This document provides details on a federal solicitation and related construction plans. Solicitation number 140L0622R0022 from the Department of the Interior Bureau of Land Management seeks bids for the La Posa Lagoon GAOA project. Volume 2 of the construction plans is a PDF file that contains drawings and specifications for the project. Bids are due by June 22, 2022 for general construction work related to improvements at the La Posa Lagoon in accordance with the solicitation and provided plans. Interested parties should review all materials to understand the full scope of work and submit responsive proposals by the specified deadline.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EL. 941.00

EL. 935.25

PLAN

SECTION

C506

INTERCELL CONTROL STRUCTURE

NO SCALE

5' DIA PRECAST CONCRETE

STRUCTURE

8" DIP

8" PRECAST CONCRETE

BASE SLAB

MANHOLE STEPS AT 12" O.C.

CIRCULAR HS20 GRATING

FROM PRIMARY

POND

TO SECONDARY

POND

PLAN

SECTION

C506

INFLUENT CONTROL STRUCTURE

NO SCALE

5' DIA PRECAST

CONCRETE MANHOLE

8" DIP TO

PRIMARY POND

8" DIP TO SECONDARY POND

8" PLUG VALVE (TYP)

VALVE BOX (TYP)

8" PLUG VALVE

8" DIP TO SECONDARY POND

GROUT INSIDE BOTTOM OF

STRUCTURE TO OUTLET

INVERTS

C505

NOTES:

1. RUBBER GASKETS ALL JOINTS, APPROVED FLEXIBLE EXTERNAL

RUBBER SEAL REQUIRED ON JOINTS BELOW GROUND WATER.

2. ALL PIPE PENETRATIONS SHALL HAVE A WATERTIGHT RUBBER

BOOT.

6" MIN

8" INTEGRAL

PRECAST

CONCRETE BASE

8" PVC FROM

FROM RV DUMP

STATION

8" PVC FROM RV DUMP STATION

8" DIP TO

PRIMARY

POND

MANHOLE STEPS AT 12" O.C.

CIRCULAR HS20 GRATING

EL. 936.25

FROM PRIMARY

POND

6" MIN

EL. 941.00

EL. 937.47

EL. 934.75

45° DIP MJ BEND

45° DIP MJ BEND

RESTRAIN MJ CONNECTIONS

RESTRAIN MJ CONNECTIONS

18" MIN (TYP ALL

LOCATIONS

18" MIN

18"

18"

WATERTIGHT BOOT ALL

PENETRATIONS (TYP)

8" PLUG VALVE (TYP)

8" DIP

8" DIP

WATERTIGHT BOOT

ALL PENETRATIONS

8" DIP

8" DIP

8" DIP

1'

VALVE BOX (TYP)

C505

ADDITIONAL VALVE AND VALVE BOX

NOT SHOWN FOR CLARITY

WATERTIGHT BOOT ALL

PENETRATIONS (TYP)

PIPE

12" MIN

4" HDPE

4" HDPE

4" HDPE 45° BEND

4" HDPE 45° BEND

4" HDPE 45° BEND

4" HDPE

4" HDPE 45° BEND

COMPACTED BACKFILL

4" HDPE

4" HDPE

NOTES:

1. ALL JOINTS SHALL BE RESTRAINED.

C506

PIPE OFFSET

NO SCALE

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

x:\

AE

\B \B

LM

NS

\15

\5-fin al-ds gn

\51 -d ra wi ng s\1

0- Ci vil \ca d\d wg

\sh ee t\1

7_

Po nd

D eta ils .dw g Ju ly

, 2

1 - 5:

:44

P M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

POND DETAILS

C506

18" MIN.

(TYP.)

18" MIN.

(TYP.)

BLOWER SCHEDULE

DESCRIPTION QTY

BLOWER BLOCK TYPE GM10S DN100

NOMINAL INLET SIZE (FLEXIBLE CONNECTOR)

4"

NOMINAL OUTLET SIZE (FLEXIBLE CONNECTOR)

4"

BLOWER MOTOR SIZE (hp)

OPERATING VOLTAGE/PHASE 460V/3Ø

# BLOWERS - TOTAL (INCLUDING STANDBY)*

# BLOWERS - NORMAL OPERATION 1

AIRFLOW - NORMAL OPERATION 268

PRESSURE - NORMAL OPERATION (psi)

4.3 / 5.6

3'-7"

4'-5"

C

L

E

A

R

S

P

A

C

E

R

E

C

O

M

M

E

N

D

E

D

F

O

R

M

A

I

N

T

E

N

A

N

C

E

C

L

E

A

C

E

R

E

C

O

M

M

E

N

D

R

M

A

I

N

T

E

N

A

N

C

E

INLET

DISCHARGE

INLET

DISCHARGE

3'-3"

4'-5"

2'-10" 1'-3"

4'-1"

4'-11"

4'-0"

1'-0"

4'-5" 3'-3"

C507

PLAN - GMS10S DN100

NO SCALE

C507

SECTION - GMS10S DN100

NO SCALE

C507

REAR ELEVATION - GM10S DN100

NO SCALE

C507

FRONT ELEVATION - GM10S DN100

NO SCALE

C507

BLOWER LAYOUT

NO SCALE

3'-0"

1'-0"

CONTROL PANEL

(APPROX SIZE)

16" SLAB ON GRADE

W/5 @ 12" TOP & BOT

C

L

E

A

C

E

R

E

C

O

M

M

E

N

D

R

M

A

I

N

T

E

N

A

N

C

E

C

L

E

A

C

E

R

E

C

O

M

M

E

N

D

R

M

A

I

N

T

E

N

A

N

C

E

TO AERATION

VALVE BOX

2'-10" 1'-3"

4'-1"

1'-0"

2'-0"

2'-10" 1'-3"

4'-1"

7"

3"

PIPE SUPPORT (TYP)

CJ

120"

(VERIFY)

120"

(VERIFY)

8"

6" U.N.O.

GRANULAR 95%

STANDARD

PROCTOR

CLASS 2 ADOT

AGGREGATE

CONCRETE SLAB

4"

16"

10"

C507

CONCRETE PAD TYPICAL SECTION

NO SCALE

C507

C507

HOUSEKEEPING PAD

(BY CONTRACTOR)

VERIFY

VERIFY PIPE SIZE

ADJUSTABLE SADDLE PIPE SUPPORT

WHICH COMPLIES WITH MANUFACTURERS

STANDARDIZATION SOCIETY SP-69 (TYPE 38)

SUPPORT PIPE:

3" DIA FOR 4"-12" PIPE

(4) 1/2" Ø 304 STAINLESS STEEL HILTI EPOXY

STUD INSERT (MINIMUM 6" EMBEDMENT)

LOWER SUPPORT PLATE:

9" DIA OR SQUARE FOR 4"-12" PIPE

C507

PIPE SUPPORT FROM FLOOR

NO SCALE

C507

#5 @12" OC TOP & BOT EW

4" SST 4" HDPE

4" THREADED

COMPANION

FLANGE

4" FLANGE

CONNECTION

KEYNOTES:

4" AIR PIPE

4" BUTTERFLY VALVE (TYP 3 LOCATIONS)

4" TEE

90° BEND (TYP 4 LOCATIONS)

CONTRACTOR TO PROVIDE AND INSTALL

BLOWER MANUFACTURER TO PROVIDE AND INSTALL

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

x:\

AE

\B \B

LM

NS

\15

\5-fin al-ds gn

\51 -d ra wi ng s\1

0- Ci vil \ca d\d wg

\sh ee t\1

7_

Po nd

D eta ils .dw g Ju ly

, 2

1 - 5:

:55

P M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

POND DETAILS

C507

NOTES:

1. THROTTLING OF VALVES WILL BE REQUIRED TO OBTAIN

EVEN AIR DISTRIBUTION IN ALL THREE GROUPS DUE TO

VARYING BOTTOM ELEVATION.

2. VALVE BOXES TO BE LOCATED NEAR EDGE OF BERM.

EXACT LOCATION TO BE FIELD DETERMINED.

NOTES:

1. THROTTLING OF VALVES WILL BE REQUIRED TO OBTAIN

EVEN AIR DISTRIBUTION IN BOTH GROUPS DUE TO

VARYING BOTTOM ELEVATION.

2. VALVE BOXES TO BE LOCATED NEAR EDGE OF BERM.

EXACT LOCATION TO BE FIELD DETERMINED.

3'-0"

2'-0"

3'-0"

7" TYP

7" TYP

3'-0"

2'-0"

3'-0"

7" TYP 7" TYP

SST

HDPE

F R

M

I N

A I

U P

P L Y

2" SST

H D

P E

S S

T

T

R

A T

I O

N

L I N

E S

R

A T

I O

N

L I N

E S

R

A T

I O

N

L I N

E S

H

D P

E

H

D P

E

H

D P

E

S

S T

S

S T

S

S T

PLAN

C508

3-OUTLET AIR DISTRIBUTION MANIFOLD

NO SCALE

SECTION

SST

HDPE

2" SST

CARSON VALVE BOX

MODEL 1730-18

2" BRASS BALL VALVE

(BLOW-OFF)

2" SST THREADED

FITTINGS

2" THREADED

COMPANION

FLANGE

4" HDPE 90° BEND

2" X 4" HDPE REDUCER

2" FLANGE CONNECTION

2" BRASS BALL VALVE

2" BRASS BALL VALVE C/W PLUG

(NORMALLY CLOSED)

2" SST CLOSE NIPPLE

2" SST PIPE

SST

HDPE

F R

I N

A

U P

P L Y

2" SST

H D

P E

S S

T

R

A T

I O

N

L I N

E S

R

A T

I O

N

L I N

E S

H

D P

E

H

D P

E

S

S T

S

S T

PLAN

CARSON VALVE BOX

MODEL 1730-18

2" BRASS BALL VALVE

(BLOW-OFF)

2" SST THREADED

FITTINGS

2" THREADED

COMPANION

FLANGE

4" HDPE 90° BEND

2" X 4" HDPE REDUCER

2" FLANGE CONNECTION

2" BRASS BALL VALVE

SECTION

SST

HDPE

2" SST

2" BRASS BALL VALVE C/W PLUG

(NORMALLY CLOSED)

2" SST PIPE

C508

2-OUTLET AIR DISTRIBUTION MANIFOLD

NO SCALE

4" HDPE AIR PIPE

KEYNOTES:

CONTRACTOR TO PROVIDE AND INSTALL (TYP)

DIFFUSER MANUFACTURER TO PROVIDE AND

INSTALL (TYP)

KEYNOTES:

CONTRACTOR TO PROVIDE AND INSTALL (TYP)

DIFFUSER MANUFACTURER TO PROVIDE AND

INSTALL (TYP)

3' X 2' X 6" THICK CONCRETE SLAB

SUPPORT PER

MANUFACTURER'S

RECOMMENDATION (TYP)

6"

3' X 2' X 6" THICK CONCRETE SLAB

6"

SUPPORT PER

MANUFACTURER'S

RECOMMENDATION (TYP)

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

x:\

AE

\B \B

LM

NS

\15

\5-fin al-ds gn

\51 -d ra wi ng s\1

0- Ci vil \ca d\d wg

\sh ee t\1

7_

Po nd

D eta ils .dw g Ju ly

, 2

1 - 5:

:59

P M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

C508

POLY PROPYLENE ROPE TO

FLOAT ON WATER SURFACE

FOR DIFFUSER RECOVERY

LENGTH OF ROPE DEPENDANT

ON WATER LEVEL

3/4" HDPE 90° BEND

DIRECT-FUSED TO DIFFUSER

HT25-8 FIN BUBBLE

MEMBRANE DIFFUSER

1"Ø UNWEIGHTED FEEDER TUBING

FROM DIFFUSER TO SINKING HOSE

(3'-0" NOMINAL LENGTH)

PRE-CAST CONCRETE

DIFFUSER BALLAST

STAINLESS STEEL CLAMPS

3/4"Ø HDPE FEEDER LINE WITH

1/2" SST CABLE BALLAST (±20'-0"

LENGTH)

3/4" OUTLET SADDLE

2"Ø HDPE

AIR SUPPLY LATERAL

"SADDLE BAG" WEIGHT

BALLAST FILLED WITH SAND

(SIZE/SPACING TBD)

TO

DIFFUSER

W A

T E

R

L E

V E

L

SST HDPE

2" SST

H

P

E

C509

FEEDER/DIFFUSER DETAIL

NO SCALE

FIELD LOCATE DISTRIBUTION

MANIFOLD NEAR EDGE OF RESERVOIR

4" HDPE MAIN AIR

SUPPLY HEADER

2" FLANGE CONNECTION

AIR DISTRIBUTION MANIFOLD

C508

C508

2" BRASS BALL VALVE

2" THREADED

COMPANION FLANGE

BALLAST WEIGHTS REQUIRED ON

ALL IN-WATER LATERAL INSTALLATION

2" HDPE IN-WATER HEADER 2" HDPE PLUG

"SADDLE BAG" WEIGHT

BALLAST FILLED WITH SAND

C509

LATERAL DETAIL AT HEADER

NO SCALE

C510

3' X 2' X 6" THICK

CONCRETE SLAB

SUPPORT PER MANUFACTURER'S

RECOMMENDATION (TYP)

4" HDPE 45° BEND

4" HDPE 45° BEND

P

E

P

E

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

x:\

AE

\B \B

LM

NS

\15

\5-fin al-ds gn

\51 -d ra wi ng s\1

0- Ci vil \ca d\d wg

\sh ee t\1

7_

Po nd

D eta ils .dw g Ju ly

, 2

1 - 5:

:03

P M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

C509

2" HDPE

1'-0"

1'-10" 1'-10"

TBD

(TYPICAL DISTANCE)

SADDLEBAGS SPACING/WEIGHT AS PER

DESIGN CALCS

2" HDPE AIR

SUPPLY LATERAL

PLAN

ELEVATION

SADDLEBAG LATERAL BALAST

(SIZE/SPACING TBD)

2"Ø HDPE IN-WATER AIR

SUPPLY LATERAL

TBD

(TYPICAL DISTANCE)

NOTES:

1. SADDLEBAGS SPACING/WEIGHT AS PER DESIGN CALCS.

C510

AIR LATERAL DETAIL

NO SCALE

SECTION A-A

A

A

2"Ø HDPE AIR

SUPPLY LATERAL

"SADDLEBAG WEIGHT"

BALLAST FILLED WITH SAND

NOMINAL 50 LB WEIGHT

(SIZE/SPACING TBD)

6" 4" 2'-4" 4"

T O

D I F

F U

S E

R

T O

D I F

F U

S E

R

T O

D I F

F U

S E

R

T O

D I F

F U

S E

R

FROM MAIN

AIR SUPPLY

23' OF 3/4" HDPE FEEDER PIPING

WEIGHTED WITH SST CABLE

(TYPICAL EACH FEEDER LINE)

2" HDPE PLUG

2" HDPE IN-WATER

HEADER

3/4" HDPE SADDLE

SADDLEBAG LOCATED

AT END OF HEADER

C510

IN-WATER MANIFOLD - PLAN

NO SCALE

CONTINUOUS LENGTH OF

MARINE GRADE ROPE

ATTACHED TO DIFFUSER

SST CRIMP CLAMP

ROPE THIMBLE

PRE-CAST CONCRETE

DIFFUSER BALLAST

HDPE MANIFOLD

3/4" HDPE 90° BEND

DIRECT-FUSED TO DIFFUSER

HT25-8 FINE BUBBLE

EPDM MEMBRANE DIFFUSER

C510

DIFFUSER CONNECTION DETAIL

NO SCALE

C510

HT25-8 DIFFUSER - PLAN

NO SCALE

SS THREADED NIPPLES

HDPE MANIFOLD

2 1/2" Ø X 1'-8" LONG

EPDM MEMBRANE

(TYPICAL OF 8 PER DIFFUSER ASSEMBLY)

1'-8"

MEMBRANE LENGTH

3'-7"

1'-10"

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

x:\

AE

\B \B

LM

NS

\15

\5-fin al-ds gn

\51 -d ra wi ng s\1

0- Ci vil \ca d\d wg

\sh ee t\1

7_

Po nd

D eta ils .dw g Ju ly

, 2

1 - 5:

:08

P M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

C510

VEHICULAR GATE

VERTICAL BARBED WIRE

EXTENDERS ON GATE

AND GATE POSTS (TYP)

PLUNGER ROD OR

OTHER METAL DEVICE

FOR CLOSURE

3 STRAND BARBED WIRE

3/8" DIA TRUSS ROD (TYP)

BRACE TUBE

TRUSS ROD

TIES AT

1' CENTERS

CATCH BLOCK

BRACE TUBE

TRUSS ROD

1' (TYP)

DOUBLE GATE

16' MAXIMUM

10" DIA

KEYNOTES:

1. 1-1/4" ID MINIMUM VERTICAL GALVANIZED STEEL POST.

2. SEE CHAIN LINK FENCE DETAIL FOR POST,

FABRIC, TRUSS ROD AND BRACE TUBE REQUIREMENTS.

3. POSTS FOR VEHICULAR GATES SHALL BE: 3-1/2" ID.

4. FRAMES FOR VEHICULAR GATES SHALL BE: STEEL 1-1/4" ID MIN.

5. FRAMES FOR PEDESTRIAN GATES SHALL BE: 1" ID MIN.

6. FURNISH A SECURE METAL LATCH FOR CLOSURE WITH FITTING FOR LOCK.

7. CONNECT BRACE TUBES TO POSTS WITH BRACE BAND AND CUP.

8. COIL SPRING TENSION WIRE.

9. INSTALL PULL POSTS TO LIMIT MAXIMUM DISTANCE BETWEEN CORNER POSTS,

END POSTS, OR PULL POSTS TO 300' MAXIMUM. PULL POSTS TO BE EQUALLY

SPACED BETWEEN CORNER OR END POSTS.

10. SEE SPECIFICATIONS FOR BARBED WIRE REQUIREMENTS.

11. SEE SPECIFICATIONS FOR CHAIN LINK FENCE REQUIREMENTS.

12. CONNECT TRUSS ROD TO POST WITH BAND AND FITTINGS HAVING A

TENSIONING DEVICE.

13. FURNISH TIGHT FIT CAP. FASTEN TO POST TOP WITH 1/4" Ø STAINLESS STEEL

RIVET. FURNISHED WITH BARBED WIRE EXTENDER AND HOLE TO PASS TOP

RAIL.

14. TOP RAIL 1-5/8" OD, CONTINUOUS WITH SLEEVE CONNECTORS. FASTEN WITH

1/4" Ø STAINLESS STEEL RIVETS.

C511

CHAIN LINK FENCE GATES

NO SCALE

C511

PEDESTRIAN GATE

F

A B

R I C

BRACE TUBE

TRUSS ROD

3 STRAND BARBED WIRE

VERTICAL BARBED WIRE EXTENDERS

ON GATE AND GATE POSTS (TYP)

BRACE TUBE

TRUSS ROD

1' (TYP)

4'

SECTIONELEVATION

TIES @ 18" OC MAXIMUM

3 STRAND BARBED WIRE

CAP (TYP)

LINE POST

2-1/2" Ø STEEL PIPE

COMPACTED

SUBGRADE

COMPACTED SUBGRADE

CONCRETE FOOTING

1-5/8" OD BRACE TUBE

CAP FITTED WITH BARBED

WIRE EXTENDER OR

POST EXTENSION

1-5/8" OD BRACE TUBE

3/8" Ø TRUSS ROD

1/4" X 3/4" FLAT STEEL

STEEL TENSION BAR

END, CORNER OR PULL POST

3" Ø STEEL PIPE, CORNER

AND PULL POSTS TO HAVE

EQUAL BRACING ON BOTH SIDES

C O

R N

E N

D

P

O S

T

1'

8' MAXIMUM SPACING TO

UNIFORM SPACING

C

L

C

L

L I N

E

P

O S

T

F

A B

R I C

CHAIN LINK FABRIC

#9 GAUGE 2" MESH

(TOP AND BOTTOM)

C511

CHAIN LINK FENCE

NO SCALE

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

x:\

AE

\B \B

LM

NS

\15

\5-fin al-ds gn

\51 -d ra wi ng s\1

0- Ci vil \ca d\d wg

\sh ee t\1

7_

Po nd

D eta ils .dw g Ju ly

, 2

1 - 5:

:14

P M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

C511

SEH NO.5 RBR RPC

974.79

SET PANEL REBAR

931.56

R

O

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

VEHICLE TRACKING PAD

AT DESIGNATED

CONSTRUCTION

ENTRANCE

STAGING AREA

CONCRETE

WASHOUT

LIMITS OF DISTURBANCE

INSTALL EROSION

LOGS EVERY 100',

(TYP)

INSTALL EROSION

LOGS EVERY 100',

(TYP)

INSTALL SILT FENCE 50'

MAX DOWNSLOPE OF ALL

GRADING ACTIVITY, TYP.

INSTALL SILT FENCE 50' MAX

DOWNSLOPE OF ALL

GRADING ACTIVITY, TYP.

INSTALL SILT FENCE 50' MAX

DOWNSLOPE OF ALL GRADING

ACTIVITY, TYP.

LIMITS OF DISTURBANCE

LIMITS OF DISTURBANCE

LA POSA TYSON CONTACT STATION

S

S

S

S

S

S

W

W

W

W

W

W

W

W

W

W

W

S

X

C

X

C

X

C

X

C

X

C

S

W

W

W

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P-OHP-OH

INSTALL EROSION

LOGS EVERY 100',

(TYP)

INSTALL EROSION

LOGS EVERY 100',

(TYP)

INSTALL EROSION

LOGS EVERY 100',

(TYP)

feetscale

200 400

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

PH

A

SE

I

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\1 0-

Ci vil

\ca d\d wg \sh ee t\1

7_

EC

P lan

.dw g

Ju ly

, 2

1 -

5:

:02 P

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

EROSION CONTROL PLAN

C600

NOTES

1. SCATTER ANY VEGETATION NOT SCHEDULED FOR RELOCATION AS NECESSARY TO

ACCOMMODATE SITE IMPROVEMENTS.

2. CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL PER SWPPP.

EROSION CONTROL LOG

STABILIZED STAGING AREA

VEHICLE TRACKING CONTROL

LIMITS OF DISTURBANCE

SILT FENCE

CONCRETE WASHOUT AREA

FLOW ARROW

SF SF

WATER LINE W

SANITARY LINE S

CHAIN LINK FENCE XC

50,000 GALLON

WATER STORAGE TANK

DI

RE

CT

IO

N

OF

F

LO

W

TO RV

STATION

4" LINE FROM

WATER TANK

4" LINE

CONNECT TO

WATER TANK

4 21

P002

P002

DIRECTION OF FLOW

8 88

STUB FOR FUTURE

2ND WELL LINE

P003

DI

RE

CT

IO

N

OF

F

LO

W

LOCATION OF FUTURE

RO SYSTEM

3'-9"

CLEAR SPACE

3'-9"

CLEAR SPACE

1'-6"

CLEAR SPACE

P

FROM WELL

STUB FOR FUTURE

2ND WELL LINE

1. 15gal BLEACH CARBOY

2. 1/4" TUBING

3. STENNER (TRANSFER PUMP)

4. 2000ml CALIBRATION COLUMN

5. STENNER (FEED PUMP)

6. KOFLO MODEL QP5-3 INJECTION QUILL WITH ISOLATION VALVE

7. WATER MAIN

8. 1/4" VENT LINES TO OUTSIDE

9. 20 GAL. CONTAINMENT TUB

10. WALL BRACKETS FOR WALL MOUNTAING

10 10

FFE = 936.0'

ELEV = 937.0'

5'-0"

PLUG AND

MARK END

P001

PUMPHOUSE PLAN

Scale: 1/2" = 1'-0"

PUMPHOUSE

NOTES:

1. 2"x1.5" TEE TO PROOF OF FLOW SWITCH

2. LIQUID CHLORINE FEED. SEE DETAIL A/P001

3. FLANGE STATIC MIXER

4. 2" BUTERFLY VALVE

5. 2" CHECK VALVE

6. 2" FLOW METER

7. PACKAGED BOOSTER PUMP

8. 4" GATE VALVE

9. 4" BUTTERFLY VALVE

10. 4" CHECK VALVE

11.X1-2280 REVERSE OSMOSIS SYSTEM

12. REJECT STREAM DRAIN PIPE

13. SKID MOUNTED WATER TREATMENT EQUIPMENT

14. 3 GALLON HYDROPNEUMATIC TANK

Scale: NTS

LIQUID CHLORINE FEED

A

Scale: 1/2" = 1'-0"

STUB FOR FUTURE 2ND WELL LINE

B

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JR

L

KA

K

P

HA

SE

D

DO

CU

ME

NT

S

/12 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\5 5-

W ate r\9 5%

S ub mi tta l\B

LM

NS

_P ro ce ss

_U pd ate d P um ph ou se

.dw g

Ju ly

, 2

1 -

9:

:24 A

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

FFE = 936.0'

CL = 940.0'

CL = 936.8'

CL = 932.5'

FFE = 936.0'

CL = 938.0'

CL = 932.5'

CL = 936.2

P002

PUMPHOUSE SECTIONS

KEYNOTES:

1 2"x1.5" TEE TO PROOF OF FLOW SWITCH

2 SAMPLE TAP

3 FLANGE STATIC MIXER

4 2" BALL VALVE

5 2" BUTTERFLY VALVE

2" FLOW METER

PACKAGED BOOSTER PUMP

2" 90° ELBOW

2"X2" TEE

PIPE SUPPORT AS REQ'D

11 2" 90° MJ ELBOW

14 141414

131311

Scale: 1/2" = 1'-0"

WEST WALL SECTION @ PUMP ROOM

Scale: 1/2" = 1'-0"

EAST WALL SECTION @ PUMP ROOM

12 12 12

12 PIPE SLEEVE REFER TO DETAIL I/P005

13 4" BUTTERFLY VALVE

4" 90° ELBOW

4"X4" TEE

16 4" 90° MJ ELBOW

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JR

L

KA

K

P

HA

SE

D

DO

CU

ME

NT

S

/12 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\5 5-

W ate r\9 5%

S ub mi tta l\B

LM

NS

_P ro ce ss

_U pd ate d P um ph ou se

.dw g

Ju ly

, 2

1 -

9:

:46 A

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

17 X1-2280 REVERSE OSMOSIS SYSTEM

18 INLET TO REVERSE OSMOSIS SYSTEM

19 OUTLET TO REVERSE OSMOSIS SYSTEM

20 REJECT WATER OUTLET

21 ZEOLITE SYSTEM

22 ANTISCALANT SYSTEM WITH PUMP

23 3 GAL. HYDROPNEUMATIC TANK

24 CONNECTION TO RO SYSTEM

25 LIQUID CHLORINE FEED. SEE DETAIL A/P001

26 CHLORINE INJECTION POINT

FFE = 936.0'

CL = 938.0'

CL = 941.0'

CL = 932.5'

CL = 938.9'

FFE = 936.0'

CL = 938.0'

CL = 941.0'

CL = 937.1

CL = 936.2

CL = 932.5'

P003

PUMPHOUSE SECTIONS

KEYNOTES:

Scale: 1/2" = 1'-0"

SOUTH WALL SECTION @ PUMP ROOM

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JR

L

KA

K

P

HA

SE

D

DO

CU

ME

NT

S

/12 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\5 5-

W ate r\9 5%

S ub mi tta l\B

LM

NS

_P ro ce ss

_U pd ate d P um ph ou se

.dw g

Ju ly

, 2

1 -

9:

:08 A

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

Scale: 1/2" = 1'-0"

REVERSE OSMOSIS SYSTEM SECTION @ PUMP ROOM

4 4

8 8

5'-0"

1 2"x1.5" TEE TO PROOF OF FLOW SWITCH

2 SAMPLE TAP

3 FLANGE STATIC MIXER

4 2" BALL VALVE

5 2" BUTTERFLY VALVE

2" FLOW METER

PACKAGED BOOSTER PUMP

2" 90° ELBOW

2"X2" TEE

PIPE SUPPORT AS REQ'D

11 2" 90° MJ ELBOW

12 PIPE SLEEVE REFER TO DETAIL I/P005

13 4" BUTTERFLY VALVE

4" 90° ELBOW

4"X4" TEE

16 4" 90° MJ ELBOW

17 X1-2280 REVERSE OSMOSIS SYSTEM

18 INLET TO REVERSE OSMOSIS SYSTEM

19 OUTLET TO REVERSE OSMOSIS SYSTEM

20 REJECT WATER OUTLET

21 ZEOLITE SYSTEM

22 ANTISCALANT SYSTEM WITH PUMP

23 3 GAL. HYDROPNEUMATIC TANK

24 CONNECTION TO RO SYSTEM

25 LIQUID CHLORINE FEED. SEE DETAIL A/P001

25 26

26 CHLORINE INJECTION POINT

6" CONCRETE

INPLACE APPROVED

SUBGRADE SURFACE

4" SELECT GRANULAR BORROW

8"

SLOPE AWAY

FROM WELL

8" WELL CASING

PITLESS

ADAPTER

2" PVC

3'- 0"

RIGID STEEL ELECTRICAL

CONDUIT FOR POWER

SUPPLY CABLE

CONCRETE SLAB,

SEE 3/GP001

TAP COVER FOR SOUNDING

TUBE AND WELL VENT ACCESS

1" PVC SOUNDING TUBE

2" PVC DROP PIPE

1-INCH WELL VENT WITH

#16 MESH SCREEN

" M

IN

DISCHARGE PIPE

COLUMN PIPE

CONNECTION FOR

HOLD PIPE

WELD-ON ATTACHMENT

TO CASING

WELL CASING

P004

WELL PLAN

NOT TO SCALE

PROPOSED PITLESS UNIT

Scale: 1" = 1'-0"

TYP CONCRETE PAD SECTION

Scale; 3" = 1'-0"

WELD-ON PITLESS ADAPTER

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JR

L

KA

K

P

HA

SE

D

DO

CU

ME

NT

S

/12 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\5 5-

W ate r\9 5%

S ub mi tta l\B

LM

NS

_P ro ce ss

_U pd ate d P um ph ou se

.dw g

Ju ly

, 2

1 -

9:

:37 A

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

WATER STORAGE RESERVOIR TYPICAL SECTION WATER STORAGE RESERVOIR ORIENTATION PLAN

EL 957.00

OVERFLOW

21' DIAMETER

EL 937.00

TANK FLOOR

ROOF ACCESS LADDER WITH LOCKABLE LADDER GATE

KEYNOTES

ROOF MOUNTED HANDRAIL - SEE DETAIL B/P004

OVERFLOW WEIR BOX WITH VORTEX BREAKER

TANK FOUNDATION WALL

CONCRETE SPLASH BLOCK

OVERFLOW BEND WITH #24 STAINLESS STEEL SCREEN

6" SAND BACKFILL

15°

15°

26°

STANDARD ROOF VENT

24" DIAMETER SHELL MANWAY - SEE DETAIL D/P005

MECHANICAL WATER LEVEL INDICATOR

4" TANK INTLET

24" SQUARE ROOF ACCESS HATCH- SEE DETAIL C/P005

4" TANK OUTLET

11 10

' H

EI

GH

T

14 4" BUTTERFLY VALVE

15 4" UNDERGROUND GATE VALVE

P005

WATER TANK STORAGE

5'-0"

10'-0"

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JR

L

KA

K

P

HA

SE

D

DO

CU

ME

NT

S

/12 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\5 5-

W ate r\9 5%

S ub mi tta l\B

LM

NS

_P ro ce ss

_U pd ate d P um ph ou se

.dw g

Ju ly

, 2

1 -

9:

:59 A

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

24" SQUARE ROOF ACCESS HATCH DETAIL

SCALE: NONE

TANK ROOF

3'- 6"

2" DIA SCH 80 STEEL

PIPE RAILING

2" DIA SCH 80 STEEL

PIPE RAILING

1/4" X 4" CONTINUOUS

KICK PLATE

ANGLE WELDED TO TANK

HAND RAIL

SCALE: NONE

24" SHELL MANWAY DETAIL

SCALE: NONE

EL 00.00

TANK FLOOR

7'- 0"

TANK FILL DETAIL

SCALE: NONE

4" PVC FILL PIPE

ATTACHED TO INSIDE

OF TANK WALL

WELL

FLUSHING

LINE

FLANGE

ADAPTER

CONNECTION

TO C900

YARD PIPING

TANK DRAIN DETAIL

SCALE: NONE

4" TANK DRAIN

DRAIN TO

WASTE VALVE

TANK WALL

CENTER DOME W/VENT DETAIL

SCALE: NONE

21' DIAMETER

' H

EI

GH

T

FLOOR PENETRATION DETAIL

SCALE: NONE

P006

TANK DETAILS

P006 G

P006 C

P006 F

P006 A

P006 D

P006 H

USE 1/2"X1 1/2" SQ HD

BOLTS W/FLAT WSHRS &

HEX NUTS (TYP.)

USE 1/2"X1 1/2" PC FN

BOLT W/FLAT WSHR &

HEX NUT (TYP.)

HORZ. SEAM (TYP 4 PLACS)

USE 1/2"X1 1/2" PC FN

BOLT W/FLAT WSHR &

HEX NUT (TYP.)

6" STEEL PIPE

#24 S.S. MESH SCREEN.

GSKT EACH SIDE OF

SCREEN

FLAP VALVE

1'- 0"

TOC

1'-0"

EXTERIOR CAGED LADDER

LOCKABLE HOOP

10' PARTIAL PERIMETER

GAUARDRAIL EACH SIDE

OF LADDER

OVERFLOW ASSEMBLY DETAIL

SCALE: NONE

EXTERIOR CAGED LADDER DETAIL

SCALE: NONE

P006 B

P006 E

P006 I

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JR

L

KA

K

P

HA

SE

D

DO

CU

ME

NT

S

/12 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\5 5-

W ate r\9 5%

S ub mi tta l\B

LM

NS

_P ro ce ss

_U pd ate d P um ph ou se

.dw g

Ju ly

, 2

1 -

9:

:15 A

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

I

CONCRETE CRADLE

6"

1'- 6"

EL 00.00

TANK FLOOR

P007

TANK DETAILS

6'-8"

6'- 0"

4'- 0"

#5 @ 12" O.C.

EACH WAY

8" TY

P.

4'- 0"

6'-4"

8"

#5 @ 12" O.C.

DOWEL

#5 @ 12" O.C.

EACH WAY

6" STEEL PIPE

TANK WALL

1'- 0"

NOTES:

1. SPLASH PAD TO HAVE

1% MIN. SLOPE AWAY

FROM OVERFLOW PIPE

2. ALL DOWELS TO BE

EPOXY COATED

OVERFLOW ASSEMBLY DETAIL

SCALE: NONEP007

J

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JR

L

KA

K

P

HA

SE

D

DO

CU

ME

NT

S

/12 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\5 5-

W ate r\9 5%

S ub mi tta l\B

LM

NS

_P ro ce ss

_U pd ate d P um ph ou se

.dw g

Ju ly

, 2

1 -

9:

:55 A

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

A100 INTERIOR DIMENSION

21'-10 3/4"

IN

T

E R

IO

R

D

IM

E N

S

IO

N

'-1

3/

4"

4' -0

A100

A100

C

LE

A R

S P

A C

E

'-6

C

LE

A R

S P

A C

E

'-9

C

LE

A R

S P

A C

E

'-9

A100

A100

A101

A1

A1

A1

A1

E Q

E

Q

05.04 05.16

05.15

05.14

08.08

22.05

22.11

22.13

22.11

22.18

22.12

22.19

22.21

22.20

LEVEL 1

100' - 0"

T.O. WALL

110' - 0"

'-0

05.14

05.15

05.03

05.04

LEVEL 1

100' - 0"

T.O. WALL

110' - 0"

23'-9 1/2"

'-0

1/4" / 1'-0"

05.15

05.14

05.03

26.02

05.04

LEVEL 1

100' - 0"

T.O. WALL

110' - 0"

'-0

'-4

3/

7' -0

05.03

26.02

08.08

05.04

LEVEL 1

100' - 0"

T.O. WALL

110' - 0"

24'-9 1/4"

05.03 05.14

05.15

05.04

26.02

LEVEL 1

100' - 0"

T.O. WALL

110' - 0"

1/4" / 1'-0"

A101

A101

A101

05.14

05.15

05.03

08.08

05.05

03.04 03.05

11 3/8"

METAL WALL PANEL

R-13 FACED INSULATION

(SLICED VAPOR RETARDER

OR PERFORATED)

HORIZONTAL GIRT, TYP

BY PEMB MFR

7/8" FURRING CHANNEL

R-6 RIGID FOAM BOARD

3/4" FIRE RESISTANT

PLYWOOD

A1

EXTERIOR WALL, TYPICAL

S E

H P ro je c t

C h e ck ed B y

D ra w n

B y

P ro je ct

S ta tu s

Is su e D at e

7/

/2

8:

:2

A

M

PUMPHOUSE

A100

L A

P O

S A

T Y

S O

N W

A S H

L T V

A

W A

S T E W

A T E R

L A

G O

O N

B U

R E

A U

O F

L A

N D

M A

N A

G M

E N

T Y

U M

A F

IE

LD

O F

F

IC

E

C O

LO

R

A D

O R

IV

E

R D

IS

T

R

IC

T O

F F

IC

E

67 JH

M M

/A

LC

U N

IT

E D

S T A

T E S D

E P

A R

T M

E N

T O

F T

H E I N

T E R

IO

R

B U

R E A

U O

F L

A N

D M

A N

A G

E M

E N

T C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

/3 0/

0 4' 8'2' 1/2" = 1'-0"A100

1 FLOOR PLAN

0 4' 8'2' 1/4" = 1'-0"A100

2 EXTERIOR ELEVATION - SOUTH

0 4' 8'2' 1/4" = 1'-0"A100

3 EXTERIOR ELEVATION - EAST

GENERAL NOTES

KEYNOTES

1. DRAWINGS CONSTITUTE THE BASIS OF DESIGN FOR A

PRE-ENGINEERED METAL PANEL BUILDING.

2. FIELD VERIFY ALL DIMENSIONS. NOTIFY GOVERNMENT IF

DIMENSIONS VARY SIGNIFICANTLY.

3. ALL DIMENSIONS TO FACE OF FINISH UNLESS NOTED

OTHERWISE.

4. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR

ROOF AND WALL PENETRATIONS.

03.04 CONCRETE SLAB, RE: STRUCTURAL

03.05 CONCRETE FOUNDATION, RE: STRUCTURAL

05.03 STANDING SEAM METAL ROOF

05.04 METAL PANEL WALL

05.05 PEMB FRAME, TYP BY PEMB MFR

05.14 PREFINISHED METAL GUTTER

05.15 DOWNSPOUT

05.16 LINE OF ROOF ABOVE

08.08 INSULATED HOLLOW METAL DOOR

22.05 STUB FOR FUTURE 2ND WELL LINE, RE: PLUMBING

22.11 LOCATION OF SYSTEM, RE: PLUMBING

22.12 LIQUID CHLORINE FEED, RE: PLUMBING

22.13 WELL CONTROLLED, RE: PLUMBING

22.18 LOCATION OF FUTURE SYSTEM, RE: PLUMBING

22.19 HIGH SERVICE PUMP CONTROLLERS, RE: PLUMBING

22.20 REMAINING ELECTRICAL EQUIPMENT PANEL, RE:

PLUMBING

22.21 TORV STATION, RE: PLUMBING

26.02 LIGHT FIXTURE, TYP. RE: ELEC.

NORTH

0 4' 8'2' 1/4" = 1'-0"A100

5 EXTERIOR ELEVATION - NORTH

0 4' 8'2' 1/4" = 1'-0"A100

6 EXTERIOR ELEVATION - WEST

0 4' 8'2' 1/4" = 1'-0"A100

4 TYPICAL BUILDING SECTION

R ev is io n Is su e

R ev

D es cr ip tio n D at e

P H

A S

E I jhegg Image jhegg Text Box 06.30.2021

05.04

07.16

05.17

06.05

07.17

08.08

07.18

05.18

06.06

07.13

08.09

07.19

06.06 07.18

06.05

08.09

07.19

08.08

07.20

05.04

07.16

LEVEL 1

100' - 0"

T.O. WALL

110' - 0"

CONCRETE

SLAB/FOOTING

RE: STRUCT

METAL PANEL

WALL

R-13 FACED INSULATION

(SLICED VAPOR RETARDER

OR PERFORATED)

FURRING CHANNEL

PEMB FRAME, TYP

BY PEMB MFR

3/4" FIRE RESISTANT

PLYWOOD

R-6 RIGID FOAM BOARD

STANDING SEAM MTL. ROOF

PANELPANEL CLIP

THERMAL SPACER BLOCK R-11 UNFACED FIBERGLASS

INSULATION

STEEL W-FLANGE, RE:

STRUCTURAL

R-19 UNFACED FIBERGLASS

INSULATION

MEMBRANE & VAPOR

RETARDER

PURLIN, RE: STRUCTURAL

BANDING, LONGITUDINAL &

TRANSVERSE

T.O. WALL

110' - 0"

6"

PREFINISHED METAL FASCIA

PREFINISHED METAL SOFFIT

METAL WALL PANEL

J-CHANNEL

DOWNSPOUT

05.21

07.32

07.33

07.34

05.14

03.04

08.10

09.10 08.08

08.11

03.11

07.13

23.12

05.19

05.20

07.21

07.22

07.23

07.24

05.21

07.25

07.26

05.23

05.22

07.13

07.14

22.22

07.15

09.09

05.21

05.24

07.27

07.28

07.29

07.01

07.30

07.31

05.25

05.04

S E

H P ro je c t

C h e ck ed B y

D ra w n

B y

P ro je ct

S ta tu s

Is su e D at e

7/

/2

8:

:2

A

M

DETAILS

A101

L A

P O

S A

T Y

S O

N W

A S H

L T V

A

W A

S T E W

A T E R

L A

G O

O N

B U

R E

A U

O F

L A

N D

M A

N A

G M

E N

T Y

U M

A F

IE

LD

O F

F

IC

E

C O

LO

R

A D

O R

IV

E

R D

IS

T

R

IC

T O

F F

IC

E

67 JH

M M

/A

LC

U N

IT

E D

S T A

T E S D

E P

A R

T M

E N

T O

F T

H E I N

T E R

IO

R

B U

R E A

U O

F L

A N

D M

A N

A G

E M

E N

T C

O N

S T

R U

C T

IO

N

D O

C U

M E

N T

S

/3 0/

GENERAL NOTES

KEYNOTES

1. DRAWINGS CONSTITUTE THE BASIS OF DESIGN FOR A

PRE-ENGINEERED METAL PANEL BUILDING.

2. FIELD VERIFY ALL DIMENSIONS. NOTIFY GOVERNMENT IF

DIMENSIONS VARY SIGNIFICANTLY.

3. ALL DIMENSIONS TO FACE OF FINISH UNLESS NOTED

OTHERWISE.

4. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR

ROOF AND WALL PENETRATIONS.

0 2' 4'1' 1 1/2" = 1'-0"A101

4 DOOR HEAD - @ EXTERIOR WALL

0 2' 4'1' 1 1/2" = 1'-0"A101

3 DOOR JAMB - @ EXTERIOR WALL

0 1' 2'6" 1" = 1'-0"A101

1 WALL SECTION

0 2' 4'1' 1" = 1'-0"A101

6 STANDING SEAM ROOF DETAIL, TYP.

0 2' 4'1' 1" = 1'-0"A101

7 LOW ROOF EAVE

0 2' 4'1' 1 1/2" = 1'-0"A101

2 DOOR SILL - @ EXTERIOR WALL

0 2' 4'1' 1" = 1'-0"A101

9 PIPE BOOT PENETRATION DETAIL, TYP.

0 2' 4'1' 1 1/2" = 1'-0"A101

5 EXT. WALL PENETRATION DETAIL, TYP.

0 2' 4'1' 1" = 1'-0"A101

8 HIGH ROOF EAVE

03.04 CONCRETE SLAB, RE: STRUCTURAL

03.11 CONCRETE STRUCTURAL STOOP

05.04 METAL PANEL WALL

05.14 PREFINISHED METAL GUTTER

05.17 HEADER, RE: STRUCTURAL

05.18 HAT CHANNEL

05.19 STAINLESS STEEL CLAMPING RING

05.20 FASTENER THROUGH FLASHING AND PANEL (AVOID

DECK AND STRUCTURE)

05.21 STANDING SEAM METAL ROOF PANEL. COLOR: TBD

05.22 BANDING, LONGITUDINAL & TRANSVERSE

05.23 SUPPORT CLAMP FASTENER TO DECK

05.24 POP RIVET

05.25 EXTENDED TOP CHORD, TYP BY PEMB MFR

06.05 WOOD SHIM

06.06 3/4" FIRE RESISTANT PLYWOOD

07.01 PREFINISHED METAL FASCIA, TYP.

07.13 SEALANT, BOTH SIDES

07.14 FLANGE SLEEVE

07.15 SEALANT OVER BACKING ROD, TYP.

07.16 R-13 FACED INSULATION (SLICED VAPOR RETARDER

OR PERFORATED)

07.17 HEAD FLASHING

07.18 R-6 RIGID FOAM BOARD

07.19 PERIMETER WEATHER SEAL

07.20 J-TRIM

07.21 R-11 UNFACED FIBERGLASS INSULATION

07.22 R-19 UNFACED FIBERGLASS INSULATION

07.23 RUBBER PIPE FLASHING, BLACK EPDM

07.24 BUTYL TAPE AND POLYURETHANE FILLET

07.25 MEMBRANE & VAPOR RETARDER

07.26 TAPE JOINT

07.27 Z FLASHING W/ BUTYL SEALANT

07.28 PREFINISHED METAL RIDGE CAP

07.29 CONTINUOUS CLEAT

07.30 PREFINISHED METAL SOFFIT

07.31 J-CHANNEL

07.32 BUTYL TAPE SEALANT

07.33 FEILD NOTCH AND HEM PANEL END

07.34 CONTINUOUS CLEAT WITH DRIP EDGE

08.08 INSULATED HOLLOW METAL DOOR

08.09 HOLLOW METAL FRAME

08.10 DOOR FRAME BEYOND

08.11 ALUMINUM THRESHOLD SET IN MASTIC SEALANT

09.09 EXTERIOR WALL, RE: PARTITION TYPES

09.10 WALL BEYOND

22.22 PIPE THROUGH PENETRATION, RE: PLUMBING

23.12 ROOF PENETRATION, RE: MECHANICAL

R ev is io n Is su e

R ev

D es cr ip tio n D at e

P H

A S

E I jhegg Image jhegg Text Box 06.30.2021

REQUIRED SPECIAL INSPECTIONS

DESCRIPTION OF WORK

IBC SECTION 1704

INSPECTION TESTING

YES NO

N/A

CONCRETE CONSTRUCTION

INSPECT REINFORCEMENT

GRADING, EXCAVATION, AND FILLING

YES NO

SPECIAL INSPECTIONS

SPECIAL INSPECTIONS STATED IN THE TABLE BELOW SHALL BE PERFORMED IN

ACCORDANCE WITH CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE, AS REFERENCED

AND AMENDED BY CHAPTER 17 OF THE 2015 ARIZONA CONSTRUCTION CODE.

FREQUENCY

C* P*

* C = CONTINUOUS, P = PERIODIC

INSPECT ANCHORS CAST IN CONCRETE

VERIFY USE OF REQUIRED DESIGN MIX

PRIOR TO CONCRETE PLACEMENT,

FABRICATE SPECIMENS FOR STRENGTH

TESTS, PERFORM SLUMP AND AIR

CONTENT TESTS, AND DETERMINE THE

TEMPERATURE OF THE CONCRETE.

INSPECT CONCRETE AND SHOTCRETE

PLACEMENT FOR PROPER APPLICATION

TECHNIQUES

VERIFY MAINTENANCE OF SPECIFIED

CURING TEMPERATURE AND TECHNIQUES

INSPECT FORMWORK FOR SHAPE,

LOCATION AND DIMENSIONS OF THE

CONCRETE MEMBER BEING FORMED

VERIFY MATERIALS BELOW SHALLOW

FOUNDATION ARE ADEQUATE TO ACHIEVE

THE DESIGN BEARING CAPACITY

VERIFY EXCAVATIONS ARE EXTENDED TO

PROPER DEPTH AND HAVE REACHED

PROPER MATERIAL

PERFORM CLASSIFICATION AND TESTING

OF COMPACTED FILL MATERIALS

VERIFY USE OF PROPER MATERIALS,

DENSITIES, AND LIFT THICKNESSES

DURING PLACEMENT AND COMPACTION

OF COMPACTED FILL

PRIOR TO PLACEMENT OF COMPACTED

FILL, INSPECT SUBGRADE AND VERIFY

THAT SITE HAS BEEN PREPARED

PROPERLY

X :\A

E \B

\B

LM

N S

\1

7\

5-fin al -d sg n\

-d ra w in gs

\1 0-

C iv il\ ca d\ dw g\ sh ee t\t itl eb lo ck

\B

LM

2x

B or de r- La

P os a S ou th

L T

V A

.d w g Ja nu ar y

, 2

5:

:0

P M

P H

A S E I

S E

H P ro je c t

C h e ck ed B y

D ra w n

B y

P ro je ct

S ta tu s

Is su e D at e

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

/3

0/

67 E E

GENERAL STRUCTURAL NOTES &

TYPICAL DETAILS

S001

L A

P O

S A

T Y

S O

N W

A S

H L

T V

A

W A

S T

E W

A T

E R

L A

G O

O N

B U

R E

A U

O F

L A

N D

M A

N A

G E

M E

N T

Y U

M A

F

IE

LD

O

F F

IC

E

C

O

LO

R A

D O

R

IV

E R

D

IS

T R

IC

T

O F

F

IC

E

U N

IT

E

D S

T A

T E

S D

E P

A R

T M

E N

T O

F T

H E

I N

T E

R

IO

R

B U

R E

A U

O F

L A

N D

M A

N A

G E

M E

N T

S H

GENERAL STRUCTURAL NOTES:

1. THESE DRAWINGS ARE FOR THE LA POSA TYSON WASH LTVA WASTEWATER LAGOON

AND NO OTHER USE IS AUTHORIZED.

2. THESE NOTES DO NOT REPLACE THE SPECIFICATIONS BUT ARE TO BE READ IN

CONJUNCTION WITH THEM. ANY DISCREPANCIES OR CONFLICTS BETWEEN THE TWO

SHALL BE BROUGHT TO THE ATTENTION OF THE GOVERNMENT FOR RESOLUTION.

GOVERNING BUILDING CODE:

1. 2018 INTERNATIONAL BUILDING CODE (IBC)

2. AMERICAN CONCRETE INSTITUTE (ACI) BUILDING CODE REQUIREMENTS FOR

STRUCTURAL CONCRETE 318-14

3. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) MINIMUM LOADS FOR BUILDINGS AND

OTHER STRUCTURES 7-16

DESIGN LOADS:

RISK CATEGORY III

1. LIVE LOAD:

ROOF, Lr 20 PSF (REDUCIBLE)

2. SNOW LOADS:

GROUND SNOW LOAD, Pg 0 PSF

3. WIND LOADS:

ULTIMATE DESIGN WIND SPEED (3 SEC GUST), Vult 106 MPH

WIND EXPOSURE C

STRUCTURE IS: ENCLOSED BUILDING

INTERNAL PRESS COEFFICIENT +/-0.18

COMPONENTS & CLADDING PRESSURE (50 PSF) TBD

4. SEISMIC LOADS:

SITE CLASS D

MAPPED SPECTRAL RESPONSE ACCELERATION, 0.2 SEC, SS 0.207 g MAPPED SPECTRAL RESPONSE ACCELERATION, 1.0 SEC, S1 0.125 g SITE AMPLIFICATION FACTOR, 0.2 SEC, Fa 1.6 SITE AMPLIFICATION FACTOR, 1.0 SEC, Fv 2.35 DESIGN SPECTRAL RESPONSE, 0.2 SEC, SDS 0.221 g DESIGN SPECTRAL RESPONSE, 1.0 SEC, SD1 0.196 g SEISMIC IMPORTANCE FACTOR, Ie 1.25

SEISMIC DESIGN CATEGORY C

5. SOIL CRITERIA:

ALLOWABLE BEARING PRESSURE 3,000 PSF

ANTICIPATED MAX DIFFERENTIAL SETTLEMENT 3/4 IN

ANTICIPATED MAX TOTAL SETTLEMENT 1 IN

LATERAL EARTH PRESSURES:

ON-SITE BACKFILL:

UNIT WEIGHT 115 PCF

ACTIVE PRESSURE (DRAINED) 35 PCF

AT REST PRESSURE (DRAINED) 55 PCF

PASSIVE PRESSURE (DRAINED) 375 PCF

FRICTION COEFFICIENT 0.45

MIN FOUNDATION EMBEDMENT (SHALLOW FOUNDATIONS) 18 IN

MIN FOUNDATION EMBEDMENT (MAT/SLAB FOUNDATIONS) 12 IN

DESIGN / CONSTRUCTION CRITERIA

1. THE CONTRACTOR SHALL VERIFY DIMENSIONS AND CONDITIONS BEFORE

CONSTRUCTION AND NOTIFY THE GOVERNMENT OF ANY DISCREPANCIES,

INCONSISTENCIES, OR DIFFICULTIES AFFECTING THE WORK BEFORE PROCEEDING.

2. ALL MATERIAL, WORKMANSHIP, AND DETAILS SHALL BE IN ACCORDANCE WITH TYPICAL

COMPETENT CONSTRUCTION PRACTICES, CURRENT MANUFACTURERS

RECOMMENDATIONS, AND ALL APPLICABLE CODES AND GOVERNMENT REGULATIONS.

SPECIAL STRUCTURAL INSPECTION IS REQUIRED AS SCHEDULED AND PER IBC CHAPTER

17. CONTRACTOR SHALL HIRE AND COORDINATE A SPECIAL INSPECTION AND TESTING

AGENCY.

3. THE CONTRACTOR SHALL COORDINATE ALL DISCIPLINES, VERIFYING SIZE AND LOCATION

OF ALL OPENINGS, WHETHER SHOWN ON STRUCTURAL DRAWINGS OR NOT, AS CALLED

FOR ON PROCESS, ARCHITECTURAL, MECHANICAL, ELECTRICAL OR OTHER DRAWINGS.

ALL CONFLICTS, INCONSISTENCIES, OR OTHER DIFFICULTIES AFFECTING STRUCTURAL

WORK SHALL BE CALLED TO THE GOVERNMENT'S ATTENTION FOR DIRECTION BEFORE

PROCEEDING.

4. EQUIPMENT AND STRUCTURAL ANCHOR ROD SIZES, TYPES, EMBEDMENT, AND PATTERNS

SHALL BE VERIFIED WITH THE MANUFACTURER OR FABRICATOR. ALL ANCHOR

PATTERNS SHALL BE TEMPLATED TO ENSURE ACCURACY OF PLACEMENT.

5. THE CONTRACTOR SHALL SUPPLY ALL NECESSARY TEMPORARY BRACING, SHORING,

GUYING, OR OTHER MEANS TO AVOID EXCESSIVE STRESSES AND TO HOLD STRUCTURAL

ELEMENTS IN PLACE DURING CONSTRUCTION.

6. JOB SITE SAFETY (INCLUDING EXCAVATIONS) IS THE SOLE RESPONSIBILITY OF THE

GENERAL CONTRACTOR & THEIR SUBCONTRACTORS.

7. THE GOVERNMENT IS NOT RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS,

TECHNIQUES OR PRACTICES. WHERE DRAWINGS AND DETAILS IMPLY THIS, THEY ARE

PROVIDED TO SHOW FINAL CONSTRUCTION. IF CONTRACTOR DESIRES TO USE

DIFFERENT MEANS AND METHODS THAN IMPLIED BY THESE DRAWINGS, SUBMIT SIMILAR

DETAILS FOR REVIEW.

8. STANDARD OR TYPICAL STRUCTURAL DETAILS ARE INTENDED TO ILLUSTRATE DESIGN

CONCEPTS AND TO SPECIFY MATERIAL AND REQUIRED PHYSICAL DIMENSIONS

MATCHING OR SIMILAR TO THE REFERENCED LOCATIONS IN THE DRAWING SET.

9. ALL ARCHITECTURAL, MECHANICAL, AND ELECTRICAL COMPONENTS SHALL BE DESIGNED

AND INSTALLED TO RESIST THE CONTROLLING CONDITION OF OPERATIONAL FORCES OR

SEISMIC FORCES IN ACCORDANCE WITH IBC AND THESE NOTES. COMPONENT SEISMIC

ATTACHMENTS SHALL BE BOLTED, WELDED, OR OTHERWISE POSITIVELY FASTENED

WITHOUT CONSIDERATION OF FRICTIONAL RESISTANCE DUE TO GRAVITY. A

CONTINUOUS LOAD PATH OF SUFFICIENT STRENGTH AND STIFFNESS SHALL BE

PROVIDED BETWEEN THE COMPONENT AND SUPPORTING STRUCTURE. CONNECTIONS

FOR BOTH ORTHOGONAL HORIZONTAL DIRECTIONS SHALL BE SHALL BE DESIGNED AND

SEALED BY THE CONTRACTOR’S ENGINEER, CURRENTLY LICENSED IN THE STATE OF

ARIZONA. COMPONENT REACTION FORCES SHALL BE SUBMITTED TO THE GOVERNMENT

FOR CONFIRMATION THAT SUPPORTING STRUCTURE CAN WITHSTAND REACTION

FORCES.

10. THERE IS NO PROVISION FOR FUTURE VERTICAL EXPANSION IN THE DESIGN.

CONCRETE:

1. ALL CONCRETE SHALL DEVELOP MINIMUM ULTIMATE COMPRESSIVE DESIGN

STRENGTH OF 4,000 PSI IN 28 DAYS.

2. CONCRETE OTHER THAN INTERIOR SLABS ON GRADES SHALL BE AIR ENTRAINED

5% +/- 1%.

3. ALL CONCRETE IS NORMAL WEIGHT UNLESS SPECIFICALLY NOTED OTHERWISE.

CEMENT SHALL BE PORTLAND CEMENT TYPE I OR MODIFIED TYPE I/II CONFORMING

TO ASTM C150.

4. THE MINIMUM MIX REQUIREMENTS MAY HAVE WATER-REDUCING ADMIXTURES

CONFORMING TO ASTM C494 ADDED TO THE MIX AT MANUFACTURER'S DOSAGE

RATES FOR IMPROVED WORKABILITY. NO CHLORIDE CONTAINING ADMIXTURES

WILL BE ALLOWED. DO NOT ADD WATER TO CONCRETE AT THE JOBSITE WITHOUT

WRITTEN APPROVAL OF THE GOVERNMENT.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN OF FORM WORK TO

COMPLY WITH THE DIMENSIONS INDICATED ON THE PLANS, MAINTAINING PROPER

ALIGNMENT DURING CONCRETE POURING OPERATIONS. SPECIAL CARE SHALL BE

TAKEN WITH FORMWORK FOR SELF-CONSOLIDATING CONCRETE.

6. THE CONTRACTOR SHALL ADJUST MIX DESIGN AS REQUIRED FOR AGGREGATE

EXPANSIONS (INCLUDING USE OF LOW-ALKALI CEMENT, LITHIUM ADMIXTURES, OR

AGGREGATES FROM ANOTHER SOURCE) AS REQUIRED TO LIMIT EXPANSION AS

MEASURED BY CURRENT TEST TO LESS THAN 0.1 PERCENT.

7. MEASURED FROM THE TIME WATER AND CEMENT ARE BATCHED TOGETHER, NO

MORE THAN 90 MINUTES SHALL ELAPSE UNTIL CONCRETE IS PLACED. THIS TIME

SHALL BE REDUCED BY ONE MINUTE FOR EVERY DEGREE THAT CONCRETE

TEMPERATURE EXCEEDS 75 DEGREES FAHRENHEIT.

8. WHEN AIR TEMPERATURE IS ABOVE 85 DEGREES, PROVIDE MIST, SHADING,

WINDSCREENS AND OTHER PROTECTION AS REQUIRED FOR 12 HOURS AFTER

PLACING.

9. WET CURE (POLY AND BURLAP OR PROPRIETARY BLANKETS KEPT MOIST DAILY)

FOR A MINIMUM OF 7 DAYS; FOOTINGS MAY BE BURIED AFTER 24 HOURS. ADD

ONE DAY OF CURE FOR FLYASH IN EXCESS OF 15 PERCENT OR GGBFS IN EXCESS

OF 10 PERCENT OF CEMENTITIOUS, AND TWO DAYS FOR FLYASH IN EXCESS OF 30

PERCENT. CONTRACTOR IS RESPONSIBLE FOR STAINING CAUSED BY BURLAP IN

VISIBLE AREAS.

10. PROTECT CONCRETE IN ACCORDANCE WITH ACI 305 AND ACI 306 FOR HOT

WEATHER CONCRETING AND COLD WEATHER CONCRETING RESPECTIVELY. IN

COLD WEATHER, HEAT IS REQUIRED IF OUTSIDE TEMPERATURE FALLS BELOW 30

DEGREES ANY TIME DURING FIRST THREE DAYS. REINFORCING SHALL BE 40

DEGREES OR WARMER AT TIME OF CONCRETE PLACEMENT. CONCRETE

TEMPERATURE SHALL BE RECORDED EVERY MORNING AND SHALL BE KEPT

ABOVE 40 DEGREES IN ALL LOCATIONS FOR 7 DAYS. CONCRETE SHALL NOT BE

EXPOSED TO COMBUSTION PRODUCTS (USE ELECTRIC HEAT, DUCTED HEATER OR

GROUND THAW). KEEP PROTECTION IN PLACE MINIMUM 24 HOURS AFTER

CESSATION OF HEATING TO PROVIDE GRADUAL COOL-DOWN.

11. CONCRETE BEING PLACED SHALL BE PROTECTED FROM RAIN. IF RAIN FALLS ON

CONCRETE BEFORE IT HAS SET, OR WITHIN 3 HOURS OF PLACEMENT IN ANY

EVENT, CONTRACTOR SHALL BEAR COST OF TESTING TO PROVE CONCRETE IS

UNAFFECTED, AND SHALL REMOVE AND REPLACE AFFECTED CONCRETE TO THE

SATISFACTION OF THE GOVERNMENT.

12. CEMENTITIOUS GROUT SHALL BE NON-SHRINK AND NON-METALLIC GROUT. PLACE

ACCORDING TO MANUFACTURER’S RECOMMENDATIONS AND TRIM NEATLY WHERE

VISIBLE.

13. COORDINATE WITH OTHER TRADES FOR SLEEVES, CONDUIT, ELECTRICAL

GROUNDING WIRES, INSERTS, UNDERGROUND UTILITIES, AND OTHER ITEMS TO BE

EMBEDDED INTO CONCRETE AND VERIFY THAT THEY ARE PROPERLY INSTALLED

AND SUPPORTED BEFORE CASTING CONCRETE. DIAMETER OF CONDUIT AND PIPE

RUNNING WITHIN SLAB OR WALL SHALL NOT EXCEED 1/6 THE SLAB OR WALL

THICKNESS AND SHALL BE PLACED IN THE CENTER OF THE MEMBER. HOLES

THROUGH SLAB OR WALL SHALL LEAVE MINIMUM 1 INCH CLEAR TO REINFORCING;

SHIFT REINFORCING AS REQUIRED. PLACEMENT OF SUCH ITEMS SHALL BE

COORDINATED WITH REINFORCING PLACEMENT WHERE THEY WOULD OTHERWISE

DISPLACE EACH OTHER. FOR INSTANCE, IN AREAS WITH A SINGLE MAT OF

REINFORCING, EAST-WEST CONDUIT SHOULD BE PLACED WITH EAST-WEST

REINFORCING AND NORTH-SOUTH CONDUIT IS PLACED WITH NORTH-SOUTH

REINFORCING.

14. UNLESS SHOWN ON DRAWINGS, CONCRETE SHALL BE PLACED WITHOUT

CONSTRUCTION JOINTS EXCEPT WHERE SPECIFICALLY SHOWN ON SHOP

DRAWINGS APPROVED BY THE GOVERNMENT. THE CONTRACTOR SHALL SUBMIT

SHOP DRAWINGS SHOWING ADDITIONAL OR ALTERNATE CONSTRUCTION JOINT

LOCATIONS TO THE GOVERNMENT FOR APPROVAL.

15. BEVEL ALL EXPOSED CORNERS OF CONCRETE 3/4"X3/4".

16. AN INDEPENDENT TESTING AGENCY SHALL CAST 4 SIX INCH TEST CYLINDERS OR

AN EQUIVALENT NUMBER OF FOUR INCH CYLINDERS FOR EACH 50 CUBIC YARDS

OF EACH CONCRETE MIX PLACED OR FOR EACH DAY'S OPERATION, WHICH EVER

IS THE LESSER AMOUNT. THE TESTING AGENCY SHALL CAST, CURE, AND TEST THE

SPECIMENS IN ACCORDANCE WITH ASTM C31 AND ASTM C39. AIR, TEMPERATURE,

AND SLUMP SHALL BE TESTED AT MINIMUM FOR THE FIRST TRUCK AND EVERY

FIFTH TRUCK THEREAFTER (1ST, 6TH, 11TH, ETC.) OR WHEN A CHANGE IN

PROPERTIES IS NOTICED, AT THE FINAL LOCATION (TEST AFTER PUMP, NOT AT

TRUCK).

FOUNDATIONS:

1. CAUTION: EXISTING UNDERGROUND UTILITIES MAY EXIST ANYWHERE ON THE SITE.

NOTIFY GOVERNMENT AND ARIZONA 811 PRIOR TO DISTURBING ANY GRADE OR

EXCAVATION.

2. STRUCTURAL FOUNDATIONS CONSIST OF TURN DOWN SLAB CONTINUOUS

FOOTINGS ESTABLISHED ON MATERIAL CAPABLE OF SAFELY SUPPORTING 3,000 PSF

AS DESCRIBED IN THE GEOTECHNICAL REPORT AS PREPARED BY TERRACON

CONSULTANTS, DATED OCTOBER 30, 2019, PROJECT NO. 65195142.

3. THE CONTRACTOR SHALL EMPLOY A CERTIFIED GEOTECHNICAL ENGINEER DURING

CONSTRUCTION TO TEST, INSPECT AND VERIFY ALL ASSUMED SOIL CONDITIONS.

4. SUBGRADE SOILS BENEATH THE INTERIOR FLOOR SLAB SHOULD BE SCARIFIED,

MOISTURE CONDITIONED AND COMPACTED TO A MINIMUM DEPTH OF 10 INCHES.

5. FOUNDATIONS SHALL BE ADEQUATELY BRACED DURING BACKFILLING AND

COMPACTION TO PREVENT MOVEMENT OR STRUCTURAL DAMAGE. BRACING SHALL

REMAIN IN PLACE UNTIL PERMANENT BRACING IS IN PLACE AND UNTIL CONCRETE

ACHIEVES SUFFICIENT STRENGTH TO RESIST IMPOSED LOADS.

6. WHEN PLACING COMPACTED FILL ADJACENT TO FOUNDATION WALLS AND PIERS,

PLACE BACKFILL AT EQUAL RATES ON BOTH SIDES TO PREVENT OVERTURNING OR

STRUCTURAL DAMAGE.

7. CONTRACTOR SHALL PROVIDE FOR DEWATERING AT EXCAVATIONS FROM EITHER

SURFACE WATER OR SEEPAGE.

8. MOISTURE CONTENT IN SOILS BENEATH BUILDING LOCATIONS SHOULD NOT BE

ALLOWED TO CHANGE AFTER EXCAVATIONS AND AFTER GRADING FOR SLABS ARE

COMPLETED. IF SUBGRADE MATERIALS BECOME DESICCATED OR SOFTENED BY

WATER OR OTHER CONDITIONS, REMOVE AND REPLACE AS NECESSARY TO RETURN

TO OPTIMUM MOISTURE CONTENT.

9. DO NOT PLACE CONCRETE ON FROZEN GROUND, NOR ALLOW GROUND BENEATH

FOUNDATIONS TO FREEZE.

10. GRADING: WHERE NOT SPECIFICALLY SHOWN ON THE PLANS, IT IS INTENDED THAT

ALL EXCAVATED AND BACKFILLED AREAS SHALL BE GRADED TO SLOPE AWAY FROM

BUILDINGS AND OTHER STRUCTURES.

REINFORCING STEEL:

1. ALL CONCRETE IS REINFORCED CONCRETE UNLESS SPECIFICALLY CALLED OUT AS

UNREINFORCED. REINFORCE ALL CONCRETE NOT OTHERWISE SHOWN WITH SAME

STEEL AS IN SIMILAR SECTIONS OR AREAS. ANY DETAILS NOT SHOWN SHALL BE

DETAILED PER ACI 315 AND MEET REQUIREMENTS OF ACI 318, CURRENT EDITIONS.

2. ALL REINFORCING STEEL SHALL CONFORM TO THE REQUIREMENTS OF ASTM A615

GRADE 60 STEEL.

3. CLEAR MINIMUM COVER OF CONCRETE OVER REINFORCING STEEL SHALL BE AS

FOLLOWS UNLESS SPECIFICALLY NOTED OTHERWISE:

• CONCRETE PLACED AGAINST EARTH 3"

• TOP MAT OF FLOOR SLABS 1 ½”

• ALL OTHER CONCRETE 2"

4. ALL FOOTING DOWELS SHALL BE ACCURATELY POSITIONED AND WIRED IN PLACE

BEFORE CASTING FOOTING CONCRETE. WHERE NOT NOTED, PROVIDE AND

INSTALL DOWELS OF SAME SIZE AND SPACING AS VERTICAL REINFORCEMENT IN ALL

COLUMNS AND WALLS. POSITION ALL ANCHOR BOLTS WITH TEMPLATES.

5. BAR LAP LENGTHS IN CONCRETE AND 90 DEGREE END HOOKS SHALL BE IN

ACCORDANCE WITH ACI-318.

6. BARS MARKED CONTINUOUS, CORNER BARS, AND ALL VERTICAL STEEL SHALL BE

LAPPED IN ACCORDANCE WITH ACI-318 AT SPLICES AND EMBEDMENTS, UNLESS

SHOWN OTHERWISE. SPLICE TOP BARS NEAR MIDSPAN AND SPLICE BOTTOM BARS

OVER SUPPORTS, UNLESS NOTED OTHERWISE.

7. BAR SUPPORT ACCESSORIES SHALL BE AS SPECIFIED IN LATEST EDITION OF THE

ACI DETAILING HANDBOOK AND THE CONCRETE REINFORCING STEEL INSTITUTE

DESIGN HANDBOOK. MAXIMUM ACCESSORY SPACING SHALL BE 4'-0" ON CENTER,

AND ALL ACCESSORIES ON EXPOSED SURFACES SHALL HAVE PLASTIC COATED

ENDS. WWF SHALL BE SUPPORTED BY CONTINUOUS BOLSTERS OR BARS ON

CHAIRS SUFFICIENTLY CLOSE TO PREVENT SHEETS FROM SAGGING APPRECIABLY

DURING CONCRETE PLACEMENT. SUPPORT REBAR USED AT CONTRACTOR’S

OPTION SHALL BE EXTRA BARS SUPPLIED BY CONTRACTOR, NOT TAKEN FROM

DESIGN REINFORCING.

PRE-ENGINEERED METAL BUILDINGS (FABRICATED ENGINEERED STRUCTURES)

1. PROVIDE RIGID-FRAME METAL BUILDINGS ACCORDING TO DRAWINGS,

SPECIFICATIONS, THE STATE BUILDING CODE, AND THE LATEST EDITION OF THE

LOW-RISE BUILDING SYSTEMS MANUAL. WHERE ANY OF THESE CONFLICT, THE

MORE STRINGENT CRITERIA SHALL BE APPLIED. WHERE INDICATED, MEMBERS

SHALL REMAIN WITHIN PERMITTED ENVELOPE TO MAINTAIN REQUIRED

CLEARANCES. GENERAL CONTRACTOR SHALL SUPPLY FULL SET OF THESE

STRUCTURAL DRAWINGS TO PRE-ENGINEERED BUILDING SUPPLIER.

2. UNLESS GALVANIZED, ALL STEEL SHALL BE PAINTED THREE COATS (ZINC-RICH,

EPOXY, URETHANE) / SHOP PRIMED.

3. BUILDING MANUFACTURER SHALL PROVIDE ALL GIRTS, PURLINS, WALL AND ROOF

SHEATHING, FLASHING, BRACING, AND OTHER COMPONENTS REQUIRED FOR A

COMPLETE SYSTEM; WITH THE EXCEPTION OF ANCHOR BOLTS, WHICH SHALL BE

SUPPLIED AND INSTALLED BY THE GENERAL CONTRACTOR.

4. MAXIMUM LATERAL DEFLECTION UNDER LOAD COMBINATIONS INCLUDING FULL

CODE WIND LOAD (BEFORE FACTORING PER ASCE-7) SHALL NOT EXCEED

HEIGHT/240 AT EAVE. DEFLECTION CALCULATIONS SHALL USE ONLY THE STIFFNESS

OF THE BARE FRAME.

POST INSTALLED ANCHOR RODS AND DOWELS

1. ALL POST-INSTALLED ANCHORS (IN CONCRETE OR CONCRETE MASONRY) SHALL BE

INSTALLED IN STRICT CONFORMANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS (INCLUDING BUT NOT LIMITED TO DRILL BIT SIZE, PROPER

CLEANING OF HOLES, INSTALLATION TORQUE, AND TEMPERATURE CONSTRAINTS).

2. WHEN A SPECIFIC PRODUCT AND MANUFACTURER IS REFERENCED IN THE

CONTRACT DOCUMENTS, THAT SPECIFIC PRODUCT SHALL BE USED UNLESS THE

CONTRACTOR SUBMITS A REQUEST FOR A PRODUCT SUBSTITUTION OF AN ANCHOR

WITH EQUIVALENT RESISTANCE VALUES IN THE APPROPRIATE BASE MATERIAL.

3. ALL REQUESTS FOR SUBSTITUTION SHALL INCLUDE PRODUCT SPECIFICATIONS AND

DESIGN DATA FOR REVIEW BY THE GOVERNMENT. CONTRACTOR SHALL SUBMIT

CALCULATIONS DEMONSTRATING PROPOSED SUBSTITUTION IS EQUAL TO

SPECIFIED PRODUCTS.

R ev is io n Is su e

R ev

D es cr ip tio n D at e

6-30-21

FOUNDATION PLAN NOTES

1. FOR ALL DIMENSIONS AND CONDITIONS NOT SHOWN, SEE ARCHITECTURAL PLANS.

2. REFERENCE CIVIL DRAWINGS FOR EXTERIOR GRADING.

3. ELEVATION 100'-0" = 934.00' (REF. CIVIL)

4. DESIGN ALLOWABLE SOILD BEARING CAPACITY (REF GEOTECHNICAL REPORT): 3,000 PSF, MAX.

5. CONTROL JOINTS SHOWN FOR BASIS OF DESIGN. CONTRACTOR TO CONFIRM SPACING.

6. ABBREVIATIONS:

C.J. = CONTROL JOINT

S500

5" SLAB ON GRADE

REINFORCE WITH WWF 6X6 - W4X4

T.O. SLAB REFERENCE ELEV. = 100'-0"

ACTUAL ELEV. = 934.00' (REF. CIVIL)

CJ

CJ

9'-4" 14'-2 1/2"

23'-6 1/2"

'-6

/2

PRE ENGINEERED BUILDING

CJ

PIPE PENETRATION THROUGH SLAB,

REF PROCESS SEE S101 FOR DETAILS

S500

SIM

'-1

3/

4"

C1

C1 C1

C1

S500

24'-9 1/4"

ROOF OUTLINE, TYP

'-9

/4

PEMB FRAME, BY

OTHERS, TYP.

S301

S301

HORIZONTAL WALL GIRT, TYP.

ROOF PURLINS PER

PEMB MNFR, TYP

FRAMING PLAN NOTES

1. FOR ALL DIMENSIONS AND CONDITIONS NOT SHOWN, SEE ARCHITECTURAL PLANS.

2. SEE S001 FOR GENERAL NOTES.

3. DEPICTIONS OF THE MANUFACTURED METAL BUILDING SYSTEMS ARE REPRESENTATIVE, NOT

INTENDED TO BE FINAL DESIGN, AND SHALL BE DESIGNED BY THE PEMB MANUFACTURER TO THE

LOADINGS DESCRIBED IN THE GENERAL NOTES.

4. DESIGN CONTINGENT ON PEMB DESIGN BY MANUFACTURER. DESIGN SHALL BE REVIEWED UPON

RECIEPT OF PEMB DESIGN.

X :\A

E \B

\B

LM

N S

\1

7\

5-fin al -d sg n\

-d ra w in gs

\1 0-

C iv il\ ca d\ dw g\ sh ee t\t itl eb lo ck

\B

LM

2x

B or de r- La

P os a S ou th

L T

V A

.d w g Ja nu ar y

, 2

5:

:0

P M

P H

A S E I

S E

H P ro je c t

C h e ck ed B y

D ra w n

B y

P ro je ct

S ta tu s

Is su e D at e

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

/3

0/

67 E E

FOUNDATION PLAN

S101

L A

P O

S A

T Y

S O

N W

A S

H L

T V

A

W A

S T

E W

A T

E R

L A

G O

O N

B U

R E

A U

O F

L A

N D

M A

N A

G E

M E

N T

Y U

M A

F

IE

LD

O

F F

IC

E

C

O

LO

R A

D O

R

IV

E R

D

IS

T R

IC

T

O F

F

IC

E

U N

IT

E

D S

T A

T E

S D

E P

A R

T M

E N

T O

F T

H E

I N

T E

R

IO

R

B U

R E

A U

O F

L A

N D

M A

N A

G E

M E

N T

S H

1/2" = 1'-0"

PUMP HOUSE FOUNDATION PLAN

1/2" = 1'-0"

ROOF FRAMING PLAN

COLUMN / PIER SCHEDULE

COLUMN DESCRIPTION COMMENTS

C1 PER PEMB MFR

R ev is io n Is su e

R ev

D es cr ip tio n D at

GENERAL NOTES

1. PROJECT CONSISTS OF CONSTRUCTION OF (1) NEW AWWA D103, 50,000 GALLON CAPACITY STEEL

TANK.

2. SEE SHEET S001 FOR MATERIAL SPECIFICATIONS AND SPECIAL INSPECTIONS.

3. CONTRACTOR SHALL COORDINATE ALL STRUCTURAL WORK SHOWN ON ALL OTHER DRAWINGS.

4. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. CONTRACTOR

SHALL BE RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION INCLUDING, BUT NOT LIMITED

TO, SHORING AND TEMPORARY BRACING TO PROVIDE STRUCTURAL STABILITY DURING

CONSTRUCTION.

5. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE CONTRACT DRAWINGS OR

SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR

CONDITIONS THAT ARE SHOWN OR CALLED FOR, WITH THE APPROVAL OF THE GOVERNMENT. WHERE SECTIONS VARY, CONTRACTOR SHALL PROVIDE FOR SMOOTH TRANSITIONS BETWEEN THEM, UNLESS

NOTED OTHERWISE.

6. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN

INSTRUCTIONS AND RECOMMENDATIONS, UNLESS NOTED OTHERWISE.

GOVERNING BUILDING CODE:

1. 2018 INTERNATIONAL BUILDING CODE (IBC)

2. AMERICAN WATER WORKS ASSOCIATION (AWWA) D103 FACTORY-COATED BOLTED CARBON STEEL

TANKS FOR WATER STORAGE

3. AMERICAN CONCRETE INSTITUTE (ACI) BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE

318-14

4. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) MINIMUM LOADS FOR BUILDINGS AND OTHER

STRUCTURES 7-16

DESIGN LOADS:

AWWA D103 USE GROUP II

RISK CATEGORY III (ASCE 7-16)

1. LIVE LOAD:

ROOF, Lr 20 PSF (REDUCIBLE)

2. SNOW LOADS:

GROUND SNOW LOAD, Pg 0 PSF

3. WIND LOADS:

ULTIMATE DESIGN WIND SPEED (3 SEC GUST), Vult 106 MPH

WIND EXPOSURE C

STRUCTURE IS: ENCLOSED BUILDING

INTERNAL PRESS COEFFICIENT +/-0.18

COMPONENTS & CLADDING PRESSURE (50 PSF) TBD

4. SEISMIC LOADS:

SITE CLASS D

MAPPED SPECTRAL RESPONSE ACCELERATION, 0.2 SEC, SS 0.207 g MAPPED SPECTRAL RESPONSE ACCELERATION, 1.0 SEC, S1 0.125 g SITE AMPLIFICATION FACTOR, 0.2 SEC, Fa 1.6 SITE AMPLIFICATION FACTOR, 1.0 SEC, Fv 2.35 DESIGN SPECTRAL RESPONSE, 0.2 SEC, SDS 0.221 g DESIGN SPECTRAL RESPONSE, 1.0 SEC, SD1 0.196 g SEISMIC IMPORTANCE FACTOR, Ie 1.25

SEISMIC DESIGN CATEGORY C

5. SOIL CRITERIA:

ALLOWABLE BEARING PRESSURE 3,000 PSF

ANTICIPATED MAX DIFFERENTIAL SETTLEMENT 3/4 IN

ANTICIPATED MAX TOTAL SETTLEMENT 1 IN

LATERAL EARTH PRESSURES:

ON-SITE BACKFILL:

UNIT WEIGHT 115 PCF

ACTIVE PRESSURE (DRAINED) 35 PCF

AT REST PRESSURE (DRAINED) 55 PCF

PASSIVE PRESSURE (DRAINED) 375 PCF

FRICTION COEFFICIENT 0.45

MIN FOUNDATION EMBEDMENT (SHALLOW FOUNDATIONS) 18 IN

MIN FOUNDATION EMBEDMENT (MAT/SLAB FOUNDATIONS) 12 IN

FOUNDATION DESIGN INFORMATION:

1. FOUNDATION DESIGN IS BASED ON THE FOLLOWING GEOTECHNICAL REPORT:

A. REPORT: GEOTECHNICAL ENGINEERING REPORT: PROPOSED BLM LA POSA WW LAGOONS

B. BY: TERRACON CONSULTANTS

C. DATED: 10/30/2019

2. STRUCTURAL FOUNDATIONS DESIGNED BY TANK DESIGNER SHALL BE ESTABLISHED ON SOIL CAPABLE

OF SAFELY SUPPORTING 3.0 KSF AS RECOMMENDED IN THE GEOTECHNICAL REPORT.

3. THE GOVERNMENT IS NOT RESPONSIBLE FOR THE ACCURACY OR CONTENT OF THE SUBSURFACE SOIL CONDITIONS DESCRIBED IN THE SPECIFICATIONS, TEST BORINGS, OR GEOTECHNICAL REPORT. THE

CONTRACTOR/GOVERNMENT SHALL EMPLOY A CERTIFIED GEOTECHNICAL ENGINEER DURING

CONSTRUCTION TO TEST, INSPECT AND VERIFY ALL ASSUMED SOIL CONDITIONS.

CONCRETE

SPLASH BLOCK

ROOF DECK

(F

IN

AL B

Y T

ANK M

FR)

R = 10'-6

PUMP HOUSE

50,000 GAL TANK

S102

S102

MANWAY, SEE

PROCESS DRAWINGS

SQUARE ROOF ACCESS

HATCH, SEE PROCESS

OVERFLOW, SEE PROCESS

STANDARD ROOF VENT,

SEE PROCESS

INLET PIPE,

SEE PROCESS

OUTLET PIPE, SEE PROCESS

ROOF ACCESS LADDER,

SEE PROCESS

EDGE OF FLOOR

15°

15°

26°

ROOF MOUNTED GUARDRAIL

'-0

H

E

IG

H T

(FINAL BY TANK MFR)

21'-0" DIAMETER

OVERFLOW, SEE PROCESS

HWE

955.00'

B Y

T A

N K

M F

R

FINISH FLOOR

EL. 935.00'

STANDARD ROOF VENT,

SEE PROCESS

NOTE: EXTERIOR

GUARDRAIL AND CAGED

LADDER NOT SHOWN FOR

CLARITY. REF PROCESS.

S102

AWWA D103 BOLTED TANK BY MFR

2"

EXTERIOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .