B08_22R0022_At4_P1_SWPPP_A-2_EC_Plan.pdf
PDF 7 MB Posted
- Attached to
- La Posa Lagoon GAOA Federal contract opportunity
- Solicitation number
- 140L0622R0022
About this file
This document contains an erosion control plan and related federal contract opportunity for the La Posa Lagoon GAOA project. The erosion control plan details sediment and erosion control measures to be implemented during construction, including installing erosion control logs every 100 feet, silt fencing 50 feet downslope from grading activities, concrete washout and staging areas, and vehicle tracking control pads. The related solicitation is for the La Posa Lagoon GAOA project and is being issued by the Bureau of Land Management within the Department of the Interior. The solicitation number is 140L0622R0022. The plan and solicitation involve construction and sediment control work to be performed at the La Posa Lagoon site.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEH NO.5 RBR RPC
974.79
SET PANEL REBAR
931.56
R
O
A
D
A
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
VEHICLE TRACKING PAD
AT DESIGNATED
CONSTRUCTION
ENTRANCE
STAGING AREA
CONCRETE
WASHOUT
LIMITS OF DISTURBANCE
INSTALL EROSION
LOGS EVERY 100',
(TYP)
INSTALL EROSION
LOGS EVERY 100',
(TYP)
INSTALL SILT FENCE 50'
MAX DOWNSLOPE OF ALL
GRADING ACTIVITY, TYP.
INSTALL SILT FENCE 50' MAX
DOWNSLOPE OF ALL
GRADING ACTIVITY, TYP.
INSTALL SILT FENCE 50' MAX
DOWNSLOPE OF ALL GRADING
ACTIVITY, TYP.
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LA POSA TYSON CONTACT STATION
S
S
S
S
S
S
W
W
W
W
W
W
W
W
W
W
W
S
X
C
X
C
X
C
X
C
X
C
S
W
W
W
INSTALL EROSION
LOGS EVERY 100',
(TYP)
INSTALL EROSION
LOGS EVERY 100',
(TYP)
INSTALL EROSION
LOGS EVERY 100',
(TYP)
feetscale
200 400
SE
H
Pr oj ec t #
Ch ec ke d
By
Dr aw n By
Pr oj ec t S ta tu s Iss ue D at e
67 JD
H
CW
H
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
/30 /20
Re v.
De sc rip tio n Da te
Re vis io n
Iss ue
LA
P
O
SA
T
YS
O N
W A
SH
L
TV
A
W A
ST
EW
A
TE
R
LA
G O
O N
BU
RE
AU
O
F
LA
ND
M
AN
AG
ME
NT
YU
MA
F
IE
LD
O
FF
IC
E
- C
OL
OR
AD
O
RI
VE
R D
IS
TR
IC
T
OF
FI
CE
X:
\A
E\ B\
BL
MN
S\
\5-fin al-ds gn \51
-d ra wi ng s\1 0-
Ci vil
\ca d\d wg \sh ee t\1
7_
EC
P lan
.dw g
Ju ne
, 2
1 -
4:
:20 P
M
UN
ITE
D S
TA
TE
S D
EP
A
RT
M
EN
T
O F
TH
E
IN
TE
RI
O
R
BU
RE
A
U O
F
LA
N D
M A
N A
G
EM
EN
T
PH
A
SE
II
EROSION COONTROL PLAN
A-2
NOTES
1. PROTECT AND/OR RELOCATE EXISTING VEGETATION PER PLANS. PLANTS TO BE SALVAGED WILL
BE LOCATED ON-SITE, FINAL LOCATION TO BE DETERMINED BY GOVERNMENT.
2. SCATTER ANY VEGETATION NOT SCHEDULED FOR RELOCATION AS NECESSARY TO
ACCOMMODATE SITE IMPROVEMENTS.
3. CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL PER SWPPP.
EROSION CONTROL LOG
STABILIZED STAGING AREA
VEHICLE TRACKING CONTROL
LIMITS OF DISTURBANCE
SILT FENCE
CONCRETE WASHOUT AREA
FLOW ARROW
SF SF
WATER LINE W
SANITARY LINE S
CHAIN LINK FENCE XC
| Sheets and Views |
| C100 OVERALL SITE PLAN |
File details come from the government source that posted it. Updated .