This document package includes specifications for a federal construction contract to install solar photovoltaic panels on the Alcatraz Prison Hospital Wing. The project involves roofing, flashing, electrical work, and photovoltaic system installation. Specified materials include modified bitumen roofing membrane, galvanized sheet metal, conduit, wiring devices, transformers, switchboards, and solar panels. Subcontracting opportunities exist for work such as masonry, carpentry, plumbing, and HVAC. The National Park Service is the contracting agency. Submittals are required for items including shop drawings, product data, samples, and warranties. Construction must meet standards for wind and seismic loading. Inspections will be conducted upon completion.

View the file

Other files

File Type Posted
B09_Amd_12_Q_A__84_Temporary_Move_Items_0012.xlsx XLSX spreadsheet
B09_Amd_12_Existing_Lighthouse_E2_0012.jpeg JPEG file
B09_Amd_12_Updated_Drawings_for_Additional_Areas_to_Paint_0012.pdf PDF
B09_Amd_12_Wage_Determination_Update_4_11_24_0012.pdf PDF
B09_Amd_12_GOGA_311373_Solicitation_Q_A_Final_0012.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0012.pdf PDF
Sol_140P2024R0025_Amd_0011.pdf PDF
B09_Amd_10_Sign_in_sheet_3_28_24_0010.pdf PDF
B09_Amd_10_Site_Visit_Tri_Fold_GOGA_311373_rev1_0010.pdf PDF
Sol_140P2024R0025_Amd_0010.pdf PDF
Sol_140P2024R0025_Amd_0009.pdf PDF
B09_Amd_9_GOGA_311373_Prebid_Site_Visit_Instructions_20240328_0009.docx DOCX document
Temporary_Bookstore_Design__0009.zip ZIP file
B09_Amd_08_GOGA_311373_Solicitation_QA_TO_POST_0008.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0008.pdf PDF
B09_Amd_07_GOGA_311373_Solicitation_QA_3_0007.xlsx XLSX spreadsheet
Sol_140P2024R0025_Amd_0007.pdf PDF
B09_Amd_07_SF30_140P2024R0025_0007.pdf PDF
Sol_140P2024R0025_Amd_0006.pdf PDF
B09_Amd_06_SF30_140P2024R0025_0006.pdf PDF
B09_Amd_06_GOGA_311373_Solicitation_QA_2_0006.xlsx XLSX spreadsheet
B09_Amd_05_Attach_38_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part4_0005.pdf PDF
B09_Amd_05_Attach_40_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part6_0005.pdf PDF
B09_Amd_05_Attach_37_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part3_0005.pdf PDF
B09_Amd_05_Attach_41_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part7_0005.pdf PDF
B09_Amd_05_Attach_36_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part2_0005.pdf PDF
B09_Amd_05_Attach_39__GOGA_311373_Complete_CD_Drawings_2023_08_07_Part5_0005.pdf PDF
B09_Amd_05_Solit_Clauses_Construction_GOGA_311373_0005.docx DOCX document
Sol_140P2024R0025_Amd_0005.pdf PDF
B09_Amd_05_Attach_35_GOGA_311373_Complete_CD_Drawings_2023_08_07_Part1_0005.pdf PDF
B09_Amd_05_SF30_140P2024R0025_0005.pdf PDF
B09_Amd_05_Attach_34_Final_Specifications_GOGA_311373_0005.pdf PDF
B09_Amd_04_SF30_140P2024R0025_0004.pdf PDF
B09_Amd_04_Attach_29_Subcontracting_Plan_0004.doc DOC document
B09_Amd_04_GOGA_311373_Solicitation_QA_1_0004.xlsx XLSX spreadsheet
B09_Amd_04_Solit_Clauses_Construction_GOGA_311373_0004.docx DOCX document
Sol_140P2024R0025_Amd_0004.pdf PDF
B09_Amd_03_Attach_GOGA_311373_Alcatraz_Historic_Structures_Sign-in_0003.pdf PDF
Sol_140P2024R0025_Amd_0003.pdf PDF
B09_Amd_03_Attach_Site_Visit_Tri_Fold_GOGA_311373_0003.docx DOCX document
B09_Amd_03_SF30_140P2024R0025_0003.pdf PDF
B09_Amd_02_Solit_Clauses_Construction_GOGA_311373_0002.docx DOCX document
Sol_140P2024R0025_Amd_0002.pdf PDF
B09_Amd_02_SF30_140P2024R0025_0002.pdf PDF
Sol_140P2024R0025_Amd_0001.pdf PDF
B09_Amd_01_SF30_140P2024R0025_0001.pdf PDF
B09_Amd_01_Attach_33_GOGA_311373_Prebid_Site_Visit_insructions_0001.docx DOCX document
B08_Attach_04_CLIN_Diagram.pdf PDF
B08_Attach_11_Langan_Geotechnical_Report.pdf PDF
B08_Solit_Clauses_Construction_GOGA_311373(3).docx DOCX document
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications taken from GOGA 150682 -

Alcatraz Roofing Photovoltaic Project

GOGA, 150682

075216 - 1

STYRENE-BUTADIENE-STYRENE (SBS)

MODIFIED BITUMINOUS MEMBRANE ROOFING

SECTION 075216

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Styrene-butadiene-styrene (SBS) modified bituminous membrane roofing.

2. Roof insulation.

B. Related Sections:

1. Section 079200 "Joint Sealants" for joint sealants, joint fillers, and joint preparation.

1.3 DEFINITIONS

A. Roofing Terminology: See ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" for definition of terms related to roofing work in this Section.

1.4 PERFORMANCE REQUIREMENTS

A. General Performance: Installed membrane roofing and base flashings shall withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Membrane roofing and base flashings shall remain watertight.

B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by membrane roofing manufacturer based on testing and field experience.

C. FM Approvals Listing: Provide membrane roofing, base flashings, and component materials that comply with requirements in FM Approvals 4450 and FM Approvals 4470 as part of a membrane roofing system, and that are listed in FM Approvals' "RoofNav" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Approvals markings.

1. Fire/Windstorm Classification: Class 1A-90

075216 - 2

D. Solar Reflectance Index: Not less than 78 when calculated according to ASTM E 1980 based on testing identical products by a qualified testing agency.

E. Energy Performance: Provide roofing system with initial Solar Reflectance not less than 0.70 and Thermal Emittance not less than 0.75 when tested according to Cool Roof Rating Council's

CRRC-1.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work.

1. Base flashings and membrane terminations.

2. Tapered insulation and crickets, including slopes and board layout.

3. Saddles and tapered edge strips, including slopes.

C. Samples for Verification: For the following products:

1. Sheet roofing materials, including base sheet and membrane cap sheet of color specified.

2. Roof insulation.

3. Aluminum fibrated roof coating.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer.

B. Manufacturer Certificates: Signed by roofing manufacturer certifying that roofing system complies with requirements specified in "Performance Requirements" Article.

1. Submit evidence of complying with performance requirements.

C. Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified testing agency, for components of membrane roofing system.

D. Research/Evaluation Reports: For components of membrane roofing system, from the ICC-ES.

E. Warranties: Sample of special warranties.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance Data: For roofing system to include in maintenance manuals.

075216 - 3

1.8 QUALITY ASSURANCE

A. Manufacturer Qualifications: A qualified manufacturer that is UL listed for membrane roofing system identical to that used for this Project.

B. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by membrane roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.

C. Source Limitations: Obtain components including roof insulation for membrane roofing system from same manufacturer as membrane roofing or approved by membrane roofing manufacturer.

D. Exterior Fire-Test Exposure: ASTM E 108, Class A for application and roof slopes indicated, as determined by testing identical membrane roofing materials by a qualified testing agency.

Materials shall be identified with appropriate markings of applicable testing agency.

E. Preliminary Roofing Conference: Before starting roof deck construction, conduct conference at Project site

F. Preinstallation Roofing Conference: Conduct conference at Project site.

1. Meet with Contracting Officer, Architect, Contracting Officer's insurer if applicable, testing and inspecting agency representative, roofing Installer, roofing system manufacturer's representative, deck Installer, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment.

2. Review methods and procedures related to roofing installation, including manufacturer's written instructions.

3. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

4. Examine deck substrate conditions and finishes for compliance with requirements, including flatness and fastening.

5. Review structural loading limitations of roof deck during and after roofing.

6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment curbs, and condition of other construction that will affect roofing system.

7. Review governing regulations and requirements for insurance and certificates if applicable.

8. Review temporary protection requirements for roofing system during and after installation.

9. Review roof observation and repair procedures after roofing installation.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight.

075216 - 4

1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.

C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.

D. Handle and store roofing materials and place equipment in a manner to avoid permanent deflection of deck.

1.10 PROJECT CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.

1.11 WARRANTY

A. Special Warranty: Manufacturer's standard or customized form, without monetary limitation, in which manufacturer agrees to repair or replace components of membrane roofing system that fail in materials or workmanship within specified warranty period.

1. Special warranty includes membrane roofing, base flashings, roof insulation, fasteners and other components of membrane roofing system.

2. Warranty Period: 20 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 SBS-MODIFIED ASPHALT-SHEET MATERIALS

A. SBS-Modified Bituminous Membrane Roofing:

1. Manufacturers: Firestone Building Products.

B. Roofing Torch Intermediate Sheet: ASTM D 6164, Grade S, Type I, SBS-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); Firestone SBS Poly Torch Base; suitable for application method specified.

C. Granule-Surface Roofing Membrane Torch Cap Sheet: ASTM D 6164, Grade G, Type II, SBS-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers);

Firestone SBS Premium Torch.

1. Surfacing: Firestone Aluminum Fibered Roof Coating.

2. Granule Color: White http://www.specagent.com/LookUp/?ulid=5029&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456819277&mf=04&src=wd

075216 - 5

2.2 BASE-SHEET MATERIALS

A. Base Sheet: ASTM D 5147, SBS-modified, self-adhesive asphalt-impregnated and coated sheet, with glass-fiber-reinforcing mat, dusted with fine mineral surfacing on both sides - Firestone MB Base SA.

2.3 AUXILIARY ROOFING MEMBRANE MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with roofing membrane.

1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.

2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."

B. Asphalt Primer: ASTM D 41 – Firestone SA Primer.

C. Liquid Flashing: Firestone UltraFlash Liquid Flashing.

D. Liquid Flashing Scrim: Firestone UltraFlash Fabric.

E. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening roofing membrane components to substrate; tested by manufacturer for required pullout strength, and acceptable to roofing system manufacturer.

F. Metal Flashing Sheet: As specified in Section 076200 "Sheet Metal Flashing and Trim."

G. Miscellaneous Accessories: Provide those recommended by roofing system manufacturer.

2.4 SUBSTRATE BOARDS

A. Georgia-Pacific Corporation; Dens Deck - ONLY AT AREAS WHERE COMPOSITE FIBER REINFORCING OCCURS: ASTM C 1177/C1177M, 0 flame spread and 0 smoke developed when tested in accordance with ASTM E 84, 500 psi, Class A, non-combustible, ¼” thick.

B. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Approvals 4470, designed for fastening substrate board to roof deck.

2.5 ROOF INSULATION

A. General: Preformed roof insulation boards manufactured or approved by roofing manufacturer, selected from manufacturer's standard sizes suitable for application.

http://www.specagent.com/LookUp/?uid=123456819294&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456819294&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456819294&mf=04&src=wd

075216 - 6

B. Polyisocyanurate Board Insulation: ASTM C 1289 – Firestone, Tapered ISO 95+.

C. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where required to match slopes indicated on drawings. Note: cants at exterior walls must be pressure treated wood. Fibrous cants are not allowed.

D. Crickets and roof require minimum ¼” per foot and maximum 1” per foot positive slope to drains.

2.6 INSULATION ACCESSORIES

A. General: Furnish roof insulation accessories recommended by insulation manufacturer for intended use and compatibility with membrane roofing.

B. Fasteners: Factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FM Approvals 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.

C. Modified Asphaltic Insulation Adhesive: Insulation manufacturer's recommended modified asphaltic, asbestos-free, cold-applied adhesive formulated to attach roof insulation to substrate or to another insulation layer.

D. Wood Nailer Strips: Comply with requirements in Section 061000 "Rough Carpentry."

E. Substrate Joint Tape: 6- or 8-inch- (150- or 200-mm-) wide, coated, glass-fiber joint tape.

2.7 WALKWAYS

A. Roll Walkway Pad: ASTM D 61642, Grade G, Type II, SBS-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); granular surfaced; Additional layer of Firestone SBS Premium Torch:

1. Granule Color: White

2.8 WOOD CANT STRIPS

A. Preservative pressure treated wood fabricated from 2x stock with minimum 3 inch (net) legs.

TimberSIL Glass Wood may be used at Contractor’s option (Contact TimberSIL Products at 703-941-5171).

B. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC3b for exterior construction not in contact with the ground.

075216 - 7

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with the following requirements and other conditions affecting performance of roofing system:

1. Verify that wood cants, blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections.

Grind or chip high areas.

B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.

C. Patch spalled areas in concrete deck as required with non-shrink grout.

D. Prime surface of concrete deck with asphalt primer at a rate of 3/4 gal./100 sq. ft. (0.3 L/sq. m) and allow primer to dry.

3.3 SUBSTRATE BOARD INSTALLATION

A. Install substrate board with long joints in continuous straight lines, perpendicular to roof slopes with end joints staggered between rows. Tightly butt substrate boards together. Only install over areas where composite fiber reinforcing is located on roof.

3.4 INSULATION INSTALLATION

A. Comply with roofing system manufacturer's written instructions for installing roof insulation.

B. Pressure Treated Wood Cant Strips: Install and secure preformed 45-degree cant strips at junctures of roofing membrane system with vertical surfaces or angle changes more than 45 degrees.

C. Install tapered insulation under area of roofing to conform to existing slopes as indicated.

D. Install insulation with long joints of insulation in a continuous straight line with end joints staggered between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch (6 mm) with insulation.

075216 - 8

1. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations.

E. Trim surface of insulation where necessary at roof drains so completed surface is flush and does not restrict flow of water.

F. Install tapered edge strips at perimeter edges of roof that do not terminate at vertical surfaces.

3.5 ROOFING MEMBRANE INSTALLATION, GENERAL

A. Install roofing membrane system according to roofing system manufacturer's written instructions and applicable recommendations in ARMA/NRCA's "Quality Control Guidelines for the Application of Polymer Modified Bitumen Roofing" and as follows:

1. Deck Type: C (concrete or nonnailable).

2. Adhering Method: T (torched)

3. Self-adhered Base Sheet: One

4. Number of SBS-Modified Asphalt Sheets: Two

5. Surfacing Type: Applied Aluminum Fibered Roof Coating

B. Start installation of roofing membrane in presence of roofing system manufacturer's technical personnel.

C. Where roof slope exceeds 1/2 inch per 12 inches (1:24) install roofing membrane sheets parallel with slope.

D. Cooperate with testing agencies engaged or required to perform services for installing roofing system.

E. Coordinate installation of roofing system so insulation and other components of the roofing membrane system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.

1. At end of each day's work, provide tie-offs to cover exposed roofing membrane sheets and insulation with a course of coated felt set in roofing cement or hot roofing asphalt, with joints and edges sealed.

2. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system.

3. Remove and discard temporary seals before beginning work on adjoining roofing.

3.6 PRIMER INSTALLATION

1. Install primer in accordance with manufacturers written instructions.

2. Apply with a solvent resistant roller.

3. Verify that surfaces are clean, dry and free of foreign materials.

4. Stir Primer thoroughly. Stir frequently during use.

5. Roller apply to substrate at a rate of one gallon per 200 square feet until surface becomes dark in color with no streaking or puddling.

6. Roller apply to all side and end laps

075216 - 9

7. Allow primed surfaces to dry according to the touch-push test before applying MB Base SA (usually less than 10 minutes).

8. Prime all laps and complete seaming procedures in accordance with Firestones requirements.

3.7 BASE-SHEET INSTALLATION

1. Install base-sheet course in accordance with manufacturers written instructions.

2. Start at low point of roof, unroll Firestone Base SA and allow the sheet to relax.

3. Align the Base Sheet so that is lays flat with no wrinkles.

4. Align subsequent rolls, shingling the laps and maintaining a minimum 3 inch side lap and a minimum 6 inch end lap.

5. Begin attachment by removing the first 12 inch wide backing from the membrane

6. Apply pressure to the top side of the exposed area, starting at the center and working out to the edges.

3.8 SBS-MODIFIED BITUMINOUS MEMBRANE INSTALLATION

A. Install modified bituminous roofing membrane intermediate sheet and cap sheet according to roofing manufacturer's written instructions, starting at low point of roofing system. Extend roofing membrane sheets over and terminate beyond cants, installing as follows:

1. Torch apply to substrate.

2. Unroll roofing membrane sheets and allow them to relax for minimum time period required by manufacturer.

B. Laps: Accurately align roofing membrane sheets, without stretching, and maintain uniform side and end laps. Stagger end laps. Completely bond and seal laps, leaving no voids.

1. Repair tears and voids in laps and lapped seams not completely sealed.

2. Apply roofing granules to cover exuded bead at laps while bead is hot.

C. Install roofing membrane sheets so side and end laps shed water.

3.9 ALUMINUN FIBRATED COATING INSTALLATION

A. Install Aluminum Fibrated Coating according to roofing manufacturer's written instructions as follows:

1. Inspect substrate to insure that it is clean, dry and free of foreign materials such as oil, grease and contaminants..

2. Mix contents thoroughly to insure complete dispersion of aluminum pigments.

3. Apply on a warm day, 60 degrees F or above with no forecast of rain for 24 hours.

4. Pour Firestone Aluminum Fibrated Roof Coating out of the container in small amounts and brush, in parallel strokes to form an even layer. Do not over brush.

5. Repeat as required to insure complete coverage.

075216 - 10

3.10 FLASHING AND STRIPPING INSTALLATION

A. Install base flashing over cant strips and other sloped and vertical surfaces, at roof edges, and at penetrations through roof; secure to substrates according to roofing system manufacturer's written instructions, and as follows:

1. Prime substrates with asphalt primer if required by roofing system manufacturer.

2. Flashing Sheet Application: Torch apply flashing sheet to substrate.

B. Extend base flashing up walls or parapets as indicated (a minimum of 8 inches (200 mm) above roofing membrane and 4 inches (100 mm) onto field of roofing membrane).

C. Mechanically fasten top of base flashing securely at terminations and perimeter of roofing where indicated.

D. Install roofing membrane cap-sheet stripping where metal flanges and edgings are set on membrane roofing according to roofing system manufacturer's written instructions.

3.11 LIQUID FLASHING INSTALLATION (Firestone UltraFlash)

A. Precautions:

1. Do not thin product.

2. Avoid contamination with water or moisture.

3. Keep all containers tightly closed until ready to use.

4. All equipment, air supplies and application substrates must be ABSOLUTELY DRY.

5. Do not apply in wet weather or when rain is imminent.

6. Do not apply if liquid flashing or substrate to which it is to be applied will become wet within 4 hours of application.

7. Do not coat UltraFlash with Firestone Aluminum Fibrated Coating or any type of aluminum paint.

8. Do not apply UltraFlash to pressure treated wood.

B. Surface Preparation:

1. Use Firestone UltraFlash primer on all non-porous and metal surfaces.

2. Wood and concrete surfaces must be clean, dry and free of surface contamination.

C. Apply liquid flashing with paint brush or trowel at 60 mils total thickness (30 mils below and 30 mils on top of the metal or fabric).

D. Surfaces to be flashed must be at least 45 degrees F and 5 degrees F above the dew point.

E. Liquid flashing must be at least 60 degrees F when mixed and applied.

F. Liquid flashing at roof and wall penetrations:

1. Remove all existing flashings.

2. Mix UltraFlash in accordance with manufacturer’s instructions.

075216 - 11

3. Apply UltraFlash to the penetration to be flashed a minimum of 6 inches up form the field of the roof or wall and a minimum of 6 inches out on to the field of the roof or wall.

4. Using a piece of UltraFlash Fabric (polyester scrim), lay the scrim into the UltraFlash completely encircling the penetration and extending a minimum of 6 inches up the penetration and 6 inches on to the field of the roof or wall.

5. Embed the fabric into the UltraFlash and coat it with UltraFlash compound until the pattern of the fabric is not visible.

6. UltraFlash Fabric must be smooth with no wrinkles or fishmouths.

7. Coat the area at least 2 inches above the scrim on the penetration and 2 inches beyond the area where the scrim extends out on to the roof or wall surface.

8. Do not feather the edges of UltraFlash. UltraFlash edges should be equal to or greater than the thickness of the UltraFlash flashing application.

9. Granules may be embedded into the fresh UltraFlash compound to match the surface of the roof.

G. Liquid flashing at roof drains:

1. Remove all existing flashings, roofing material and cement from existing drain details.

2. Mix UltraFlash in accordance with manufacturer’s instructions.

3. Apply UltraFlash as indicated on drawings.

3.12 W ALKWAY PAD INSTALLATION

A. Install Walkway Pad in same manner as roofing cap sheet:

1. Torch apply to substrate.

2. Unroll roofing membrane sheets and allow them to relax for minimum time period required by manufacturer.

3.13 FIELD QUALITY CONTROL

A. Testing Agency: Engage a qualified testing agency to perform tests and inspections and to prepare test reports.

B. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion.

1. Notify Architect and Contracting Officer 48 hours in advance of date and time of inspection.

C. Roofing system will be considered defective if it does not pass tests and inspections.

1. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements.

075216 - 12

3.14 PROTECTING AND CLEANING

A. Protect roofing system from damage and wear during remainder of construction period. When remaining construction will not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Contracting Officer.

B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.

C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

D. Remove debris, scraps, containers and other rubbish and trash resulting from installation of the roofing system from job site each day.

E. Remove bituminous markings from finished surfaces. In areas where finished surfaces are soiled by asphalt or any other source of soiling caused by work of this section, consult manufacturers of surfaces for cleaning advice and conform to their instructions.

END OF SECTION 075216

SECTION 076200

SHEET METAL FLASHING AND TRIM

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Manufactured Products:

a. Manufactured counter-flashing.

2. Formed Products:

a. Formed wall sheet metal fabrications.

b. Formed equipment support flashing.

B. Related Sections:

1. Section 061000 "Rough Carpentry" for wood nailers, curbs, and blocking.

C. General: Sheet metal flashing and trim assemblies as indicated shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.

D. Thermal Movements: Provide sheet metal flashing and trim that allows for thermal movements from ambient and surface temperature changes.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each manufactured product and accessory.

B. Shop Drawings: Show fabrication and installation layouts of sheet metal flashing and trim, including plans, elevations, expansion-joint locations, and keyed details.

1. Identification of material, thickness, weight, and finish for each item and location in Project.

GOGA, 150682 076200 - 1

2. Details for forming sheet metal flashing and trim, including profiles, shapes, seams, and dimensions.

3. Details for joining, supporting, and securing sheet metal flashing and trim.

4. Details of connections to adjoining work.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified fabricator.

B. Warranty: 2 year warranty for workmanship and materials.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance Data: For sheet metal flashing, trim, and accessories to include in maintenance manuals.

1.6 QUALITY ASSURANCE

A. Fabricator Qualifications: Shop that employs skilled workers who custom fabricate sheet metal flashing and trim similar to that required for this Project and whose products have a record of successful in-service performance.

B. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "Architectural Sheet Metal Manual" unless more stringent requirements are specified or shown on Drawings.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Do not store sheet metal flashing and trim materials in contact with other materials that might cause staining, denting, or other surface damage. Store sheet metal flashing and trim materials away from uncured concrete and masonry.

PART 2 - PRODUCTS

2.1 SHEET METALS

A. General: Protect mechanical and other finishes on exposed surfaces from damage by applying a strippable, temporary protective film before shipping.

B. Metallic-Coated Steel Sheet: Restricted flatness steel sheet, metallic coated by the hot-dip process and pre-painted by the coil-coating process to comply with ASTM A 755/A 755M.

1. Zinc-Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, G90 (Z275) coating designation; structural quality.

2. Surface: Smooth, flat.

3. Finish: Bright rolled.

GOGA, 150682 076200 - 2

2.2 UNDERLAYMENT MATERIALS

A. Self-Adhering, High-Temperature Sheet: Minimum 30 to 40 mils (0.76 to 1.0 mm) thick, consisting of slip-resisting polyethylene-film top surface laminated to layer of butyl or SBS-modified asphalt adhesive, with release-paper backing; cold applied. Provide primer when recommended by underlayment manufacturer.

1. Thermal Stability: ASTM D 1970; stable after testing at 240 deg F (116 deg C).

2. Low-Temperature Flexibility: ASTM D 1970; passes after testing at minus 20 deg F (29 deg C).

a. Products: Firestone MB Base or equivalent.

2.3 MISCELLANEOUS MATERIALS

A. General: Provide materials and types of fasteners, solder, protective coatings, separators, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation and recommended by manufacturer of primary sheet metal unless otherwise indicated.

B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads and recommended by manufacturer of primary sheet metal.

1. General: Blind fasteners or self-drilling screws, gasketed with hex-washer head.

a. Exposed Fasteners: Heads matching color of sheet metal using plastic caps or factory-applied coating.

b. Blind Fasteners: High-strength stainless-steel rivets suitable for metal being fastened.

2. Fasteners for Zinc-Coated (Galvanized) Steel Sheet: Hot-dip galvanized steel according to ASTM A 153/A 153M or ASTM F 2329 or Series 300 stainless steel.

C. Solder:

1. For Zinc-Coated (Galvanized) Steel: ASTM B 32, Grade Sn50, 50 percent tin and 50 percent lead or Grade Sn60, 60 percent tin and 40 percent lead.

D. Sealant Tape: Pressure-sensitive, 100 percent solids, gray polyisobutylene compound sealant tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape 1/2 inch (13 mm) wide and 1/8 inch (3 mm) thick.

E. Elastomeric Sealant: ASTM C 920, elastomeric polyurethane or silicone polymer sealant; low modulus; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.

F. Bituminous Coating: Cold-applied asphalt emulsion complying with ASTM D 1187.

G. Asphalt Roofing Cement: ASTM D 4586, asbestos free, of consistency required for application.

Firestone MB Flashing Cement or equivalent.

GOGA, 150682 076200 - 3

http://www.specagent.com/LookUp/?ulid=5148&mf=04&src=wd

2.4 MANUFACTURED SHEET METAL FLASHING AND TRIM

1. Material: Galvanized steel, 0.022 inch (0.56 mm) thick.

2. Surface-Mounted Type: Provide with slotted holes for fastening to substrate, with neoprene or other suitable weatherproofing washers, and with channel for sealant at top edge.

3. Accessories:

a. Counter-flashing Wind-Restraint Clips: Provide clips to be installed before counter-flashing to prevent wind uplift of counter-flashing lower edge.

2.5 FABRICATION, GENERAL

A. General: Custom fabricate sheet metal flashing and trim to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, geometry, metal thickness, and other characteristics of item indicated. Fabricate items at the shop to greatest extent possible.

1. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with performance requirements, but not less than that specified for each application and metal.

2. Obtain field measurements for accurate fit before shop fabrication.

3. Form sheet metal flashing and trim without excessive oil canning, buckling, and tool marks and true to line and levels indicated, with exposed edges folded back to form hems.

4. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not allowed on faces exposed to view.

B. Fabrication Tolerances: Fabricate sheet metal flashing and trim that is capable of installation to a tolerance of 1/4 inch in 20 feet (6 mm in 6 m) on slope and location lines as indicated and within 1/8-inch (3-mm) offset of adjoining faces and of alignment of matching profiles.

C. Sealed Joints: Form nonexpansion but movable joints in metal to accommodate elastomeric sealant.

D. Expansion Provisions: Where lapped expansion provisions cannot be used, form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with butyl sealant concealed within joints.

E. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, non-corrosive metal.

F. Fabricate cleats and attachment devices of sizes as recommended by SMACNA's "Architectural Sheet Metal Manual" and by FMG Loss Prevention Data Sheet 1-49 for application, but not less than thickness of metal being secured.

G. Seams: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with elastomeric sealant unless otherwise recommended by sealant manufacturer for intended use.

H. Do not use graphite pencils to mark metal surfaces.

GOGA, 150682 076200 - 4

2.6 LOW-SLOPE ROOF SHEET METAL FABRICATIONS

A. Roof and Roof to Wall Transition: Fabricate from the following materials:

1. Galvanized Steel: 0.034 inch (0.86 mm) thick.

B. Base Flashing: Fabricate from the following materials:

1. Galvanized Steel: 0.028 inch (0.71 mm) thick.

C. Counter-flashing: Fabricate from the following materials:

1. Galvanized Steel: 0.022 inch (0.56 mm) thick.

D. Flashing Receivers: Fabricate from the following materials:

1. Galvanized Steel: 0.022 inch (0.56 mm) thick.

E. Roof-Penetration Flashing: Fabricate from the following materials:

1. Galvanized Steel: 0.028 inch (0.71 mm) thick.

2.7 MISCELLANEOUS SHEET METAL FABRICATIONS

A. Equipment Support Flashing: Fabricate from the following materials:

1. Galvanized Steel: 0.028 inch (0.71 mm) thick.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions and other conditions affecting performance of the Work.

1. Verify compliance with requirements for installation tolerances of substrates.

2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored.

B. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 UNDERLAYMENT INSTALLATION

A. General: Install underlayment as indicated on Drawings.

B. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle free.

Apply primer if required by underlayment manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation; use primer rather than nails for installing underlayment at low temperatures. Apply in shingle fashion to shed water, with end laps of not less than 6 inches (150 mm) staggered 24 inches (600 mm) between courses. Overlap side

GOGA, 150682 076200 - 5

edges not less than 3-1/2 inches (90 mm). Roll laps with roller. Cover underlayment within 14 days.

3.3 INSTALLATION, GENERAL

A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system.

1. Install sheet metal flashing and trim true to line and levels indicated. Provide uniform, neat seams with minimum exposure of solder, welds, and sealant.

2. Install sheet metal flashing and trim to fit substrates and to result in watertight performance. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal.

3. Space cleats not more than 12 inches (300 mm) apart. Anchor each cleat with two fasteners. Bend tabs over fasteners.

4. Install exposed sheet metal flashing and trim without excessive oil canning, buckling, and tool marks.

5. Install sealant tape where indicated.

6. Torch cutting of sheet metal flashing and trim is not permitted.

7. Do not use graphite pencils to mark metal surfaces.

B. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating or by other permanent separation as recommended by SMACNA.

1. Coat back side of uncoated aluminum sheet metal flashing and trim with bituminous coating where flashing and trim will contact wood, ferrous metal, or cementitious construction.

2. Underlayment: Where installing metal flashing directly on cementitious or wood substrates, install a course of felt underlayment and cover with a slip sheet or install a course of polyethylene sheet.

C. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at a maximum of 10 feet (3 m) with no joints allowed within 24 inches (600

mm) of corner or intersection. Where lapped expansion provisions cannot be used or would not be sufficiently watertight, form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with sealant concealed within joints.

D. Fastener Sizes: Use fasteners of sizes that will penetrate not less than recommended by fastener manufacturer to achieve maximum pull-out resistance.

E. Seal joints as shown and as required for watertight construction.

1. Where sealant-filled joints are used, embed hooked flanges of joint members not less than 1 inch (25 mm) into sealant. Form joints to completely conceal sealant. When ambient temperature at time of installation is moderate, between 40 and 70 deg F (4 and 21 deg C), set joint members for 50 percent movement each way. Adjust setting

GOGA, 150682 076200 - 6

proportionately for installation at higher ambient temperatures. Do not install sealant-type joints at temperatures below 40 deg F (4 deg C).

2. Prepare joints and apply sealants to comply with requirements in Section 079200 "Joint Sealants."

F. Soldered Joints: Clean surfaces to be soldered, removing oils and foreign matter. Pre-tin edges of sheets to be soldered to a width of 1-1/2 inches (38 mm), except reduce pre-tinning where pre-tinned surface would show in completed Work.

1. Do not solder metallic-coated steel sheet.

2. Do not use torches for soldering. Heat surfaces to receive solder and flow solder into joint. Fill joint completely. Completely remove flux and spatter from exposed surfaces.

3.4 ROOF FLASHING INSTALLATION

A. General: Install sheet metal flashing and trim to comply with performance requirements, sheet metal manufacturer's written installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, set units true to line, and level as indicated. Install work with laps, joints, and seams that will be permanently watertight and weather resistant.

B. Roof Edge Flashing: Anchor to resist uplift and outward forces according to recommendations in FMG Loss Prevention Data Sheet 1-49 for specified wind zone and as indicated.

C. Pipe or Post Counter-flashing: Install counter-flashing umbrella with close-fitting collar with top edge flared for elastomeric sealant, extending a minimum of 4 inches (100 mm) over base flashing. Install stainless-steel draw band and tighten.

D. Counter-flashing: Coordinate installation of counter-flashing with installation of base flashing.

Insert counter-flashing in reglets or receivers and fit tightly to base flashing. Extend counter-flashing 4 inches (100 mm) over base flashing. Lap counter-flashing joints a minimum of 4 inches (100 mm) and bed with sealant. Secure in a waterproof manner by means of anchor and neoprene washer at 8-inch centers.

E. Roof-Penetration Flashing: Coordinate installation of roof-penetration flashing with installation of roofing and other items penetrating roof. Seal with elastomeric sealant and clamp flashing to pipes that penetrate roof.

3.5 WALL FLASHING INSTALLATION

A. General: Install sheet metal wall flashing to intercept and exclude penetrating moisture according to SMACNA recommendations and as indicated. Coordinate installation of wall flashing with installation of wall-opening components such as windows, doors, and louvers.

3.6 MISCELLANEOUS FLASHING INSTALLATION

A. Overhead-Piping Safety Pans: Suspend pans independent from structure above as indicated on Drawings. Pipe and install drain line to plumbing waste or drainage system.

GOGA, 150682 076200 - 7

GOGA, 150682 076200 - 8

B. Equipment Support Flashing: Coordinate installation of equipment support flashing with installation of roofing and equipment. Weld or seal flashing with elastomeric sealant to equipment support member.

3.7 ERECTION TOLERANCES

A. Installation Tolerances: Shim and align sheet metal flashing and trim within installed tolerance of 1/4 inch in 20 feet (6 mm in 6 m) on slope and location lines as indicated and within 1/8-inch (3-mm) offset of adjoining faces and of alignment of matching profiles.

B. Installation Tolerances: Shim and align sheet metal flashing and trim within installed tolerances specified in MCA's "Guide Specification for Residential Metal Roofing."

3.8 CLEANING AND PROTECTION

A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.

B. Clean and neutralize flux materials. Clean off excess solder.

C. Clean off excess sealants.

D. Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed unless otherwise indicated in manufacturer's written installation instructions. On completion of installation, remove unused materials and clean finished surfaces. Maintain in a clean condition during construction.

E. Replace sheet metal flashing and trim that have been damaged or that have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.

END OF SECTION 076200

SPEC COVER SHEET-100% .pdf
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
INSTALL SOLAR GENERATED POWER ON ALCATRAZ
00 00 10
DOCUMENT 00 00 10
DIVISION 21 – FIRE SUPPRESSION (NOT USED)
DIVISION 22 – PLUMBING
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING (HVAC)
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
02 41 00
02 82 13
All submittals required by this Section shall be maintained on-site by the Contractor and shall be available for review by the CO or the COR.
03 01 30.71
03 30 00
05 12 00
05 50 00
06 10 00
07 52 16
07 62 00
07 84 13
07 92 00
08 80 00
09 91 13
PLUMBSPEC
220513.pdf
220516
220519
220529
220548
220553
221116
221119
221123
221219
221223
224500
MECHSPEC
230513.pdf
230553
233113
233416
233417
ELECTSPEC
26 0500 Common Work Results For Electrical.pdf
26 0519 Low-Voltage Electrical Power Conductors And Cables
26 0523 Control Voltage El;ectrical Power Cables UTP
26 0526 Grounding And Bonding For Electrical Systems
26 0529 Hangers And Supports For Electrical Systems
26 0533 Raceway And Boxes For Electrical Systems
26 0548 Vibration And Seismic Controls For Electrical Systems
26 0553 Identification For Electrical Systems
26 0913 Electrical Power Monitoring And Control
26 2200 Low-Voltage Transformers
26 2413 Switchboards
26 2416 Panelboards
26 2726 Wiring Devices
26 2813 Fuses
26 2816 Enclosed Switches and Circuit Breakers
26 2913 Enclosed Controllers
26 3100 Photovoltaic collectors
26 3213 Engine Generators
26 3323 Central Battery Equipment
26 4313 surge protective devices
26 5100 Interior Lighting

32 31 13