This document is a Bid Schedule for Solicitation Number 140P8624R0017, titled "PAINT THE POINT BONITA SUSPENSION BRIDGE", issued by the Department of the Interior National Park Service Pacific West Region.

The solicitation requires the contractor to perform various tasks related to the preservation of the Point Bonita Suspension Bridge in the Golden Gate National Recreation Area, including constructing scaffolding, sandblasting metal components, sanding and painting wood components, applying epoxy coatings, and repairing concrete. The contract includes a base period and option periods. Offerors must submit pricing for the base line items as well as all option line items. The government reserves the right to award any or no options. Pricing will be evaluated based on best value to the government, and offerors are encouraged to submit alternate proposals for cost savings.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

CONTRACT BID SCHEDULE
SOLICITATION NUMBER:
PARK PMIS: 319229
DEVELOPED AREA: Golden Gate National Recreation Area
PROJECT TITLE: : Paint the Point Bonita Suspension Bridge
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
BASE
1Construct Pre-engineered scaffolding with work platform4392SF$0.00
2Sandblast Metal Bridge Components1109SF$0.00
3Rough Sand Wood Exterior and Paint2840SF$0.00
4Apply Epoxy Based Coating System to metal bridge components1,109SF$0.00
5Apply acrylic primer and paint wood components of bridge2,840SF$0.00
6Repair concrete landing200SF$0.00
TOTAL PROPOSED BASE PRICE + Options -------------- CLIN 1 thru CLIN 6$0.00