B08_Attachment_0002_Price_Schedule_BLRI_RS.pdf
PDF 84 KB Posted
- Solicitation number
- 140P5126Q0020
About this file
This is a Price Schedule for FY26 Cyclic Roadway Striping services on the Blue Ridge Parkway spanning Amherst, Rockbridge, Bedford, and Botetourt Counties, Virginia.
The contract requires roadway striping work across a 74.89-mile stretch of the parkway, organized into one required work section and four optional work sections. The Required Work spans 27.25 miles from the end of Sky Line Drive (north side of I-64 Bridge) to the intersection with VA Highway 56/Tye River Turnpike, including two access ramps, with an estimated 289,611 linear feet of striping. Optional work is divided into four phases: Option 1 covers 10.35 miles with 109,296 linear feet of striping; Option 2 covers 8.02 miles with 84,691 linear feet of striping plus an access ramp; Option 3 covers 17.98 miles with 189,869 linear feet of striping plus two access ramps; and Option 4 covers 10.99 miles with 116,054 linear feet of striping, extending to where the Appalachian Trail crosses the Blue Ridge Parkway. The price schedule identifies specific mile posts, distance measurements, and striping quantities for each work section and access ramp. Unit costs and extended costs are indicated in the schedule but appear blank in this document, requiring contractor pricing proposals for completion.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/16/2026
REQUIRED WORK
Section MP Start MP End Estimated
Distance (MI)
Estimated
Striping (LF) Unit Cost Extended Cost Notes:
Access Ramp to U.S. Highway
- 0.10 0.19 2,006 At Mile Post 0.10
0001AA (First Part) 0.0 27.25 27.25 287,760
North End: From end of Sky Line Drive (North Side of I-64
Bridge)
South End: Intersection with VA Highway 56 / Tye River
Turnpike Access Ramp to VA State
Highway 56
- 27.25 0.08 845 At Mile Post 27.25 on Left
OPTION 1 WORK
0001AA (Second Part) 27.25 37.6 10.35 109,296
North End: Intersection with VA Highway 56 / Tye River
Turnpike ramp
South End: Irish Gap, underpass VA State Road 805
(Pedlar River Rd / Nettle Creek Rd)
OPTION 1 WORK TOTAL
OPTION 2 WORK
0001AB (First Part) 37.6 45.62 8.02 84,691
North End: Irish Gap, underpass VA State Road 805
(Pedlar River Rd / Nettle Creek Rd)
South End: Intersection with U.S. Highway 60 ramp
Access Ramp to U.S. Highway
- 45.62 0.19 2,006 At Mile Post 45.62 on Left
OPTION 2 WORK TOTAL
OPTION 3 WORK
0001AB (Second Part) 45.62 63.60 17.98 189,869
North End: Intersection with U.S. Highway 60 ramp
South End: North end of James River Bridge (not including the bridge)
Access Ramp to VA State
Highway 130
- 61.58 0.04 422 At Mile Post 61.58 on Left
Access Ramp to U.S. Highway
501 / Lee Highway
- 64.13 0.20 2,112 At Mile Post 64.13 on Left
OPTION 3 WORK TOTAL
OPTION 4 WORK
0001AB (Third Part) 63.9 74.89 10.99 116,054
North End: South end of James River Bridge (not including the bridge)
South End: Where the Appilachian Trail crosses the Blue
Ridge Parkway
OPTION 4 WORK TOTAL
TOTAL (w/ all OPTIONS )
Amherst, Rockbridge, Bedford, Botetourt Counties, Virginia
Blue Ridge Parkway
FY26 CYCLIC ROADWAY STRIPING
PRICE SCHEDULE
REQUIRED WORK TOTAL
File details come from the government source that posted it. Updated .