This is a construction drawings set for the Conlon Creek Stream Stabilization project at Muir Woods National Monument in California. The project involves ecological restoration and stream habitat improvement work on approximately 4,116 square feet of disturbed area within Conlon Creek and a tributary channel.
The scope of work includes removal of existing failed infrastructure (approximately 82 linear feet of culvert, two concrete headwalls, and metal trash racks), excavation and grading of the creek channel and tributary, installation of six rock weir grade-control structures with engineered streambed material, construction of rock revetment trenches at four locations, channel bottom widening to 4 feet with 2.5-foot depth, placement of 721 linear feet of fiber rolls for erosion control, installation of 13-foot-wide biodegradable matting on channel banks, and restoration plantings. The project also includes temporary water management features such as fish exclusion fencing, rock diversion berms, and a trash pump system with screened intake device for potential dewatering if required during construction. Site access is restricted to Muir Woods Road with equipment staging in designated stockpile areas. The drawings specify NAVD88 elevation references, detailed cross-sections at multiple stations, and comprehensive erosion control measures including gravel entrance roads with tire wash stations and sediment basin ponds. All excavated materials are to be stockpiled on-site for reuse where suitable, with unsuitable materials disposed off-site at contractor expense. Construction must comply with OSHA excavation safety requirements, and all utility lines must be protected or coordinated with utility companies prior to tree removal.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
SHEET SUB SHEET
NO. SHEET DESCRIPTION
1 G0.1 TITLE SHEET AND INDEX
2 G0.2 LEGEND AND NOTES
3 G0.3 DEMOLITION AND PROTECTION PLAN
4 G0.4 SITE ACCESS AND STAGING
5 C1.0 PROPOSED CENTERLINE COORDINATES
6 C1.1 PROPOSED CONDITIONS
7 C1.2 CONLON CREEK PROFILE
8 C1.3 TRIBUTARY PROFILE & CROSS SECTIONS
9 C1.4 DETAILS
10 E1.1 EROSION CONTROL
Exp. 3/31/26
1/24/2025
E (E) OVERHEAD ELECTRICAL UTILITY
LIMIT OF GRADING
EXISTING GROUND CONTOUR
LEGEND NOTES
1. NO GUARANTEE IS INTENDED THAT UNDERGROUND
OBSTRUCTIONS NOT SHOWN ON THE PLANS WILL NOT BE
ENCOUNTERED. LOCATION OF EXISTING UNDERGROUND
UTILITIES OR OBSTRUCTIONS AS SHOWN ON THESE PLANS IS
BASED UPON THE BEST INFORMATION AVAILABLE, HOWEVER,
THE NPS AND THE ENGINEER ASSUME NO RESPONSIBILITY
FOR THE ACCURACY OF THE INFORMATION SHOWN OR THE
INADVERTENT OMISSION OF ANY SUCH INFORMATION.
2. PROTECT ALL UTILITIES DURING EXCAVATION AND THOSE
UTILITIES ADJACENT TO THE EXCAVATION UNLESS
OTHERWISE SPECIFIED ON PLANS. ANY UTILITIES THAT ARE
BROKEN OR DAMAGED DURING CONSTRUCTION SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSE.
3. SITE PREPARATION INCLUDES REMOVING ALL VEGETATION
AND OVER-SIZE DEBRIS FROM THE AREAS THAT WILL BE
GRADED. AT LOCATIONS WHERE TREES AND STUMPS HAVE
BEEN REMOVED, REMOVE ALL ROOTS LARGER THAN 2
INCHES IN DIAMETER, CHIP AND MULCH ON-SITE FOR USE AS
TOP DRESSING OF DISTURBED AREAS.
4. PRIOR TO PLACING ANY FILLS, THE SUBGRADE SURFACE
SHOULD BE SCARIFIED TO A DEPTH OF 8-INCHES; MOISTURE
CONDITIONED TO ABOVE THE OPTIMUM MOISTURE CONTENT
AND COMPACTED TO A MINIMUM OF 90 PERCENT RELATIVE
COMPACTION (ASTM D-1557). WHERE MATERIALS CANNOT BE
TESTED PER ASHTO D-1557, COMPACT TO PROVIDE FIRM,
UNYIELDING SURFACE.
5. FOR CUT AND FILL EARTH SLOPE CONSTRUCTION, THE
MAXIMUM INCLINATION OF SLOPES SHOULD BE 2:1
(HORIZONTAL TO VERTICAL). THE MAXIMUM INCLINATION OF
ROCK SLOPES SHALL BE 1:1.
6. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL
EXCAVATION AND EARTHWORK RELATED ACTIVITIES
ASSOCIATED WITH THIS PROJECT. ALL EXCAVATION WORK
MUST CONFORM TO THE EXCAVATION SAFETY
REQUIREMENTS SET FORTH BY OSHA 1926 SUBPART P.
7. PROTECT THE PUBLIC FROM OPEN EXCAVATIONS AND
TRENCHES. AT NO TIME SHALL AN EXCAVATION OR TRENCH
BE UNATTENDED WITHOUT PROPER PLATING OR SAFETY
FENCING BARRICADES IN PLACE. AT THE END OF THE WORK
DAY, INSPECT ALL EXCAVATION AND TRENCH PLATING AND
SAFETY FENCING / BARRICADES TO ENSURE THEY ARE
PROPERLY FUNCTIONING.
8. EXCAVATED MATERIALS SHALL BE GRADED, HAULED,
STOCK-PILED AND PROTECTED IF CONTRACTING OFFICER'S
REPRESENTATIVE DEEMS SUITABLE FOR BACKFILLING, OR
OTHER PURPOSES. MATERIAL DEEMED UNSUITABLE SHALL
BE DISPOSED OF BY THE CONTRACTOR.
9. CONTRACTOR MAY TEMPORARILY STOCK-PILE SOIL ON SITE
THAT IS UNSUITABLE FOR BACKFILL MATERIAL FOR FUTURE
DISPOSAL AT AN APPROVED OFF SITE LOCATION PRIOR TO
THE END OF THE PROJECT. STORAGE OF SOIL ON SITE
SHALL BE DONE IN A NEAT AND ORDERLY MANNER WITH ALL
NECESSARY EROSION CONTROL MEASURES IN PLACE.
10. GRADING SHALL BE REVIEWED IN FIELD AND APPROVED BY
CONTRACTING OFFICER'S REPRESENTATIVE.
FINISHED GROUND CONTOUR
(E) CREEK CENTER LINE
NOTE AND DETAIL/SECTION REFERENCING
DRAWING FROM WHICH DETAIL WAS TAKEN
DETAIL REFERENCE NUMBER
DRAWING FROM WHICH SECTION WAS TAKEN
SECTION REFERENCE LETTER
"-" INDICATES THAT THE DETAIL/SECTION IS SHOWN ON THE SAME SHEET
DETAIL REFERENCE NUMBER
DRAWING ON WHICH SECTION IS SHOWN
SECTION REFERENCE LETTER
DRAWING ON WHICH DETAIL IS SHOWN
C3
SCALE:
DETAIL 1
C1NTS
SCALE:
SECTION A
C2NTS
(E) TREE
(E) POWER POLE
(E) SIGN
REMOVE (E) TREE
11. FOR THE CONLON ROAD SITE, ALL EQUIPMENT AND
PERSONNEL SHALL ACCESS THE SITE VIA THE ENTRANCE
AT MUIR WOODS ROAD.
12. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL
TRAFFIC AND ENCROACHMENT PERMITS RELATED TO THE
DELIVERY AND HAULING OF CONSTRUCTION EQUIPMENT
AND MATERIALS, AND TRAFFIC CONTROL MEASURES AND
DEVICES. THE CONTRACTOR MUST FOLLOW ALL PERTINENT
STATE AND LOCAL REQUIREMENTS OF TRANSPORTING
LARGE VEHICLES AND EQUIPMENT TO THE PROJECT SITE.
13. THE CONTRACTOR IS RESPONSIBLE FOR PLACEMENT,
MAINTENANCE AND REMOVAL OF TEMPORARY TRAFFIC
CONTROL DEVICES AND SIGNS. IF SIGNS ARE PLACED IN
THE COUNTY OR NPS RIGHT-OF-WAY (ROW), THE
CONTRACTOR SHALL BE RESPONSIBLE FOR APPLYING FOR
AND SECURING THE NECESSARY ENCROACHMENT
PERMIT(S). IF SIGNS ARE TO BE PLACED ON PRIVATE
PROPERTY, THE CONTRACTOR SHALL RECEIVE
PERMISSION FROM THE CONTRACTING OFFICER'S
REPRESENTATIVE AND PROPERTY OWNER PRIOR TO
PLACEMENT.
14. THE CONTRACTOR SHALL INFORM THE CONTRACTING
OFFICER'S REPRESENTATIVE A MINIMUM OF 72-HOURS IN
ADVANCE OF THE ANTICIPATED DATE AND 4-HOUR WINDOW
OF LARGE / OVERSIZED TRUCK-TRAILER CONSTRUCTION
TRAFFIC ON MUIR WOODS ROAD.
15. THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIR OF
ANY DAMAGE TO MUIR WOODS ROAD, RESULTING FROM
THE CONSTRUCTION INGRESS / EGRESS ACTIVITIES. THE
POST-PROJECT CONDITION OF MUIR WOODS ROAD SHALL
MEET OR EXCEED PRE-PROJECT CONDITIONS AND, IF
NECESSARY, BE REPAIRED TO THE SATISFACTION OF THE
CONTRACTING OFFICER'S REPRESENTATIVE AT
CONTRACTOR'S EXPENSE.
16. ALL OFF SITE HAULING SHALL BE IN ACCORDANCE WITH
APPLICABLE PERMITS; FEDERAL, STATE, AND LOCAL
REQUIREMENTS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR OBTAINING ALL NECESSARY HAULING
PERMITS, TRAFFIC PLANS AND PAYMENT OF ALL
APPLICABLE FEES.
17. ALL HAULING AND ACCESS TO THE SITE SHALL CEASE IN
THE EVENT OF RAIN. HAULING MAY RESUME ONCE RAIN
STOPS AND UPON AUTHORIZATION FROM THE
CONTRACTING OFFICER'S REPRESENTATIVE.
18. CONTRACTOR, SUBCONTRACTORS, AND TRUCKERS TO
YIELD TO ALL TRAFFIC ON MUIR WOODS ROAD.
19. CONTRACTOR TO PROVIDE WATER TRUCK FOR DUST
CONTROL AND SITE BACKFILLING ACTIVITIES.
20. CONTRACTOR TO FLAG AND PROTECT EXISTING UTILITY
POLES IN WORK ZONE. CONTRACTOR TO INSTALL
EXCLUSION ZONE AROUND POLES ADJACENT TO
CONSTRUCTION ZONE USING CONSTRUCTION FENCING.
21. IT IS ANTICIPATED THAT THE CHANNEL WILL BE DRY
DURING CONSTRUCTION. IF DEWATERING IS REQUIRED,
CONTRACTOR SHALL PREPARE AND SUBMIT A
DEWATERING PLAN TO CONTRACTING OFFICER'S
REPRESENTATIVE FOR APPROVAL PRIOR TO COMMENCING
ANY EARTHWORK ACTIVITIES.
(E) SURVEY CONTROL MONUMENT
PROTECT IN PLACE
(E) POWER POLE GUY WIRE
X
B C1.3
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
N83° 04' 09.38"E
223.291
CONLON CREEK
CONLON AVE
(E) INCISED
TRIBUTARY
CHANNEL
TO CONLON PARKING LOT
AND MUIR WOODS ROAD
CONLON AVE
CONLON CREEK
PLAN VIEW
(E) ±82 L.F.
CULVERT TO
BE REMOVED
(E) CONCRETE
HEADWALL TO
BE REMOVED
PRIV
ATE
A
CCESS
NO E
NTR
Y T
HIS
P
OIN
T
ROA CP-3 SET 60D
N: 2,153,402.93 E: 5,965,947.16
EL: 151.31
ROA CP-2 SET 60D
N: 2,153,363.74 E: 5,965,865.34
EL: 147.20
ROA CP-1 SET 3/8" REBAR
N: 2,153,354.16 E: 5,965,875.17
EL: 147.31
40'x10' STOCKPILE AREA
FOR ROCK AND SOIL
BENCH MARK
NAVD88 ELEVATIONS ARE BASED ON CONTROL POINT #200 FROM
GPS STATIC NETWORK OPUS SOLUTION. SET 3/8” REBAR WITH
“ROA” CONTROL CAP. ELEVATION 148.65'
BASIS OF BEARING
BASED ON EXISTING NPS CONTROL POINTS FOUND AND ROTATED
TO MATCH EXISTING NPS TOPO. EXISTING NPS CONTROL POINT
BEARINGS ARE BASED ON NAD83, SPCS CA ZONE 3 (0403)
ROA OPUS BASE SET 3/8"
REBAR WITH "ROA" CAP
N: 2,153,327.22 E: 5,965,653.51
EL: 148.65
XX
X
OVERHEAD UTILITY LINE ATTACHED TO
(E) TREE TO BE REMOVED. PROTECT
UTILITY LINE AND CONTACT UTILITY
COMPANY TWO WEEKS PRIOR
TO REMOVING TREE
(E) CONCRETE
HEADWALL TO
BE REMOVED
(E) BAY TREE
PROTECT IN PLACE
NOTES:
1. CONTOUR INTERVAL = 1 FOOT.
2. REMOVE (E) RIPRAP FROM CHANNEL WITHIN LIMITS OF GRADING AND PLACE IN BASE OF ERODING TRIBUTARY
CHANNEL AS DIRECTED BY COR AND PER SPECIFICATIONS. SEE SHEET C1.4.
3. REMOVE NATIVE STREAMBED AND BAR MATERIALS TO THE LIMITS OF EXCAVATION SHOWN AND STOCKPILE
FOR LATER USE AS DIRECTED BY CONTRACTING OFFICER'S REPRESENTATIVE.
4. REMOVE AND DISPOSE OF CONCRETE HEADWALLS OF OFF-SITE. (2 EACH)
5. CONTRACTOR TO REMOVE EXISTING CULVERTS AND DISPOSE OF THEM OFFSITE.
(E) BAY TREES
PROTECT IN PLACE
(E) METAL TRASH RACK AND
CONCRETE TO BE REMOVED
APPROXIMATE LIMITS OF
GRADING/DISTURBANCE
(E) LARGE BAY TREE &
CLEMATIS PATCH
PROTECT IN PLACE
(E) BAY TREE
PROTECT IN PLACE
(E) PLUM TREE
PROTECT IN PLACE
(E) BAY TREE
PROTECT IN PLACE
(E) REDWOOD TREE
PROTECT IN PLACE
REMOVE (E) ACACIA TREE
LARGE HAZELNUT & CLEMATIS PATCH.
PROTECT PLANTS THAT ARE OUTSIDE
LIMITS OF GRADING WORK ZONE
HAZELNUT PATCH PROTECT
AREA OUTSIDE LIMITS OF
GRADING WORK ZONE
(E) ROCK HEADWALL
TO BE REMOVED
FAILED CULVERT CROSSING AND LIMIT OF
(E) TEMPORARY RIPRAP. REMOVE
APPROX. 337 S.F. OF MATERIAL AND
PLACE IN TRIBUTARY CHANNEL AS FILL.
X
APPROXIMATE LIMITS OF
GRADING/DISTURBANCE (TYP)
(4,116 S.F.)
(E) TREE PROTECT IN PLACE
MUIR W
OODS RD
CONLON AVE
CAMINO DEL CANYON
CAMINO DEL CANYON
MUIR WOODS NATIONAL MONUMENT
REDWOOD CREEK
M U
IR
W
O O
D S
R D
CONLO
N A
VE
CONLON PARKING LOT
SITE ENTRANCE FROM
MUIR WOODS RD
PLAN VIEW
STOCKPILE AREA
FOR ROCK AND SOIL
PROJECT AREA
SEE SHEET G0.3
(E) ROCK STOCKPILE STAGING
AREA AND PUMP HOUSE
NURSERY LOT FOR
DAY TO DAY PARKING
CONTRUCTION ENTRANCE &
TIRE WAS PER DETAIL ON C1.4
Exp. 3/31/26
EXISTING STEEL GATE
0+00
1+00
2+00
3+00
0+00
0+97
CONLON AVE
CONLON CREEK
THALWEG
STA 3+15.08, CL ELEV 154.65
N50° 05' 39.39"W
28.041
N50° 2 7' 24.56"E
126.189
N83° 04' 09.38"E
223.291
N61° 29' 45.48"E
51.121
SITE PLAN
NOTES:
1. CONTOUR INTERVAL = 1 FOOT
ROA CP-3 SET 60D
N: 2,153,402.93 E: 5,965,947.16
EL: 151.31
ROA CP-2 SET 60D
N: 2,153,363.74 E: 5,965,865.34
EL: 147.20
ROA CP-1 SET 3/8" REBAR
N: 2,153,354.16 E: 5,965,875.17 EL: 147.31
ROA OPUS BASE SET 3/8"
REBAR WITH "ROA" CAP
N: 2,153,327.22 E: 5,965,653.51
EL: 148.65
P1
P2P3
P4
P5 P6
P7
P8
P9
P10
P11
P12
P13
P14
P1
P1
P1
P18 P19
P20 P21
P22 P23
P24
P25
P26
P27
P31 P30P28
P29
P32
P33 P34
P35 P36 P37
POINT NORTHING EASTING ELEVATION
P1 2,153,485.95 5,966,061.45 155.82 P2 2,153,483.27 5,966,044.47 154.65 P3 2,153,483.04 5,966,043.00 154.65 P4 2,153,480.41 5,966,026.33 153.79 P5 2,153,472.02 5,966,006.30 153.33 P6 2,153,470.48 5,966,002.64 153.27 P7 2,153,457.98 5,965,985.73 152.76 P8 2,153,452.76 5,965,973.27 152.47 P9 2,153,449.19 5,965,964.76 150.97 P10 2,153,446.42 5,965,957.46 150.97 P11 2,153,443.34 5,965,952.36 151.47 P12 2,153,436.88 5,965,946.63 149.97 P13 2,153,431.32 5,965,932.79 150.47 P14 2,153,426.28 5,965,927.75 148.97 P15 2,153,420.74 5,965,925.48 148.97 P16 2,153,410.84 5,965,924.91 149.47 P17 2,153,405.90 5,965,924.62 149.09 P18 2,153,400.06 5,965,926.02 148.42 P19 2,153,397.04 5,965,927.29 148.05 P20 2,153,391.67 5,965,928.64 147.43 P21 2,153,387.01 5,965,928.76 146.91 P22 2,153,378.10 5,965,929.21 145.91 P23 2,153,369.43 5,965,929.65 144.93 P24 2,153,361.38 5,965,925.50 143.92 P25 2,153,353.79 5,965,919.26 142.82 P26 2,153,341.02 5,965,902.89 140.49 P27 2,153,336.18 5,965,896.68 140.49 P28 2,153,378.56 5,965,920.09 148.50 P29 2,153,378.10 5,965,929.21 145.91 P30 2,153,377.42 5,965,942.85 148.00 P31 2,153,378.37 5,965,945.86 148.42 P32 2,153,383.63 5,965,961.65 150.45 P33 2,153,387.23 5,965,974.79 152.48 P34 2,153,390.65 5,965,984.35 153.85 P35 2,153,393.74 5,965,992.43 155.01 P36 2,153,395.54 5,966,005.80 156.82 P37 2,153,396.96 5,966,014.49 159.00
APPROXIMATE LIMITS OF
GRADING/DISTURBANCE
APPROXIMATE LIMITS OF
GRADING/DISTURBANCE (TYP)
(4,116 S.F.)
BENCH MARK
NAVD88 ELEVATIONS ARE BASED ON CONTROL POINT #200 FROM
GPS STATIC NETWORK OPUS SOLUTION. SET 3/8” REBAR WITH
“ROA” CONTROL CAP. ELEVATION 148.65'
BASIS OF BEARING
BASED ON EXISTING NPS CONTROL POINTS FOUND AND ROTATED
TO MATCH EXISTING NPS TOPO. EXISTING NPS CONTROL POINT
BEARINGS ARE BASED ON NAD83, SPCS CA ZONE 3 (0403)
015115
150 150
0+00
1+00
2+00
3+00
0+00
0+97
N50° 05' 39.39"W
28.041
N50° 2 7' 24.56"E
126.189
3" MIN. FLEXIBLE HOSE
CONLON AVE
POOL 1
(EL 150.97)POOL 2
(EL 149.97)
PO
O
L
(E L
8.
LIMIT OF GRADING
WORK ZONE (TYP)
CONLON CREEK
THALWEG
TRIBUTARY THALWEG
END IMPROVEMENTS
STA 0+97.30
FINISH TOP OF BANK GRADES TO CONFORM TO ROADWAY
AND PROVIDE FLAT FOUNDATION TO SUPPORT TEMPORARY
CREEK CROSSING (E.G. CRANE MAT OR RAIL CAR) BY OTHERS.
OVERHEAD UTILITY LINE ATTACHED TO (E)
TREE TO BE REMOVED. PROTECT UTILITY
LINE AND CONTACT UTILITY COMPANY TWO
WEEKS PRIOR TO REMOVING TREE
(N) ROCK WEIR 1 GRADE
CONTROL SEE DETAIL ON
SHEET C4
CONLON CREEK THALWEG
LIMIT OF GRADING
WORK ZONE (TYP)
WEIR 3
(TOP 152.47)
WEIR 5
(TOP 150.47)
WEIR 6
(TOP 149.47)
4' WIDE x 2.5' DEEP
CHANNEL BOTTOM
4' WIDE
CHANNEL
BOTTOM (TYP)
WEIR 4
(TOP 151.47)
LIMIT OF GRADING
WORK ZONE (TYP)
ROCK R
AMP
REMOVE (E) HEADWALL
(SEE NOTE 3 THIS SHEET)
(E) TREES
PROTECT
IN PLACE
STA 3+13.58, 0.00' ELEV 154.65
MATCH (E) CHANNEL BOTTOM
AND CHANNEL SIDE SLOPES
(E) OVERHEAD POWER LINE
PROTECT IN PLACE
N83° 04' 09.38"E
223.291
(E) BAY TREE PROTECT IN PLACE
WEIR 2
153.33
REMOVE (E) HEADWALL
(SEE NOTE 3 THIS SHEET)
2' WIDE x 1' DEEP
CHANNEL BOTTOM
ROOTWAD
INSTALLATION
AS DIRECTED
BY COR
4'W x 10'L ROCK
REVETMENT TRENCH
(TYP OF 4 LOCATIONS)
.2
4'W x 6'L ROCK
REVETMENT TRENCH
15'
8'
MATCH EXISTING CHANNEL ELEVATION
STA 0+77.94, 0.00' ELEV 140.49
MATCH (E) CHANNEL BOTTOM
AND CHANNEL SIDE SLOPES
4' WIDE
CHANNEL
BOTTOM (TYP)
TRASH PUMP
6" DEEP (MIN) HDPE
CONTAINMENT
8" SUCTION
LINE
SCREENED INTAKE DEVICE
3" MIN. FLEXIBLE HOSE
BY-PASS DIFFUSER (55 GAL DRUM)
TRIBUTARY THALWEG
STA 0+09.13 CL
CONLON CREEK
STA 1+34.15 CL
ON-SITE MATERIALS COMPACTED TO
90% MAXIMUM RELATIVE DENSITY
STREAMBED MATERIAL FROM
CONLON CREEK EXCAVATION
STREAMBED MATERIAL FROM
CONLON CREEK EXCAVATION
TEMPORARY ROCK BERM, TOP ELEV = 158 WITH HDPE
20 MIL LINER. REMOVE AT COMPLETION & RESTORE AREA
FISH EXCLUSION FENCE
FISH EXCLUSION FENCE
ROOTWAD INSTALLATION
AS DIRECTED BY CO
WEIR MATERIAL (CLASS V-VIII RSP)
CLASS V-VIII RSP WITH ENGINEERED
STREAMBED MATERIAL
SITE PLAN
NOTES:
1. CONTOUR INTERVAL = 1 FOOT
ROA CP-3 SET 60D
N: 2,153,402.93 E: 5,965,947.16
EL: 151.31
ROA CP-2 SET 60D
N: 2,153,363.74 E: 5,965,865.34
EL: 147.20
ROA CP-1 SET 3/8" REBAR
N: 2,153,354.16 E: 5,965,875.17 EL: 147.31
ROA OPUS BASE SET 3/8"
REBAR WITH "ROA" CAP
N: 2,153,327.22 E: 5,965,653.51
EL: 148.65
HC
1.3
GC1.3FC1.3
EC1.3
DC1.3
CC1.3
B C1.3
A C1.3
IC
1.3
JC1.3
KC
1.3
(E) LARGE BAY TREE & CLEMATIS PATCH
PROTECT IN PLACE
(E) BAY TREE
PROTECT IN PLACE
(E) PLUM TREE
PROTECT IN PLACE
(E) BAY TREE
PROTECT IN PLACE
LARGE HAZELNUT & CLEMATIS PATCH
PROTECT AREA OUTSIDE LIMITS OF
GRADING WORK ZONE
LARGE HAZELNUT & CLEMATIS PATCH
PROTECT AREA OUTSIDE LIMITS OF
GRADING WORK ZONE
(E) REDWOOD TREE
PROTECT IN PLACE
(E) BAY TREES
PROTECT IN PLACE
(E) TREE
PROTECT IN PLACE
LC1.3
TEMPORARY DIVERSION NOTE:
OPTIONAL BID ITEM, IF A DRY YEAR, FISH
EXCLUSION FENCE, ROCK DIVERSION BERM,
INTAKE DEVICE, TRASH PUMP, FLEXIBLE HOSE
AND DIFFUSER WILL NOT BE NECESSARY.
BENCH MARK
NAVD88 ELEVATIONS ARE BASED ON CONTROL POINT #200 FROM
GPS STATIC NETWORK OPUS SOLUTION. SET 3/8” REBAR WITH
“ROA” CONTROL CAP. ELEVATION 148.65'
BASIS OF BEARING
BASED ON EXISTING NPS CONTROL POINTS FOUND AND ROTATED
TO MATCH EXISTING NPS TOPO. EXISTING NPS CONTROL POINT
BEARINGS ARE BASED ON NAD83, SPCS CA ZONE 3 (0403)
STATION (FT)
0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50
STA. 3+13.58 CL ELEV 154.65'
INSTALL (N) ROCK WEIR 1
GRADE CONTROL STRUCTURE
(SEE SHEET C1.3)(E) GRADE @ CL
(E) GRADE
(N) 4' WIDE CHANNEL
BOTTOM 2.5' DEEP
(N) WEIR 3
STA. 2+36.37
CL ELEV 152.47(N) WEIR 4
STA. 2+13.37
CL ELEV 151.47
(N) WEIR 5
STA. 1+90.37
CL ELEV 150.47
(N) ROCK WEIR ELEV 147.80
(SEE SHEET C1.3)
(N) WEIR 6
STA. 1+67.37
CL ELEV 149.47
BACKFILL INTERSTICES OF ROCK
RIP-RAP RAMP WITH PLATE VIBRATED
CLASS I AGGREGATE SUBBASE
POOL 3
ELEV 148.97
11.22%
2.41%
STA. 0+77.94, CL ELEV 140.49
END RAMP APRON
STA. 1+65.87, CL ELEV 151.70
BEGIN RAMP APRON. CONFORM
ROCK RAMP WITH (N) WEIR 4.
TRANSITION TO (N) ROCK RAMP
(SEE SHEET C5)
1+75
23' CL TO CL (TYP)
(N) 12" TO 16" ENGINEERED STREAMBED
MATERIAL. COMPACT (E) SUBGRADE TO
FIRM, UNYIELDING SURFACE PRIOR TO
PLACING ROCK (TYP)
(N) ROCK WEIR ELEV 146.80
(SEE SHEET C1.3)
(N) ROCK WEIR
ELEV 145.80
(SEE SHEET C1.3)
(N) ROCK WEIR
ELEV 144.80
(SEE SHEET C1.3)
(N) ROCK WEIR ELEV 150.95
(SEE SHEET C1.3)
3.7'
3' 6'
CLASS VIII RSP
REVETMENT
3'
6:
WEIR 3-6
4.67'H
WEIR 1-2
PER PLAN
(N) ROCK WEIR
6 LOCATIONS (TYP)
4' (TYP)
AT THALWEG 4' MIN BOULDER
IMBEDDED @ 3/4 Ø 10' OC AND
ALTERNATE SIDES
(TYP OF 8 LOCATIONS)
(N) ROCK RAMP
1.5'
20' POOL (TYP)
2.41%
(N) WEIR 2
STA. 2+75.00
CL ELEV 153.33
2.5'
2.5'
2.5'
POOL 1
ELEV 150.97
POOL 2
ELEV 149.97
1.5'
1.5'
(N) ROCK WEIR ELEV 150.10
(SEE SHEET C1.3)
3'
APRON RAMP SECTION POOL SECTION CHUTE SECTION
CLASS I-II RSP (TYP)
PLACED IN
INTERLOCKING
MANNER AND
CONSOLIDATED
TO SATISFACTION
OF CONTRACTING
OFFICER.
3'
STA. 0+77.94,
MATCH (E) GRADE
WEIR MATERIAL (CLASS V-VIII RSP)
ON-SITE MATERIALS COMPACTED TO
90% MAXIMUM RELATIVE DENSITY
12" TO 16" ENGINEERED STREAMBED
MATERIAL
CLASS V-VIII RSP WITH CLASS I
AGGREGATE SUBBASE
CLASS VIII RSP
REVETMENT
(N) 12" TO 16" ENGINEERED STREAMBED
MATERIAL. COMPACT (E) SUBGRADE TO
FIRM, UNYIELDING SURFACE PRIOR TO
PLACING ROCK (TYP)
2.5'
2.5'
TYP
3.9'
(N) 12" TO 16" ENGINEERED STREAMBED MATERIAL.
COMPACT (E) SUBGRADE TO FIRM, UNYIELDING
SURFACE PRIOR TO PLACING ROCK (TYP)
(E) GRADE @ CL
CLASS VIII RSP REVETMENT
NOTES:
1. ROCK WEIR POOL STRUCTURE CONSTRUCTED TO CREATE POOLS MAX.
1.5' DEEP AND 20' LONG. INTERVENING ROCK WEIRS TO BE CONSTRUCTED
3'-4' WIDE. DISTANCE BETWEEN DOWNSTREAM FACES OF WEIRS TO BE 20'.
ENGINEERED STREAMBED THICKNESS VARIES 12" TO 16".
CONLON CREEK PROFILEBENCH MARK
NAVD88 ELEVATIONS ARE BASED ON CONTROL POINT #200 FROM
GPS STATIC NETWORK OPUS SOLUTION. SET 3/8” REBAR WITH
“ROA” CONTROL CAP. ELEVATION 148.65'
BASIS OF BEARING
BASED ON EXISTING NPS CONTROL POINTS FOUND AND ROTATED
TO MATCH EXISTING NPS TOPO. EXISTING NPS CONTROL POINT
BEARINGS ARE BASED ON NAD83, SPCS CA ZONE 3 (0403)
EL
EV
AT
IO
N (F
T)
0+00 0+25 0+50 0+75 1+00
(E) GRADE
TOP OF NORTH
TRIBUTARY BANK
INTX CONLON CREEK CREST
STA. 0+23.34 CL ELEV 147.75
END IMPROVEMENTS
STA. 0+97.30 CL
ELEV 159.00
(E) GRADE @ CL
STA:0+23.34
ELEV:147.75
STA:0+38.25
ELEV:149.81
STA:0+53.15
ELEV:151.81
STA:0+68.06
ELEV:153.81
STA:0+83.00
ELEV:155.81
STA. 0+38.25 CL
ELEV 149.81
STA. 0+53.15 CL
ELEV 151.81
(E) GRADE
TOP OF SOUTH
TRIBUTARY BANK
STA. 0+68.08 CL
ELEV 153.81
STA. 0+83.00 CL
ELEV 155.81
4'W X 10'L ROCK REVETMENT
TRENCH. MATCH (E) GROUND
(TYP) 3 LOCATIONS
CONLON
CREEK 20'
STA:0+97.30
ELEV:159.00
18"
18"
4'
7.11%
10.91%
9.43%
.56
STREAMBED MATERIAL
FROM CONLON CREEK
EXCAVATION GRADING
WEIR MATERIAL (CLASS V-VIII RSP)
12" TO 16" ENGINEERED STREAMBED
MATERIAL (STRUCTURAL BACKFILL)
STREAMBED MATERIAL FROM
CONLON CREEK EXCAVATION
(N) 12" TO 16" ENGINEERED STREAMBED MATERIAL.
COMPACT (E) SUBGRADETO FIRM, UNYIELDING
SURFACE PRIOR TO PLACING ROCK (TYP)
44.8%
.8%
13.5%
13.4%
13.5%
13.5%
CLASS V-VIII RSP WITH CLASS I
AGGREGATE SUBBASE
1+67.49
1+90.49
2+05
2+13.49
2+36.49
2+50
3+12.08
1+46.44
0+40
0+60
0 10
-10 0 10
-10 0 10
-10 0 10
-10 0 10
-10 0 10
-10 0 10
-10 0 10
-10 0
-10 0 10
7'
7'
7'
4'
7'
2:1 2:1
2:1 2:1
2:1 2:1
2:1 2:1
2:1 2:1
2:1 2:1
2:1
2:1
(E) GRADE
(E) GRADE
(E) GRADE
(E) GRADE
(E) GRADE
(E) GRADE
7'
20:1
20:1
20:1 20:1
20:1 20:1
20:1 20:1
KEY WEIR INTO BANK 5' MIN
3'
(E) GRADE
(N) GRADE
2:1
2:1
4'
0+80
(E) GRADE
(E) GRADE
KEY WEIR INTO BANK 5' MIN
KEY WEIR INTO BANK 5' MIN
KEY WEIR INTO BANK 5' MIN
KEY WEIR INTO BANK 5' MIN
12"-16"
3'
(E) GRADE
3'
3'
(E) GRADE
2.
5'
4.
4.
12"-16"
12"-16"
12"-16"
4.
12"-16"
20:1
4.
12"-16"
4'
2.
5'
12"-16"
3'
4.
12"-16"
(N) GRADE
(N) GRADE
2'
3'
2'
2'
COMPACT
BACKFILL TO
90% RELATIVE
DENSITY
COMPACT BACKFILL
TO 90% RELATIVE
DENSITY
1+17.15
SCALE:
SECTION D
C1.11"=5'
SCALE:
SECTION C
C1.11"=5'
SCALE:
SECTION B
C1.11"=5'
SCALE:
SECTION A
C1.11"=5'
-10 0 10
SCALE:
SECTION H
C1.11"=5'
SCALE:
SECTION G
C1.11"=5'
SCALE:
SECTION F
C1.11"=5'
SCALE:
SECTION E
C1.11"=5'
SCALE:
SECTION K
C1.11"=5'
SCALE:
SECTION J
C1.11"=5'
SCALE:
SECTION I
C1.11"=5'
SCALE:
SECTION L
C1.11"=5'
2:1 2:1
4'
12"-16"
3'
(E) GRADE
WEIR MATERIAL (CLASS V-VIII RSP)
CLASS I-II RSP
12" TO 16" ENGINEERED STREAMBED
MATERIAL (STRUCTURAL BACKFILL)
STREAMBED MATERIAL FROM
CONLON CREEK EXCAVATION
(N) GRADE
SCARIFY & COMPACT (E) GROUND
PRIOR TO PLACING ROCK
2:1 2:14'
(E) GRADE
7'
20:1 2:1 2:1
(E) GRADE KEY WEIR
INTO BANK
5' MIN
KEY WEIR
INTO BANK
5' MIN
20:1*
(N) POOL
CONSTRUCTED WITH 12"
TO 16" ENGINEERED
STREAM BED MATERIAL
2.5'
(N) POOL CONSTRUCTED
WITH 12" TO 16" ENGINEERED
STREAM BED MATERIAL
SCARIFY & COMPACT (E) GROUND
PRIOR TO PLACING ROCK
1'
4.
CLASS I-II RSP (TYP)
NOTE:
* WIDTH VARIES 3'
CONLON CREEK OR
2' FOR TRIBUTARY
TRIBUTARY PROFILE
SCALE:
CHUTE SECTION DETAIL
NTS
SCALE:
WEIR SECTION DETAIL
NTS
BENCH MARK
NAVD88 ELEVATIONS ARE BASED ON CONTROL POINT #200 FROM
GPS STATIC NETWORK OPUS SOLUTION. SET 3/8” REBAR WITH
“ROA” CONTROL CAP. ELEVATION 148.65'
BASIS OF BEARING
BASED ON EXISTING NPS CONTROL POINTS FOUND AND ROTATED
TO MATCH EXISTING NPS TOPO. EXISTING NPS CONTROL POINT
BEARINGS ARE BASED ON NAD83, SPCS CA ZONE 3 (0403)
15'
MIN
12" MIN.
2% �
12" MIN.
30' MIN.
SL
O
PE
TO
P O
N D
SEDIMENT
BASIN POND
3:
M
AX
NO SCALE
NOTES:
1. ALL EMPLOYEES, SUBCONTRACTORS, AND OTHERS
THAT LEAVE THE SITE WITH MUD CAKED TIRES
AND UNDERCARRIAGES SHALL USE THE WASH
FACILITY.
2. REMOVE ACCUMULATED SEDIMENT IN WASH RACK
AND OR SEDIMENT TRAP TO MAINTAIN SYSTEM
PERFORMANCE.
3. OTHER DIRT REMOVAL SYSTEM MAY BE
SUBSTITUDED WITH PRIOR APPROVAL OF COR.
MIRAFI 140-N FILTER
FABRIC OR EQUIVALENT
GRAVEL ENTRANCE ROAD
CRUSHED AGGREGATE 2"-4"
EXISTING GROUND
GRAVEL ENTRANCE ROAD
CRUSHED AGGREGATE 2"-4"
A -
A GRAVEL ENTRANCE SECTION
CONSTRUCTION ENTRANCE & TIRE WASH
ISOMETRIC VIEW
3'
6'
MATS/BLANKETS SHOULD
BE INSTALLED VERTICALLY
DOWNSLOPE.
3'
TAMP SOIL OVER MAT/BLANKET
MIN. 4"
OVERLAP
12"
4'
TYPICAL SLOPE
SOIL STABLIZATION
NOTES:
1. SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS AND
GRASS. MATS/ BLANKETS SHALL HAVE GOOD SOIL CONTACT.
2. APPLY PERMANENT SEEDING BEFORE PLACING BLANKETS.
3. LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT
CONTACT WITH THE SOIL. DO NOT STRETCH.
BERM
12" STAKE
12" (300mm)
1-1/2"
12"
SCALE:
EROSION CONTROL BLANKET
NTS
CONLON AVE.
015115
150 150
0+00
1+00
2+00
3+00
0+00
0+97
BOTTOM OF CHANNEL
INSTALL ±721 L.F. FIBER ROLLS
(TYP) (SEE NOTE 3 THIS SHEET)
INSTALL DUFF AND/OR SLASH AT ALL
ACCESS POINTS TO CREEK (TYP)
(SEE NOTE 4 THIS SHEET)
INSTALL 1,876 S.F. DUFF AND/OR
SLASH (TYP) (SEE NOTE 4 THIS SHEET)
INSTALL 2,686 S.F. DUFF AND/OR SLASH
(TYP) (SEE NOTE 4 THIS SHEET)
LIMIT OF GRADING
INSTALL 100 S.F. EROSION
CONTROL BLANKET (TYP)
(SEE NOTE 2 THIS SHEET)
LIMIT OF GRADING
TRASH PUMP
6" DEEP (MIN) HDPE
CONTAINMENT
8" SUCTION
LINE
SCREENED INTAKE DEVICE
3" MIN. FLEXIBLE HOSE
290 L.F. 3" MIN. FLEXIBLE HOSE
DIFFUSER
(55 GAL)
LIMIT OF GRADING
INSTALL 606 S.F. DUFF AND/OR SLASH
(TYP) (SEE NOTE 4 THIS SHEET)
NOTES:
1. CONTOUR INTERVAL OF 1-FT.
2. INSTALL 13' WIDE BIO-D MAT OR EQUIVALENT ON TOP OF CHANNEL BANKS AS
SHOWN. INSTALL PER MANUFACTURER'S SPECIFICATIONS.
3. INSTALL AND STAKE FIBER ROLL PER DETAIL ON SHEET C1.4.
4. SPREAD DUFF AND SLASH OVER DISTURBED AREAS ADJACENT TO EARTHEN
CHANNEL AND OVER ACCESS ROADS TO CREEK AND OTHER WORK AREAS OFF
OF MAIN ROADWAY.
PLAN VIEW
WIDTH VARIES
WIDTH VARIES
| G0.1 |
| G0.2 |
| G0.3 |
| G0.4 |
File details come from the government source that posted it. Updated .