL
EW = EACH WAY
EXIST = EXISTING
EXP = EXPANSION
FDOT = FLORIDA DEPARTMENT OF
TRANSPORTATION
FEC = FIRE EXTINGUISHER CABINET
FFWC = FLORIDA FISH AND WILDLIFE
CONSERVATION COMMISSION
FRP = FIBER REINFORCED POLYMER
FT = FEET
GR = GRADE
GRND = GROUND
GVWR = GROSS VEHICLE WEIGHT RATING
HK = HOOK
HORIZ = HORIZONTAL
EXIST = EXISTING
INFO = INFORMATION
IE = INVERT ELEVATION
INV = INVERT ELEVATION
JT = JOINT
LB = POUND
LF = LINEAR FEET
LG = LONG
LT = LEFT
MAX = MAXIMUM
MH = MANHOLE
MHW = MEAN HIGH WATER
MHHW = MEAN HIGH HIGH WATER
MHTL = MEAN HIGH TIDE LINE
MIN = MINIMUM
MISC = MISCELLANEOUS
MLW = MEAN LOW WATER
MLLW = MEAN LOWER LOW WATER
MPH = MILES PER HOUR
MSL = MEAN SEA LEVEL
N = NORTH
NAVD = NORTH AMERICAN VERTICAL
DATUM
NIC = NOT IN CONTRACT
NTS = NOT TO SCALE
NO. = NUMBER
OC = ON CENTER
PDA = PILE DYNAMIC ANALYZE
PL = PLATE
PROP = PROPOSED
PSF = POUND PER SQUARE FOOT
PSI = POUND PER SQUARE INCH
QTY = QUANTITY
RCP = REINFORCED CONCRETE PIPE
REINF = REINFORCEMENT
REQ'D = REQUIRED
RT = RIGHT
S = SOUTH
SF = SQUARE FEET
SP = SOUTHERN PINE
SPA = SPACES
SPP = STEEL PIPE PILE
SSP = STEEL SHEET PILE
SQ = SQUARE
SS = STAINLESS STEEL
STA = STATION
STD = STANDARD
T = TON
TBR = TO BE REMOVED
TOC = TOP OF CONCRETE
TOS = TOP OF STEEL
TYP = TYPCIAL
U/G = UNDERGROUND
UON = UNLESS OTHERWISE NOTED
VERT = VERTICAL
W = WEST
WP = WORK POINT
W/ = WITH
WWF = WELDED WIRE FABRIC
= DIAMETER OR PHASE
= DEGREES
= SECONDS OR INCH
= MINUTES OR FEET
= ASTERISK
= SQUARE
= NUMBER OR POUNDS
= AND
= AT
LEGEND:
W
UE
U
FM
SS
SD
FO
UNDERGROUND
WATER LINE
UNDERGROUND
ELECTRIC LINE
UNDERGROUND
UNKNOWN UTILITY
SANITARY FORCE MAIN
SANITARY SEWER
STORM DRAIN SEWER
UNDERGROUND FIBER
OPTIC LINE
POST
SITE SIGN
STORM MANHOLE
SANITARY MANHOLE
STORM INLET
ELECTRIC UTILITY FEATURE
SANITARY SEWER JUNCTION BOX
UNKNOWN UTILITY FEATURE
x
PHOTO IDENTIFIER AND
DIRECTION
MEAN HIGH WATER LINE
TEMPORARY BENCHMARK
STANDARD PENETRATION BORING
TBM-#
B-#
MHW
x
SECTION CUT
VIEW NUMBER
SHEET NUMBER VIEW
REFERENCED TO
VIEW NUMBER
SHEET NUMBER VIEW
REFERENCED TO
LIVING SHORELINE CONSTRUCTION NOTES - MANGROVE PLANTINGS
1. CONTRACTOR TO PLANT 5 RED MANGROVES AND 30 BLACK MANGROVES WITHIN THE 8'
WATERSIDE OFFSET OF THE NORTH WALL IN ACCORDANCE WITH THE CONTRACTOR'S PLANTING
PLAN TO BE COORDINATED WITH AND APPROVED BY THE CO. PROPAGULES ARE TO BE
PREPARED, GERMINATED, POTTED, & INITIALLY HARDENED AT A DESIGNATED OFFSITE SEEDLING NURSERY. PROPAGULES ARE TO BE OF AT LEAST 12 MONTHS MATURITY AT TIME OF PLANTING.
2. PROPAGULES ARE TO BE TRANSPORTED USING APPROPRIATE METHODS OUTLINED BY THE
NURSERY, ENSURING THAT 1/3 OF THE TOTAL HYPOCTYL LENGTH IS ROOTED IN POTTING SOIL IN
AN APPROPRIATELY SIZED BAG.
3. ANY FILL/EXCAVATION OPERATIONS TO OBTAIN THE FINISHED GRADE ARE TO OCCUR PRIOR TO
MANGROVE TRANSPORT.
4. PLANTING SUBSTRATES SHALL BE CLEARED OF ANY DEBRIS PRIOR TO PLANTING. THIS MAY
INCLUDE CEARING AREAS OF BRUSH, REMOVING STANDING DEAD WOOD, OR ANYTHING THAT
MAY SHADE OUT AN AREA OF PLANTING.
5. PLANTING HOLES ARE TO BE PREPARED FOR EACH PROPAGULE PRIOR TO PLANTING. EACH
PREPARED PLANTING HOLE SHALL BE APPROXIMATELY 1.5X THE HEIGHT AND LENGTH OF THE
MANGROVE ROOTBALLS.
6. PROPAGULES ARE TO BE PLANTED SUCH THAT APPROXIMATELY 1/3 OF THE TOTAL LENGTH IS
DIRECTLY PLANTED INTO THE GROUND, THEN BACKFILLED WITH LOOSELY COMPACTED SOIL
SUCH THAT THE ROOT COLLAR IS AT POST-FILLED GROUND LEVEL.
7. PLANTING HOLE BACKFILL MATERIAL IS TO ONLY CONTAIN NATIVE SOIL AND SHALL NOT BE
IMPORTED.
8. FOR RED MANGROVES, PROPAGULES ARE TO BE SPACED AT LEAST 3.0' APART (MINIMUM).
9. FOR BLACK MANGROVES, PROPAGULES ARE TO BE SPACED AT LEAST 3.0' APART (MINIMUM).
10. LARGER PROPUGULE ROOTBALLS ARE TO BE PRIORITIZED AND PLANTED AT THE SEAWARD LIMIT
OF THE IMPACTED AREA. PLANTING IS TO BE CONDUCTED STARTING AT THE MOST SEAWARD
PORTION AND THEN MOVING INLAND.
11. EARLY MONTHS OF POST-PLANTING MAINTENANCE WILL INCLUDE DAILY SITE INSPECTIONS, DEBRIS REMOVAL, REMOVAL OF BARNACLES OR PESTS, AND/OR THE REPLACEMENT OF SICK /
DEAD MANGROVES.
GM002
SECTION - NORTH WALL
SCALE: 1/2" = 1'-0"
TO BE DEMOLISHED
TO BE EXCAVATED
SALVAGE FOR RE-USE
MATANZAS RIVER
CA
ST
IL
LO
D
RI
VE
(10)
(5)
(5)
(10)
(5)
(10)
U
U
U
U
U
U
U
U
U
U
U
U
UU
U
U
U
U
U U
U
U
U
U U
U U
U U
U U
U
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
UEUEUE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UEUE
UE
UE
UE
UEUE
UE
UE
U E
U E
U E
UE
UE
UE
UE
UE
U E
UE
U
E U
E
UE
U E
UE
SSSS
SSSS
SS
FM
FM
SS
FO
FO
8.0'
TEMPORARY STEEL
SHEET PILE
COFFERDAM AS
REQUIRED
TEMPORARY STEEL
SHEET PILE COFFERDAM
AS REQUIRED
EXISTING RIP RAP
BREAKWATER
TO REMAIN
TB
TB
TB TB
TB
TB
TURBIDITY BARRIER
SF
SF SF SF
SF
SILT FENCE
MHHW
MHHW
MHHW
MHHW MHHW
MHHW
M H
H W
M H
H W
M H
H W
MHHW
MHHW
MHHW
MHHW
MHHW
MHHW
MHHW
MHHW
MHHW
M
HHW
M
HHW
MHHW MHHW MHHW MHHW MHHW
MHHW
MHHW MHHW
8.0'
TB
TB
TB TB
TB
TB
TB
35 RED/BLACK
MANGROVES WITHIN
COFFERDAM
FOOTPRINT
71 SF EXISTING
SCATTERED
OYSTER CLUMPS
RELOCATE TO
RECIPIENT SITE
OYSTER RELOCATION RECIPIENT SITE
(EXISTING OYSTER HABITAT)
OUTSIDE COFFERDAM FOOTPRINT
TEMPORARY ACCESS
SCAFFOLDING
970 SF EXISTING SCATTERED
OYSTER CLUMPS
RELOCATE TO RECIPIENT SITE
DM301
WETLAND
BOUNDARY
200'-0" MAX (SEE NOTE 1)
TB
TB
TB
TB
TB
TB
TBM #1
TBM #2
TBM #3
1380 SF EXISTING
WETLANDS IN
PROJECT FOOTPRINT
450 SF EXISTING
WETLANDS IN
PROJECT FOOTPRINT
CONNECT COFFERDAM TO
PERMANENT SOUTH
TRANSITION WALL STEEL
SHEET PILE
'-0
'-0
MONITORING POINT
ON NPS FACE OF
PROPERTY WALL
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JLL
09/05/2025 082
ENVIRONMENTAL
CONTROL PLANGM102
40' 0' 40' 80'
SCALE: 1''=40'
NOTES:
1. MAXIMUM LENGTH OF SCAFFOLDING ALONG THE
CENTER SEAWALL AT ANY GIVEN TIME NOT TO
EXCEED 200 LINEAR FEET.
2. TURBIDITY CURTAINS MUST COMPLETELY
ENCIRCLE THE AREAS OF WORK IN OR
IMMEDIATELY ADJACENT TO TIDAL WATERS.
CONTRACTOR IS RESPONSIBLE MAINTENANCE,
LOCATION, AND ANCHORAGE OF CURTAINS.
3. NO INDIVIDUAL COFFERDAM MAY BE INSTALLED
FOR LONGER THAN 120 CALENDAR DAYS.
4. PERMANENTLY HAND RELOCATE OYSTER CLUMPS
TO RECIPIENT SITE ON NORTH SIDE OF PROPERTY.
RECIPIENT SITE SHOULD BE OUTSIDE COFFERDAM
FOOTPRINT.
LEGEND:
SILT FENCE
TURBIDITY BARRIER
MEAN HIGH HIGHER WATER LINE (MHHW)
EQUALS TO MEAN HIGH TIDE LINE (MHTL)
BREAKWATER BOUNDARY
WETLAND BOUNDARY
OYSTER RECIPIENT SITE
AREA OF EXISTING WETLANDS WITHIN
PROJECT FOOTPRINT
AREA OF EXISTING OYSTERS WITHIN
PROJECT FOOTPRINT
TEMPORARY IN WATER SCAFFOLDING
BOUNDARIES
VIBRATION MONITORING LOCATION
TEMPORARY STEEL SHEET PILE
COFFERDAM
TB
SF
MHHW
CA
ST
IL
LO
D
RI
VE
(10)
(5)
(5)
(10)
(5)
(10)
N O
R
TH
T R
AN
SI
TI
O
N
.9
SOUTH WALL
224.7'
U
U
U
U
U
U
U
U
U
U
U
U
UU
U
U
U
U
U U
U
U
U
U U
U U
U U
U U
U
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
UEUEUE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UEUE
UE
UE
UE
UEUE
UE
UE
U E
U E
U E
UE
UE
UE
UE
UE
U E
UE
U
E U
E
UE
U E
UE
SSSS
SSSS
SS
FM
FM
SS
FO
FO
RIP RAP
BREAKWATER
STONE STEPS
TB-1
TB-2
TB-3
TB-4 TB-5
MHW
MHW
MHW
MHW MHW
MHW
MHW
M H
W
M H
W MHW
MHW
MHW
MHW
M
HW
MHW
MHW
MHW
MHW
M
HW
M
HW
MHW MHW MHW
M H
W
MHW
MHW
MHW
MHW
PALM TREE
LIGHT
POLE
NORTH WALL
280.5'
C
EN
TE
R
W
AL
L
5.
7'
CENTER WALL216.8'
CEN
TE
R W
AL
L
.6
CENTER W
ALL
44.2'
CENTER WALL
212.3'
CENTER W
ALL
104.7' SOUTH TRANSITION
WALL
70.0'
(ALONG FACE
OF CAP)
PALM
TREE
CENTER WALL
TIMBER
WALKWAY
TBM #1
TBM #2
TBM #3
EXISTING 42"
OUTFALL
EXISTING ABANDONED
OUTFALL
EXISTING
LIFT STATION
ADJACENT
PROJECT
(BY OTHERS)
ELEV. 5.02
ELEV. 6.00
ELEV. 7.10
ELEV. 6.01
ELEV. 7.04
ELEV. 7.00
ELEV. 7.03
ELEV. 7.00
ELEV. 8.00
ELEV. 5.00
CONTROL POINT TABLE
POINT
TBM #1
TBM #2
TBM #3
NORTHING
2023225.87
2023113.66
2022903.88
EASTING
557533.03
557657.52
557623.32
ELEVATION
3.59
5.27
5.32
LEGEND:
W
UE
U
FM
SD
FO
UNDERGROUND
WATER LINE
UNDERGROUND
ELECTRIC LINE
UNDERGROUND
UNKNOWN UTILITY
SANITARY FORCE MAIN
STORM DRAIN SEWER
UNDERGROUND FIBER
OPTIC LINE
POST
SITE SIGN
STORM MANHOLE
SANITARY MANHOLE
STORM INLET
ELECTRIC UTILITY FEATURE
SANITARY SEWER JUNCTION BOX
UNKNOWN UTILITY FEATURE
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 083
EXISTING SEAWALL PLANVM101
40' 0' 40' 80'
SCALE: 1''=40'
VM101
OVERALL SITE PLAN
SCALE: 1" = 40'
NOTES:
1. BORING LOCATIONS ARE APPROXIMATE, REFER TO
BM601 AND BM602 FOR SOIL BORING PROFILES.
2. REFER TO G101 AND C001 THROUGH C004 FOR
EXISTING UPLAND CONDITIONS AND SITE ACCESS.
DM901
VM901
VM901
DM901
VM901 7
VM901
VM901
VM901
VM901 11/12
VM901
VM901
x
VM901
PHOTO IDENTIFIER AND
DIRECTION
TOPOGRAPHIC ELEVATION
CONTOUR
BATHYMETRIC ELEVATION
CONTOUR (NEGATIVE)
PROPERTY LINE
VM301
VM301
VM301
VM301
MEAN HIGH WATER LINE
TEMPORARY BENCHMARK
STANDARD PENETRATION BORING
TBM-#
TB-#
MHW
X
(X)
VM301
2'-6"
EL+6.0' APPROX
T/EXIST WALL
MHW EL +1.64'
4' -2
" M A
X2' -6
POURED IN PLACE
SMALL AGGREGATE
GROUT WITH SHELLS
EXIST GRADE
EXIST WATERSIDE
FACE OF WALL
EL UNKNOWN
B/EXIST WALL
EXIST
MUDLINE
MLW EL -2.97'
MHTL EL +2.01'
2'-10"
0.0 NAVD88
EL+8.0' APPROX
T/EXIST WALL
MHW EL +1.64'
7' -4
M
A X
STACKED COQUINA
EXIST GRADE
VARIES
EXIST WATERSIDE
FACE OF WALL
EL UNKNOWN
B/EXIST WALL
EXIST MUDLINE
MLW EL -2.97'
MHTL EL +2.01'
EXIST FILL
EXIST GRADE
EXIST STEP
EXIST SHELL
CONCRETE
TABBY MIX
WORN\ERODED
C
O U
R S
E S
C O
Q U
IN
A
C
O U
R S
E S
G R
A N
IT
E
EXIST CEMENT
PLASTER OVER
COQUINA BLOCK
EL VARIES
10' TO 10.5'
EL VARIES
6.33' TO 7.9'
DAMAGED / MISSING
CONCRETE TOPPING
AND CAP STONES
0.0 NAVD88
MHW EL +1.64'
MLW EL -2.97'
MHTL EL +2.01'
UNKNOWN FILL
0.0 NAVD88
EL+6.5' APPROX
T/EXIST WALL
MHW EL +1.64'
EXIST GRADE
VARIES
EXIST WATERSIDE
FACE OF CAP
TIP EL APPROX
-13.5'
EXIST MUDLINE
MLW EL -2.97'
PRECAST
SHEET PILE
2'-6" WIDE (TYP)
PRECAST CONCRETE
BEAM / TIE-BACK ANCHOR
GRANITE
CAP STONE
CONCRETE
CAP
3'-0"
9' -3
M
A X
SIDEWALK (TYP)
MHTL EL +2.01'
1' -0
1'
-6
1'-1" 10"
VARIES 0" TO 1'-1"
3'-0"
0.0 NAVD88
EL+5.5' APPROX
T/EXIST WALL
MHW EL +1.64'
7' -2
M
A X
STACKED COQUINA
EXIST GRADE
VARIES
EXIST WATERSIDE
FACE OF WALL
EL UNKNOWN
B/EXIST WALL
EXIST MUDLINE
MLW EL -2.97'
SIDEWALK (TYP)
MHTL EL +2.01'
1' -0
GRANITE CAP
STONE
STEPPED BACK
OF WALL, SEE 5
DM902
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JLL
09/05/2025 084
TYPICAL EXISTING
SEAWALL SECTIONSVM301
NOTES:
1. REFERENCE DATUM FOR ELEVATIONS IS
NAVD88.
2. MEAN HIGH HIGH WATER LINE (MHHW)
EQUALS TO MEAN HIGH TIDE LINE (MHTL)
VM101
TYPICAL SECTION - NORTH WALL
SCALE: 1/2" = 1'-0"
VM101
TYPICAL SECTION - NORTH TRANSITION WALL
SCALE: 1/2" = 1'-0"
VM101
TYPICAL SECTION - CENTER WALL
SCALE: 1/2" = 1'-0"
VM101
TYPICAL SECTION - SOUTH WALL
SCALE: 1/2" = 1'-0"
VM101
TYPICAL SECTION - SOUTH TRANSITION WALL
SCALE: 1/2" = 1'-0"
2' 0'-0'' 2' 4'
SCALE: 1/2"=1'-0''
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 085
EXISTING CONDITIONSVM901
VM101
PHOTO - NORTH WALL - LANDSIDE
SCALE: NTS
VM101
PHOTO - NORTH WALL - WATERSIDE
SCALE: NTS
VM101
PHOTO - NORTH TRANSITION - LANDSIDE
SCALE: NTS
VM101
PHOTO - NORTH TRANSITION - WATERSIDE
SCALE: NTS
VM101
PHOTO - CENTER WALL - LANDSIDE
SCALE: NTS
VM101
PHOTO - CENTER WALL - TOP SIDE
SCALE: NTS
VM101
PHOTO - CENTER WALL - WATERSIDE
SCALE: NTS
VM101
PHOTO - SOUTH WALL LANDSIDE
SCALE: NTS
VM101
PHOTO - SOUTH TRANSITION - WATERSIDE
SCALE: NTS
VM101
PHOTO - SOUTH WALL -WATERSIDE
SCALE: NTS
VM101
PHOTO - SOUTH TRANSITION - LANDSIDE
SCALE: NTS
VM101
PHOTO - SOUTH - SOUTH TRANSITION WALL INTERFACE
SCALE: NTS
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 086
BORING LOGS (1 OF 2)BM601
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JLL
09/05/2025 087
BORING LOGS (2 OF 2)BM602
(10)
(5)
(5)
(10)
(5)
(10)
MATANZAS RIVER
CA
ST
IL
LO
D
RI
VE
U
U
U
U
U
U
U
U
U
U
U
U
UU
U
U
U
U
U U
U
U
U
U U
U U
U U
U U
U
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
UEUEUE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UEUE
UE
UE
UE
UEUE
UE
UE
U E
U E
U E
UE
UE
UE
UE
UE
U E
UE
U
E U
E
UE
U E
UE
SSSS
SSSS
SS
FM
FM
SS
FO
FO
8.0'
8.0'
STEEL SHEET
PILE COFFERDAM
STEEL SHEET
PILE COFFERDAM
REMOVE CAMERA /
LIGHT POLE
REMOVE EXISTING
DRAIN AND PIPE
PRESERVE AND PROTECT
EXISTING DRAIN LINE
DEMOLISH NORTH
TRANSITION WALL
DEMOLISH
TIMBER WALKWAY
APPROX 450 SF
DEMOLISH SOUTH WALL
AND ADJACENT SIDEWALK,
REMOVE AND STORE GRANITE
CAP STONES FOR RE-USE
LOCATE AND CAP EXISTING
BURIED UTILITIES. REFER TO
CIVIL SHEETS FOR BYPASS DETAILS
DEMOLISH EXISTING
STEPS
DM301
DM301
DM301
DM301
REMOVE AND STORE EXISTING
GRANITE STEPS FOR RE-USE
REMOVE EXISTING
EDGE STONES
DM301
TBM #1
TBM #3
TBM #2
10.0'±
PULL FIRST 4
CONCRETE
SHEET PILES
PRESERVE AND PROTECT
ADJACENT PROPERTY WALL
D501
GRIND EXISTING
TABBY SURFACE
DM101
DEMOLISH
NORTH WALL
PRESERVE AND
PROTECT EXISTING
SITE WALLS
REMOVE AND STORE
GRANITE CAP STONES
FOR RE-USE
MAINTAIN PARKING LOT ACCESS
SEE G101 FOR SITE ACCESS
REQUIREMENTS AND RESTRICTIONS
PRESERVE AND PROTECT
EXISTING OUTFALL AND STORM
DRAIN THROUGH CONSTRUCTION
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 088
DEMOLITION PLANDM101
40' 0' 40' 80'
SCALE: 1''=40'
GENERAL DEMOLITION NOTES
1. INSTALL PROPOSED STEEL SHEET PILE PRIOR TO CONDUCTING WALL DEMOLITION FOR NORTH, NORTH TRANSITION, AND SOUTH WALLS TO SUPPORT IN-SITU SOIL REFER TO SM101 FOR
DETAILS.
2. TBM #1 WILL BE DISTURBED DURING THE COURSE OF CONSTRUCTION. ESTABLISH TEMPORARY
CONTROL AS REQUIRED TO COMPLETE THE WORK BASED ON PROVIDED CONTROL POINTS.
GM102
EXISTING SITE PLAN
SCALE: 1" = 40'
LEGEND:
UTILITY LINE DEMOLITION
TO BE DEMOLISHED
TO BE EXCAVATED
SALVAGE FOR RE-USE
DM101
PARTIAL PLAN - DEMOLITION OF EXISTING SITE WALL
SCALE: 1" = 5'
5' -0
3'-0"
NOTE
SITE RETAINING WALL FOOTING DEPTH IS UNKNOWN.
FOR BIDDING ASSUME STRUCTURE IS 5'-0" TALL.
REMOVE SIDEWALK
SEE CIVIL SHEETS
SAWCUT AND PARTIALLY
DEMOLISH EXISTING SITE
RETAINING WALL
ABANDON REMAINDER OF
RETAINING WALL IN PLACE
REMOVE EXISTING STEPS
OFF NORTH TRANSITION
WALL EXISTING COQUINA HANDLING
1. CONDUCT DEMOLITION OF THE EXISTING NORTH TRANSITION AND SOUTH WALLS USING
METHODS THAT WILL PRESERVE THE INTEGRITY OF EXISTING COQUINA STONES TO THE
GREATEST EXTENT PRACTICABLE.
2. PLACE ANY REMOVED COQUINA STONE OR FRAGMENT GREATER THAN 2'-0"x1'-0" x1'-0" IN
DIMENSION ASIDE FOR EVALUATION BY A GOVERNMENT REPRESENTATIVE. EVALUATION WILL
OCCUR THE SAME DAY AS STONE REMOVAL.
3. AT THE DIRECTION OF THE GOVERNMENT'S REPRESENTATIVE, TRANSPORT STONES DEEMED
SUITABLE FOR SALVAGE TO THE GOVERNMENT'S STOCKPILE ON THE NORTH SIDE OF THE
PROPERTY.
4. FOR BIDDING AND ESTIMATING, ASSUME 100% OF ALL MATERIAL WILL NEED TO BE LEGALLY
DISPOSED OFF-SITE. ASSUME 50% OF MATERIAL WILL NEED TO BE HANDLED AND
TRANSPORTED TO THE GOVERNMENT'S STOCKPILE LOCATION.
EL VARIES +5.0' TO +6.0'
T/EXIST WALL
MHW EL +1.64'
4' -2
2' -6
EXIST WATERSIDE
FACE OF WALL
EL UNKNOWN
B/EXIST WALL
EXIST
MUDLINE
MLW EL -2.97'
0.0 NAVD88
DEMOLISH
EXISTING WALL
TEMPORARY STEEL
SHEET PILE
COFFERDAM AS
REQUIRED
RESTORE
MUDLINE TO
ORIGINAL
GRADES AT
END OF
CONSTRUCTION
MHTL EL +2.01'
EXCAVATE, AS
REQUIRED FOR
EXISTING WALL
DEMOLITION
8'-0"
WORK AREA
PROPOSED STEEL
SHEET PILE, SEE
SHEET SM102
EXIST GRADE
EXIST STEP
TO REMAIN
EL VARIES
10' TO 10.5'
EL VARIES
6.33' TO 7.9'
REMOVE EXISTING
PORTLAND JOINTS
RAKE TO SOUND
MATERIAL
0.0 NAVD88
REMOVE EXISTING
EDGE STONES
EXIST FILL
DM901
DM901
MHW EL +1.64'
MLW EL -2.97'
MHTL EL +2.01'
ADJUSTABLE TEMPORARY
SCAFFOLDING / WORK
PLATFORM AS REQUIRED
BASE BLOCK
REMOVE TOP 3" OF
EXISTING TABBY
OR TO SOUND
UNDERLYING MATERIAL
REMOVE EXISTING EDGE
STONES/PLASTER
REMOVE TOP STONE
COURSE AND /OR
SAWCUT TO CREATE
HORIZONTAL SURFACE
AT EL. +7.5' MIN
C/SM103
B/SM103
A/SM103
DM902
SAWCUT EXISTING
WALL AT EL. +9.5'
RESTORE MUDLINE TO
ORIGINAL GRADES AT
END OF CONSTRUCTION
3'-0"
0.0 NAVD88
EL+5.5' APPROX
T/EXIST WALL
MHW EL +1.64'
7' -2
M
A X
DEMOLISH
SIDEWALK
EXIST WATERSIDE
FACE OF WALL
MLW EL -2.97'
1' -0
REMOVE AND
STORE CAP STONE
SEE DM601
MHTL EL +2.01'
EL UNKNOWN
B/EXIST WALL
8'-0"
WORK AREA
EXIST
MUDLINE
TEMPORARY STEEL
SHEET PILE
COFFERDAM AS
REQUIRED
RESTORE
MUDLINE TO
ORIGINAL
GRADES AT
END OF
CONSTRUCTION
EXCAVATE, AS
REQUIRED FOR
EXISTING WALL
DEMOLITION
PROPOSED STEEL
SHEET PILE, SEE
SHEET SM102
VARIES 3'-9" TO 7'-2"
DRIVE PROPOSED
SHEETS THROUGH
EXISTING WALL FACE AS
REQUIRED.
PRE-DRILLING IS
PERMITTED 5
DM902
0.0 NAVD88
EL+6.5' APPROX
T/EXIST WALL
MHW EL +1.64'
EXIST WATERSIDE
FACE OF CAP
EXIST MUDLINE
MLW EL -2.97'PRECAST
SHEET PILE
TO REMAIN
PRESERVE AND PROTECT
PRECAST CONCRETE
BEAM / TIE-BACK ANCHOR
PARTIALLY REMOVE
CONCRETE CAP
3'-0"
9' -3
M
A X
DEMOLISH
SIDEWALK
1' -0
REMOVE AND
STORE CAP STONE SEE DM601
4'-0"
MHTL EL +2.01'
TIP EL APPROX -13.5'
RESTORE MUDLINE
TO ORIGINAL GRADES
AT END OF CONSTRUCTION
VARIES 0" TO 1'-1"
6"
SAWCUT FLUSH WITH
FACE OF PANEL
2'-10"
EL+8.0' APPROX
T/EXIST WALL
7' -4
M
A X
EXIST WATERSIDE
FACE OF WALL
DEMOLISH
EXISTING WALL
MHW EL +1.64'
MLW EL -2.97'
0.0 NAVD88
MHTL EL +2.01'
EL UNKNOWN
B/EXIST WALL
8'-0"
WORK AREA
EXIST
MUDLINE
TEMPORARY STEEL
SHEET PILE
COFFERDAM AS
REQUIRED
RESTORE
MUDLINE TO
ORIGINAL
GRADES AT
END OF
CONSTRUCTION
EXCAVATE, AS
REQUIRED FOR
EXISTING WALL
DEMOLITION
PROPOSED STEEL
SHEET PILE, SEE
SHEET SM102
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 089
DEMOLITION SECTIONSDM301
DM101
DEMOLITION SECTION - NORTH WALL
SCALE: 1/2" = 1'-0"
DM101
DEMOLITION SECTION - CENTER WALL
SCALE: 1/2" = 1'-0"
DM101
DEMOLITION SECTION - NORTH TRANSITION WALL
SCALE: 1/2" = 1'-0"
DM101
DEMOLITION SECTION - SOUTH WALL
SCALE: 1/2" = 1'-0"
DM101
DEMOLITION SECTION - SOUTH TRANSITION WALL
SCALE: 1/2" = 1'-0"
2' 0'-0'' 2' 4'
SCALE: 1/2"=1'-0''
NOTE: FOR BIDDING, ASSUME FOUR
VERTICAL FEET OF EXCAVATION
NOTE: FOR BIDDING, ASSUME FOUR
VERTICAL FEET OF EXCAVATION
NOTE: FOR BIDDING, ASSUME FOUR
VERTICAL FEET OF EXCAVATION
NOTE: FOR BIDDING, ASSUME 6" OF
TABBY REMOVAL TO ACCOUNT FOR
UNSOUND CONDITIONS.
SD
SD
SD
SD
BACK FACE OF
EXISTING
CONCRETE PANEL
EXISTING GRANITE
CAP STONE (ST-18)
SEE DM601
3'-6"
BACK FACE OF EXISTING
SEAWALL CAP
PROJECT LIMIT
N:2022348.60 E:557628.40
CL 42" DRAINAGE PIPE
EXISTING GRANITE
CAP STONE (ST-17)
SEE DM601 5'
-9
1' -0
3'-0"
'-0
3' -6
1'
-8
SALVAGE
GRANITE CAP
PRECAST CONCRETE
SHEET PILING (10"X30")
10"
EXISTING
SIDEWALK
APPROXIMATE EXISTING
MUDLINE; RESTORE
DISTURBED MATERIAL
OUTBOARD OF HEADWALL
FACE AT THE END OF
CONSTRUCTION
2' -0
DEMOLISH
EXISTING CAP
1'-1"
CLEAR EXISTING
SEDIMENT AS REQUIRED
TO EXTEND HEADWALL
PRESSURE WASH FACE
OF EXISTING OUTFALL
PRIOR TO REBAR
INSTALLATION
PRECAST CONCRETE
SHEET PILING
8'-8"
DM501
N.I.C
BY OTHERS
PROJECT LIMIT
DEMOLISH EXISTING
CAP
SALVAGE EXISTING
GRANITE CAP STONES,
SEE DM601
2' -6
TEMPORARILY CLEAR EXISTING
SEDIMENT AS REQUIRED TO
EXTEND HEADWALL
APPROXIMATE EXISTING MUDLINE
RESTORE DISTURBED MATERIAL AT
THE END OF CONSTRUCTION
DM301
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 090
EXISTING OUTFALL
DEMOLITION DETAILSDM501
1' 0' 1' 2'
SCALE: 1''=1'
DM501
PLAN - 42" OUTFALL LOCATION
SCALE: 1" = 1'-0"
DM501
ELEVATION - 42" CONCRETE HEADWALL
SCALE: 3/8" = 1'-0"
DM501
SECTION - 42" CONCRETE HEADWALL
SCALE: 3/8" = 1'-0"
DM501
DM501
4'-0" 0'-0'' 2'-0" 4'-0"
SCALE: 3/8"=1'-0''
SW-34
SW-40
SAWCUT AT
EXISTING
JOINTS TO REMOVE
STONES (TYP)
REMOVE AND
SALVAGE (8)
GRANITE TREADS
STONES - 48"x10"X10"
REMOVE AND
SALVAGE GRANITE
LANDING
REMOVE COQUINA
BLOCKS. SEE NOTE 6
REMOVE PLASTER
FROM STONES
REMOVE AND
DISPOSE EXISTING
MORTAR /PLASTER
JOINTS
SAWCUT EXISTING
JOINTS TO REMOVE
STONES (TYP)
ST-17 ST-18
PR
O
JE
C
T
LI
M
IT
EXISTING WALL
CONCRETE CAP
SAWCUT
EXISTING JOINTS
TO REMOVE
STONES (TYP)
BY OTHERS
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 091
GRANITE STONE
SALVAGEDM601
DM601
PHOTO - STONE SALVAGE - SOUTH WALL STEPS
SCALE: NTS
NOTES:
1. SALVAGE ALL GRANITE STONES ON THE SOUTH WALL,
STEPS, AND SOUTH TRANSITION WALL UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING
OFFICER. SET ALL STONES IN THEIR ORIGINAL PLAN
LOCATION ALONG THE WALL IN THE FINISHED WORK.
2. CAP STONES ARE NOMINALLY 36" WIDE BY 12" TALL.
3. TABLE DIMENSIONS ARE ACCURATE +/- ONE INCH.
FIELD VERIFY ALL STONE DIMENSIONS PRIOR TO
REMOVING.
4. CONDUCT DEMOLITION TO PRESERVE INTEGRITY AND
SHAPE OF EXISTING CAP STONES. REMOVE PLASTER
JOINTS AND PLASTER ADHERED TO EACH STONE.
5. REMOVE, TAG FOR IDENTIFICATION, AND SECURELY
STORE STONES DURING WALL CONSTRUCTION UNTIL
RE-INSTALLATION.
6. SW-1 CONTAINS A HISTORIC MASONRY MARKER AND
MUST BE SET AS THE FIRST STONE AT THE NORTH SIDE
OF THE SOUTH WALL, SEE DM902.
7. SHOULD A SW CAP STONE BE DAMAGED/BROKEN
DURING CONSTRUCTION, TAKE AN EXISTING CAP
STONE OF SIMILAR OR EQUAL SIZE FROM THE SOUTH
TRANSITION WALL (ST) AND USE IN ITS PLACE. PROVIDE
A NEW REPLACEMENT CAP STONE FOR THE ST.
DM601
PHOTO - STONE SALVAGE - SOUTH WALL
SCALE: NTS
DM601
PHOTO - STONE SALVAGE - SOUTH TRANSITION WALL
SCALE: NTS
SOUTH WALL CAP SALVAGE TABLE
ID
LENGTH
(IN) NOTE ID
LENGTH
(IN) NOTE
SW-1 59 PRESERVE HISTORIC
MARKER SW-27 39
SW-2 76 SW-28 63.5
SW-3 50.5 SW-29 41
SW-4 56.5 SW-30 57.5
SW-5 75.5 SW-31 53.5
SW-6 75 SW-32 73.5
SW-7 52 SW-33 78.5
SW-8 52 SW-34 111 NORTH OF STAIRS
SW-9 53.5 SW-35 43 STAIRS
SW-10 63.5 SW-36 37.5 STAIRS
SW-11 62.5 SW-37 50 STAIRS
SW-12 53.5 SW-38 65 STAIRS
SW-13 49 SW-39 34 STAIRS
SW-14 34 SW-40 43 STAIRS
SW-15 35.5 SW-41 67.5
SW-16 36.5 SW-42 37.5
SW-17 34.5 SW-43 34.5
SW-18 35 SW-44 53
SW-19 50 SW-45 54.5
SW-20 50 SW-46 36
SW-21 38.5 SW-47 36.5
SW-22 49.5 SW-48 30.5
SW-23 57.5 SW-49 57.5
SW-24 42 SW-50 34
SW-25 47.5 SW-51 41
SW-26 42 SW-52 59.5
SW-27 50.5 SW-53 46
SOUTH TRANSITION SALVAGE TABLE
ID LENGTH (IN) NOTE
ST-1 52.5
ST-2 50.5
ST-3 50.5
ST-4 36
ST-5 58
ST-6 43
ST-7 41
ST-8 46.5
ST-9 44.5
ST-10 44
ST-11 36
ST-12 38.5
ST-13 46.5
ST-14 38.5
ST-15 37
ST-16 49.5 OUTFALL
ST-17 49.5 OUTFALL
ST-18 46 OUTFALL
SOUTH STEPS SALVAGE TABLE
L (IN) W (IN) H (IN) QTY NOTE
48 10 10 8 TREAD
58 48 12 1 LANDING
CONDUCT DEMOLITION
OPERATIONS IN A MANNER THAT
WILL NOT DAMAGE OR
ADVERSELY AFFECT THE
CONDITION OR STABILITY OF THE
CENTER WALL
CENTER WALL
CENTER WALL
CONDUCT DEMOLITION OPERATIONS IN
A MANNER THAT WILL NOT DAMAGE OR
ADVERSELY AFFECT THE CONDITION
OR STABILITY OF THE CENTER WALL
REMOVE MORTAR OVERSPREAD
AND EXISTING PORTLAND JOINTS
REMOVE AND STORE
CAP STONES FOR
RE-USE (TYP)
REMOVE AND STORE
CAP STONES FOR
RE-USE (TYP)
DEMOLISH CAP AND
PLASTER FACING
EXTRACT FIRST
4 EXISTING
CONCRETE
SHEET PILE
SAWCUT WALL TO EL. +9.5'
(MIN) OR TO COMPETENT
MATERIAL
DEMOLISH EXISTING
TIMBER WALKWAY
SAWCUT CAP
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JLL
09/05/2025 092
DEMOLITION DETAILS (1
OF 2)DM901
DM901
PHOTO - NORTH TRANSITION WALL
SCALE: NTS
DM901
PHOTO - NORTH TRANSITION WALL
SCALE: NTS
DM901
PHOTO - CENTER WALL - WATERSIDE
SCALE: NTS
DM901
PHOTO - CENTER WALL - LANDSIDE
SCALE: NTS
DM901
PHOTO - SOUTH AND SOUTH TRANSITION WALL
SCALE: NTS
REMOVALS
DM101
PHOTO - SOUTH-SOUTH TRANSITION WALL INTERFACE
SCALE: NTS
NOTE:
FOR BIDDING PURPOSES, ASSUME ONE VERTICAL FOOT OF
MATERIAL REMOVAL.
NOTES:
1. REMOVE JOINT MATERIAL TO A DEPTH EQUAL TO THE
GREATER OF 1/2" OR 2 TIMES THE JOINT WIDTH.
2. CONDUCT REMOVALS USING METHODS THAT WILL NOT
DAMAGE EXISTING BLOCKS TO REMAIN
LEGEND:
CENTER WALL
SW-1
SW-2
SAWCUT AND REMOVE
EXISTING STEPS
REMOVE AND DISPOSE
EXISTING SIDEWALK
SEE CIVIL SHEETS
PRESERVE AND
PROTECT LOWER TWO
COURSES OF COQUINA
REMOVE TOP EDGE
COURSE OF COQUINA SEE
GRIND EXISTING
TABBY SEE
DM301
DM301
SEE 3
DM301
GRIND EXISTING
TABBY SEE
DM301
PRESERVE AND
PROTECT LOWER TWO
COURSES OF COQUINA
REMOVE EXISTING
CAP STONE LAYER
AND PLASTER
GRIND EXISTING
TABBY
REMOVE LOOSE,
DAMAGED TABBY TO
SOUND, UNIFORM
SUBSTRATE OR MIN.
DEPTH REQUIRED FOR
REPAIR, WHICHEVER IS
GREATER
REMOVE CHIPPED,
LOOSE, AND UNSOUND
MATERIAL
STEPPED BACK OF
SOUTH WALL
CORE / PRE-DRILL
AS NEEDED FOR
SHEET PILE
INSTALLATION
HISTORIC MASONRY
MARKER
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JLL
09/05/2025 093
DEMOLITION DETAILS (2
OF 2)DM902
DM902
PHOTO - CENTER WALL DEMOLITION
SCALE: NTS
REMOVALS
DM902
PHOTO - CENTER WALL DEMOLITION
SCALE: NTS
DM902
PHOTO - CENTER WALL DEMOLITION
SCALE: NTS
DM902
PHOTO - CENTER WALL DEMOLITION AT STA 1+1.57
SCALE: NTS
DM902
PHOTO - EXPOSED REAR SIDE OF SOUTH WALL
SCALE: NTS
NOTE:
PHOTO PROVIDED BY NPS FROM
PRIOR TEST PIT PROJECT
DESIGNED: SUB SHEET NO. DRAWING NO..
PMIS/PKG NO.
SHEET
OF
TITLE OF
SHEET
189856
324271
CASTILLO DE SAN MARCOS NATIONAL MONUMENT
PRIME:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
STRUCTURAL
MH STRUCTURES
POWDER SPRINGS, GA
LANDSCAPE
CATALYST DESIGN
GROUP
WINTER PARK, FL
COASTAL
MOFFATT & NICHOL, INC
MIAMI, FL
A/E FIRM
RVS/LRB
RAW
JJL
09/05/2025 094
STRUCTURAL NOTES
(1 OF 2)SM001
GENERAL DESIGN CRITERIA
1. ALL ELEVATIONS REFER TO NORTH AMERICAN VERTICAL DATUM (NAVD) OF 1988.
2. MINIMUM WALL STRUCTURE SERVICE DESIGN LIFE OF 50 YEARS.
DESIGN LOADS
1. GRAVITY LOADS
A. 100 PSF UNIFORM LIVE LOAD BEHIND BULKHEAD, BULKHEAD HAS NOT BEEN DESIGNED
FOR CONSTRUCTION EQUIPMENT LOADS IN EXCESS OF 100 PSF.
B. 60 PSF UNIFORM LIVE LOAD ON WOOD WALKWAYS.
2. WIND LOADS
A. DESIGN BASED ON ASCE 7-22 (3 SECOND GUST)
a. 135 MPH FOR EXPOSED PORTIONS OF WALLS
b. 77 MPH FOR WOOD WALKWAYS (10-YEAR MRI)
c. RISK CATEGORY II (WALLS), I (WOOD WALKWAY)
d. EXPOSURE D
3. LATERAL EARTH PRESSURE ON BULKHEAD WALL FROM UNIFORM LIVE LOAD AND SOIL BEHIND
THE WALL.
CONCRETE AND REINFORCING STEEL
1. ALL DETAILING, FABRICATION, AND ERECTION OF REINFORCING STEEL MUST CONFORM TO THE LATEST EDITION OF THE "ACI MANUAL OF CONCRETE PRACTICE" INCLUDING BUT NOT LIMITED TO: ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE" AND ACI SP-66 "ACI DETAILING
MANUAL".
2. ALL REINFORCING BAR SPLICES ARE CLASS "B" TENSION LAP SPLICES IN ACCORDANCE WITH ACI
318-19, CHAPTER 12, UNLESS OTHERWISE NOTED.
3. PROVIDE CEMENT CONFORMING TO ASTM C150, TYPE II FOR EXTREMELY AGGRESSIVE
ENVIRONMENT WITH SLAG OR FLY ASH. MAXIMUM W/C RATIO FOR MARINE CONCRETE IS 0.40
4. ALL CAST-IN-PLACE CONCRETE IS NORMAL WEIGHT CONCRETE (145± PCF) UNLESS OTHERWISE
NOTED.
5. MINIMUM CONCRETE COVER FOR STEEL REINFORCEMENT IS 3", UNLESS OTHERWISE NOTED ON
THE DRAWINGS.
6. CONCRETE MUST CONTAIN CORROSION INHIBITING ADMIXTURE EUCON CIA OR APPROVED
EQUAL.
7. COURSE AGGREGATES MUST CONFORM TO ASTM C33, NO 57.
8. PROVIDE 3/4", 45° CHAMFER ON ALL EXPOSED EXTERNAL CORNERS OF CONCRETE, UNLESS
OTHERWISE NOTED ON THE DRAWINGS.
9. ALL JOINTS BETWEEN CAST-IN-PLACE CONCRETE AND HARDENED CONCRETE SHALL BE
CLEANED AND ROUGHENED TO A 1/4" AMPLITUDE AND COATED WITH AN EPOXY BONDING
COMPOUND IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, UNLESS
OTHERWISE NOTED.
10. CONCRETE MATERIALS MUST CONFORM TO THE FOLLOWING MINIMUM COMPRESSIVE STRENGTH
UNLESS OTHERWISE NOTED:
A. CAST-IN-PLACE CONCRETE: 5500 PSI @ 28 DAYS
B. CEMENTITIOUS GROUT: 8000 PSI @ 28 DAYS
C. COQUINA CONCRETE: 1000 PSI @ 28 DAYS
11. CONCRETE REINFORCING MATERIALS MUST CONFORM TO THE FOLLOWING, UNLESS OTHERWISE
NOTED:
A. REINFORCEMENT AND DOWELS FOR CONCRETE: ASTM A 615, GR 60
B. REINFORCEMENT TO BE WELDED: ASTM A 706, GR 60
C. STAINLESS STEEL REINFORCEMENT: ASTM A 955, GR 60
D. FIBER REINFORCED POLYMER (FRP) REINFORCEMENT: ASTM D 8505
12. NO MORE THAN 50% OF LAP SPLICES SHALL BE AT THE SAME LOCATION, STAGGER SPLICES.
13. TOP BAR LAP SPLICES SHALL NOT BE AT SUPPORT LOCATIONS.
14. BOTTOM BAR LAP SPLICES SHALL NOT BE AT THE CENTERLINE OF THE SPAN.
15. ALL DOWEL HOOKS AND BENDS MUST CONFORM TO THE LATEST EDITION OF THE "ACI MANUAL
OF CONCRETE PRACTICE" INCLUDING BUT NOT LIMITED TO ACI 301 "SPECIFICATIONS FOR
STRUCTURAL CONCRETE AND ACI 318-19" BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE.
16. ALL UNFORMED CONCRETE SURFACES MUST BE GIVEN A WOOD FLOAT FINISH UNLESS
OTHERWISE SPECIFIED. ALL EXPOSED CONCRETE WALKING SURFACES SHALL HAVE LIGHT
BROOM FINISH UNLESS OTHERWISE SPECIFIED.
17. REPAIR ALL SURFACE BLEMISHES IN CONCRETE WITHIN 24 HOURS AFTER FORM REMOVAL.
18. PROVIDE CONSTRUCTION JOINTS IN THE BULKHEAD CAP AT 30' O.C. CONTINUOUS CONCRETE
POUR LENGTH MUST NOT EXCEED 30'.
19. DO NOT PLACE FRESH CONCRETE AGAINST HARDENED CONCRETE THAT IS LESS THAN 7 DAYS
OLD.
20. METAL CHAIRS ARE PROHIBITED. DO NOT PERMIT METAL TIES OR OTHER METALLIC MATERIAL TO
PROTRUDE FROM THE SURFACE OF THE CONCRETE.
21. CURE CONCRETE USING CONTINUOUS MOISTURE AND/OR MEMBRANE CURING COMPOUND(S) IN
ACCORDANCE WITH PROJECT SPECIFICATIONS.
22. PROVIDE NON-SHRINK GROUT IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
23. PROVIDE MECHANICAL REINFORCING BAR CONNECTORS WITH A MINIMUM 125% YIELD
STRENGTH OF THE REINFORCING BAR.
PERMANENT STEEL SHEET PILE (SSP)
1. STEEL USED FOR THE WALL SYSTEM MUST BE HEAVY GAUGE HOT-ROLLED SECTION WITH FULL INTERLOCKING SHEETS CONFORMING TO ASTM A572, GRADE 60 (FY=60 KSI) WITH A MINIMUM 3/8"
THICKNESS UNLESS OTHERWISE NOTED.
2. STEEL SHEET PILES MUST BE SANDBLASTED TO A NEAR WHITE FINISH (SSPC SP10) PRIOR TO
COATING.
3. COAT STEEL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ADDED PRECAUTIONS MUST BE TAKEN TO MINIMIZE DAMAGE TO THE PILE COATING SYSTEM DURING HANDLING AND DRIVING.
REPAIRS TO THE PILE COATING SYSTEM MUST BE MADE AS SOON AS POSSIBLE AFTER THE
DAMAGE OCCURS. SUBMIT REPAIR METHODS FOR REVIEW AND PRE-APPROVAL TO MINIMIZE
SITE DELAYS.
4. COATING MUST EXTEND FROM 1-FT ABOVE THE BOTTOM ELEVATION OF THE BULKHEAD CAP
FASCIA TO 5-FT BELOW MUDLINE. COATING IS ONLY REQUIRED ON WATERSIDE FACE OF SSP
WALL ELEMENTS.
5. STEEL SHEET PILE ELEMENTS OF THE WALL SYSTEM MUST BE DRIVEN TO THE MINIMUM TIP
ELEVATION INDICATED USING A HAMMER OF AN APPROVED TYPE, WITH A CAPACITY AT LEAST
EQUAL TO THE HAMMER MANUFACTURER'S RECOMMENDATION FOR THE TOTAL WEIGHT OF THE
PILING SYSTEM AND CHARACTERISTICS OF SUBSURFACE MATERIAL TO BE ENCOUNTERED.
6. ALL PILES SHALL BE DRIVEN TO REQUIRED CAPACITY BASED ON DRIVING CRITERIA ESTABLISHED BY THE TEST PILE PROGRAM, BUT UNDER NO CIRCUMSTANCES SHALL THE PILE TIP ELEVATION
BE HIGHER THAN THE MINIMUM EMBEDMENT DEPTH INDICATED. IMMEDIATELY NOTIFY THE
ENGINEER OF ANY PILES THAT DO NOT REACH THE REQUIRED PILE TIP ELEVATION.
7. VERIFY COORDINATES & GEOMETRY PRIOR TO DRIVING STEEL PILES FOR THE WALL SYSTEM.
8. PROVIDE LAYOUT OF PILING INCLUDING STEEL SHEETS, AND CONNECTORS ENSURING BEST FIT
TO DESIGN ALIGNMENTS TO ENGINEER FOR REVIEW.
9. PILE DRIVING TOLERANCES:
a. TOP OF PILE AT CUTOFF ELEVATION MUST BE WITHIN 3’’ HORIZONTALLY AND"VERTICALLY
OF PLAN LOCATION. MANIPULATION OF PILES TO FORCE THEM INTO POSITION IS NOT
PERMITTED.
b. PLACE PILES PLUMB WITH OUT-OF PLUMBNESS NOT EXCEEDING 1/8” PER FOOT OF LENGTH
AND TRUE TO LINE.
c. CHECK ALL PILE FOR HEAVE. RE-DRIVE ALL HEAVED PILES TO THE TIP ELEVATION
INDICATED.
13. JETTING IS PROHIBITED.
14. COORDINATE PILE DRIVING SCHEDULE SO AS NOT TO INTERFERE WITH OR BE DETRIMENTAL TO
THE CONCRETE PLACEMENT AND CURING.
15. SUBMIT PROPOSED CONSTRUCTION SEQUENCING PLAN DETAILING, INSTALLATION TECHNIQUES, QUALITY CONTROL, EQUIPMENT AND BULKHEAD CONSTRUCTION PHASING TO THE ENGINEER
FOR REVIEW PRIOR TO INITIATING CONSTRUCTION.
16. MAINTAIN PILE DRIVING LOGS FOR ALL PILES.
17. SUBMIT PILE HAMMER DATA FOR REVIEW BY THE ENGINEER.
18. DUE TO POTENTIAL UNFORSEEN EXISTING WALL FOUNDATIONS, HAVE EQUIPMENT AND BE
PREPARED TO PREDRILL DRIVE-LINE PER PROPOSED ALIGNMENT. NOTIFY CONTRACTING
OFFICER AND ENGINEER IF OBSTRUCTIONS ARE ENCOUNTERED.
STRUCTURAL AND MISCELLANEOUS STEEL
1. ALL STEEL WORK MUST BE PERFORMED IN ACCORDANCE WITH THE AISC CODE OF STANDARD
PRACTICE FOR STEEL BUILDINGS AND BRIDGES (AISC 360) AND PROJECT SPECIFICATIONS.
2. ALL STRUCTURAL STEEL SHAPES, PLATES, BARS, FABRICATIONS, BOLTS AND ALL HARDWARE
EXCEPT STAINLESS STEEL MUST BE ZINC-COATED OR GALVANIZED BY THE HOT-DIPPED
PROCESS IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A123 AND/OR A153 AS
APPLICABLE, AFTER FABRICATION, UNLESS OTHERWISE NOTED.
3. FIELD TREAT DAMAGED GALVANIZED FINISH WITH TWO COATS OF HIGH ZINC DUST OXIDE PAINT, COLD GALVANIZING COMPOUNDS, OR APPROVED EQUAL CONFORMING TO THE REQUIREMENTS
OF ASTM A780. IN ADDITION, ALL EXPOSED THREADED SURFACES MUST BE PAINTED WITH TWO
COATS OF HIGH-ZINC-DUST OXIDE PAINT AFTER INSTALLATION OF NUT.
4. INSTALL ADHESIVE ANCHORS IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
5. INSTALL ANCHOR BOLTS IN ACCORDANCE WITH PROJECT SPECIFICATIONS.
6. PERFORM PULL OUT TESTS ON 10% OF EACH TYPE OF ANCHOR. TEST ANCHORS TO 125% OF THE
CAPACITY OF THE ANCHOR IN TENSION.
STEEL MATERIALS:
1. STEEL SHEET PILING ASTM A572, GRADE 60
2. PLATES, BARS, FABRICATIONS, HARDWARE ASTM A572, GRADE 50, UON
3. FASTENERS ASME/ANSI B18.2.2 & ASTM F3125-ASTM A325
4. THREADED ANCHOR BOLTS ASTM F1554 GR 105, HDG, UON
5. WELDED STUDS ASTM A108
6. BOLTS ASTM A325
7. NUTS ASTM A363
8. WASHERS ASTM F436
9. LADDER RUNGS, HANDRAILS, AND
CONNECTIONS ASTM A276 TYPE 316
10. LADDER SYSTEMS ANCHOR BOLTS ASTM F593 TYPE 316
WELDING
1. UNDERWATER WELDING MUST BE IN ACCORDANCE WITH AWS D3.6.
2. STRUCTURAL WELDING MUST BE PERFORMED BY AWS CERTIFIED WELDERS.
3. WELDS MUST BE VISUALLY INSPECTED BY AWS CERTIFIED WELDING INSPECTORS.
4. WELDED CONNECTIONS MUST BE PRE-QUALIFIED IN ACCORDANCE WITH AWS D1.1 AND MADE
USING THE SHIELDED METAL ARC PROCESS (OR ENGINEER APPROVED EQUAL) WITH
ELECTRODES CONFORMING TO E70XX.
5. WELDING OF STAINLESS STEEL MATERIALS MUST BE PRE-QUALIFIED IN ACCORDANCE WITH D1.6
BACKFILL AND PLACEMENT PROCEDURES
1. UPLAND GRANULAR FILL MUST BE PLACED IN UNIFORM LAYERS NOT EXCEEDING 12 INCHES IN
LOOSE THICKNESS.
2. EACH LAYER MUST BE COMPACTED TO A DRY DENSITY NOT LESS THAN 95 PERCENT OF ITS
MODIFIED PROCTOR (ASTM D1557) MAXIMUM VALUE.
3. CONTRACTOR MUST SUBMIT A BULKHEAD CONSTRUCTION SEQUENCING PLAN DETAILING THE
INTENDED ORDER OF CONSTRUCTION. THE PLAN MUST BE SUBMITTED PRIOR TO COMMENCING
PILE DRIVING.
4. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARILY BRACING AND SUPPORTING ALL
STRUCTURAL COMPONENTS DURING BACKFILLING AND CONSTRUCTION OPERATIONS.
5. MATERIAL MUST CONTAIN LESS THAN 10% BY WEIGHT MATERIAL PASSING THE U.S. STANDARD
SIEVE NO. 200.
6. MATERIAL MUST HAVE NO PARTICLE LARGER THAN 3 INCHES IN DIAMETER IN ALL DIRECTIONS.
7. MATERIAL MUST BE FREE OF CLAY LUMPS AND OTHER DELETERIOUS MATERIALS.
WOOD CONSTRUCTION
1. ALL WOOD CONSTRUCTION MUST CONFORM TO THE RECOMMENDATIONS OF THE AMERICAN
WOOD COUNCIL.
2. WOOD MATERIALS MUST BE TREATED IN ACCORDANCE WITH AWPA P5 FOR WOOD IN
SALTWATER IMMERSION,PRESERVATIVE RETENTION MUST BE 2.50 PCF, UNLESS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .