B08_22R0022_At3_P1_SWPPP_A-1_EC_Plan.PDF

PDF 2 MB Posted

Attached to
La Posa Lagoon GAOA Federal contract opportunity
Solicitation number
140L0622R0022
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document contains plans and drawings for the La Posa Lagoon GAOA project. The plans show details for a new RV dump station with 8 bays constructed in two phases, a new RV fill station with 4 bays, a new 22'x24' pump house, a new 50,000 gallon water storage tank, wastewater ponds, septic tanks, and related site infrastructure. The project will be constructed on Bureau of Land Management property in Yuma, Arizona for the Department of the Interior. The solicitation number for the project is 140L0622R0022 and bids are due by June 30, 2021. The selected contractor will be responsible for site work, utilities, structures, and other site elements depicted in the plans and drawings in accordance with the specifications and requirements of the Bureau of Land Management.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

S

S

S

S

S

W

W

W

W

W

W

W

W

W

W

W

S

X

C

X

C

X

C

X

C

X

C

S

W

W

W

RV DUMP STATION

PHASE I - 4 BAYS

PHASE II - 4 BAYS

22'x24' PUMP HOUSE

50,000 GALLON WATER

STORAGE TANK

WELLHEAD

6'X6' CONCRETE PAD

SANITARY SEWER LINE

WATER LINE

WASTEWATER PONDS

BLOWERS

14.5' X 5' MANUAL SCREEN

CONCRETE BOX

6" THICK ADOT CLASS 2

AGGREGATE BASE

6' HIGH CHAINLINK

SECURITY FENCE

SEH NO.5 RBR RPC

974.79

SET PANEL REBAR

931.56

6" THICK ADOT CLASS 2

AGGREGATE BASE

RV FILL STATION

PHASE I - 4 BAYS

PHASE II - 4 BAYS

(2) 5,000 GALLON

SEPTIC TANKS

LA POSA TYSON CONTACT STATION

500' SETBACK

R

O

A

D

A

TEE WITH SHUTOFF

VALVE

SEE SHEET C101

SEE SHEET C203

SEE SHEET C300

SEE SHEET C301

SEE SHEET C103

SEE SHEET C105

REJECT

WATER LINE

END MAIN HERE.

ADD LAST SERVICE

OF PHASE I

END MAIN HERE.

ADD LAST SERVICE

OF PHASE I.

PRIMARY SURVEY CONTROL POINT TABLE

POINT #

NORTHING

956073.14

966196.73

947349.54

959789.10

EASTING

557739.05

545381.76

557945.90

555415.70

ELEVATION

974.79

970.23

1041.67

931.56

DESCRIPTION

SEH NO.5 RBR RPC

NGS E 479

NGS KEISER

SET PANEL REBAR

*NOTE: CONTROL POINTS 503 AND 504 ARE LOCATED OUTSIDE THE

BOUNDS OF THIS SHEET.

feetscale

200 400200

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\1 0-

Ci vil

\ca d\d wg \sh ee t\1

7_ Ov er all

S ite

.dw g

Ju ne

, 2

1 -

4:

:43 P

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

II

OVERALL SITE PLAN

A-1

GENERAL NOTES:

1. HORIZONTAL CONTROL DATUM IS BASED ON THE

2011 ADJUSTMENT OF THE ARIZONA COORDINATE

SYSTEM, WEST ZONE, NORTH AMERICAN DATUM OF

1983 (GRID)(IFT).

2. VERTICAL DATUM IS BASED ON NAVD 88.

3. SEE SHEET C101 FOR PUMPHOUSE SITE PLAN.

4. SEE SHEET C102 FOR RV DUMP STATION SITE PLAN.

5. SEE SHEET C103 FOR RV FILL STATION SITE PLAN.

6. SEE SHEET C200 FOR POND GRADING PLAN.

W

S

SEH NO.5 RBR RPC

974.79

EXISTING MAJOR ROAD

EXISTING MINOR ROAD

PROPOSED WATER LINE

PROPOSED SANITARY SEWER LINE

SURVEY CONTROL POINT

LEDGEND

Sheets and Views
C100 OVERALL SITE PLAN

File details come from the government source that posted it. Updated .