B03_-_Wage_Determinations_WD__NM20260029.pdf

PDF 2 MB Posted

Attached to
Hickman Wildlife Water Catchment and Pipe Fence
Solicitation number
140L1726Q0054
Issued by

About this file

This is a prevailing wage determination document issued by the U.S. Department of Labor for New Mexico construction projects, effective May 18, 2026. The determination applies to building construction in Socorro County and establishes prevailing wage rates and fringe benefits for various construction trades and labor classifications.

The document lists wage rates and fringe benefits for multiple job classifications including carpenters, electricians, ironworkers, power equipment operators, plumbers, sheet metal workers, truck drivers, laborers, and numerous other construction trades. Rates vary based on specific work classifications, with examples including carpenter (metal stud installation only) at $24.08 per hour plus $10.79 fringe; electrician (low voltage wiring for alarms) at $40.30 per hour plus $13.41 fringe; and plumber (HVAC pipe installation) at $43.07 per hour plus $16.60 fringe. The determination includes detailed geographic zones extending from Albuquerque with mileage-based premium calculations for work performed at distances beyond specified zones. The document contains supplementary guidance on wage determination appeals processes, union rate identifiers, survey rate identifiers, and state-adopted rate identifiers. It notes that Executive Order 13658 establishes a minimum wage requirement of at least $13.65 per hour for contracts awarded between May 11 and December 31, 2026. The prevailing wage rates apply to all federal construction contracts subject to the Davis-Bacon Act in this region.

View the file

Other files

File Type Posted
Sol_140L1726Q0054_Amd_0010.pdf PDF
Hickman_Wildlife_Water_Contract_Site_Visit_Sign_In_Sheet_0010.pdf PDF
B11-140L1726Q0054_Question_and_Answers_11_02_2026_0010.pdf PDF
B11-_140L1726Q0054_Question_and_Answers_10_26_2026_0009.pdf PDF
Sol_140L1726Q0054_Amd_0009.pdf PDF
Sol_140L1726Q0054_Amd_0008.pdf PDF
Sol_140L1726Q0054_Amd_0007.pdf PDF
B011_-_140L1726Q0054_Question_and_Answers_10_19_2026_0007.pdf PDF
A04_-_Revised_SOW_Hickman_Water_Catchment_and_Fence_10_19_2026_0007.pdf PDF
A06_-Similar_Project__BLM_Catchment_Photos_NOT_THE_CURRENT_PROJECT_0007.pdf PDF
Sol_140L1726Q0054_Amd_0006.pdf PDF
Sol_140L1726Q0054_Amd_0005.pdf PDF
Sol_140L1726Q0054_Amd_0004.pdf PDF
B09_-_Amendment_03_Attachment_-_Extend_Solicitation_and_add_Add_Site_Visit_0003.pdf PDF
Sol_140L1726Q0054_Amd_0003.pdf PDF
B011_-_140L1726Q0054_Question_and_Answers_9_3_2026_0002.pdf PDF
Sol_140L1726Q0054_Amd_0002.pdf PDF
Sol_140L1726Q0054_Amd_0001.pdf PDF
A04_-_Bid_Schedule_Hickman_Wildlife_Water_Catchment_and_Pipe_Fence.pdf PDF
Sol_140L1726Q0054.pdf PDF
A06_-_SFO_PIPE_FENCE_ARROYO_CROSSING_DRAWINGS.pdf PDF
A06_-_Water_Catchment_Drawings.pdf PDF
A04_-_SOW_Hickman_Water_Catchment_and_Fence.pdf PDF
A06_-_MAPS_Hickman_Wildlife_Water_and_Catchment_Project.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .