This is a Price Schedule for FY26 Cyclic Roadway Striping services on the Blue Ridge Parkway across Amherst, Rockbridge, Bedford, and Botetourt Counties, Virginia.
The contract requires roadway striping on a 27.25-mile section (0001AA First Part) running from the end of Sky Line Drive at the I-64 Bridge north to the intersection with VA Highway 56/Tye River Turnpike, with an estimated 287,760 linear feet of striping. Four optional work sections extend the project to mile post 74.89 where the Appalachian Trail crosses the Blue Ridge Parkway. Option 1 covers 10.35 miles (109,296 LF) from VA Highway 56 to Irish Gap. Option 2 adds 8.02 miles (84,691 LF) from Irish Gap to the U.S. Highway 60 intersection. Option 3 extends 17.98 miles (189,869 LF) to the north end of the James River Bridge, excluding the bridge itself. Option 4 covers the final 10.99 miles (116,054 LF) from the south end of James River Bridge to where the Appalachian Trail crosses. Option 5 provides a combined pricing alternative for all work from mile post 27.25 through 74.89 (47.34 miles, 499,910 LF), excluding the bridge. The schedule includes access ramps at various highway intersections with specified locations and linear footage. Unit costs and extended costs are provided for each section to enable pricing evaluation by offerors.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5/21/2026
REQUIRED WORK
Section MP Start MP End Estimated
Distance (MI)
Estimated
Striping (LF) Unit Cost Extended Cost Notes:
Access Ramp to U.S. Highway
- 0.10 0.19 2,006 At Mile Post 0.10
0001AA (First Part) 0.0 27.25 27.25 287,760
North End: From end of Sky Line Drive (North Side of I-64
Bridge)
South End: Intersection with VA Highway 56 / Tye River
Turnpike
Access Ramp to VA State
Highway 56
- 27.25 0.08 845 At Mile Post 27.25 on Left
OPTION 1 WORK
0001AA (Second Part) 27.25 37.6 10.35 109,296
North End: Intersection with VA Highway 56 / Tye River
Turnpike ramp
South End: Irish Gap, underpass VA State Road 805
(Pedlar River Rd / Nettle Creek Rd)
OPTION 1 WORK TOTAL
OPTION 2 WORK
0001AB (First Part) 37.6 45.62 8.02 84,691
North End: Irish Gap, underpass VA State Road 805
(Pedlar River Rd / Nettle Creek Rd)
South End: Intersection with U.S. Highway 60 ramp
Access Ramp to U.S. Highway
- 45.62 0.19 2,006 At Mile Post 45.62 on Left
OPTION 2 WORK TOTAL
OPTION 3 WORK
0001AB (Second Part) 45.62 63.60 17.98 189,869
North End: Intersection with U.S. Highway 60 ramp
South End: North end of James River Bridge (not including the bridge)
Access Ramp to VA State
Highway 130
- 61.58 0.04 422 At Mile Post 61.58 on Left
Access Ramp to U.S. Highway
501 / Lee Highway
- 64.13 0.20 2,112 At Mile Post 64.13 on Left
OPTION 3 WORK TOTAL
OPTION 4 WORK
0001AB (Third Part) 63.9 74.89 10.99 116,054
North End: South end of James River Bridge (not including the bridge)
South End: Where the Appilachian Trail crosses the Blue
Ridge Parkway
OPTION 4 WORK TOTAL
OPTION 5 WORK
COMBINED:
0001AA (Second Part) and
0001AB (All Parts)
27.25 74.89 47.34 499,910
North End: Intersection with VA Highway 56 / Tye River
Turnpike ramp
Excludes 0.3 miles over James River Bridge
South End: Where the Appalachian Trail crosses the Blue
Ridge Parkway
Access Ramp to U.S. Highway
- 45.62 0.19 2,006 At Mile Post 45.62 on Left
Access Ramp to VA State
Highway 130
- 61.58 0.04 422 At Mile Post 61.58 on Left
Access Ramp to U.S. Highway
501 / Lee Highway
- 64.13 0.20 2,112 At Mile Post 64.13 on Left
OPTION 5 WORK TOTAL
Amherst, Rockbridge, Bedford, Botetourt Counties, Virginia
Blue Ridge Parkway
FY26 CYCLIC ROADWAY STRIPING
PRICE SCHEDULE
REQUIRED WORK TOTAL
File details come from the government source that posted it. Updated .