This document is a Request for Proposals (RFP) for a construction project to extend the public launch ramp at Hemenway Harbor in Lake Mead National Recreation Area, Boulder City, Nevada. The RFP provides key details including the solicitation number, contracting officer and point of contact information, and project timeline. It specifies that proposals are due on October 28, 2024, and the period of performance is 730 calendar days. The project has unique material delivery and logistical requirements due to the remote rural location and the need to minimize visitor impact, as the park will remain open during construction. The RFP outlines the non-price evaluation factors in descending order of importance, including technical approach, project experience, key personnel, management approach, schedule, and safety. Past performance is equal in importance to the combined non-price factors. The government intends to award without discussions if possible, and alternate proposals will not be accepted.

View the file

Other files

File Type Posted
AMEND_05_Attach_(1)_401CertificationMerged_HemenwayHarborRampExtension_0005.pdf PDF
AMEND_05_Attach_(2)_54112_NVW_Hemenway_Harbor_Boat_Launch_Issuance_Letter-Signed_0005.pdf PDF
AMEND_05_Attach_(3)_54112_NVW_Hemenway_Harbor_Boat_Launch_Temporary_Permit_0005.pdf PDF
AMEND_05_Attach_(4)_54112_NVW_Hemenway_Harbor_Boat_Launch_DMR_Form_0005.docx DOCX document
Sol_140P2024R0147_Amd_0005.pdf PDF
Sol_140P2024R0147_Amd_0004.pdf PDF
Sol_140P2024R0147_Amd_0003.pdf PDF
Sol_140P2024R0147_Amd_0002.pdf PDF
B11_Preproposal_SignIn_LAKE_0002.pdf PDF
B08_Attach_(11)_GenRefs_0001.doc DOC document
Sol_140P2024R0147_Amd_0001.pdf PDF
B08_Attach_(10)_Construction_Contract_Administration.docx DOCX document
B08_Attach_(2)_Geotech_Report_from_Kleinfelder_19106_005_-_FINAL_Revised.pdf PDF
B08_Attach_(4)_Construction_Drawings.pdf PDF
B08_Attach_(5)_Contract_Price_Schedule_BLANK.xlsx XLSX spreadsheet
Sol_140P2024R0147.pdf PDF
B08_Attach_(6)_WD_NV20240024_20240719.pdf PDF
B08_Attach_(1)_Specifications_-_Division_1_and_Division_2-49_Sept_2024.pdf PDF
B08_Attach_(7)_Deliverables_LmtOnSubconRpt_REQD.pdf PDF
B08_Attach_(8)_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_(9)_Solit_PSP_Vol_I_PastPerf_REQD(1).docx DOCX document
B08_Attach_(3)_Appendix_B_-_LakeMeadLMP_BO-2018.pdf PDF
A14_SSN_LAKE_318673__324894__332529_Extend_Public_Ramp.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AFTER PREPROPOSAL CONFERENCE

· Direct all questions to Dayna Omiya, Contracting Officer. Please submit all questions no later than Wednesday, October 18, 2024 at 12:00 PM MT.

· Questions directed to any other Government team member will be redirected to Ms. Omiya. No answers will be provided by any other team member. All questions and answers will be provided to all prospective offerors by amendment to the solicitation

· Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.SAM.gov Award of a Contract:

Best Value Tradeoff Alternate proposals shall not be accepted or evaluated.

The Government intends to evaluate proposals and award a contract without discussions with offerors; therefore the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them to be necessary as stated in FAR 6.401 to address any weakness and/or to clarify technical scope to ensure understanding of the project requirements.

Project Location:

Lake Mead National Recreation Area, Boulder City, Nevada

During Site Visit Direct all Questions to Dayna Omiya

Responses do not change the solicitation document

Changes to the solicitation document shall be made by formal written amendment only

Pre-proposal Conference/Site Visit meeting notes, questions, and answers will be issued by a formal written amendment to the solicitation for information only

Preproposal Conference/ Site Visit- Thursday, October 10, 2024

Request for Proposals No. 140P2024R0147 CO: Dayna Omiya dayna_omiya@nps.gov CS: Amy Solomon amy_solomon@nps.gov

LAKE 332529

Extend Public Launch Ramp at Hemenway Harbor

Clauses 52.211-10 Commencement, Prosecution, and Completion of Work - Commence work within 10 days after NTP. Complete not later than 730 days after NTP.

52.211-12 Liquidated Damages – Construction - If contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,566.00 each calendar day of delay until the work is completed or accepted.

Special Requirement 2 – Key Personnel: Project Manager, Job-Site Superintendent, Quality Control Manager, Safety Manager. Prospective contractor shall not be allowed to change key personnel during the first 120 days of performance.

DIAR 1452.228-70 Liability Insurance-Department of the Interior: The contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the CO by an insurance company which is acceptable to the CO. The amounts of insurance shall be not less than:

Construction $100,000 each person $500,000 each occurrence $1,000,000 property damage

Submission and Evaluation Section L Instructions for the Submission of Offers

· Proposals Due October 28, 2024, 12:00 PM MT

· Volume I Non-Price Proposal

· Volume II Business and Price Proposal

· Alternate proposals SHALL NOT be considered

· Government may award without discussion

· Send electronic proposals to: CS_DSC_Proposal_Submission@nps.gov Dayna_omiya@nps.gov Amy_Solomon@nps.gov Submissions shall contain the solicitation number, park-PMIS, and number of total emails (example in solicitation) Non-Price Evaluation Factors: Factors 1 – 7 are in descending order of importance. Past Performance, Factor 7, is equal to Factors 1-6 when combined.

FACTOR 1 – TECHNICAL APPROACH

FACTOR 2 – PROJECT EXPERIENCE

FACTOR 3 – KEY PERSONNEL

FACTOR 4 – MANAGEMENT APPROACH

FACTOR 5 – SCHEDULE

FACTOR 6 – SAFETY

FACTOR 7 – PAST PERFORMANCE

Overall: Proposed pricing is an evaluation factor. All evaluation factors other than price, when combined are significantly more important than price.

Refer to solicitation for specific information on submission requirements and evaluation.

This project is located at Lake Mead National Recreation Area, Boulder City, Nevada. The surrounding area is rural with limited staging room available, the nearest suppliers and lodging facilities is 32 miles to Boulder City, NV and 26 miles to Las Vegas, NV from the Park, and unique material delivery requirements. The Park will remain open during construction thus contract activities and logistics must be structured and scheduled to minimize visitor impact. The site requires protective measures to ensure the surrounding area remains undisturbed. The anticipated 730 calendar-day period of performance includes potential weather shutdown and winter construction may be required.

PROJECT OVERVIEW

image1.png image2.jpeg image3.png image4.jpeg image5.jpeg image50.jpeg image6.png image7.jpeg