This file is a set of architectural and mechanical drawings for the Heat Exchanger Replacement & Boiler System Repairs project at Quentin N. Burdick Memorial Health Facility in Aberdeen, South Dakota. The project (GP25TM400H10) is managed by the Great Plains Area Indian Health Service, Division of Facilities Management, dated November 3, 2025, and drawn by Taylor Strand with review by Brad Weekley.

The drawings specify comprehensive demolition and installation work for the facility's heating system. Demolition activities include removal of two steam heat exchangers, two boiler water heat exchangers, incorporated storage tanks, all associated piping and valves back to connection points with the existing hot water distribution system and boiler water supply pumps, existing valves, pressure gauges, sight glasses, relief air dampers, damper controls, and flue gaskets. Installation requirements include new heat exchangers per contractor design, new motorized and manual gate valves, butterfly isolation valves, non-slam check valves, three-way mixing valves, wye-type strainers, flexible pump connectors, manual balancing valves, manual drain/vent valves, sight glasses, boiler flue gaskets, and relief air damper controls and dampers in existing ductwork. All new piping shall be schedule 40 carbon steel pipe. The pipe accessory schedule specifies quantities for required components, including three 2.5-inch butterfly valves, eighteen 3-inch butterfly valves, nine 4-inch butterfly valves, pressure gauges in various sizes, flexible pump connections, balancing valves, check valves, three-way mixing valves, and strainers. The contractor is responsible for field verification of existing conditions and all demolition and installation coordination necessary to meet design requirements.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quentin N. Burdick

Memorial Health Facility

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

Project Vicinty

Site Map

T.1

TITLE

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Heat Exchanger Replacement & Boiler System Repairs

M.2

M.4

M.6

M.1

1 1

1 1

3 3

1 1

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to demolition.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of demolition in the field.

3. Demo existing pipe show dashed and in red.

4. See SOW for additional requirements.

Heat Exchanger Demolition Notes:

1. Contractor shall demolish existing heat exchangers to include the two steam heat exchangers, two boiler water heat exhcangers, and incoporated storage tanks.

2. Contractor shall demolish all associated piping and valves back to the connection with the existing hot water distribution system and boiler water supply pumps.

3. Contractor shall perform all demolition necessary to meet the requirements of the replacement water heating system design.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.1

BOILER ROOM

DEMOLITION PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/8" = 1'-0"

1 BOILER ROOM - DEMOLITION PLAN

1/2" = 1'-0"

BOILER SECTION VIEW - DEMOLITION

PLAN

KEYNOTES

Key Value Keynote Text

1 DEMO EXISTING VALVE

2 DEMO EXISTING HEAT EXCHANGERS

3 DEMO EXISTING FLUE GASKET

4 DEMO EXISTING RELIEF AIR DAMPER CONTROLS

5 DEMO EXISTING RELIEF AIR DAMPER

M.3

M.3

1 1

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to demolition.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of demolition in the field.

3. Demo existing pipe show dashed and in red.

4. See SOW for additional requirements.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.2

BOILER PUMPS

DEMOLITION PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/2" = 1'-0"

1 BOILER PUMPS - DEMOLITION PLAN

4 BOILER PUMPS - 3D DEMOLITION PLAN

KEYNOTES

Key Value Keynote Text

1 DEMO EXISTING VALVE

2 DEMO EXISTING PRESSURE GAUGE

1 1 1 1

1 1

11 1 1

1 2 2 2

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to demolition.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of demolition in the field.

3. Demo existing pipe show dashed and in red.

4. See SOW for additional requirements.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.3

BOILER PUMPS

DEMOLITION PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/2" = 1'-0"

BOILER PUMPS SECTION VIEW N -

DEMOLITION PLAN

1/2" = 1'-0"

BOILER PUMPS SECTION VIEW S -

DEMOLITION PLAN

KEYNOTES

Key Value Keynote Text

M.5

M.5

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to demolition.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of demolition in the field.

3. Demo existing pipe show dashed and in red.

4. See SOW for additional requirements.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.4

CLINIC PUMPS

DEMOLITION PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility 1/2" = 1'-0"

1 CLINIC PUMPS - DEMOLITION PLAN

2 CLINIC PUMPS - 3D DEMOLITION PLAN

KEYNOTES

Key Value Keynote Text

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to demolition.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of demolition in the field.

3. Demo existing pipe show dashed and in red.

4. See SOW for additional requirements.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.5

CLINIC PUMPS

DEMOLITION PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/2" = 1'-0"

CLINIC PUMPS SECTION VIEW W -

DEMOLITION PLAN

1/2" = 1'-0"

CLINIC PUMPS SECTION VIEW E -

DEMOLITION PLAN

KEYNOTES

Key Value Keynote Text

M.6

NORTH

BOILER

SOUTH

BOILER

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to demolition.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of demolition in the field.

3. Demo existing pipe show dashed and in red.

4. See SOW for additional requirements.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.6

EXPANSION TANKS

DEMOLITION PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/2" = 1'-0"

1 EXPANSION TANKS - DEMOLITION PLAN

EXPANSION TANKS - 3D DEMOLITION

PLAN

1/2" = 1'-0"

BOILER SECTION VIEW E - DEMOLITION

PLAN

KEYNOTES

Key Value Keynote Text

2 DEMO EXISTING SIGHT GLASS

M.8

M.12

M.10

M.7

1 1

General Notes:

1. Contractor shall field verify exact location, sizes, and elevations of all existing valves, piping, and equipment prior to installation.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of installation in the field.

3. Contractor is responsible for all new piping installation necessary to accomplish the work shown. All new piping shall be schedule 40 carbon steel pipe.

4. See SOW for additional requirements.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.7

BOILER ROOM PIPING

PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/8" = 1'-0"

1 MECHANICAL ROOM - FLOOR PLAN

1/2" = 1'-0"

2 BOILER SECTION VIEW - PIPING PLAN

KEYNOTES

Key Value Keynote Text

1 INSTALL NEW MOTORIZED GATE VALVE MATCH TO PIPE SIZE

2 INSTALL NEW MANUAL GATE VALVE MATCH TO PIPE SIZE

3 INSTALL NEW HEAT EXCHANGERS PER CONTRACTOR DESIGN

4 INSTALL NEW BOILER FLUE GASKETS

5 INSTALL NEW RELIEF AIR DAMPER CONTROLS

6 INSTALL NEW RELIEF AIR DAMPER IN EXISTING DUCT WORK

7 INSTALL NEW BUTTERFLY ISOLATION VALVE MATCH TO PIPE SIZE

M.9

M.9

1 1

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to installation.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of installation in the field.

3. Contractor is responsible for all new piping installation necessary to accomplish the work shown. All new piping shall be schedule 40 carbon steel pipe.

4. See SOW for additional requirements.

5. Non-slam check valves shall be placed 5-10 pipe diameters upstream of any turbulence causing device and 5 pipe diameters downstream of any turbulence causing device. Verify placement with check valve manufacturer for best performance.

6. Balancing valves shall be placed 5 pipe diameters downstream of any turbulence causing device and 3 pipe diameters upstream of any turbulence causing device. Verify placement with balancing valve manufacturer for best performance.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.8

BOILER PUMPS PIPING

PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/2" = 1'-0"

1 BOILER PUMPS - PIPING PLAN

2 BOILER PUMPS - 3D PIPING PLAN

KEYNOTES

Key Value Keynote Text

1 INSTALL NEW BUTTERFLY ISOLATION VALVE MATCH TO PIPE SIZE

2 INSTALL NEW MANUAL BALANCING VALVE MATCH TO PIPE SIZE

3 INSTALL NEW FLEXIBLE PUMP CONNECTOR MATCH TO PIPE SIZE

4 INSTALL NEW WYE-TYPE STRAINER MATCH TO PIPE SIZE

5 INSTALL NEW THREE-WAY MIXING VALVE MATCH TO PIPE SIZE

6 INSTALL NEW MANUAL GATE VALVE MATCH TO PIPE SIZE

7 INSTALL NEW NON-SLAM CHECK VALVE MATCH TO PIPE SIZE

8 INSTALL NEW PRESSURE GUAGE

5 5 5 5

3 33

2 2 2

4 4 4

1 1 1 1

4 4 44

6 6

7 7

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to installation.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of installation in the field.

3. Contractor is responsible for all new piping installation necessary to accomplish the work shown. All new piping shall be schedule 40 carbon steel pipe.

4. See SOW for additional requirements.

5. Non-slam check valves shall be placed 5-10 pipe diameters upstream of any turbulence causing device and 5 pipe diameters downstream of any turbulence causing device. Verify placement with check valve manufacturer for best performance.

6. Balancing valves shall be placed 5 pipe diameters downstream of any turbulence causing device and 3 pipe diameters upstream of any turbulence causing device. Verify placement with balancing valve manufacturer for best performance.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.9

BOILER PUMPS PIPING

PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/2" = 1'-0"

BOILER PUMPS SECTION VIEW N -

PIPING PLAN

1/2" = 1'-0"

BOILER PUMPS SECTION VIEW S -

PIPING PLAN

KEYNOTES

Key Value Keynote Text

1 INSTALL NEW BUTTERFLY ISOLATION VALVE MATCH TO PIPE SIZE

2 INSTALL NEW MANUAL BALANCING VALVE MATCH TO PIPE SIZE

3 INSTALL NEW NON-SLAM CHECK VALVE MATCH TO PIPE SIZE

4 INSTALL NEW FLEXIBLE PUMP CONNECTOR MATCH TO PIPE SIZE

5 INSTALL NEW PRESSURE GUAGE

6 INSTALL NEW MANUAL GATE VALVE MATCH TO PIPE SIZE

7 INSTALL NEW WYE-TYPE STRAINER MATCH TO PIPE SIZE

M.11

M.11

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to installation.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of installation in the field.

3. Contractor is responsible for all new piping installation necessary to accomplish the work shown. All new piping shall be schedule 40 carbon steel pipe.

4. See SOW for additional requirements.

5. Non-slam check valves shall be placed 5-10 pipe diameters upstream of any turbulence causing device and 5 pipe diameters downstream of any turbulence causing device. Verify placement with check valve manufacturer for best performance.

6. Balancing valves shall be placed 5 pipe diameters downstream of any turbulence causing device and 3 pipe diameters upstream of any turbulence causing device. Verify placement with balancing valve manufacturer for best performance.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.10

CLINIC PUMPS PIPING

PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility 1/2" = 1'-0"

1 CLINIC PUMPS - PIPING PLAN

2 CLINIC PUMPS - 3D PIPING PLAN

KEYNOTES

Key Value Keynote Text

1 INSTALL NEW BUTTERFLY ISOLATION VALVE MATCH TO PIPE SIZE

2 INSTALL NEW MANUAL BALANCING VALVE MATCH TO PIPE SIZE

3 INSTALL NEW NON-SLAM CHECK VALVE MATCH TO PIPE SIZE

4 INSTALL NEW THREE-WAY MIXING VALVE MATCH TO PIPE SIZE

5 INSTALL NEW PRESSURE GUAGE

1 1

2 2

3 3

1 1

4 4

5 5

2 2 3 3

General Notes:

1. Contractor shall field verify exact location, size, and elevation of all existing valves, piping, and equipment prior to installation.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of installation in the field.

3. Contractor is responsible for all new piping installation necessary to accomplish the work shown. All new piping shall be schedule 40 carbon steel pipe.

4. See SOW for additional requirements.

5. Non-slam check valves shall be placed 5-10 pipe diameters upstream of any turbulence causing device and 5 pipe diameters downstream of any turbulence causing device. Verify placement with check valve manufacturer for best performance.

6. Balancing valves shall be placed 5 pipe diameters downstream of any turbulence causing device and 3 pipe diameters upstream of any turbulence causing device. Verify placement with balancing valve manufacturer for best performance.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.11

CLINIC PUMPS PIPING

PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/2" = 1'-0"

CLINIC PUMPS SECTION VIEW W -

PIPING PLAN

1/2" = 1'-0"

CLINIC PUMPS SECTION VIEW E -

PIPING PLAN

KEYNOTES

Key Value Keynote Text

1 INSTALL NEW BUTTERFLY ISOLATION VALVE MATCH TO PIPE SIZE

2 INSTALL NEW PRESSURE GUAGE

3 INSTALL NEW FLEXIBLE PUMP CONNECTOR MATCH TO PIPE SIZE

4 INSTALL NEW MANUAL BALANCING VALVE MATCH TO PIPE SIZE

5 INSTALL NEW NON-SLAM CHECK VALVE MATCH TO PIPE SIZE

M.12

SOUTH

BOILER

NORTH

BOILER

3 3

General Notes:

1. Contractor shall field verify exact location, sizes, and elevations of all existing valves, piping, and equipment prior to installation.

2. Existing valve and fitting locations shown are approximate. Contractor is responsible for identifying and coordinating the actual extent of installation in the field.

3. Contractor is responsible for all new piping installation necessary to accomplish the work shown. All new piping shall be schedule 40 carbon steel pipe.

4. See SOW for additional requirements.

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.12

EXPANSION TANKS

PIPING PLAN

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

1/2" = 1'-0"

1 EXPANSION TANKS - PIPING PLAN

1/2" = 1'-0"

3 BOILER SECTION VIEW E - PIPING PLAN

2 EXPANSION TANKS - 3D PIPING PLAN

KEYNOTES

Key Value Keynote Text

1 INSTALL NEW SIGHT GLASS MATCH TO PIPE SIZE

2 INSTALL NEW DRAIN/AIR VENT MATHC TO PIPE SIZE

3 INSTALL NEW MANUAL GATE VALVE MATCH TO PIPE SIZE

PROJECT NUMBER:

DATE:

DRAWN BY:

CHECKED BY:

TASK ORDER NO:

CONTRACT NO:

LAST REVISION DATE:

www.ihs.gov

DIVISION OF FACILITIES MANAGEMENT

115 4TH AVENUE SE, RM 309

ABERDEEN, SD 57401

(605) 226-7451 FAX (605) 226-7580

GREAT PLAINS AREA INDIAN HEALTH SERVICE

OFFICE OF ENVIRONMENTAL

HEALTH & ENGINEERING

M.13

PIPING SCHEDULES

Heat Exchanger Replacement & Boiler

System Repairs

Brad Weekley

Taylor Strand

11/03/2025

GP25TM400H10

Quentin N Burdick Memorial Health Care

Facility

PIPE ACCESSORY SCHEDULE

Family and Type Count

BUTTERFLY VALVE: 2 1/2" 3

BUTTERFLY VALVE: 3" 18

BUTTERFLY VALVE: 4" 9

DRY-TYPE PRESSURE GAUGE: 3" Dial - 1/4" 4 DRY-TYPE PRESSURE GAUGE: 4" Dial - 1/4" 2

FLEXIBLE PUMP CONNECTION: 3" 12

MANUAL BALANCING VALVE: CB-3F 6

MANUAL DRAIN/VENT VALVE: -- 6

MANUAL GATE VALVE: 4" 6

MOTORIZED GATE VALVE: 4" 2

NON-SLAM CHECK VALVE: 3" 6

THREE-WAY MIXING VALVE: 4" 3

WYE-TYPE STRAINER: 4" 2

* All valve and pipe sizing shall be verified by contractor on site prior to ordering. Field values may vary.