B09_Amd_03_Attach_Site_Visit_Tri_Fold_GOGA_311373_0003.docx

DOCX document 118 KB Posted

Attached to
GOGA 311373 Alcatraz Prison Hospital Wing Seismic
Solicitation number
140P2024R0025
Issued by

About this file

This document provides details for a federal solicitation seeking seismic retrofitting and stabilization services at Alcatraz Island. The National Park Service is soliciting proposals for the GOGA 311373 Alcatraz Prison Hospital Wing Seismic and Stabilize project located at Golden Gate National Recreation Area in Alcatraz Island, California. Proposals are due by January 31, 2024 at 1:00 PM Pacific Time and must be submitted electronically to the identified contracting staff. Evaluation will be based on seven factors including project experience, technical approach, key personnel experience, schedule, management and safety, past performance, and small business participation. The work includes seismic retrofitting of the Hospital Wing of the Cellhouse as well as stabilization and structural repairs to the exterior due to corrosion. Construction must be coordinated with public visitation and bird nesting season which occurs between February 1 and September 1 each year.

View the file

Other files

File Type Posted
B09_Amd_12_Q_A__84_Temporary_Move_Items_0012.xlsx XLSX spreadsheet
B09_Amd_12_Existing_Lighthouse_E2_0012.jpeg JPEG file
B09_Amd_12_Updated_Drawings_for_Additional_Areas_to_Paint_0012.pdf PDF
B09_Amd_12_Wage_Determination_Update_4_11_24_0012.pdf PDF
B09_Amd_12_GOGA_311373_Solicitation_Q_A_Final_0012.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0012.pdf PDF
Sol_140P2024R0025_Amd_0011.pdf PDF
B09_Amd_10_Sign_in_sheet_3_28_24_0010.pdf PDF
B09_Amd_10_Site_Visit_Tri_Fold_GOGA_311373_rev1_0010.pdf PDF
Sol_140P2024R0025_Amd_0010.pdf PDF
Sol_140P2024R0025_Amd_0009.pdf PDF
B09_Amd_9_GOGA_311373_Prebid_Site_Visit_Instructions_20240328_0009.docx DOCX document
Temporary_Bookstore_Design__0009.zip ZIP file
B09_Amd_08_GOGA_311373_Solicitation_QA_TO_POST_0008.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0008.pdf PDF
B09_Amd_07_GOGA_311373_Solicitation_QA_3_0007.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0007.pdf PDF
B09_Amd_07_SF30_140P2024R0025_0007.pdf PDF
Sol_140P2024R0025_Amd_0006.pdf PDF
B09_Amd_06_SF30_140P2024R0025_0006.pdf PDF
B09_Amd_06_GOGA_311373_Solicitation_QA_2_0006.xlsx XLSX spreadsheet
B09_Amd_05_Attach_38_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part4_0005.pdf PDF
B09_Amd_05_Attach_40_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part6_0005.pdf PDF
B09_Amd_05_Attach_37_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part3_0005.pdf PDF
B09_Amd_05_Attach_41_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part7_0005.pdf PDF
B09_Amd_05_Attach_36_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part2_0005.pdf PDF
B09_Amd_05_Attach_39__GOGA_311373_Complete_CD_Drawings_2023_08_07_Part5_0005.pdf PDF
B09_Amd_05_Solit_Clauses_Construction_GOGA_311373_0005.docx DOCX document
Sol_140P2024R0025_Amd_0005.pdf PDF
B09_Amd_05_Attach_35_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part1_0005.pdf PDF
B09_Amd_05_SF30_140P2024R0025_0005.pdf PDF
B09_Amd_05_Attach_34_Final_Specifications_GOGA_311373_0005.pdf PDF
B09_Amd_04_SF30_140P2024R0025_0004.pdf PDF
B09_Amd_04_Attach_29_Subcontracting_Plan_0004.doc DOC document
B09_Amd_04_GOGA_311373_Solicitation_QA_1_0004.xlsx XLSX spreadsheet
B09_Amd_04_Solit_Clauses_Construction_GOGA_311373_0004.docx DOCX document
Sol_140P2024R0025_Amd_0004.pdf PDF
B09_Amd_03_Attach_GOGA_311373_Alcatraz_Historic_Structures_Sign-in_0003.pdf PDF
Sol_140P2024R0025_Amd_0003.pdf PDF
B09_Amd_03_SF30_140P2024R0025_0003.pdf PDF
B09_Amd_02_Solit_Clauses_Construction_GOGA_311373_0002.docx DOCX document
Sol_140P2024R0025_Amd_0002.pdf PDF
B09_Amd_02_SF30_140P2024R0025_0002.pdf PDF
Sol_140P2024R0025_Amd_0001.pdf PDF
B09_Amd_01_SF30_140P2024R0025_0001.pdf PDF
B09_Amd_01_Attach_33_GOGA_311373_Prebid_Site_Visit_insructions_0001.docx DOCX document
B08_Attach_04_CLIN_Diagram.pdf PDF
B08_Attach_11_Langan_Geotechnical_Report.pdf PDF
B08_Solit_Clauses_Construction_GOGA_311373(3).docx DOCX document
B08_Attach_18_PV_SBS___Flashing_Specification.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AFTER PREPROPOSAL CONFERENCE

· Direct all questions to both Ashley McAveinew, Contracting Officer, and Patrick Naulty, Contracting Specialist. Please submit all questions not later than 1/24/2024.

· Questions directed to any other Government team member will be redirected to Ms. McAvinew or Mr. Naulty. No answers will be provided by any other team member. All questions and answers will be provided to all prospective offerors by amendment to the solicitation.

· Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.SAM.gov Award of a Contract:

Best Value Trade Alternate proposals shall not be accepted or evaluated.

The government intends to evaluate proposals and award a contract without discussions with offerors; therefore the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The government reserves the right to conduct discussions if the CO later determines them to be necessary.

Project Location:

Golden Gate National Recreation Area, Alcatraz Island, CA

Responses to questions during the site visit do not change the solicitation document

Changes to the solicitation document shall be made by formal written amendment only

Preproposal Conference/Site Visit meeting notes, attendance sheet, questions, and answers will be issued by a formal written amendment to the solicitation for information only

Alcatraz Prison Hospital Wing Seismic and Stabilize, GOGA 311373

Preproposal Conference/ Site Visit- Wednesday January 10, 2024 & Thursday January 11, 2024.

Request for Proposals No. 140P2024R0025 CO: Ashley McAvinew ashley_mcavinew@nps.gov CS: Patrick Naulty patrick_naulty@nps.gov

Clauses 52.211-10 Commencement, Prosecution, and Completion of Work - Commence work within 10 days after NTP. Complete not later than 1140 days after NTP.

52.211-12 Liquidated Damages – Construction - If contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,696 for each calendar day of delay until the work is completed or accepted.

Special Clause 2 – Key Personnel: Project Manager, On-site Job-site Superintendent, On-site Quality Control Supervisor, & On-Site Project Safety Manager. Prospective contractor shall not be allowed to change key personnel during the first 365 days of performance.

DIAR 1452.228-70 – Liability Insurance: The contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the CO by an insurance company which is acceptable to the CO. The amounts of insurance shall be not less than:

Construction $100,000 each person $500,000 each occurrence $1,000,000 property damage

52.225-11 Buy American – Construction Materials Under Trade Agreements – Refer to Clause for specific requirements.

Submission and Evaluation Section L Instructions for the Submission of Offers Proposals Due January 31, 2024, 13:00 PT.

· Volume I – Non-Price Proposal

· Volume II - Business and Price Proposal

· Alternate proposals SHALL NOT be considered.

· Government may award without discussion.

· Send electronic proposals to: CS_DSC_Proposal_Submission@nps.gov patrick_naulty@nps.gov Ashley_mcavinew@nps.gov

· Submissions shall contain the solicitation number, park-PMIS, and number of total emails (example in solicitation) Evaluation Factors: The evaluation factors are correlated to the proposal preparation instructions. Factors 1- 7 are of equal importance.

Overall: All evaluation factors, other than price, when combined are significantly more important than price

FACTOR 1 – PROJECT EXPERIENCE

FACTOR 2 – TECHNICAL APPROACH

FACTOR 3 – KEY PERSONNEL EXPERIENCE

FACTOR 4 – SCHEDULE

FACTOR 5 – MANAGEMENT AND SAFETY

FACTOR 6 – PAST PERFORMANCE

FACTPR 7 – SMALL BUSINESS PARTICIPATION

Refer to solicitation for specific information on submission requirements and evaluation.

Overview of project The Work includes seismic retrofitting of the Hospital Wing of the Cellhouse. The Work also includes stabilization and structural repairs due to corrosion to the exterior of the historic Cellhouse. See solicitation, for more detail.

Construction activity will require coordination with public visitation and bird nesting season. Special site restrictions and protections are required during the bird nesting season that occurs between approximately February 1 and September 1. Delivery and mobilization of heavy equipment may be limited by restrictions during bird nesting season. All workers are required to attend an additional natural resource briefing once per month during bird breeding season. Natural resource briefings will be held in conjunction with regularly scheduled safety meetings.

image1.png