Sol_140P8624R0017_Amd_0002.pdf

PDF 88 KB Posted

Attached to
PAINT THE POINT BONITA SUSPENSION BRIDGE
Solicitation number
140P8624R0017
Issued by

About this file

This document is a Contract Amendment that extends the closing date and answers questions related to a solicitation for the PAINT THE POINT BONITA SUSPENSION BRIDGE contract opportunity.

The amendment extends the solicitation closing date to August 19, 2024 at 6:00 PM PST. It provides answers to questions regarding the pedestrian path closure, the condition of the bridge cables, and the estimated painting square footage. The cables have surface corrosion and must be cleaned and coated to prevent further damage, with care taken to maintain structural integrity. The painting square footage will need to be verified by the contractor based on the provided construction drawings. All other terms and conditions of the solicitation remain unchanged.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8624R0017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPG

San Francisco CA 94123 Building 201, Fort Mason

NPS, PWR - GOGA MABO

08/12/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/10/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment is being issued to Extend the closing date and time of solicitation to

08/19/2024 at 6:00 PM PST and answer questions received from interested parties.

Question 1. Will the pedestrian path be closed to the public during construction?

Answer 1. The Tunnel, pedestrian path from the tunnel will be closed, and all access to the bridge closed during construction. The Path leading up to the to the tunnel may have pedestrian traffic but can be closed at the contractor's request for extended periods of time.

Question 2. Are the cables part of Bid Item 2 Sandblast Metal Bridge Components? If so, Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Liset Gomez

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8624R0017/0002 they are in very bad shape and do not want to damage them further, please clarify.

Answer 2. The cables on the bridge have been assessed by federal highways as having surface corrosion. Cables must be taken down to bare white metal, and flash corrosion prevented when applying the coating system as outlined in the specifications. Care must be taken to avoid damage to the structural integrity of the cables.

Please refer to Collins report (Attachment 12) attached for more detail about condition of bridge, and corrosion to cables.

Question 3. The square footage listed in Bid item

3 Rough Sand Wood Exterior and Paint @ 2,840 SF seems very low. Please clarify.

Answer 3. A complete set of construction drawings for the bridge has been provided to the contractors (attachment 02). Contractor is responsible for verifying all dimensions, including area to be painted. Please verify and calculate square footage to be painted based upon construction documents.

All other terms and conditions remain the same.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .