Solicitation Summary: Belcourt Heat Exchange Replacement and Boiler System Repairs
This is a Request for Proposal (RFP) issued by the Indian Health Service for heat exchanger replacement and boiler system repairs at the Quentin N. Burdick Memorial Health Facility in Belcourt, North Dakota. The solicitation (75H701-26-R-00022) is set aside as a 100% Indian Small Business Economic Enterprise (ISBEE) under NAICS code 236220, with a size standard of $45 million. The project involves replacement of two domestic water heating systems, boiler isolation valves, pump components, flue gaskets, burners, and control system upgrades. The contractor must be licensed in North Dakota to design and engineer the heating systems. The construction contract is anticipated to cost between $500,000 and $1,000,000 with a firm-fixed-price structure. The project period is 180 calendar days from notice to proceed, with work hours of 8:00 a.m. to 5:00 p.m., Monday through Friday. A mandatory site visit is scheduled for April 29, 2026, at 11:00 a.m. CT at the hospital's south entrance in Belcourt, North Dakota.
Proposals are due May 21, 2026, at 2:00 p.m. PST and must be submitted electronically in PDF format in two volumes: Volume I (Indian Economic Enterprise Representation and Price Proposal, not exceeding 20 pages) and Volume II (Technical Proposal addressing specialized experience with 3-5 relevant projects and past performance). Award will be made using Lowest Price Technically Acceptable (LPTA) procedures to the lowest-priced, technically acceptable offeror. Key requirements include performance and payment bonds, a 1-year warranty, comprehensive commissioning, owner training, compliance with tribal employment ordinances and infection control standards, and submission of as-built drawings and operation/maintenance manuals. Offerors must maintain active System for Award Management (SAM) registration and demonstrate Indian Economic Enterprise status through documentation of 51% Indian ownership, majority of contract earnings to Indians/tribes, and Indian-controlled management with requisite technical capabilities. The Contracting Officer is Taylor Kanthack at taylor.kanthack@ihs.gov.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING SERVICES
Solicitation Number: 75H701-26-R-00022 Belcourt Heat Exchange Replacement and Boiler System Repairs
SITE VISIT: SITE VISIT: 29 April 2026 at 11:00AM CT (L.6.) unless changed by Amendment
PROPOSAL DUE DATE:21 May 2026 at 2:00PM PST, unless changed by Amendment Proposals must set forth full, accurate, and complete information as required by this request for proposal (including Gres). The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
Table of Contents Proposals must set forth full, accurate, and complete information as required by this request for proposal (including Gres). The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION E – INSPECTION AND ACCEPTANCE
SECTION F – DELIVERIES OR PERFORMANCE
SECTION G – CONTRACT ADMINISTRATION DATA
SECTION H – SPECIAL CONTRACT REQUIREMENTS
SECTION I – CONTRACT CLAUSES
SECTION J – LIST OF ATTACHMENTS
SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
SECTION L – INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS
SECTION M – EVALUATION FACTORS FOR AWARD
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
75H70126R00022
Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
Project: Belcourt Heat Exchange Replacement and Boiler System Repairs
Project No: GP25TM401H06
See Section L for Proposal Submittal Instructions and Site Visit Information.
This project will be procured as a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside under North American Industry Classification System (NAICS) code 236220, Commercial and Institutional Building Construction. The associated size standard for this procurement is $45 million.
CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $500,000 and $1,000,000.
Indian Health Service Division of Engineering Services (DES) - Seattle Attn: Taylor Kanthack 701 5th Ave Seattle, WA 98104
Taylor Kanthack taylor.kanthack@ihs.gov 240-478-1501 see box 10
1 5504/16/2026
5/21/2026
2:00PM PT
10 Days after award
Section F
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
B.3
Indian Health Service, DES - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104
IHS Great Plains Area Office 115 4th Ave SE, Room 309 Aberdeen, SD 57401
Solicitation 75H701-26-R-00022 Belcourt Heat Exchange Replacement and Boiler System Repairs
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
IMPORTANT INFORMATION:
Under no circumstances will any oral statements made be binding upon the Government unless such statements or agreements are issued in writing by the Contracting Officer.
Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed within the change and shall immediately notify the Contracting Officer.
B.1. PRICE SCHEDULE
CLINs Item/Task Description Lump Sum Price
Contractor shall provide furnish all labor, equipment, materials, supplies, supervision, tools, permits, transportation, quality control, personal protective equipment (PPE), coordination with Authorities Having Jurisdiction (AHJ), construction permits, incidental design, travel and insurance and associated expenses necessary and incidentals in order to perform the Heat Exchanger Replacement & Boiler System Repairs, in accordance with the attached specifications, drawings and other attachments.
NOTES:
As a reminder, all offerors are responsible for allowing for all applicable state, local taxes and fees within their bids and to perform their own due diligence in ascertaining them. The Contractor is responsible to pay all applicable taxes, or applicable requirements that may be incurred as a result of this project.
Failure on the part of the successful Offeror not to include these fees or the appropriate impacts will not constitute a request for an equitable adjustment to the contract price.
B.2. Incidental Payment Items: The intent of the contract is to provide for the complete work of the project described in the contract. Unless otherwise provided, the contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, taxes and fees required to complete the project in accordance with the attached drawings, specifications, and provisions of the contract.
Payment for contract work will be made for and under those pay items included in the Schedule of Items (which is one lump sum price for the contract). All other work and materials will be considered as incidental to and included in the payment for items shown.
B.3. SF1442, Block 24: Submit invoices in accordance with Section I, HHSAR 352.232‐71, Electronic Submission of Payment Requests and Section G, G.4 through G.6.
B.4. Pricing Data Submission: In accordance with FAR 15.403-3(a)(ii), Requiring Data Other Than Certified Cost or Pricing Data, it may be requested that pricing data be submitted to show the breakdown of costs for the above price schedule. This may be requested so that the determination of a fair and reasonable price can be made by the Contracting Officer. For example, the price breakdown shall have the direct labor cost and the direct material cost broken out.
B.5. Wage Determination: Construction wages shall be paid for all applicable labor categories for each price schedule line item and shall be included in all pricing in accordance with FAR 52.222-6, Construction Wage Rate Requirements. The applicable Wage Determination is included in Section J, Attachment J02.
END OF SECTION
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
STATEMENT OF WORK
Heat Exchanger Replacement & Boiler System Repairs
Belcourt Service Unit
Belcourt, North Dakota
1. Project Description (BASE BID) A. Title: Heat Exchanger Replacement & Boiler System Repairs
B. Location: This project is at the Quentin N. Burdick Memorial Health Facility, in Belcourt, ND.
C. Period of Performance: 180 calendar days from notice to proceed.
D. Description: The project defined within this scope of work will cover the following: replacement of the hospital’s two domestic water heating systems; replacement of boiler system isolation valves; replacement of boiler pump’s triple duty valves, pressure gauges, thermometers, etc;
laser align and grout in pumps; replace gate valves and site glasses on boiler expansion tanks;
replace boiler and breaching flue gaskets; replace boiler burners; and upgrade and replace controls on boiler room make up air unit and exhaust fan. The new hot water heating systems shall be designed and sized by a mechanical engineer licensed in the state of North Dakota.
E. Background: The boiler plant at the Quentin N Burdick is an aging system with numerous system issues. The condition of the system is a risk to the operation of the boiler plant and the facility it serves. This project will remedy the various issues and increase the lifespan of the boiler plant.
F. Related Documents
This SOW and any other standard government or IHS documents are included and considered a part of this contract
1. This SOW and any other standard government or IHS documents are included and considered a part of this contract.
2. IHS Architecture and Engineering Design Manual – 2025
3. FGI 2022 – Healthcare Facility Design Guide
4. NFPA 101 Life Safety Code – 2012
5. NFPA 99 Healthcare Facilities Code – 2012
6. NFPA 70 National Electric Code (NEC)
7. NFPA 99 Healthcare Facilities Codebook, 2012
8. International Mechanical Code – 2024
9. International Plumbing Code – 2024
G. Common Acronyms or Definitions
1. IHS – Indian Health Service
2. CMS – Centers for Medicare & Medicaid Services
3. BAS – Building Automation System
4. Metasys – Name of the existing BAS
5. CO – Contracting Officer
6. COR – Contracting Officer’s Representative
7. PM – Project Manager
8. IGCE – Independent Government Cost Estimate
9. BIM – Building Information Model
10. LOD – Level of Design
11. CAD – Computer Aided Design
2. Scope of Work (SOW) The scope of this project includes all design, demo, new installation, and clean up for installation of the products described below.
The contractor shall provide all engineering, design, material, labor, equipment and supervision required to accomplish the following:
A. Scope of Design: A professional engineer licensed in the state of North Dakota shall provide stamped design sheets and equipment selection for the installation of two separate domestic water heating systems. Additionally, two new burners shall be selected to replace the existing burners for the hot water boilers.
1) Boiler Room Primary Domestic Water Heating System: A domestic water heating system shall be selected that meets the criteria below. This system will serve as a primary heating system and will be in Mechanical Room C012. See design sheets for further details.
i. Utilizes both the hot water boilers and the steam generator as heating sources. Utilizes available capacity of hot boiler water and steam.
1. Available Hot Water Capacity – 870,000 Btu/h @165F.
2. Available Steam Capacity – 573 lb/hr @ 8 psi.
ii. Provides sufficient hot water storage to meet changes in demand. Hot water storage shall be a minimum of 600 gallons.
iii. Maintains a water storage temperature of 140 F.
iv. Utilizes a master mixing valve to deliver 140 F and 125 F water temperatures to the corresponding domestic hot water loops.
v. Control and monitoring connected to existing building automation system
1. Supply and return temperature monitoring
2. Flow monitoring, GPM
2) Desing Submission Requirements:
i. Table 1. Milestones and Deliverables Schedule
No Item Duration Period
1 Design Contract Award 0 Date contract awarded
10 65% Construction Documents Submittal 14 days after previous milestone
11 Government Review 7 days after previous milestone
12 95% Construction Documents Submittal 14 days after previous milestone
13 Government Review 7 days after previous milestone
14 Final Construction Documents Submittal 10 days after previous milestone TOTAL DESIGN DURATION 52 days
ii. Table 2. Design Review Meeting Locations
No Item Location
1 Pre-Design Investigation Belcourt, ND
2 65% Schematic Review Meeting Conference Call
5 100% Final Construction Documents Conference Call
iii. Coordination: The AE shall coordinate with the IHS project engineer and IHS hospital staff.
iv. Submittal Checklist.
1. Design Schedule
2. 65% Construction Documents Submittal
3. 95% Construction Documents Submittal
4. Final Construction Documents Submittal
B. Demolition: The Design Builder shall remove and properly dispose of the existing heat exchanger, valves, and piping necessary to complete the work indicated in the design-builders water heater design and attached design sheets for boiler repairs.
C. Construction: The design-builder shall install the new primary domestic water heating system, backup domestic water heater, and boiler burners per the submitted design. The additional installation described below shall be according to this scope of work and included IHS design sheets.
1) Boiler Isolation Valves: See IHS design sheets for valve locations and details.
i. Motorized Butterfly Valves: The contractor shall install new DDC butterfly valves as described below.
1. Comply with MSS-SP-67
2. End connection: Grooved
3. Pressure Rating: CWP 175 PSI minimum
4. Body Material: Coated ductile iron
5. Stem Material: Stainless steel
6. Disc Material: Stainless steel
7. Disc Seal: EPDM
8. Manufacturer: Victaulic or approved equal
ii. Manual Butterfly Valves: The contractor shall install new manual butterfly valves as described below
1. Comply with MSS-SP-67
2. End Connection: Grooved
3. Pressure Rating: CWP 175 PSI minimum
4. Temperature Rating: 180 F minimum
5. Body Material: Coated ductile iron
6. Stem Material: Stainless steel
7. Disc Material: Stainless steel
8. Disc Seal: EPDM
9. Manufacturer: Victaulic or approved equal
iii. Manual Gate Valves: The contractor shall install new manual gate valves as described below
1. Comply with MSS-SP-70
2. End Connection: Flanged
3. Pressure Rating: CWP 175 PSI minimum
4. Temperature Rating: 180F minimum
5. Body Material: Coated ductile iron
6. Stem Material: Stainless steel
7. Manufacturer: Watts, Milwaukee, Apollo, NIBCO or approved equal
2) Hydronic Hot Water Pumps Upgrades: See IHS design sheets for locations and details
i. Balancing Valve: The contractor shall install new calibrated balancing valves are described below
1. End Connection: Flanged
2. Pressure Rating: CWP 175 PSI minimum
3. Temperature Rating: 180F minimum
4. Body Material: Ductile Iron/Cast Iron
5. Stem Material: Stainless steel
6. Seal Ring: EPDM
7. Manufacturer: Bell & Gossett or approved equal
ii. Flexible Pump Connections: The contractor shall install new flexible pump connectors as described below
1. End Connection: Flanged
2. Pressure Rating: CWP 175 PSI minimum
3. Temperature Rating: 180F minimum
4. Body Material: Stainless steel
5. Manufacturer: Metraflex or approved equal
iii. Non-Slam Check Valve: The contractor shall install new non-slam check valves as described below
1. End Connection: Flanged
2. Pressure Rating: CWP 175 PSI minimum
3. Temperature Rating: 180F minimum
4. Body Material: Ductile Iron/Cast Iron
5. Manufacturer: Watts, Milwaukee, Apollo, NIBCO or approved equal
iv. Strainer: The contractor shall install a new wye-patterned strainer as described below. A drain connection shall be furnished with a closure plug.
1. End Connection: Flanged
2. Pressure Rating: CWP 175 PSI minimum
3. Temperature Rating: 180F minimum
4. Body Material: Ductile Iron/Cast Iron
5. Screen Material: Stainless steel
6. Manufacturer: Watts or approved equal
v. 3-Way Mixing Valve: The contractor shall install a new three-way mixing valves as described below. The three-way mixing valve shall be connected to the Metasys building automation system for monitoring and control.
1. End Connection: Flanged
2. Pressure Rating: CWP 175 PSI minimum
3. Temperature Rating: 180F minimum
4. Body Material: Ductile Iron/Cast Iron
5. Seal Material: EPDM
6. Manufacturer: Powers or approved equal
vi. Pressure Gauge: The contractor shall install new dry-type pressure gauges.
vii. Laser Aligning: The contractor shall laser align the pumps and drivers in accordance with manufacturer’s recommendations. Provide before and after alignment data to project engineer for alignment verification. Laser align prior to grouting. The contractor shall laser align the 6 pumps indicated in the IHS plan sheets.
viii. Grouting: The contractor shall verify pump base is level and grout space between pump base and concrete pad with non-shrink grout.
3) Hot Water Boiler Expansion Tanks: The contractor shall replace existing boiler expansion tank sight glasses, drain valves, and manual air bleeding valve with equivalent. See IHS design sheet for location and details.
4) Boiler Flue Gaskets & Remediation: The contractor shall replace the existing boiler flue gaskets with new equivalent. Location is indicated on IHS plan sheets.
i. Asbestos Testing & Remediation: Test existing gasketing material for asbestos containing material. If asbestos is detected engage a licensed asbestos abatement contractor for removal in accordance with OSHA Standard 1910.1001– 29 CFR 1910 Subpart Z.
ii. Removal & Replacement: The contractor shall disconnect flue section or breeching as required for access to existing gaskets. Remove existing gaskets and clean all surfaces to bare metal without damage to flanges. Supply and install new high-temperature fuel-oil compatible gaskets. Install according to manufacturer’s specifications.
5) Relief Air Damper: The contractor shall install a new low-leakage, galvanized steel control damper to match the existing duct dimensions. Additionally, the contractor shall install new linkage and a ddc damper actuator sized for the torque requirements of the installed damper. The new actuator shall be connected to the existing Metasys building automation system for monitoring and control.
6) Pipe Insulation: All new piping shall be installed with ½” fiberglass piping insulation.
7) Pipe Markers: The contractor shall install new pipe markers on all boiler piping and domestic water piping in mechanical room C011 & C012. Pipe markers shall be installed a minimum of every 50 feet on straight runs, at both sides of wall penetrations, and at each valve, branch or change in direction. Pipe markers shall be snap-around type and compliant with ANSI/ASME A13.1 Standards. Coordinate specific locations & wording on-site with project engineer.
8) Controls & BAS: The contractor shall provide the following for control and monitoring of the new and existing systems.
i. Motorized Valves: DDC controlled isolation valves shall be added to the existing METASYS building automation system and included in the existing graphics.
ii. 3-way Valves: New 3-way valves shall be added to the existing METASYS building automation system and included in the existing graphics. The existing 3-way valves are currently connected to the existing BAS, new valves shall utilize the existing wire.
iii. Boiler Water Temperature: The nine (9) existing boiler water supply and return temperature sensors shall be recalibrated, and verification shall be provided that they are reading the correct temperature.
iv. Boiler Water Pressure Sensors: Two (2) new pressure sensors shall be installed.
One on the main boiler water supply line and one on the main boiler water return line.
v. Pump pressure sensors: Six (6) new differential pressure sensors on pump suction and discharge piping. Utilize existing ¼” tubing. Add to the existing METASYS building automation system and include in the existing graphics.
D. Commissioning: The Design Builder shall commission the system upon completion of the construction by a Certified Commissioning Professional (CCP) or a Certified Commissioning Authority (CxA). The systems in the building will be operated in their different modes of operation to ensure the facility operates properly as a whole. This testing provides both Owner with documentation that the building was operating properly at turnover. The commissioning will ensure the installed steam boiler meets the needs required by the facility. The Commissioning Authority shall schedule and direct the testing once all construction checklists have been completed by the Commissioning Authority. The Commissioning Authority will provide all participating parties, including the project officer, with a performance test plan in advance of scheduled testing. Skilled technicians shall be provided by the appropriate contractor familiar with the system and building to execute the functional performance testing of the control system and perform functional performance testing of the equipment. The Design Builder shall assign representatives with expertise and authority to act on their behalf and shall schedule them to participate in and perform commissioning process activities including, but not limited to, the following:
a. Evaluate performance deficiencies identified in test reports and, in collaboration with entity responsible for system and equipment installation, recommend corrective action.
b. Cooperate with the Commissioning Authority for resolution of issues recorded in the Issues Log.
c. Integrate and coordinate commissioning process activities with construction schedule.
d. Review and accept construction checklists provided by the Commissioning Authority.
e. Complete construction checklists as work is completed and provide them to the Commissioning Authority as requested.
f. Review and accept commissioning process test procedures provided by the Commissioning Authority.
g. Complete commissioning process test procedures and correct all note deficiencies identified by the Commissioning Authority.
B. Owner’s Training: The design-builder shall host an on-site training meeting to train facility maintenance staff on the proper operation and maintenance of the heat exchanger system. The training shall cover manufacturers’ recommended maintenance procedures and manufacturer’s recommended operating procedure required for the full operation of the steam boiler system.
E. Warranty: Provide a 1-year labor and material warranty at no additional cost to the government which provides for the repair of all work and equipment that was provided under this scope of work.
F. Clean Up: Jobsite shall be cleaned daily and must comply with the Infection Control & Safety Officer’s requirements given with the ICRA and PRCA. The construction areas involved shall be free of any debris, rubbish and left-over material scraps upon completion of the project. Trash receptacles used for the collection of this debris and their removal from the project site shall be provided by the contractor. The site will be inspected by the engineer prior to final payment to ensure the sites return to their original condition prior to construction.
G. Site Restoration: The construction site shall be free of any materials, debris and/or rubbish. The contractor will be responsible for the removal of this debris and must restore the site to its original condition as approved by the project engineer. Photos are to be taken before construction begins for documentation of the site’s original condition by the contractor.
H. Additional Facility Requirements: Contractor shall comply with the requirements of the hospital’s Facility Manager, Infection Control Officer and Safety Officer. These requirements will be laid out during the pre-construction meeting. Other permits and requirements will be given after the pre-construction meeting and the ICRA and PRCA assessments are completed.
4. Period of Performance.
A. Time of the Essence: All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
B. The Work will be substantially completed within one hundred and eighty (180) calendar days after notice to proceed.
5. Submittals A. Submittals or shop drawings shall be submitted for the following items and shall be delivered electronically to the COR or designated PM for final approval before ordering any new material or equipment.
1. Design drawings and specifications
2. Non-shrink grout
3. Boiler flue gaskets
4. Relief air damper
5. Pressure gauges
6. Sight glasses
7. Pipe Markers
8. Pipe Insulation
9. Boiler Valves
(a) Motorized butterfly valves
(b) Manual butterfly valves
(c) Manual gate valves
(d) Balancing valves
(e) Flexible pump connections
(f) Non-slam check valves
(g) Strainers
(h) 3-way mixing valves
6. Schedule/Meetings A. The general contractor shall submit a detailed schedule to the COR for approval within (30) calendar days of the award.
B. Pre-Construction Meeting: One Pre-Construction meeting shall be conducted prior to the start of the construction of the contract.
C. Progress Meetings: Progress meetings shall be conducted at regular intervals as merited by the progress of the work.
D. Substantial Completion: One substantial completion meeting shall be held following notification of the Project Officer by the General Contractor that the project is Substantially Complete.
E. Final Completion: One final completion meeting shall be held following determination that the project is complete.
7. Miscellaneous A. Security Requirements.
1. All contractors are required to check in with the facility manager/maintenance staff before commencing work on any project.
2. The contractor will be responsible for the security of the work site. The hospital and the Indian Health Service staff shall not be responsible for the security of the contractor’s tools, equipment, or material during the project.
B. Protection of Government Property. The contractor shall protect all Government property against damage, to include but not limited to dust, fumes, impact, scratching, water, paint, joint compound, power failure, power surges, weather, heavy equipment, etc.
1. All damage caused by the contractor, whether to equipment, roads, landscaping, building components or any other type of Government property encountered at or near the project site shall be repaired or replaced to match the existing and to the satisfaction of the Project Officer at no cost to the Government.
2. The Contractor assumes responsibility for all damage and/or injury to persons or property resulting from any action of prime contractor and subcontractor employees (at any tier).
3. The Contractor, at the Contractor’s expense, shall maintain adequate public liability and property damage insurance during the continuance of this contract, insuring the Contractor against all claims for injury or damage.
4. The Contractor shall maintain Workers’ Compensation and other legally required insurance with respect to the Contractor’s own employees and agents.
5. The Government shall in no event be liable or responsible for damage or injury to any person or property occasioned through the use, maintenance, or operation of any vehicle or other equipment by, or the action of, the Contractor or the Contractor’s employees and agents in performing under this contract, and the Government shall be indemnified and held harmless against claims for damage or injury in such cases.
C. Occupancy of Government Facilities. The contractor shall be responsible for properly informing the COR of any condition which would jeopardize the building or its contents, such as loss of heat, air conditioning, danger of pipes freezing, loss of electrical power, water, sewer or loss of building security.
D. Correspondence. All correspondence shall be addressed to the COR. Each letter, document, etc., shall contain the following information:
1. Date
2. Project Numbers, Contract Number, Delivery Order Number and Service Unit Name/Location.
3. Name of those who were sent copies.
E. Superintendent. The prime contractor shall have an onsite superintendent for this project while all work is being performed unless prior approval is granted by the COR.
F. TERO/EPA. The contractor is required to acquire and maintain a tribal business license before any work commences. The contractor shall comply with the Tribal Employment Rights Ordinance (TERO) and pay TERO and EPA fees.
G. Construction Materials and Storage
1. All materials shall be stored and handled according to the manufacturers’ recommendations.
2. All materials shall be submitted to the COR prior to ordering, for approval by the project engineer.
3. The contractor(s) shall be present and on site to receive all construction material, equipment, or products. IHS staff will not be present, responsible, nor receive, or provide any type of offloading equipment for construction materials, products, or equipment. It is solely the contractor(s) responsibility to properly receive all construction equipment, products, and materials on site.
4. The contractor(s) shall provide their own means of storing all construction materials, products, or equipment required for installation. IHS staff will not be responsible or provide any means of storing construction material, products, or equipment before or during construction. All material, products, or equipment remain the contractor(s) property until the project has been deemed substantially completed by all parties.
H. Hours Of Operation
1. The project shall start after award.
2. The work hours shall be 8:00am – 5:00pm, Monday – Friday. Weekends and after-hours work may be available upon request.
8. Payments to the Contractor A. The Government will pay the Contractor a fixed price, as indicated below, which will constitute full compensation for all Contractor professional and incidental services, travel expenses, and materials necessary to furnish complete project as required and specified in this SOW.
B. Progress payments will be paid following acceptance by the Government of that schedule item and a properly submitted and approved invoice.
9. Project Officer Will be provided at time of award.
10. Invoice Format The Contractor is responsible for submitting payments through government’s electronic invoicing system (IPP).
The IPP website address is: https://www.ipp.gov
Upon reaching 100% completion of the entire contract, submission of the final invoice must be accompanied by Final Claims Release before payment can be approved. Failure to provide the proper information may cause the invoice to be returned or delayed.
11. Closeout Documents The Contractor shall submit one hard copy set of all final, installed submittal items, accessories, and all installation/operation/maintenance documents to the facility manager/engineer. The final installed submittal package and O&M shall also be sent electronically to the COR and/or PM.
SECTION D – PACKAGING AND MARKING
D.1. PACKAGING AND MARKING
(a) All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Indian Health Service. Preservation, packaging and packing shall be in accordance with industry standard packaging appropriate for the item(s) involved. The Indian Health Service is not responsible in any manner for deliveries intended for the project that are not generated by the Indian Health Service.
(b) Equipment and materials provided by the Contractor shall be new and, where appropriate, shall arrive on-site sealed in original manufacturer’s containers. The Government reserves the right to refuse any items deemed to not meet this requirement.
(c) Material shall be stored in an enclosed and dry area protected from damage and soiling. The contractor shall coordinate a suitable storage area with the Facility Manager.
SECTION E – INSPECTION AND ACCEPTANCE
E.1. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(s):
https://www.acquisition.gov/far/ (End of clause)
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
Number Title Date 52.246-12 Inspection of Construction Aug 1996
E.2. INSPECTION OF SITE
https://www.acquisition.gov/far/
(a) The Contractor shall be responsible for the complete coordination and proper relation of the work of all trades.
(b) No allowances or extra construction on behalf of any Contractor will be permitted subsequently by reason of error or oversight on the part of any sub-contractor at any tier, or on account of interferences by the activities of the owner or others unless permissible in accordance with FAR 52.246-12, Inspection of Construction.
(c) All dimensions shown on government provided drawings are based on “as-built” record drawings and, to the extent possible, accurately represent existing conditions; however, there may be some variance between existing conditions and contract drawings. The Contractor is responsible for verifying all dimensions and for reporting to the CO any discrepancies that may affect performance of the work represented by contract drawings and specifications.
E.3. INSPECTION AND ACCEPTANCE
All work under this contract is subject to inspection and final acceptance by the Contracting Officer or the duly authorized representative of the government. The Government’s Contracting Officer’s Representative (COR) is a duly authorized representative of the government and is responsible for inspection and acceptance of all items to be delivered under this contract.
The Government reserves the right to inspect all aspects of work performed, including hiring a third party inspector to verify proper installation and operation. Contractor is required to demonstrate full and complete operation of all work performed. Final acceptance will be based on an acceptable final inspection.
(a) Substantial Completion Inspection
(1) Substantial completion is the date when the work is sufficiently complete, in accordance with the contract documents, ready for beneficial occupancy or the designated portion thereof, for the use for which it is intended.
(2) The Government at this point will conduct an inspection for the development of punch list items in preparation for final inspection.
(3) The substantial completion inspection should be at least 15 days prior to the contractual completion date and the date of final inspection. The Contractor is to notify the CO at least 10 days in advance to schedule the substantial completion inspection.
(4) If at the time of the substantial completion inspection the Government finds that the Contractor will not have the project complete at the contract completion date, the CO will withhold 10% of any progress payment due the Contractor. These funds will be used to off-set any liquidated or actual damages assessed against the Contractor. Remaining funds will be released upon final inspection, and completion of the contract.
(b) Final Inspection
(1) Final Inspection completion date is the date established in the contract when the project is to be fully complete and is ready to turn over to the Government. When the Contractor is ready for final inspection, he shall request so in writing to the Contracting Officer and his duly authorized representative (COR) at least 5 days prior to the desired date.
(2) This includes final clean-up of the site, removal of all trailers, construction signs and debris removed, all punch list items resolved, Government’s manuals turned over, all as built drawings completed and turned over to the Government.
(3) All contract items, including any punch-list items, and final clean-up of the project site shall be totally complete on the day and at the time the final inspection is scheduled. Any discrepancies noted at the final inspection shall be corrected by the Contractor within the time specified by the Contracting Officer.
(4) Failure on the part of the Contractor to have the project ready for final inspection may result in assessment of damages as specified in the contract.
(5) Final inspection and acceptance of the work will be by the CO or an authorized representative appointed in writing.
SECTION F – DELIVERIES OR PERFORMANCE
F.1. 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(s):
https://www.acquisition.gov/far/ (End of clause)
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
Number Title Date 52.236-15 Schedules For Construction Contracts (DEVIATION) (RFO Aug
2025) Apr 1984
52.242-14 Suspension of Work Apr 1984
F.2 PERIOD OF PERFORMANCE
The Contractor shall be required to commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, prosecute the work diligently, and complete the entire work ready for use not later than 180 calendar days after the date the contractor receives the Notice to Proceed (NTP). The time stated for completion shall include final cleanup of the premises.
END OF SECTION
SECTION G – CONTRACT ADMINISTRATION DATA
G.1. CONTRACTING OFFICER
The Contracting Officer (CO) is the individual appointed with the authority to enter into, obligate funds, administer and make related determinations pertaining to the contract on behalf of the federal Government. The Contracting Officer must sign all contractual documents, including contract modifications, and approve payment requests. The Contracting Officer is the only individual authorized to make changes to the contract.
G.2. CONTRACTING OFFICER’S REPRESENTATIVE (COR)
(a) Contracting Officer's Representatives (COR), may be appointed for the purpose of representing the Contracting Officer and assuring compliance with the contract requirements.
https://www.acquisition.gov/far/
(b) The COR does NOT have the authority to alter the Contractor’s obligations under the contract; direct changes that fall within the purview of the “Changes” clause of the contract; or modify any of the terms, conditions, specifications, or cost of the contract.
(c) The COR may approve minor field changes which do not affect the scope, period of performance and/or price of the contract. The COR is authorized to issue notices regarding noncompliance of contract requirements, and to stop work on any portion of the job if the Contractor's methods cause unsafe conditions or will result in noncompliant work which would be impracticable to correct or to replace while permitting other (conforming) portions of the work to continue. Issuance of a Notice of Noncompliance as described herein does not constitute a suspension of work as described in FAR Clause 52.242-14, Suspension of Work (April 1984).
(d) The COR is appointed in writing and the contractor will receive a copy of the appointment letter.
G.3. ADDRESS FOR CORRESPONDENCE
(a) It is the intent of the Government to use electronic means as much as possible while administering this contract.
(b) Most correspondence should be sent via e-mail directly to the Administrative CO and COR. Include the Contract Number on all correspondence. If sending documents via postal mail, include the Contract Number on all correspondence. Overnight Mail and U.S. Mail shall be sent to the CO, unless otherwise specified, at the following address:
Indian Health Service (IHS) – Division of Engineering Services - Seattle Attn: Taylor Kanthack 701 5th Ave, Suite 1650 Seattle, WA 98104
G.4. PAYMENT PROCESS
(a) FAR 52.232-5, Payments Under Fixed -Price Construction Contracts, requires that before the first progress payment under the contract is submitted, the contractor shall prepare a Schedule of Values including each principal category of the work which when added together equal the total contract price. A sample format is available from the Contracting Officer. The following is the detail required by the Contracting Officer:
(1) The principle categories of work shall be broken into line items of sufficient detail to allow meaningful measurement of the work on a monthly basis as determined by the COR. Units of measure appropriate to the type of work shall be used. “Lump sum” pricing of line items shall be avoided except where payment for that line item is to be requested based on 100% completion of that line item or where there is no other practical unit of measure.
(2) The cost of preparatory work (e.g., shop drawings or product submittals), field and home office overhead, profit, insurance, taxes, warranties, as-built drawings, etc., shall be pro-rated into items of physical work and not listed as separate line items. Cost of Performance and Payment Bonds may be listed as a single line item and not pro-rated. Also, cost of mobilization and demobilization relating to transportation or installation costs associated with such items as site trailers, heavy equipment, temporary batch plants, temporary on-site manufacturing and assembly facilities, temporary on-site quarter’s facilities, temporary sanitation facilities, temporary utility connections, and/or temporary secured storage facilities may be listed as line items and not pro-rated. If mobilization is listed separately, a line item for demobilization must be listed separately. A detailed listing of the items included and the individual cost for each item shall be provided in support of proposed amounts for mobilization and demobilization.
(b) Material stored on site may be included in earned progress if the Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform in contract.
(c) The following are instructions for submitting pay requests:
(1) Requests are to be submitted with signature for the Contractor certification statement (scanned signature okay) to the Contracting Officer. Use of a format that complies with all of the requirements of the “Payments” clause of the contract is mandatory. The “Contractor Payment Application” form will be provided at the Pre-Construction meeting.
(2) The Contractor is responsible for delivery of each request for payment electronically using the Department of Treasury Invoice Processing Platform (IPP) www.ipp.gov or successor system.
(3) If the contractor wishes to inquire concerning the status of any pay request, the contractor should contact the Contracting Officer.
(4) A completed Release of Claims that complies with the requirements of the “Payments” clause must be submitted with the request for final payment. A sample format is available from the Contracting Officer.
(d) The final payment request will be rejected and returned to the contractor if all items required under the contract have not been completed, submitted, approved, and accepted prior to the receipt of the request; e.g., deficient work items, as-built, payrolls, reports, O&M manuals, warranties, delivery of extra stock material, etc.
G.5. PAYMENT FOR MATERIALS STORED ON SITE
(a) This clause supplements, but does not replace, FAR 52.232-5 Payments Under Fixed-Price Construction Contracts, with regard to material payments.
(b) Consideration for payment under this contract for materials stored on site is subject to the following conditions:
(1) The contractor shall furnish the contracting officer a list of the major high-cost items to be incorporated into the contract and for which payment, prior to installation, will be requested. Those items approved by the contracting officer will be entered on the Schedule of Values, as a percentage factor, or factors if items are listed individually.
(2) Payment is limited to major high-cost items. Payment of major high-cost items does not include contractor overhead and profit. Costs such as sales tax, freight, handling, pallets, etc., are excluded.
(3) Payment requests shall be consistent with approved material submittals and shall be supported by the following documents:
(i) Certified paid vendor invoices
(ii) Inventory checklists, jointly validated by the contractor, contracting personnel, and/or construction inspector.
(iii) Accepted delivery tickets, if applicable.
(4) All material for which payment is requested shall be delivered to an approved location on-site, and certified that none will be removed without written permission of the contracting officer. Materials may also be stored in a bonded warehouse offsite if no adequate storage space is available on base.
http://www.ipp.gov/
(5) Payments will be made monthly, or at more frequent intervals as determined by the contracting officer.
(6) The contractor shall remain responsible and retain title to the materials until incorporated into the work.
G.6. INVOICE REQUIREMENTS
(a) Invoices shall be prepared, submitted and paid in accordance with the following FAR clauses specified in Section I:
(1) FAR 52.232-5, Payments Under Fixed -Price Construction Contracts (May 2014)
(2) FAR 52.232-27, Prompt Payment for Construction Contracts (Jan 2017)
(3) FAR 52.232-33, Payment by Electronic Funds Transfer-- System for Award Management (Oct
2018)
(4) FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar
2023)
(5) HHSAR 352.232‐71, Electronic Submission of Payment Requests (Feb 2022)
(b) For the first payment, the signed payment invoice shall be sent via e‐mail to the IHS Contracting Officer for validity prior to any submission in the IPP system.
(c) Invoices for payment shall be sent via e‐mail to the Contracting Officer at taylor.kanthack@ihs.gov and the designated Contracting Officer’s Representative (COR). The invoice will then be reviewed and signed by the COR prior to submission to the Contracting Officer for final approval.
(d) Progress payments WILL be authorized for this project.
(e) The final invoice must be marked “Final” and be accompanied by a Release of Claims form, which lists the final payment as outstanding, in the Remarks field. The Release of Claims form is available from the CO. Final payment will be made within 30 calendar days upon receipt of a properly executed invoice.
(f) The contractor will contact the Contracting Officer with any payment issues or concerns.
Note: In accordance with FAR 52.232‐40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ‐‐ Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor. This applies to all small business subcontractors at all tier levels.
G.7. CERTIFICATION OF PAYMENTS - RELEASE OF CLAIM
The Contractor, when submitting final payment under this contract, shall submit to the Contracting Officer:
(a) A certification that the Contractor has made payment from proceeds of prior payments, or that he will make timely payment from the proceeds of the progress or final payment then due him, to any subcontractors and suppliers in accordance with established contractual arrangements; and
(b) A properly executed Contractor's Release. The Release of Claims form is available from the Contracting Officer. Failure to submit this completed release will result in a delay of final payment.
G.8. TIME EXTENSION FOR UNUSUALLY SEVERE WEATHER
mailto:taylor.kanthack@ihs.gov
This paragraph specifies the procedure for the determination of time…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .