This is a Price Schedule for FY26 Cyclic Roadway Striping services on the Blue Ridge Parkway spanning Amherst, Rockbridge, Bedford, and Botetourt Counties, Virginia.

The contract requires roadway striping work across a 74.89-mile stretch of the parkway, organized into one required work section and four optional work sections. The Required Work spans 27.25 miles from the end of Sky Line Drive (north side of I-64 Bridge) to the intersection with VA Highway 56/Tye River Turnpike, including two access ramps, with an estimated 289,611 linear feet of striping. Optional work is divided into four phases: Option 1 covers 10.35 miles with 109,296 linear feet of striping; Option 2 covers 8.02 miles with 84,691 linear feet of striping plus an access ramp; Option 3 covers 17.98 miles with 189,869 linear feet of striping plus two access ramps; and Option 4 covers 10.99 miles with 116,054 linear feet of striping, extending to where the Appalachian Trail crosses the Blue Ridge Parkway. The price schedule identifies specific mile posts, distance measurements, and striping quantities for each work section and access ramp. Unit costs and extended costs are indicated in the schedule but appear blank in this document, requiring contractor pricing proposals for completion.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/16/2026

REQUIRED WORK

Section MP Start MP End Estimated

Distance (MI)

Estimated

Striping (LF) Unit Cost Extended Cost Notes:

Access Ramp to U.S. Highway

- 0.10 0.19 2,006 At Mile Post 0.10

0001AA (First Part) 0.0 27.25 27.25 287,760

North End: From end of Sky Line Drive (North Side of I-64

Bridge)

South End: Intersection with VA Highway 56 / Tye River

Turnpike Access Ramp to VA State

Highway 56

- 27.25 0.08 845 At Mile Post 27.25 on Left

OPTION 1 WORK

0001AA (Second Part) 27.25 37.6 10.35 109,296

North End: Intersection with VA Highway 56 / Tye River

Turnpike ramp

South End: Irish Gap, underpass VA State Road 805

(Pedlar River Rd / Nettle Creek Rd)

OPTION 1 WORK TOTAL

OPTION 2 WORK

0001AB (First Part) 37.6 45.62 8.02 84,691

North End: Irish Gap, underpass VA State Road 805

(Pedlar River Rd / Nettle Creek Rd)

South End: Intersection with U.S. Highway 60 ramp

Access Ramp to U.S. Highway

- 45.62 0.19 2,006 At Mile Post 45.62 on Left

OPTION 2 WORK TOTAL

OPTION 3 WORK

0001AB (Second Part) 45.62 63.60 17.98 189,869

North End: Intersection with U.S. Highway 60 ramp

South End: North end of James River Bridge (not including the bridge)

Access Ramp to VA State

Highway 130

- 61.58 0.04 422 At Mile Post 61.58 on Left

Access Ramp to U.S. Highway

501 / Lee Highway

- 64.13 0.20 2,112 At Mile Post 64.13 on Left

OPTION 3 WORK TOTAL

OPTION 4 WORK

0001AB (Third Part) 63.9 74.89 10.99 116,054

North End: South end of James River Bridge (not including the bridge)

South End: Where the Appilachian Trail crosses the Blue

Ridge Parkway

OPTION 4 WORK TOTAL

TOTAL (w/ all OPTIONS )

Amherst, Rockbridge, Bedford, Botetourt Counties, Virginia

Blue Ridge Parkway

FY26 CYCLIC ROADWAY STRIPING

PRICE SCHEDULE

REQUIRED WORK TOTAL

File details come from the government source that posted it. Updated .