This document is an amendment to a federal solicitation for the Extend Public Launch Ramp at Hemenway Harbor - 332529 project at Lake Mead National Recreation Area in Boulder City, Nevada. The amendment extends the proposal due date to November 12, 2024 and provides responses to questions received. Key details include:

The project requires extending the public launch ramp at Hemenway Harbor. The period of performance is December 1, 2024 to December 1, 2026. The solicitation number is 140P2024R0147. The contracting agency is the National Park Service. The amendment addresses questions related to wage rates, excavation, turbidity curtains, submission requirements, and key personnel. Responses provide clarification on the applicable wage rates, use of standard construction equipment, turbidity curtain requirements, ability to submit past experience from parent/subsidiary companies, and acceptance of partially complete projects for evaluation factors.

View the file

Other files

File Type Posted
AMEND_05_Attach_(1)_401CertificationMerged_HemenwayHarborRampExtension_0005.pdf PDF
AMEND_05_Attach_(2)_54112_NVW_Hemenway_Harbor_Boat_Launch_Issuance_Letter-Signed_0005.pdf PDF
AMEND_05_Attach_(3)_54112_NVW_Hemenway_Harbor_Boat_Launch_Temporary_Permit_0005.pdf PDF
AMEND_05_Attach_(4)_54112_NVW_Hemenway_Harbor_Boat_Launch_DMR_Form_0005.docx DOCX document
Sol_140P2024R0147_Amd_0005.pdf PDF
Sol_140P2024R0147_Amd_0003.pdf PDF
B11_Trifold_LAKE_332529_0002.docx DOCX document
Sol_140P2024R0147_Amd_0002.pdf PDF
B11_Preproposal_SignIn_LAKE_0002.pdf PDF
B08_Attach_(11)_GenRefs_0001.doc DOC document
Sol_140P2024R0147_Amd_0001.pdf PDF
B08_Attach_(10)_Construction_Contract_Administration.docx DOCX document
B08_Attach_(2)_Geotech_Report_from_Kleinfelder_19106_005_-_FINAL_Revised.pdf PDF
B08_Attach_(4)_Construction_Drawings.pdf PDF
B08_Attach_(5)_Contract_Price_Schedule_BLANK.xlsx XLSX spreadsheet
Sol_140P2024R0147.pdf PDF
B08_Attach_(6)_WD_NV20240024_20240719.pdf PDF
B08_Attach_(1)_Specifications_-_Division_1_and_Division_2-49_Sept_2024.pdf PDF
B08_Attach_(7)_Deliverables_LmtOnSubconRpt_REQD.pdf PDF
B08_Attach_(8)_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_(9)_Solit_PSP_Vol_I_PastPerf_REQD(1).docx DOCX document
B08_Attach_(3)_Appendix_B_-_LakeMeadLMP_BO-2018.pdf PDF
A14_SSN_LAKE_318673__324894__332529_Extend_Public_Ramp.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0147 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

33252910/21/20240004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/27/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

LAKE 332529 Extend Public Launch Ramp at Hemenway Harbor

The purpose of this Amendment No. 0004 is to:

1) Provide official government responses to questions received. Refer to the continuation sheet of the SF 30;

2) Provide a two-week extension with proposals due on November 12, 2024 by 12:00 PM MT.

All other Solicitation Terms and Conditions remain unchanged by this Amendment No. 0004.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Dayna Omiya

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0147/0004

Government Point(s) of Contact:

Dayna Omiya, Contracting Officer

Dayna_Omiya@nps.gov

Amy Solomon, Contract Specialist amy_solomon@nps.gov

Period of Performance: 12/01/2024 to 12/01/2026

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Questions and Answers:

Q1. A review of the wage determination contained in the solicitation documents shows lacks wage rates for divers. A search of all other current Davis-Bacon wage rate determinations for Nevada also shows no current active wage rates for divers. Is there another applicable wage rate determination that we should be using for the diver's wage rates.

A1. Utilize $73.97 inclusive of rate and fringes. DOL Conformance information can be found at:

https://sam.gov/content/wage-determinations/resources/dba-conformances

Q2. Specification section 31 20 00-4, paragraph 3.3.B. Excavation, mentions that the contractor should bid the project assuming all soil and rock will be rippable with standard construction equipment. Can government please clarify if an excavator with a ripper tooth attachment considered as a standard construction equipment?

If rock is encountered which cannot be ripped with a ripper tooth, Can the contractor assume that we will be allowed to request a modification for change of conditions.

A2. Yes, an excavator with a ripper tooth attachment would be considered standard construction equipment. If rock is encountered which cannot be ripped with standard construction equipment, it may be considered a change of condition.

Q3. Sheet 7 of 22: Erosion control plan, Call-out note mentions that the Turbidity curtain shall encompass entire work area, does this mean only the active in-water work area of each CLIN or the entire work area of the contract from station 8+14 to station 19+40? It will be very challenging for the contractor to maintain the turbidity curtain for the entire work area, can government please confirm if only the active in-water work area requires turbidity curtain installation?

A3. Confirm, turbidity curtains are only required around the active in-water work area to contain any sediments disturbed from work activities. For reference, the 401 water quality certification permit requires turbidity curtains "around the anticipated area of impact during construction activities" remaining in place "until suspended sediment has settled and turbidity levels meet water quality standards".

Q4. Will a bubble curtain installation in an active in-water work area along with a turbidity curtain entrance/exit gate with turbidity monitoring measures be acceptable in lieu of Type III -Turbidity Curtain?

A4. Bubble curtain would not meet the materials requirements in Section 35 01 01 of the Specifications.

Bidders should assume a turbidity curtain will be required for control of sediments in water.

Q5. Because the site visit occurred less than two weeks before the bid due date, we respectfully request an extension of two weeks to the current October 28 bid due date.

A5. A two-week extension with proposals due on November 12th (Nov 11th is a federal holiday) is acceptable.

Q6. For Factor 3, Key Personnel, can the Superintendent or the Quality Control Manager, if appropriately qualified, also perform the Site Safety Officer?

A6. The superintendent may not serve in any other key personnel position. Given the size of the site and scope of the project, it is acceptable for other key personnel to perform multiple roles if appropriately qualified.

Q7. May the ISBEE prime contractor submit project experience from other wholly owned subsidiaries of our parent company, (i.e., our ISBEE sister companies) for Factor 2, Project Experience and Factor 7, Past Performance.

https://sam.gov/content/wage-determinations/resources/dba-conformances

A7. Please submit project experience for the ISBEE entity that will be proposing on this solicitation.

Q8. For Factor 7, Past Performance, will you accept a Past Performance Questionnaire previously completed by the client for a different proposal submission?

A8. Ensure Past Performance Questionnaire is compliant with Section L of the RFP.

Q9. For Factor 2, Project Experience and Factor 7, Past Performance, will you accept projects that are 85% or higher substantially complete?

A9. Submit the attached "Project Experience" form addressing specific experience aspects below for up to 3 relevant projects completed in the last 5 years.

Q10. A review of the wage determination contained in the solicitation documents lacks wage rates for divers / diving related trades. A search of all other current Davis-Bacon wage rate determinations for Nevada also shows no current active wage rates for divers. Is there another applicable wage rate determination that we should be using for the diver's wage rates and if so what is that determination?

A10. Utilize $73.97 inclusive of rate and fringes. DOL Conformance information can be found at:

https://sam.gov/content/wage-determinations/resources/dba-conformances

Q11. Section H, Key Personnel. 01 31 00 Project Management and Coordination, 1.8A Can key personnel listed in Section H, and Environmental Manager listed in 01 31 00, fulfill multiple responsibilities (wear dual hats, etc.)?

A11. The superintendent may not serve in any other key personnel position. Given the size of the site and scope of the project, it is acceptable for other key personnel to perform multiple roles if appropriately qualified.

Q12. Factor 2-Project Experience. Can ongoing projects from major teaming subcontractor's project experience be included to meet this requirement? The current project is in excess of $40 Million, 50% complete, and is very relevant to this project given its scope. Preliminary CPARS are available if needed.

A12. Submit the attached "Project Experience" form addressing specific experience aspects below for up to 3 relevant projects completed in the last 5 years.

Q13. We are only required to submit the electronic copy as a part of the Volume II- Business Proposal, and we are NOT required to submit the originally executed hard copy at all, is that correct?

A13. Yes.