This document is a technical design drawing for a Lift Station Plan and Elevation, specifically for the Castillo de San Marcos National Monument project. The lift station includes two electric motor grinder pumps, each with a 50-gallon per minute capacity, operating at 3,450 RPM with 2-horse power motors. The design specifies detailed requirements for pump control, including alternating pump operation, a control panel location, and specific control levels. The station features a reinforced concrete pad designed to overcome buoyancy forces with consideration for seasonal high groundwater depths. The technical drawing (Sheet C601) provides comprehensive plan and elevation views, a material list, and a pumping equipment schedule, with key components including submersible grinder pumps, PVC piping, valves, guide rails, and various mounting and connection hardware. The drawing is digitally signed and dated 9/5/2025, indicating it is a current or near-future infrastructure project specification.

View the file

Other files

File Type Posted
Sol_140P2026R0016_Amd_0005.pdf PDF
B09_-_CASA_324271_Updated__Consolidated_RFIs_as_of_1-21-26_0005.xlsx XLSX spreadsheet
B09_-_CASA_324271_-_Revision_1__2026-01-07_0004.pdf PDF
B09_-_10_45_00-RIB-Pedestrian_Control_Devices-Jan-8-2026_0004.pdf PDF
Sol_140P2026R0016_Amd_0004.pdf PDF
B09_-_CASA324271_Final_Construction_Drawings_-_Signed_GM001_0004.pdf PDF
B09_-_CASA_324271_-_Consolidated_RFIs_as_of_1-8-26_0004.xlsx XLSX spreadsheet
Sol_140P2026R0016_Amd_0003.pdf PDF
B09_-_Sign-in_Sheet_for_Site_visit_0003.pdf PDF
B09_-_CASA_324271_-_Drawings_-_Revision_1__2025-12-22_0003.pdf PDF
B09_-_RFIs_for_CASA_324271_-_With_Responses_12-22-2025_0003.pdf PDF
Sol_140P2026R0016_Amd_0002.pdf PDF
B08_-_Attachment_13_-_CASA_324271_STRUCT_drawings_0002.pdf PDF
Sol_140P2026R0016_Amd_0001.pdf PDF
B08_-_Attachment_02_-_NPS_CASA_324271_Seawall_DD_CD_-_Final_CDs_-_ARCH_-_stamped.pdf PDF
B08_-_Attachment_11_-_Vol_II_-_GenRefs_doc.pdf PDF
B08_-_Attachment_06_-_NPS_CASA_324271_Seawall_DD_CD_-_Final_CDs_-_MECH_-_stamped.pdf PDF
B08_-_Attachment_01_-_CASA_324271_Project_Specifications.pdf PDF
B08_-_Attachment_10_-_Vol_I_PastPerf.docx DOCX document
Sol_140P2026R0016.pdf PDF
B08_-_Attachment_07_-_NPS_CASA_324271_Seawall_DD_CD_-_Final_CDs_-_MARINE_-_stamped_pdf.pdf PDF
B08_-_Attachment_05_-_NPS_CASA_324271_Seawall_DD_CD_-_Final_CDs_-_LA_-_stamped.pdf PDF
B08_-_Attachment_09_-_Vol_I_Exp.docx DOCX document
B08_-_Attachment_12_-_SF-24_Bid_Bond.pdf PDF
B08_-_Attachment_08_-_Wage_Determination_WD_FL20250135.pdf PDF
B08_-_Attachment_04_-_NPS_CASA_324271_Seawall_DD_CD_-_FInal_CDs_-_ELEC_-_stamped.pdf PDF
B08_-_Attachment_03_-_NPS_CASA_324271_Seawall_DD_CD_-_Final_CDs_-_CIVIL_-_stamped.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIFT STATION:

1. THE LIFT STATION MUST CONTROL AND MONITOR THE WET WELL LEVEL IN THE LIFT STATION. THE SYSTEM IS DESIGNED TO OPERATE AND MAINTAIN THE

PROPER LEVEL USING ONE PUMP WITH THE SECOND AS STANDBY. EACH PUMP IS SIZED FOR THE DESIGN FLOW CONDITION.

2. THE PUMPS WILL ALTERNATE BASED ON RUNTIME AND/OR NUMBERS OF STARTS TO EQUALIZE THE PUMPS RUNTIME. IN THE EVENT OF FAILURE OF THE

RUNNING PUMP THE STANDBY PUMP SHALL KICK ON AT THE HIGH SEWAGE LEVEL TO AID WITH SEWAGE PUMP OUT.

3. THE CONTROL PANEL SHALL BE LOCATED IN THE EXISTING MAIN FORT. THE CONTROL PANEL SHALL FIT IN THE EXISTING SPACE.

4. THE CONTROL LEVELS SHALL INCLUDE PUMP OFF, PUMP ON, STANDBY PUMP ON, AND HIGH-LEVEL ALARM.

5. CONTRACTOR SHALL COORDINATE THE MOTOR VOLTAGE AND CONTROLS WITH THE ELECTRICAL POWER SUPPLIED BY/TO THE SITE.

6. LIFT STATION VENT SHALL BE ROUTED SUCH THAT IT DOES NOT OBSTRUCT TRAFFIC.

C601

LIFT STATION ELEVATION

SCALE: 3/4" = 1'-0" AK

JA

JA

09/05/2025 33

LIFT STATION PLAN &

ELEVATIONC601

4'-0"

'-0

1'-6"

'-6

LIFT STATION PLAN

SCALE: NTS

C601

2'-0" 0'-0'' 1'-0" 2'-0"

SCALE: 3/4"=1'-0''

1'-6"

PUMPING EQUIPMENT SCHEDULE

PUMP NO. DESCRIPTION CAPACITY TOTAL DYNAMIC HEAD RPM ELECTRIC MOTOR DATA APPROX. DRY WEIGHT

P1, P2

ELECTRIC MOTOR

GRINDER PUMP

50 GALLONS PER

MNUTE

10 FEET 3450

2 HORSE POWER, 230 VOLTS,

1 PHASE, 60 HERTZ

91 POUNDS

GENERAL NOTES:

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL DRAWINGS PRIOR TO ANY CONSTRUCTION, INCLUDING CIVIL, STRUCTURAL, MECHANICAL, AND ELECTRICAL. ANY APPARENT DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER PRIOR TO

THE START OF CONSTRUCTION SO THAT A CLARIFICATION MAY BE ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR CODE

REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS OWN EXPENSE AND AT NO EXPENSE TO THE OWNER.

2. ALL WORK, AS SHOWN ON DRAWINGS, IS SCHEMATIC AND SHALL BE FABRICATED AND INSTALLED BASED ON ACTUAL FIELD MEASUREMENTS. CONTRACTOR

SHALL COORDINATE WITH OTHER TRADES AS REQUIRED.

3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE STARTING WORK.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF AND REPAIR OF ADJACENT EXISTING SURFACES, AREAS, AND PROPERTY THAT MAY BE

DAMAGED AS A RESULT OF ANY DEMOLITION AND/OR NEW WORK.

5. ALL APPLICABLE SAFETY REGULATIONS SHALL BE STRICTLY FOLLOWED: METHODS OF CONSTRUCTION AND ERECTION OF STRUCTURAL MATERIAL IS THE

CONTRACTORS RESPONSIBILITY.

6. HANDLE, STORE, AND INSTALL ALL EQUIPMENT PER THE MANUFACTURER'S INSTRUCTIONS, EXCEPT AS SHOWN OR SPECIFIED OTHERWISE.

7. PROVIDE DIELECTRIC UNIONS AT POINTS OF CONNECTION BETWEEN ALL DISSIMILAR METALS.

8. ALL HARDWARE, ANCHORS, FASTENERS, PIPE SUPPORTS, AND HANGERS SHALL BE GRADE 316L STAINLESS STEEL.

MATERIAL LIST

ITEM QTY. DESCRIPTION

1 1 INLET HUB

2 2 SUBMERSIBLE GRINDER PUMP AND MOTOR

3 -

2" POLYVINYL CHLORIDE (PVC) SCHEDULE (SCH) 80 DISCHARGE PIPE, LENGTH AS

REQUIRED

4 2 2" 90° PVC ELBOW

5 2 2" CHECK VALVE

6 2 2" BALL VALVE

7 1 2"x2"x2" PVC TEE

8 - 4" PVC SCH 80 DISCHARGE PIPE, LENGTH AS REQUIRED

9 1 BOOT TYPE PIPE CONNECTOR

10 - 4" PVC FORCE MAIN TO SEWER MANHOLE, SEE CIVIL DRAWINGS FOR CONTINUATION

11 4 304 STAINLESS STEEL GUIDE RAIL

12 2 304 STAINLESS STEEL LIFTING CHAIN

13 1 NATIONAL PIPE THREAD (NPT) ELECTRICAL COUPLING

14 2 304 STAINLESS STEEL GUIDE RAIL BRACKET W/ CORD GRIPS

15 4 FLOAT SWITCH

16 1 4" SCH 80 PVC VENT, PIPE TO ODOR CONTROL, SEE NOTE 5.

17 1 54" ACCESS HATCH

18 1 48" FIBERGLASS BASIN

19 1 ANTI - FLOATATION FLANGE FIBERGLASS ENCAPSULATED ASTM A-36 STEEL

20 2 1 14" x 2" PVC SCH 80 REDUCER

21 1 2"x4" PVC REDUCER

22 1 MECHANICAL COMPRESSION FLEXIBLE COUPLING WITH GASKET AND CLAMP

EXISTING 6" CLAY PIPE,

CONTRACTOR TO VERIFY PIPE

MATERIAL AND PIPE INVERT

ELEVATION

C301

REINFORCED

CONCRETE PAD

REINFORCED

CONCRETE PAD

CONCRETE SLAB SHALL BE SIZED TO

OVERCOME BUOYANCY FORCES ASSUMING

SEASONAL HIGH GROUNDWATER DEPTH OF 6.5'

FROM THE PROPOSED FINISHED GRADE.

/5

/2

:2 :0

P

M

189856

324271

DATE:

TECH REVIEW:

DESIGNED: SUB SHEET NO. DRAWING NO.

PMIS/PKG NO.

SHEET

OF9

/5

/2

:2 :0

P

M

TITLE OF SHEET

PRIME:

CROFT & ASSOCIATES

KENNESAW, GEORGIA

STRUCTURAL

MH STRUCTURES

POWDER SPRINGS, GA

LANDSCAPE

CATALYST DESIGN

GROUP

WINTER PARK, FL

COASTAL

MOFFATT & NICHOL, INC

MIAMI, FL

A/E FIRM

CASTILLO DE SAN MARCOS NATIONAL MONUMENT

This item has been digitally signed and sealed by Wilfredo J. Ruiz Planell on the date adjacent to the seal.

Signature must be verified on any electronic copies.

Wilfredo J Ruiz Planell

Digitally signed by Wilfredo J Ruiz Planell DN: CN=Wilfredo J Ruiz Planell, dnQualifier=A01410D000001903B3DE255000571CB, O=MOFFATT AND NICHOL INC, C=US

Reason: I am approving this document.

Date: 2025.09.05 19:08:56-04'00'

File details come from the government source that posted it. Updated .