B08_22R0022_At4_P1_SWPPP_A-2_EC_Plan.pdf

PDF 7 MB Posted

Attached to
La Posa Lagoon GAOA Federal contract opportunity
Solicitation number
140L0622R0022
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document contains an erosion control plan and related federal contract opportunity for the La Posa Lagoon GAOA project. The erosion control plan details sediment and erosion control measures to be implemented during construction, including installing erosion control logs every 100 feet, silt fencing 50 feet downslope from grading activities, concrete washout and staging areas, and vehicle tracking control pads. The related solicitation is for the La Posa Lagoon GAOA project and is being issued by the Bureau of Land Management within the Department of the Interior. The solicitation number is 140L0622R0022. The plan and solicitation involve construction and sediment control work to be performed at the La Posa Lagoon site.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEH NO.5 RBR RPC

974.79

SET PANEL REBAR

931.56

R

O

A

D

A

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

S F

S

F

S

F

S

F

S

F

S

F

S

F

S

F

VEHICLE TRACKING PAD

AT DESIGNATED

CONSTRUCTION

ENTRANCE

STAGING AREA

CONCRETE

WASHOUT

LIMITS OF DISTURBANCE

INSTALL EROSION

LOGS EVERY 100',

(TYP)

INSTALL EROSION

LOGS EVERY 100',

(TYP)

INSTALL SILT FENCE 50'

MAX DOWNSLOPE OF ALL

GRADING ACTIVITY, TYP.

INSTALL SILT FENCE 50' MAX

DOWNSLOPE OF ALL

GRADING ACTIVITY, TYP.

INSTALL SILT FENCE 50' MAX

DOWNSLOPE OF ALL GRADING

ACTIVITY, TYP.

LIMITS OF DISTURBANCE

LIMITS OF DISTURBANCE

LA POSA TYSON CONTACT STATION

S

S

S

S

S

S

W

W

W

W

W

W

W

W

W

W

W

S

X

C

X

C

X

C

X

C

X

C

S

W

W

W

INSTALL EROSION

LOGS EVERY 100',

(TYP)

INSTALL EROSION

LOGS EVERY 100',

(TYP)

INSTALL EROSION

LOGS EVERY 100',

(TYP)

feetscale

200 400

SE

H

Pr oj ec t #

Ch ec ke d

By

Dr aw n By

Pr oj ec t S ta tu s Iss ue D at e

67 JD

H

CW

H

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

/30 /20

Re v.

De sc rip tio n Da te

Re vis io n

Iss ue

LA

P

O

SA

T

YS

O N

W A

SH

L

TV

A

W A

ST

EW

A

TE

R

LA

G O

O N

BU

RE

AU

O

F

LA

ND

M

AN

AG

ME

NT

YU

MA

F

IE

LD

O

FF

IC

E

- C

OL

OR

AD

O

RI

VE

R D

IS

TR

IC

T

OF

FI

CE

X:

\A

E\ B\

BL

MN

S\

\5-fin al-ds gn \51

-d ra wi ng s\1 0-

Ci vil

\ca d\d wg \sh ee t\1

7_

EC

P lan

.dw g

Ju ne

, 2

1 -

4:

:20 P

M

UN

ITE

D S

TA

TE

S D

EP

A

RT

M

EN

T

O F

TH

E

IN

TE

RI

O

R

BU

RE

A

U O

F

LA

N D

M A

N A

G

EM

EN

T

PH

A

SE

II

EROSION COONTROL PLAN

A-2

NOTES

1. PROTECT AND/OR RELOCATE EXISTING VEGETATION PER PLANS. PLANTS TO BE SALVAGED WILL

BE LOCATED ON-SITE, FINAL LOCATION TO BE DETERMINED BY GOVERNMENT.

2. SCATTER ANY VEGETATION NOT SCHEDULED FOR RELOCATION AS NECESSARY TO

ACCOMMODATE SITE IMPROVEMENTS.

3. CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL PER SWPPP.

EROSION CONTROL LOG

STABILIZED STAGING AREA

VEHICLE TRACKING CONTROL

LIMITS OF DISTURBANCE

SILT FENCE

CONCRETE WASHOUT AREA

FLOW ARROW

SF SF

WATER LINE W

SANITARY LINE S

CHAIN LINK FENCE XC

Sheets and Views
C100 OVERALL SITE PLAN

File details come from the government source that posted it. Updated .