B08_Attach_26_ProjectWasteManagementPlanWorksheet_Sample_10-13-21_v508.pdf

PDF 85 KB Posted

Attached to
GOGA 311373 Alcatraz Prison Hospital Wing Seismic
Solicitation number
140P2024R0025
Issued by

About this file

This document is a sample project waste management plan worksheet for use by the National Park Service Denver Service Center. The worksheet template outlines materials to track including asphalt, concrete, brick, masonry, tile, building materials, carpet, cardboard, ceiling tile, drywall, glass, scrap metal, unpainted wood and pallets, yard trimmings, brush, trees, stumps, and garbage. For each material, columns track quantities recycled, reused, diverted from landfill, and sent to landfill to calculate total quantities generated and diversion percentages. Additional columns calculate tipping fee savings and costs and revenues associated with recycling, reuse, and diversion.

The related federal contract opportunity is solicitation number 140P2024R0025 for seismic work on the Alcatraz Prison Hospital Wing through the Department of the Interior National Park Service National Office. The solicitation type is listed as a full and open opportunity.

View the file

Other files

File Type Posted
B09_Amd_12_Q_A__84_Temporary_Move_Items_0012.xlsx XLSX spreadsheet
B09_Amd_12_Existing_Lighthouse_E2_0012.jpeg JPEG file
B09_Amd_12_Updated_Drawings_for_Additional_Areas_to_Paint_0012.pdf PDF
B09_Amd_12_Wage_Determination_Update_4_11_24_0012.pdf PDF
B09_Amd_12_GOGA_311373_Solicitation_Q_A_Final_0012.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0012.pdf PDF
Sol_140P2024R0025_Amd_0011.pdf PDF
B09_Amd_10_Sign_in_sheet_3_28_24_0010.pdf PDF
B09_Amd_10_Site_Visit_Tri_Fold_GOGA_311373_rev1_0010.pdf PDF
Sol_140P2024R0025_Amd_0010.pdf PDF
Sol_140P2024R0025_Amd_0009.pdf PDF
B09_Amd_9_GOGA_311373_Prebid_Site_Visit_Instructions_20240328_0009.docx DOCX document
Temporary_Bookstore_Design__0009.zip ZIP file
B09_Amd_08_GOGA_311373_Solicitation_QA_TO_POST_0008.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0008.pdf PDF
B09_Amd_07_GOGA_311373_Solicitation_QA_3_0007.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0007.pdf PDF
B09_Amd_07_SF30_140P2024R0025_0007.pdf PDF
Sol_140P2024R0025_Amd_0006.pdf PDF
B09_Amd_06_SF30_140P2024R0025_0006.pdf PDF
B09_Amd_06_GOGA_311373_Solicitation_QA_2_0006.xlsx XLSX spreadsheet
B09_Amd_05_Attach_38_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part4_0005.pdf PDF
B09_Amd_05_Attach_40_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part6_0005.pdf PDF
B09_Amd_05_Attach_37_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part3_0005.pdf PDF
B09_Amd_05_Attach_41_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part7_0005.pdf PDF
B09_Amd_05_Attach_36_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part2_0005.pdf PDF
B09_Amd_05_Attach_39__GOGA_311373_Complete_CD_Drawings_2023_08_07_Part5_0005.pdf PDF
B09_Amd_05_Solit_Clauses_Construction_GOGA_311373_0005.docx DOCX document
Sol_140P2024R0025_Amd_0005.pdf PDF
B09_Amd_05_Attach_35_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part1_0005.pdf PDF
B09_Amd_05_SF30_140P2024R0025_0005.pdf PDF
B09_Amd_05_Attach_34_Final_Specifications_GOGA_311373_0005.pdf PDF
B09_Amd_04_SF30_140P2024R0025_0004.pdf PDF
B09_Amd_04_Attach_29_Subcontracting_Plan_0004.doc DOC document
B09_Amd_04_GOGA_311373_Solicitation_QA_1_0004.xlsx XLSX spreadsheet
B09_Amd_04_Solit_Clauses_Construction_GOGA_311373_0004.docx DOCX document
Sol_140P2024R0025_Amd_0004.pdf PDF
B09_Amd_03_Attach_GOGA_311373_Alcatraz_Historic_Structures_Sign-in_0003.pdf PDF
Sol_140P2024R0025_Amd_0003.pdf PDF
B09_Amd_03_Attach_Site_Visit_Tri_Fold_GOGA_311373_0003.docx DOCX document
B09_Amd_03_SF30_140P2024R0025_0003.pdf PDF
B09_Amd_02_Solit_Clauses_Construction_GOGA_311373_0002.docx DOCX document
Sol_140P2024R0025_Amd_0002.pdf PDF
B09_Amd_02_SF30_140P2024R0025_0002.pdf PDF
Sol_140P2024R0025_Amd_0001.pdf PDF
B09_Amd_01_SF30_140P2024R0025_0001.pdf PDF
B09_Amd_01_Attach_33_GOGA_311373_Prebid_Site_Visit_insructions_0001.docx DOCX document
B08_Attach_04_CLIN_Diagram.pdf PDF
B08_Attach_11_Langan_Geotechnical_Report.pdf PDF
B08_Solit_Clauses_Construction_GOGA_311373(3).docx DOCX document
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Waste Management Plan Worksheet Sample National Park Service (NPS) - Denver Service Center (DSC) | 10-13-21

A B C D E F G H I J

Material Quantity Recycled (in tons)

Quantity Salvaged or Reused (in tons)

A + B = Total

Quantity Diverted from Landfill

Quantity to

Landfill (in tons)

C + D = Total

Quantity Generated (in tons)

Tip Fee/Ton at Landfill

C x F = Tip Fee

Savings resulting from Landfill

Diversion

Cost of Recycling (R), Salvage (S), or Reuse (Re) (Specify

R, S, or Re)

Revenue from Recycling (R), Salvage (S), or Reuse (Re) (Specify

R, S, or Re)

G - H + I = Total Cost (-) or Savings (+) from Diversion

Asphalt/Concrete

Brick/Masonry/Tile

Building Materials (doors, windows, fixtures, shingles, lumber, insulation, sheet goods, etc.)

Carpet

Carpet Padding, Foam Only

Cardboard

Ceiling Tile

Drywall

Glass

Scrap Metal Aluminum

Copper

Steel

Unpainted Wood & Pallets

Yard Trimmings, Brush, Trees, Stumps, etc.

Garbage/Trash

Other

Column Totals

Total

Quantity Recycled

Total Quantity Reused or Salvaged

Total Quantity Diverted from Landfill

Total Quantity to Landfill

Total Quantity

Generated

Tip Fee Savings from Diversion

Total Cost of Recycling, Salvage, or

Reuse

Revenue from Recycling, Salvage, or

Reuse

Total Cost (-) or Savings (+) from Diversion

Percentage Diverted = __________________ (C divided by E from Column Totals). Should meet 60% diversion goal.