B08_22R0022_At5_P1_SWPPP_Template.pdf
PDF 10 MB Posted
- Attached to
- La Posa Lagoon GAOA Federal contract opportunity
- Solicitation number
- 140L0622R0022
About this file
This document provides details on a federal solicitation and related file. The solicitation number 140L0622R0022 from the Department of the Interior Bureau of Land Management seeks proposals for work on the La Posa Lagoon GAOA project. The related file is a SWPPP template for the project. Proposals are due in response to the solicitation to perform services required for the La Posa Lagoon GAOA, which includes best management practices and erosion control plans outlined in the SWPPP template file. The Bureau of Land Management is the contracting agency managing this opportunity.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stormwater Pollution Prevention Plan (SWPPP)
ADEQ SWPPP Template, April 2020 i
For Construction Activities At:
La Posa Tyson Wash LVTA Wastewater Lagoon U.S. Highway 95
Quartzite, Arizona 85346
SWPPP Prepared For:
Bureau of Land Management Yuma Field Office
7341 E 30th Street, Suite A Yuma, Arizona 85365
SWPPP Prepared By:
Insert Company or Organization Name Insert Name
Insert Address Insert City, State, Zip Code Insert Telephone Number
Insert Email
SWPPP Preparation Date:
06/18/2021
Estimated Project Dates:
Project Start Date: __ __ / __ __ / __ __ __ __ Project Completion Date: __ __ / __ __ / __ __ __ __
ADEQ SWPPP Template, April 2020 ii
CERTIFICATION AND NOTIFICATION
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
Name: Title:
Signature: Date:
[Repeat as needed for multiple construction operators at the site.]
The following certification statement must be signed and dated by a person who meets the requirements of CGP Appendix B.9.
This certification must be re-signed in the event of a SWPPP Modification.
ADEQ SWPPP Template, April 2020 iii
Contents
CERTIFICATION AND NOTIFICATION .................................................................................................... ii
SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES
1.1 Operator(s) /Subcontractor(s)
1.2 Stormwater Team
SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING
2.1 Site Information
2.2 Site Maps ................................................................................. Error! Bookmark not defined.
2.2 Discharge Information
2.4 Sequence and Estimated Dates of Construction Activities
2.5 Allowable Non-Stormwater Discharges
SECTION 3: EROSION AND SEDIMENT CONTROLS
3.1 Natural Buffers or Equivalent Sediment Controls
3.2 Perimeter Controls
3.3 Sediment Track-Out
3.4 Stockpiles of Sediment or Soil
3.5 Minimize the Disturbance of Steep Slopes
3.6 Topsoil
3.7 Soil Compaction
3.8 Storm Drain Inlets
3.9 Constructed Stormwater Conveyance Channels
3.10 Sediment Basins
3.11 Chemical Treatment
3.12 Other Stormwater Controls
3.13 Dewatering Practices
3.14 Site Stabilization Requirements, Schedules and Deadlines
3.15 Final Stabilization
3.16 Post-Construction BMPs
SECTION 4: POLLUTION PREVENTION REQUIREMENTS
4.1 Potential Sources of Pollution
4.2 Concrete Wash Out
4.3 Washing of Equipment and Vehicles
4.4 Washing of Applicators and Containers used for Paint, Concrete or Other Materials
4.5 Fueling and Maintenance of Equipment or Vehicles
4.6 Pollution Prevention Measures
4.7 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes
4.8 Building Products (see CGP Parts 3.5(4)(c))
4.9 Pesticides, Herbicides, Insecticides, Fertilizers and Landscape Materials (see CGP Parts
3.5(4)(c))
4.10 Diesel Fuel, Oil, Hydraulic Fluids, Other Petroleum Products, and Other Chemicals (see CGP
Parts 3.5(4)(c))
4.11 Hazardous or Toxic Waste (see CGP Parts 3.5(4)(c))
4.12 Construction and Domestic Waste (see CGP Parts 3.5(4)(c))
4.13 Sanitary Waste (see CGP Parts 3.5(4)(c))
4.1 Spill Prevention and Response Procedures
SECTION 5: INSPECTIONS
5.1 Personnel Responsible for Inspections and Qualifications (see CGP Parts 4.1)
ADEQ SWPPP Template, April 2020 iv
5.2 Inspection Schedule (see CGP Parts 4.2)
5.3 Reductions in Inspection Frequency (if applicable)
5.4 Inspection Schedule for Sites within ¼ mile upstream of Impaired Water or OAWs:
5.5 Inspection Schedule for Inactive and Unstaffed Sites:
5.6 Scope of Inspections (see CGP Parts 4.3)
5.7 Inspection Report Form (see CGP Parts 4.4)
5.8 Inspection Follow-up (see CGP Parts 4.5)
SECTION 6: CORRECTIVE ACTION
6.1 Corrective Action Triggers
6.2 Corrective Action Deadlines
6.3 Corrective Action Report/ Forms
SECTION 7: DELEGATION OF AUTHORITY
SECTION 8: TRAINING
SECTION 9: SWPPP UPDATES AND MODIFICATIONS
SECTION 10: POSTING SWPPP, SWPPP REVIEW, AND MAKING SWPPPS AVAILABLE
SECTION 11: STORMWATER MONITORING
SECTION 12: REPORTING REQUIREMENTS
SECTION 13: NOTICE of TERMINATION (NOT) (see CGP Part 2.6)
SWPPP APPENDICES
ADEQ SWPPP Template, Version 1.0 6
SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES
1.1 Operator(s) /Subcontractor(s)
Operator(s):
Insert Company or Organization Name:
Insert Name:
Insert Address:
Insert City, State, Zip Code:
Insert Telephone Number:
Insert Email:
Insert area of control (if more than one operator at site):
[Repeat as necessary.]
Emergency 24-Hour Contact:
Insert Name:
Insert Telephone Number:
Site Supervisor(s):
Insert Name:
Insert Address:
Insert City, State, Zip Code:
Insert Telephone Number:
Insert Email:
Insert area of control (if more than one on site) :
Instructions (see CGP 6.2)
Operators Identify the operator(s) who will be engaged in construction activities at the site. Indicate respective responsibilities, where appropriate. Also include the 24-hour emergency contact.
All operator(s) shall sign and certify the SWPPP in accordance with the signatory requirements of the CGP Appendix B, Subsection 9.
Subcontractors generally are not considered operators for the purposes of the CGP.
Subcontractors List subcontractors expected to work on-site. Notify subcontractors of stormwater requirements applicable to their work.
Consider using Subcontractor Agreements / Lists such as the type included as a sample in Appendix G of the Template.
ADEQ SWPPP Template, Version 1.0 7
Subcontractor(s):
Insert Name:
Insert Address:
Insert City, State, Zip Code:
Insert Telephone Number:
Insert Email:
Insert area of control (if more than one operator at site):
1.2 Stormwater Team
Insert Role or Responsibility:
Insert Position:
Insert Name:
Insert Telephone Number:
Insert Email:
Insert Role or Responsibility:
Insert Position:
Insert Name:
Insert Email:
Instructions (see CGP Part 6.3(1)):
Identify the staff members (by name or position) that comprise the project’s stormwater team as well as their individual responsibilities. At a minimum the stormwater team is comprised of individuals who are responsible for overseeing the development, implementation and maintenance of the SWPPP, any later modifications to it, and for compliance with the requirements in this permit (i.e., installing and maintaining stormwater controls, submitting reports, conducting site inspections, taking corrective actions where required, employee training, and testing for non-stormwater discharges).
Each member of the stormwater team must have ready access to either an electronic or paper copy of applicable portions of the 2020 CGP and your SWPPP.
ADEQ SWPPP Template, Version 1.0 8
SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING
2.1 Site Information
Project Name and Address
Project/Site Name: La Posa Tyson Wash LVTA Wastewater Lagoon Project Street/Location: U.S. Highway 95 City: Quartzite State: Arizona ZIP Code: 85346 County or Similar Subdivision: La Paz County Project Latitude/Longitude in Decimal Degrees, to six decimal places
Latitude: Longitude:
33°37’52.80” N 114°13’37.90” W
Select only one of the following methods used to determine latitude/longitude:
☐ USGS topographic map (specify scale: )
☐EPA Web Site ☐ ADEQ Web site ☐ GPS
☒ Other (please specify): Google Earth
Function of the construction activity
☐ Residential ☐ Commercial ☐ Industrial ☐ Road Construction
☐ Linear Utility ☒ Other (specify):Recreational___________________________________
Additional Project Information
Did municipality receive a copy of the authorization certificate ☐ No ☐ Yes
If yes, list municipality:___________________________________
Does the site include unique site features including streams, stream buffers, wetlands, specimen trees, natural vegetation, steep slopes, or highly erodible soils that are to be preserved (include these features on your site map and described the BMPs to protect these features within the context of the SWPPP):
☐ Yes ☐ No
If you are conducting construction activities in response to a public emergency, document the cause of the public emergency (e.g., natural disaster, extreme flooding conditions), information substantiating its occurrence (e.g., state disaster declaration), and a description of the construction necessary to reestablish effective public services: N/A
Instructions (see “Site Information” section of Appendix C – NOI form and 6.3(4) (a) through (g)):
In this section, you are asked to compile basic site information that will be helpful to you when you file your Notice of Intent (NOI).
ADEQ SWPPP Template, Version 1.0 9
2.2 Discharge Information
Does your site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)?
☐ Yes ☒ No
Which MS4? ____________________________________________________
A list of regulated MS4s can be found at: www.azdeq.gov, search word “MS4”
Are there any surface waters that are located within 50 feet of your construction disturbances?
☐ Yes ☒ No The outfalls are identified in the Appendix A-Site Map, Figure(s).
Table 1 – Names of Receiving Waters (Part 6.3(6)) Include on Site Map in Appendix A
Name(s) of the first surface water that receives stormwater directly from your site and/or from the MS4 (note: multiple rows provided where your site has more than one point of discharge that flows to different surface waters).
1. Unidentified Water (460)
2. Tyson Wash
3.
4.
5.
6.
[Include additional rows as necessary.]
Note: The SWPPP shall identify the nearest receiving water(s), including ephemeral and intermittent streams, dry washes, and arroyos. If applicable, the SWPPP shall also identify the areal extent and describe any wetlands near the site that could be disturbed or that could potentially receive discharges from disturbed areas of the project.
Impaired Waters and Outstanding Arizona Water (OAWs) Operators may determine whether their sites are located within 1/4 mile upstream of any impaired waters or OAWs by using ADEQ’s EMAPS, found at www.azdeq.gov. OAWs are listed in A.A.C. R18-11-112(G). Impaired Water and OAWs shall be identified on the Site Map contained in Appendix A.
Is the surface water listed as Impaired Water: ☐ YES ☒ NO If yes, use Table 2 below:
Instructions:
For Table 1, list the name of the first surface water that receives discharges from your site. If your site has discharges to multiple surface waters, indicate the names of all such waters.
For Table 2, if any of the surface waters you listed out in Table 1 are listed as impaired or outstanding Arizona waters, provide specified information about pollutants causing the impairment and whether or not a Total Maximum Daily Load (TMDL) has been completed for the surface water. For more information on TMDLs and impaired waters, visit www.azdeq.gov, search words “surface water monitoring and assessment”.
http://www.azdeq.gov/ http://www.azdeq.gov/
ADEQ SWPPP Template, Version 1.0 10
Describe the method(s) you used to determine whether or not your project/site discharges to an impaired water: INSERT
TEXT HERE
Table 2 – Impaired Waters / TMDLs (Answer the following for each surface water listed in Table 1 above)
Is this surface water listed as
“impaired”?
If you answered yes, then answer the following:
What pollutant(s) are causing the impairment?
Has a TMDL been completed?
Title of the TMDL document
1. ☐ YES ☐ NO ☐ YES ☐ NO
2. ☐ YES ☐ NO ☐ YES ☐ NO
3. ☐ YES ☐ NO ☐ YES ☐ NO
4. ☐ YES ☐ NO ☐ YES ☐ NO
5. ☐ YES ☐ NO ☐ YES ☐ NO
6. ☐ YES ☐ NO ☐ YES ☐ NO
[Include additional rows as necessary.]
Is this surface water listed as an Outstanding Arizona Water (OAW): ☐ YES ☐ NO List OAW: ___________________________
2.4 Sequence and Estimated Dates of Construction Activities
Phase I
INSERT GENERAL DESCRIPTION OF PHASE 1
INSERT ESTIMATED START AND END DATES OF CONSTRUCTION DISTURBANCES ASSOCIATED WITH THIS PHASE FOR EACH STORMWATER CONTROL, INSERT ESTIMATED DATE(s) OF INSTALLATION OF EACH STORMWATER
CONTROL
Instructions (see CGP Part 6.3(3))
Describe the intended construction sequence and timing of major activities.
For each phase of construction, include the following information:
Installation of stormwater controls, and when they will be made operational;
Commencement and duration of construction activities, including clearing and grubbing, mass grading, site preparation (i.e., excavating, cutting and filling), final grading, and creation of soil and vegetation stockpiles requiring stabilization;
Cessation, temporarily or permanently, of construction activities on the site, or in designated portions of the site;
Final or temporary stabilization of areas of exposed soil.
Removal of temporary stormwater conveyances/channels and other stormwater control measures, removal of construction equipment and vehicles, and cessation of any pollutant-generating activities.
For additional information see EPA’s Construction Sequencing BMP Fact Sheet at https://www.epa.gov/npdes/stormwater-discharges-construction-activities#resources
ADEQ SWPPP Template, Version 1.0 11
FOR AREAS OF THE SITE REQUIRED TO BE STABILIZED, INSERT ESTIMATED DATE(s) OF APPLICATION OF
STABILIZATION MEASURES
Phase II
INSERT GENERAL DESCRIPTION OF PHASE II
INSERT ESTIMATED START AND END DATES OF CONSTRUCTION DISTURBANCES ASSOCIATED WITH THIS PHASE FOR EACH STORMWATER CONTROL, INSERT ESTIMATED DATE(s) OF INSTALLATION OF EACH STORMWATER
CONTROL
FOR AREAS OF THE SITE REQUIRED TO BE STABILIZED, INSERT ESTIMATED DATE(s) OF APPLICATION OF
STABILIZATION MEASURES
[Repeat as needed.]
2.5 Allowable Non-Stormwater Discharges
List of Allowable Non-Stormwater Discharges Present at the Site
Type of Allowable Non-Stormwater Discharge Likely to be Present at Your Site?
Discharges from emergency fire-fighting activities ☒ YES ☐ NO Water used to control dust, provided reclaimed water or other process wastewaters are not used1
☒ YES ☐ NO
Routine external building wash down where detergents are not used ☐ YES ☒ NO Water used to rinse vehicles and equipment, provided that reclaimed water or other wastewater is not used and no soaps, solvents, detergents, oils, grease or fuels are present in the rinsate
☒ YES ☐ NO
Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents are not used
☐ YES ☒ NO
Uncontaminated air conditioning or compressor condensate ☐ YES ☒ NO Uncontaminated groundwater or spring water ☐ YES ☒ NO Foundation or footing drains where flows are not contaminated with process materials such as solvents
☐ YES ☒ NO
Water from fire-fighting system testing and maintenance, including hydrant flushings ☐ YES ☒ NO Discharges related to installation and maintenance of potable water supply systems, including disinfection and flushing activities, discharges resulting from pressure releases or overflows, and discharges from wells approved by ADEQ for drinking water use
☒ YES ☐ NO
Hydrostatic testing of new pipes, tanks or vessels using potable water, surface water, or uncontaminated groundwater
☒ YES ☐ NO
Water used for compacting soil, provided reclaimed water or other wastewaters ☒ YES ☐ NO
Instructions (see CGP Part 1.3(2))
Identify all allowable sources of non-stormwater discharges.
If the site is within 1/4 mile of an outstanding Arizona water (OAW), the operator shall not discharge any non-stormwater under this permit, except for emergency fire-fighting activities, unless specifically authorized by
ADEQ.
ADEQ SWPPP Template, Version 1.0 12 are not used Water used for drilling and coring such as for evaluation of foundation materials, where flows are not contaminated with additives
☐ YES ☒ NO
Uncontaminated waters obtained from dewatering operations/ foundations in preparation for and during excavation and construction provided the discharge are managed as specified in Part 3.6 of the permit.
☐ YES ☒ NO
Note: Reclaimed water may be used for dust control, soil compaction, or landscape irrigation if a valid reuse permit is obtained and there are no discharges of reclaimed water off-site.
Describe the pollution prevention associated with the allowable non-stormwater discharges at your site and the control measures used to eliminate or reduce these discharges:
BMP Description:
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Maintenance and Inspection:
Responsible Staff:
Repeat as needed
(Note: Identify the likely locations of these allowable non-stormwater discharges/ outfalls on your Site Map in Appendix A).
ADEQ SWPPP Template, Version 1.0 13
SECTION 3: EROSION AND SEDIMENT CONTROLS
3.1 Natural Buffers or Equivalent Sediment Controls
Buffer Compliance Alternatives
Are there any surface waters within 50 feet of your sites activities? ☐ YES ☒ NO
(Note: If no, no further documentation is required in this section of the SWPPP Template.)
General Instructions for Erosion and Sediment Controls (See CGP Parts 3.3 and 6.3(7)
Describe the areas of concern and the erosion and sediment controls (BMPs) that will be installed/ maintained at your site to control pollutants in stormwater. For each activity:
Clearly describe appropriate control measures.
Note the location of each BMP on your site map(s).
Describe the scheduling/ sequencing for BMP implementation.
Describe the maintenance and inspection procedures that will be used for that specific BMP.
Include protocols, thresholds, and schedules for cleaning, repairing, or replacing damaged or failing
BMPs.
Identify staff responsible for maintaining BMPs. If your SWPPP is shared by multiple operators, indicate the operator responsible for each BMP.
Categorize each BMP under one of the following subsection(s) 3.1- 3.16 listed below.
For any structural BMPs, you should provide design specifications and details and refer to them. Attach them as appendices to the SWPPP or within the text of the SWPPP.
For more information or ideas on BMPs, see EPA’s National Menu of BMPs
Instructions (see CGP Parts 3.3(7))
This section only applies to you if a surface water is located within 50 feet your construction activities. If this is the case, consult CGP Part 3.3(7) and Appendix G for information on how to comply with the buffer requirements.
Describe the compliance alternative that was chosen to meet the buffer requirements, and include any required documentation supporting the alternative selected. The compliance alternative selected must be maintained throughout the duration of permit coverage. However, if you select a different compliance alternative during your period of permit coverage, you must modify your SWPPP to reflect this change.
If you qualify for one of the exceptions in CGP Part 3.3(7)(c), include documentation related to your qualification for such exceptions.
ADEQ SWPPP Template, Version 1.0 14
3.2 Perimeter Controls
General Perimeter controls will be achieved by installing silt fences along the downstream perimeter and installing temporary erosion control logs in existing drainage channels near the downstream perimeter of the project
BMP Description: Silt Fence
Design Specifications Included: ☒ Yes ☐ No Figure No. (Arizona DOT Standard specifications, Sec. 915 and Standard Drawing ES7)
Installation Schedule:
BMP Description: Erosion Control Log
Design Specifications Included: ☒ Yes ☐ No Figure No. (Per Plan Sheet C600)
Installation Schedule:
Instructions (see CGP Parts 3.3(6)(a)):
Describe sediment controls that will be used (e.g., silt fences, filter berms, temporary diversion dikes, or fiber rolls) to meet the requirement to “install sediment controls along those perimeter areas of your site that will receive stormwater from construction activities.”
For linear projects, where you have determined that the use of perimeter controls in portions of the site is impracticable, document why you believe this is to be the case.
Also see, EPA’s Silt Fence BMP Fact Sheet at or Fiber Rolls BMP Fact Sheet at
ADEQ SWPPP Template, Version 1.0 15
3.3 Sediment Track-Out
A vehicle tracking pad will be installed at the designated constriction entrance
BMP Description:
Design Specifications Included: ☒ Yes ☐ No Figure No. Arizona DOT Standard Drawing ES11
Installation Schedule:
Note: Some fine grains may remain visible on the surfaces of paved roads even after implementing sediment removal practices. Such “staining” is not a violation of Part 3.5(3)
Instructions (see CGP Parts 3.5(3):
Describe stormwater controls that will be used to “minimize the track-out of sediment onto off-site streets, other paved areas, and sidewalks from vehicles exiting your construction site.”
Describe location(s) of vehicle exit(s), procedures to remove accumulated sediment off-site (e.g., vehicle tracking), and stabilization practices (e.g., stone pads or wash racks or both) to minimize off-site vehicle tracking of sediment. Also, include the design, installation, and maintenance specifications for each control.
Describe reasons for any departure from the use of standard departures from the use of ingress/egress control measure and why certain measures cannot be installed and discuss alternatives.
Describe procedures will be used to monitor discovery and removal of sediment and debris.
Also, see EPA’s Construction Entrances BMP Fact Sheet at:
ADEQ SWPPP Template, Version 1.0 16
3.4 Stockpiles of Sediment or Soil
Stockpiling of material will be minimized by moving cut material directly to areas where grading is to occur. The installed BMP’s will act as stockpile mitigation. All stockpiles to be surrounded by silt fence or erosion control logs to minimize discharge.
Design Specifications Included: ☒ Yes ☐ No Figure No. (Arizona DOT Standard Specifications, Sec. 810-2.06 & Standard Detail ES1
Installation Schedule:
Instructions (see CGP Parts 3.3(6)(b):
Describe stormwater controls and other measures you will take to minimize the discharge of sediment or soil particles from stockpiled sediment or soil. Include a description of structural practices (e.g., diversions, berms, ditches, storage basins), including design, installation, and maintenance specifications, used to divert flows from stockpiled sediment or soil, retain or detain flows, or otherwise limit exposure and the discharge of pollutants from stockpiled sediment or soil.
Also, describe any controls or procedures used to minimize exposure resulting from adding to or removing materials from the pile.
ADEQ SWPPP Template, Version 1.0 17
3.5 Minimize the Disturbance of Steep Slopes
The project area does not contain steep slopes, therefore the minimization of steep slopes is not needed
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
3.6 Topsoil
Top soil is not present on the project site.
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Instructions (see CGP Parts 3.3(5):
Describe how you will minimize the disturbance to steep slopes.
Steep slopes may be defined by a state, Tribe, local government, or industry technical manual (e.g., stormwater BMP manual). Where no such definition exists, steep slopes are automatically defined as those that are 15 percent or greater in grade.
Describe controls (e.g., erosion control blankets, tackifiers), including design, installation and maintenance specifications, that will be implemented to minimize sediment discharges from slope disturbances.
Also, see EPA’s Geotextiles BMP Fact Sheet at:
Instructions (see CGP Parts 3.3(8)
Describe how topsoil will be preserved and identify these areas and associated control measures on your site map(s).
If it is infeasible for you to preserve topsoil on your site, provide an explanation for why this is the case.
ADEQ SWPPP Template, Version 1.0 18
3.7 Soil Compaction
Avoiding soil compaction of undisturbed areas will be achieved by construction fencing and utilizing existing road alignments and other disturbed areas as haul routes
Design Specifications Included: ☐ Yes ☒ No Figure No.
Installation Schedule:
3.8 Storm Drain Inlets
Note: Inlet protection measures can be removed in the event of flood conditions that may endanger the safety of the public.
Such actions are allowable only under extreme conditions and shall be documented on the SWPPP. The operator shall evaluate alternatives to be used in the future to prevent a recurrence of this problem.
No inlets are present on the project site.
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Instructions (see CGP Parts 3.3(8):
― In areas where final vegetative stabilization will occur or where infiltration practices will be installed, describe the controls, including design, installation, and maintenance specifications that will be used to restrict vehicle or equipment access or condition the soil for seeding or planting.
Instructions (see CGP Parts 3.3(6)(c):
Describe controls (e.g., inserts, rock-filled bags, or block and gravel, etc.) including design, installation, and maintenance specifications that will be implemented to protect all inlets that will receive stormwater from your construction activities, and that you have authority to access.
Also, see EPA’s Storm Drain Inlet Protection BMP Fact Sheet at:
ADEQ SWPPP Template, Version 1.0 19
3.9 Constructed Stormwater Conveyance Channels
Stormwater conveyance channels will be protected by installing erosion control logs every 100 lineal feet on center
BMP Description: Erosion Control Logs
Design Specifications Included: ☒ Yes ☐ No Figure No. (Per Plan) Installation Schedule:
3.10 Sediment Basins
Sediment Basins are not present on the project site.
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Instructions (see CGP Parts 3.3(3)(a):
If you will be installing a stormwater conveyance channel, describe control practices (e.g., velocity dissipation devices), including design specifications and details (volume, dimensions, outlet structure), that will be implemented at the construction site.
Instructions (see CGP Parts 3.3(3)(b)
If you will install a sediment basin, include design specifications and other details (volume, dimensions, outlet structure) that will be implemented at in conformance with CGP Part 3.3(3)(b).
Note: Maintenance requirements. The operator shall maintain sediment basins, ponds, and traps, and remove accumulated sediment when design capacity has been reduced by 50%. (See CGP Parts 3.3(3)(b)(ii)) http://www.epa.gov/npdes/stormwater/menuofbmps/construction/sediment_basins
ADEQ SWPPP Template, Version 1.0 20
3.11 Chemical Treatment
Soil Types List all the soil types (including soil types expected to be found in fill material) that are expected to be exposed during construction and that will be discharged to locations where chemicals will be applied: N/A
Treatment Chemicals Include justification for the use of such chemicals and the assessment of potential water quality impacts:
N/A
Descriptions of the training specific personnel have or will receive on the use and storage of the chemical treatments at the site:
N/A
List all treatment chemicals that will be used at the site and explain why these chemicals are suited to the soil characteristics:
N/A
Describe how each of the chemicals will stored: N/A
Describe the dosage of all treatment chemicals you will use at the site or the methodology you will use to determine dosage:
N/A
Provide information from any applicable Material Safety Data Sheets (MSDS): N/A
Include schematic drawings of any chemically-enhanced controls or chemical treatment systems to be used for application of the treatment chemicals; N/A
Include references to applicable state or local requirements affecting the use of treatment chemicals, and copies of applicable manufacturer’s specifications regarding the use of your specific treatment chemicals and/or chemical treatment systems: N/A
Instructions (see CGP Parts 6.3(9)
If you are using treatment chemicals such as polymers, flocculants, or other cationic treatment chemicals at your site, provide details for each of the items below. This information is required as part of the SWPPP requirements in CGP Part 6.3(9).
ADEQ SWPPP Template, Version 1.0 21
3.12 Other Stormwater Controls
No other stormwater controls will be needed on the project site.
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
3.13 Dewatering Practices
Note: The operator shall retain superchlorinated wastewaters (i.e., containing chlorine above residual levels acceptable in drinking water systems) on-site until the chlorine dissipates, or shall otherwise effectively dechlorinate the water to concentrations that meet surface water quality standards of the surface water prior to discharge.
Dewatering is not anticipated for this site
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Instructions:
Describe any other stormwater controls that do not fit into the above categories.
Instructions (see CGP Parts 3.6):
If you will be discharging stormwater that is removed from excavations, trenches, foundations, vaults, or other similar points of accumulation, include design specifications and details of all dewatering practices that are installed and maintained to comply with CGP Part 3.6.
Describe the sediment control practices (sediment trap, sediment basin, dewatering tanks, tube settlers, weir tanks, or filtration systems).
The operator shall ensure all water from dewatering or basin draining activities is discharged in a manner that does not cause nuisance conditions, including erosion in receiving channels or on surrounding properties.
ADEQ SWPPP Template, Version 1.0 22
3.14 Site Stabilization Requirements, Schedules and Deadlines
Note: The operator is not expected to apply temporary or permanent stabilization measures to areas that are intended to remain unvegetated or unstabilized following construction (e.g., dirt access roads, utility pole pads, areas being used for storage of vehicles, equipment, or materials).
Seeding is not anticipated for this project.
☐ Permanent ☐ Temporary ☐ Vegetative ☐ Non-Vegetative
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Approximate Completion Date:
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Approximate Completion Date:
Instructions (see CGP Parts 3.4(1)):
The CGP requires you to immediately initiate stabilization when work in an area of your site has temporarily or permanently stopped, and to complete certain stabilization activities within prescribed deadlines. The CGP also requires that stabilization measures meet certain minimum criteria. See CGP 3.4(1).
For your SWPPP you must include the following:
• Describe the specific vegetative (sodding, mulching, preserving trees, etc.) and/or non-vegetative practices that will be used to stabilize exposed soils where construction activities have temporarily or permanently ceased. Avoid using impervious surfaces for stabilization whenever possible.
• Also, see EPA’s Seeding BMP Fact Sheet at:
• https://www.epa.gov/npdes/stormwater-discharges-construction-activities#resources
• Once you begin construction, consider using the Grading/Stabilization Activities log in Appendix H of the Template to document your compliance with the stabilization requirements
ADEQ SWPPP Template, Version 1.0 23
3.15 Final Stabilization
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Completion Date:
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Completion Date:
Instructions (see CGP Parts 3.4(2)
Describe procedures for final stabilization. If you complete major construction activities on part of your site, you can document your final stabilization efforts for that portion of the site (specific vegetative and/or non-vegetative practices). The UCGP allows you to then discontinue inspection activities in these areas.
You can amend or add to this section as areas of your project are finally stabilized.
Update your site plans to indicate areas that have achieved final stabilization.
ADEQ SWPPP Template, Version 1.0 24
3.16 Post-Construction BMPs
BMP Description: Erosion Control Logs
☐ Permanent ☒ Temporary ☐ Vegetative ☒ Non-Vegetative
Design Specifications Included: ☐ Yes ☐ No Figure No. (per plan)
Installation Schedule:
Completion Date:
Design Specifications Included: ☐ Yes ☐ No Figure No. (per plan)
Installation Schedule:
Completion Date:
Instructions (see CGP Parts 3.4(3)(b)
List all post-construction stormwater management measures that will be installed during the construction project to control pollutant discharges after construction has been completed.
Also see post-construction section of EPAs Menu of BMPs at:
https://www.epa.gov/npdes/stormwater-discharges-construction-activities#resources
Post-Construction Stormwater Management (see CGP Part 6.4(13))
• The SWPPP shall include a description of post-construction stormwater management control measures that will be installed during the construction process to control pollutants in stormwater discharges after construction have been completed.
• If ‘temporary’ sediment basins are to be used as/converted to retention or detention basins in the post-construction phase, the operator shall remove and properly dispose of all sediments accumulated in the basin during construction activities prior to filing an NOT.
• New discharge connections or permanent stormwater outfalls directly to OAWs are prohibited under this permit.
Note: The installation of these devices may also require a separate permit under section 404 of the Clean Water Act.
Note: This permit only authorizes and requires the operator to install and maintain stormwater management measures up to and including final stabilization of the site, and does not require continued maintenance after stormwater discharges associated with the construction activity have been eliminated from the site and an NOT has been submitted to ADEQ. However, post-construction control measures that discharge pollutants from point sources once construction is complete may require authorization under a separate AZPDES permit.
ADEQ SWPPP Template, Version 1.0 25
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Completion Date:
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Completion Date:
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Completion Date:
ADEQ SWPPP Template, Version 1.0 26
SECTION 4: POLLUTION PREVENTION REQUIREMENTS
4.1 Potential Sources of Pollution
Table 3 - Construction Site Pollutants
INSERT TEXT OR USE TABLE BELOW
Pollutant-Generating Activity
Pollutants or Pollutant Constituents
(that could be discharged if exposed to stormwater)
Location on Site (or reference SWPPP site map where this is shown)
Concrete Wash Concrete Concrete Washout
Washing Equipment Grease, excess oil Staging Area
Fueling Gasoline, diesel Staging Area
[Include additional rows as necessary.]
Instructions (see CGP Part 3.5):
Identify and describe all pollutant-generating activities at your site (e.g., paving operations; concrete, paint, and stucco washout, washing of equipment and vehicles, fueling and maintenance areas, and waste disposal;
solid waste storage and disposal). Use the following sections below for additional detail.
For each pollutant-generating activity, include an inventory of pollutants or pollutant constituents associated with that activity (e.g., sediment, fertilizers, and/or pesticides, paints, solvents, fuels), which could be exposed to rainfall or snowmelt, and could be discharged from your construction site. You must take into account where potential spills and leaks could occur that contribute pollutants to stormwater discharges.
ADEQ SWPPP Template, Version 1.0 27
4.2 Concrete Wash Out
Concrete washout will be installed per Arizona DOT Erosion and Pollution Control Guidelines
Impacted Outfall:
Design Specifications Included: ☐ Yes ☒ No
Installation Schedule:
4.3 Washing of Equipment and Vehicles
Mitigating runoff from washing vehicles by contractor’s means and methods
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Instructions (see CGP Parts 3.5(2)(a)):
Describe concrete wash out and maintenance practices that will be implemented to eliminate the discharge of pollutants (e.g., providing secondary containment (examples: liners, spill berms, decks, spill containment pallets).
Instructions (see CGP Parts 3.5(2)(b))
Describe equipment/vehicle washing practices that will be used to minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyances and directing wash waters to a sediment basin or sediment trap, using filtration devices, such as filter bags or sand filters, or using other similarly effective controls).
Describe how you will prevent the discharge of soaps, detergents, or solvents by providing either (1) cover (examples: plastic sheeting or temporary roofs) to prevent these detergents from coming into contact with rainwater, or (2) a similarly effective means designed to prevent the discharge of pollutants from these areas.
Also, see EPA’s Vehicle Maintenance and Washing Areas BMP Fact Sheet at www.epa.gov/npdes/stormwater/menuofbmps/construction/vehicile_maintain http://www.epa.gov/npdes/stormwater/menuofbmps/construction/vehicile_maintain
ADEQ SWPPP Template, Version 1.0 28
4.4 Washing of Applicators and Containers used for Paint, Concrete or Other Materials
Concrete washout will be installed per Arizona DOT Erosion and Pollution Control Guidelines Eliminating the discharge of water from the cleanout of stucco, paint, concrete, form release oils, curing compounds, and other construction materials by contractor’s means and methods
Design Specifications Included: ☐ Yes ☒ No
Installation Schedule:
4.5 Fueling and Maintenance of Equipment or Vehicles
Eliminating discharge and spilled chemicals by contractor’s means and methods.
Instructions (see CGP Parts 3.5(2)(c)):
Describe how you will comply with the CGP Part 3.5(2)(c) requirement to “provide an effective means of eliminating the discharge of water from the washout and cleanout of stucco, paint, concrete, form release oils, curing compounds, and other construction materials.”
Also, see EPA’s Concrete Washout BMP Fact Sheet at:
Instructions (see CGP Parts 3.5(2)(d)):
Describe equipment/vehicle fueling and maintenance practices that will be implemented to eliminate the discharge of spilled or leaked chemicals (e.g., providing secondary containment (examples: spill berms, decks, spill containment pallets) and cover where appropriate, and/or having spill kits readily available.
Also, see EPA’s Vehicle Maintenance and Washing Areas BMP Fact Sheet at
ADEQ SWPPP Template, Version 1.0 29
Impacted Outfall:
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
4.6 Pollution Prevention Measures
Good housekeeping procedures to prevent litter, construction debris, and construction chemicals exposed to stormwater will be by contractor’s means and methods.
4.7 Storage, Handling, and Disposal of Construction Products, Materials, and Wastes
Any types of construction product, materials, and waste that are to be used or stored at the project site will be managed by contractor’s means and methods
4.8 Building Products (see CGP Parts 3.5(4)(c))
Note: Examples include plastic sheeting, asphalt sealants, copper flashing, roofing materials, adhesives, concrete admixtures.)
Building products will be managed by contractor’s means and methods
Instructions (see CGP Parts 3.5(4)(a)):
Describe good housekeeping procedures used to prevent litter, construction debris, and construction chemicals exposed to stormwater, including material storage practices.
Instructions (see CGP Parts 3.5(4)(b)):
For any of the types of construction products, materials, and wastes in Sections 3.5(4)(b) below that are expected to be used or stored at your site, provide the information on how you will comply with the corresponding CGP provision and the specific practices that will be employed.
Also, see EPA’s General Construction Site Waste Management BMP Fact Sheet at
ADEQ SWPPP Template, Version 1.0 30
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
4.9 Pesticides, Herbicides, Insecticides, Fertilizers and Landscape Materials (see CGP Parts 3.5(4)(c))
Pesticides, Herbicides, Insecticides, Fertilizers, and Landscape Materials will be managed by contractor’s means and methods
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
4.10 Diesel Fuel, Oil, Hydraulic Fluids, Other Petroleum Products, and Other Chemicals (see CGP Parts 3.5(4)(c))
Diesel Fuel, Oil, Hydraulic Fluids, Other Petroleum Products, and Other Chemicals will be managed by contractor’s means and methods
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
ADEQ SWPPP Template, Version 1.0 31
4.11 Hazardous or Toxic Waste (see CGP Parts 3.5(4)(c))
Note: Examples include paints, solvents, petroleum-based products, wood preservatives, additives, curing compounds, acids.
Hazardous or Toxic Waste will be managed by contractor’s means and methods
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
4.12 Construction and Domestic Waste (see CGP Parts 3.5(4)(c))
Construction and Domestic Waste will be managed by contractor’s means and methods
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
4.13 Sanitary Waste (see CGP Parts 3.5(4)(c))
Sanitary Waste will be managed by contractor’s means and methods
ADEQ SWPPP Template, Version 1.0 32
Design Specifications Included: ☐ Yes ☐ No Figure No.
Installation Schedule:
Maintenance and Inspection:
4.14 Spill Prevention and Response Procedures
Note: Procedures for notification of appropriate facility personnel and emergency response. Where a leak, spill, or other release occurs that contains a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, or 40 CFR Part 302, the operator shall notify ADEQ Emergency Response Duty Office at
(602) 771-2330 or, toll free, at (800) 234-5677. Contact information must be in locations that are readily accessible and available. Within 7 calendar days of knowledge of the release, operators shall provide a description in the SWPPP of the release;
the circumstances leading to the release; and the date of the release. Local requirements may necessitate additional reporting of spills or discharges to local emergency response, public health or drinking water supply agencies.
INSERT TEXT HERE
Instructions (see CGP Parts 3.5(5)):
Describe equipment and procedures you will use to prevent and respond to leaks, spills, and other releases.
You must implement the following at a minimum:
Procedures for labeling containers;
Preventive measures such as barriers between materials storage and traffic areas, secondary containment provisions and procedures for material storage and handling;
Procedures for expeditiously stopping, containing, and cleaning up leaks, spills, and other releases.
Identify the name or title of the employee(s) responsible for detection and response of spills or leaks.
Record Hazardous Substance/ Spill Log in Appendix N.
Some projects/site may be required to develop a Spill Prevention Control and Countermeasure (SPCC) plan under a separate regulatory program (40 CFR 112). If you are required to develop an SPCC plan, or you already have one, you should include references to the relevant requirements from your plan.
Also, see EPA’s Spill Prevention and Control Plan BMP Fact sheet at:
ADEQ SWPPP Template, Version 1.0 33
SECTION 5: INSPECTIONS
5.1 Personnel Responsible for Inspections and Qualifications (see CGP Parts 4.1)
Contractor to details inspection information according to means and methods below Note: All personnel conducting inspections must be considered a “qualified person.” Appendix A of the 2020 CGP defines a qualified person as “those (either the operator’s employees or outside personnel) who are knowledgeable in the principles and practice of erosion and sediment controls and pollution prevention, who possess the skills and training to assess conditions at the construction site that could impact stormwater quality, and the skills and training to assess the effectiveness of any control measures selected to control the quality of stormwater discharges from the construction activity.”
5.2 Inspection Schedule (see CGP Parts 4.2)
Specific Routine Inspection Frequency
INSERT INSPECTION SCHEDULE BASED ON CGP PARTS 4.2, WHICHEVER APPLIES
Rain Gauge Location (if applicable) SPECIFY LOCATION(S) OF RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED Include this information in Appendix M
5.3 Reductions in Inspection Frequency (if applicable)
For the reduction in inspections resulting from temporary or final stabilization: SPECIFY (1) LOCATIONS WHERE STABILIZATION STEPS HAVE BEEN COMPLETED AND (2) DATE THAT THEY WERE COMPLETED
(Note: It is likely that you will not be able to include this in your initial SWPPP. If you qualify for this reduction (see CGP Part 4.2(2)), you will need to modify your SWPPP to include this information.)
For the reduction in inspections in based on seasonal rainfall patterns: INSERT BEGINNING AND ENDING
DATES OF THE SEASONALLY-DEFINED ARID PERIOD FOR RAINFALL PATTERNS
For reduction in inspections due to unlikely runoff due to winter conditions: INSERT BEGINNING AND
ENDING DATES OF FROZEN CONDITIONS ON YOUR SITE
5.4 Inspection Schedule for Sites within ¼ mile upstream of Impaired Water or OAWs:
INSERT INSPECTION SCHEDULE
Instructions (see CGP Part 4):
Describe the procedures (below) that you will follow for conducting inspections in accordance with CGP Sections 4.1, 4.2, 4.3, 4.4 and 4.5. Include Inspection Forms in Appendix D.
ADEQ SWPPP Template, Version 1.0 34
5.5 Inspection Schedule for Inactive and Unstaffed Sites:
INSERT INSPECTION SCHEDULE AND COPY OF DOCUMENTION TO SUPPORT THE FACILITY HAS CHANGED ITS
STATUS FROM ACTIVE TO INACTIVE AND UNSTAFFED
5.6 Scope of Inspections (see CGP Parts 4.3)
INSERT SCOPE OF INSPECTIONS
5.7 Inspection Report Form (see CGP Parts 4.4)
INSERT COPY OF ANY INSPECTION REPORT FORMS YOU WILL USE HERE OR IN APPENDIX D
INSERT WHERE INSPECTION REPORTS SHALL BE RETAINED
5.8 Inspection Follow-up (see CGP Parts 4.5)
INSERT INSPECTION FOLLOW-UP PROCEDURES
ADEQ SWPPP Template, Version 1.0 35
SECTION 6: CORRECTIVE ACTION
Contractor to detail corrective action information according to means and methods below
6.1 Corrective Action Triggers
INSERT THE REQUIREMENTS FOR TAKING CORRECTIVE ACTIONS
6.2 Corrective Action Deadlines
INSERT THE DEADLINES IMPOSED FOR CORRECTIVE ACTIONS
6.3 Corrective Action Report/ Forms
INSERT THE DETAILS OF EACH CORRECTIVE ACTION WHICH WILL BE IDENTIFIED IN THE INSPECTION REPORT AND DOCUMENTED IN THE CORRECTIVE ACTION FORM/ REPORT AND MAINTAINED WITHIN THE SWPPP.
Instructions (CGP Parts 5):
Describe the procedures for taking corrective action in compliance with CGP Part 5. Include Inspection Forms in Appendix E.
For each corrective action taken in accordance with this Part, the operator shall document the details of the corrective action in the inspection report required by Part 4.4. These reports shall be signed in accordance with the signatory requirements in Appendix B, Subsection 9 and maintained with the SWPPP in accordance with the record keeping requirements in Appendix B, Subsection 11.
ADEQ SWPPP Template, Version 1.0 36
SECTION 7: DELEGATION OF AUTHORITY
Insert Name:
Insert Position:
Insert Address:
Insert City, State, Zip Code:
Insert Email:
Instructions:
― Identify the individual(s) or positions within the company who have been delegated authority to sign inspection reports, certification or other information.
― Attach a copy of the signed delegation of authority (see example in Appendix J of the Template.
For more on this topic, see Appendix I, Subsection 11 of EPA’s CGP.
ADEQ SWPPP Template, Version 1.0 37
SECTION 8: TRAINING
Table 4 - Documentation for Completion of Training Name Date Training Completed
INSERT NAME OF PERSONNEL HERE AND TYPE OF TRAINING INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
INSERT NAME OF PERSONNEL HERE INSERT COMPLETION DATE HERE
Instructions (see CGP Part 6 .3(1))
Complete the table below to provide documentation that the personnel required to be trained or have completed the appropriate training.
If personnel will be taking course training (which is not required as part of the CGP), consider using Appendix I to track completion of this training.
The following personnel, at a minimum, must receive training, and therefore should be listed out individually in the table below:
Personnel who are responsible for the design, installation, maintenance, and/or repair of stormwater controls (including pollution prevention measures);
Personnel responsible for the application and storage of treatment chemicals (if applicable);
Personnel who are responsible for conducting inspections as required in Part 4; and Personnel who are responsible for taking corrective actions as required in Part 5.
Required personnel must be trained to understand the following if related to the scope of their job duties:
The location of all stormwater controls on the site required by this permit, and how they are to be…
This is the start of the file's text. The full file is on GovTribe.