This document is a sample Contract Price Schedule template for a federal contract opportunity. It provides a structured format for offerors to submit pricing for base and option line items related to construction or design-build projects.

The template includes three examples: 1) a Design-Bid-Build (DBB) contract for extending a public launch ramp at Lake Mead National Recreation Area, 2) a Design-Build (DB) contract for a new structure at Yosemite Valley, and 3) a DBB contract for a visitors center at Old Faithful in Yellowstone National Park. Each example lists the Contract Line Item Number (CLIN), line item title, quantity, unit of measure, unit price, and total price. Offerors are required to provide pricing for all base and option line items, with instructions on rounding and handling errors. The template references the applicable Division 01 specifications for measurement and payment details.

View the file

Other files

File Type Posted
AMEND_05_Attach_(1)_401CertificationMerged_HemenwayHarborRampExtension_0005.pdf PDF
AMEND_05_Attach_(2)_54112_NVW_Hemenway_Harbor_Boat_Launch_Issuance_Letter-Signed_0005.pdf PDF
AMEND_05_Attach_(3)_54112_NVW_Hemenway_Harbor_Boat_Launch_Temporary_Permit_0005.pdf PDF
AMEND_05_Attach_(4)_54112_NVW_Hemenway_Harbor_Boat_Launch_DMR_Form_0005.docx DOCX document
Sol_140P2024R0147_Amd_0005.pdf PDF
Sol_140P2024R0147_Amd_0004.pdf PDF
Sol_140P2024R0147_Amd_0003.pdf PDF
B11_Trifold_LAKE_332529_0002.docx DOCX document
Sol_140P2024R0147_Amd_0002.pdf PDF
B11_Preproposal_SignIn_LAKE_0002.pdf PDF
B08_Attach_(11)_GenRefs_0001.doc DOC document
Sol_140P2024R0147_Amd_0001.pdf PDF
B08_Attach_(10)_Construction_Contract_Administration.docx DOCX document
B08_Attach_(2)_Geotech_Report_from_Kleinfelder_19106_005_-_FINAL_Revised.pdf PDF
B08_Attach_(4)_Construction_Drawings.pdf PDF
Sol_140P2024R0147.pdf PDF
B08_Attach_(6)_WD_NV20240024_20240719.pdf PDF
B08_Attach_(1)_Specifications_-_Division_1_and_Division_2-49_Sept_2024.pdf PDF
B08_Attach_(7)_Deliverables_LmtOnSubconRpt_REQD.pdf PDF
B08_Attach_(8)_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_(9)_Solit_PSP_Vol_I_PastPerf_REQD(1).docx DOCX document
B08_Attach_(3)_Appendix_B_-_LakeMeadLMP_BO-2018.pdf PDF
A14_SSN_LAKE_318673__324894__332529_Extend_Public_Ramp.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

Contract Price Schedule Template
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:
PARK - PMIS:LAKE - 332529
(Project Management Information System)
Developed Area:Lake Mead National Recreation Area
Project Title:Extend Public Launch Ramp at Hemenway Harbor
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN) & Option #Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
CLIN 0001Precast Launch Ramp (elevation 1,050-1,040) - (18,788 SF total, 181 existing panels, 124 new panels, 18,300 SF of panels)1LS
CLIN 0002Precast Launch Ramp (elevation 1,040-1,030) - (20,020 SF total, 325 new panels, 19,500 SF of panels)1LS
CLIN 0003Precast Launch Ramp (elevation 1,030-1,020) - (20,020 SF total, 325 new panels, 19,500 SF of panels)1LS
TOTAL BASE PRICE (Contract Line Item Number 1 through 3) ---------------------------------------------------------------------------------
CLIN 0004OPTION 1-Precast Launch Ramp (elevation 1,020-1,010) - 20,020 SF total, 325 new panels, 19,500 SF of panels)1LS
CLIN 0005OPTION 2-Precast Launch Ramp (elevation 1,010-1,000) - (26,157 SF total, 425 new panels, 25,500 SF of panels)1LS
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 4 and 5) -----------------------------------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS

(Contract Line Item Number 1 through 5) --------------------------------------------------------------------------------------------------------------- All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Bid-Build (DBB) Sample

Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Old Faithful
Project Title:Johnstonian Visitors Center
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Visitors Center1Lump Sum$0.00
2Water Line400Lineal Feet- 0
3Sanitary Sewer Line200Lineal Feet- 0
4Rock Excavation150Cubic Yards- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ---------------------------------------------------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum- 0
6OPTION B, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) -------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Build (DB) Sample

Contract Price Schedule - Design-Build (DB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Yosemite Valley
Project Title:Design and Build a New Structure
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Design1Lump Sum$0.00
2Construction1Lump Sum- 0
TOTAL BASE PRICE (Contract Line Item Number 1 and 2) ---------------------------------------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ----------------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.