B09_Amd_04_GOGA_311373_Solicitation_QA_1_0004.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 140P2024R0025
About this file
This document contains questions and answers regarding solicitation number 140P2024R0025 for the GOGA 311373 Alcatraz Prison Hospital Wing Seismic project. The solicitation involves seismic and stabilization work on the Alcatraz Prison Hospital Wing for the Department of the Interior National Park Service National Office. Key details include that the bid due date was extended to February 29, 2024 per Amendment 3. Amendment 4 provides clarification that proof testing of micropiles will be to 150% of design load rather than 100% as originally specified. Reinforcing for micropiles will be modified to ASTM A615 Grade 75 steel. Confirmation was also provided that the total number of micropiles is 27. The document clarifies symbols used on drawings and permits use of a batch plant at the designated staging area 6A on the island for concrete production.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOGA 311373
| Solicitation Question + Answer | Schedule of Changes | ||||||
| PMIS | GOGA 311373 | |||||
| Solicitation | 140P2024R0025 Amendment 4 | |||||
| # | Date | Asker | Question | Answer | Response By | Amd # |
| 1 | 1/11/24 | Mike Cashman, Plant Construction Company | Plant Construction Company would like to request a one (1) month time extension to sub our bid proposal. We would like to have an extension of the bid due date to February 28th. | Amendment #3 on 1/16/2024: "Yes, the solicitation due date is extended to February 29, 2024." | NPS | 3 |
| 2 | 1/22/24 | NPS | Provide updated Contact Information in Summary of Work Section 01 11 00. | Revise section 01 11 00 paragraph 1.09.F.1 to remove "Aaron Warren 415.559.3126" and replace with "Antonette Sespene 415.559.3123". Revise section 01 11 00 paragraph 1.09.F.3 to remove "Aaron Warren 415.559.3126" and replace with "Trevor Hendronetto 415.866.3948". | NPS | 4 |
| 3 | 1/23/24 | Mike Cashman, Plant Construction Company | The geotechnical report recommends proof testing to 150% of design load. The specifications indicate testing to 100% of design load. Please clarify what the test load will be. Geotech paragraph 3.2 vs. Spec. Section 31 63 33 | Specification 31 63 33 - Drilled Micropiles will be followed for proof testing of micropiles. Please be advised that the test load provided in Section 3.4.C.4 will be modified in an addendum so that the "Maximum Test Load = 150 kips". |
| Additionally, 03 30 00, under section 2.4, micropile reinforcing will be modified in an addendum from "ASTM A615, Grade 60" to "ASTM A615, Grade 75". | WJE | 4 | |||||
| 5 | 1/23/24 | Mike Cashman, Plant Construction Company | The project specifications have provisions for steel casing. The project plans do not indicate casing. Is permanent steel casing required on this project? Spec Section 31 63 33 | Steel casing is not needed from a geotechnical standpoint. | WJE | 4 | |
| 6 | 1/23/24 | Mike Cashman, Plant Construction Company | If steel casing is required, what is the maximum casing OD allowed for this installation? Spec Section 31 63 33 | Steel casing is not needed from a geotechnical standpoint. | WJE | 4 | |
| 9 | 1/23/24 | Mike Cashman, Plant Construction Company | Please clarify the emergency egress plan for the Phase 3A Basement work as drawing G007 only shows an emergency egress path from the First Floor and which is not accessible from the Basement level. Sheet G007 | There is no work being completed in the basement level of the Hospital Wing during Phase 3A, and the egress plan for this floor remains unchanged from its current configuration. | WJE | 4 | |
| 10 | 1/23/24 | Mike Cashman, Plant Construction Company | We would want to check the overall number of micropiles in this project. We believe the total number of piles is 27. Please confirm. Sheets S440, S450 & S460 | There are a total of 27 micropiles for the project. | WJE | 4 | |
| 11 | 1/23/24 | Mike Cashman, Plant Construction Company | Please clarify the symbols at the wall elevations (similar to sheet A360 at grid K.3): symbols are 920-PLp0 & 901-BF or 901-SM at wall? What does the 0 mean after the PLp symbol? Are these symbols the existing conditions of the walls? Sheet A360 | The "O/" is provided in the definitions on Sheet G003 and is defined as "over". For example, 920-PLp O/ 901-BF OR 901-SM reads: direct applied plaster over board-formed concrete finish or smooth concrete finish. |
| These symbols represent the finishes after the new concrete is placed. | WJE | 4 | |||||
| 12 | 1/23/24 | Mike Cashman, Plant Construction Company | Will we be allowed to set up a batch plant for concrete on the island? If so, please advise to the location we should assume. | Yes, a batch plant for this project is required, see section 01 27 00 paragraph 3.1. A permissable location for the batch plant may be at "Barbershop Plaza" in staging area 6A on drawing G005. See contract documents for additional details on staging areas or other limitations. | NPS | 4 |