This federal contract solicitation seeks construction services for the expansion and renovation of an existing 5,000 square foot building leased from the Monacan Nation to serve as a health clinic. The contractor will provide all labor, materials, equipment, and incidentals necessary to complete the project. The clinic will offer primary care, behavioral health, outpatient pharmacy, optometry, preventive services, patient registration, and other basic healthcare services. The existing structure is constructed of CMU block on a concrete slab foundation and was previously used for warehouse operations. The solicitation does not specify pricing terms, response dates, or other transactional details.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 West 1st Street, Suite 201, Duluth, Minnesota 55802 tel (218) 727-2626 fax (218) 722-7467 dsgw.com DULUTH I TWIN CITIES I VIRGINIA
Specifications
Monacan Health Clinic
Madison Heights, VA
IHS Project #
NS21MA002H7
DSGW Project #
021041.00
June 15th, 2021
VOLUME 2:
DIVISIONS 21 - 33
Attachment J02
21041 - Monacan Health Clinic
IHS # NS21MA002H7
00 01 10 - 1 TABLE OF CONTENTS
SECTION 00 01 10
TABLE OF CONTENTS
MONACAN HEALTH CLINIC
MADISON HEIGHTS, VIRGINIA
VOLUME 1 – DIVISIONS 00 - 12
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 – Project Manual Title and Registration Sheet 00 01 10 – Table of Contents 00 01 15 – Schedule of Drawings 00 31 00 – Available Project Information 00 43 25 – Request for Approval of Substitution
DIVISION 01 -- GENERAL REQUIREMENTS
01 10 00 – Summary 01 30 00 – Administrative Requirements 01 40 00 – Quality Requirements 01 50 00 – Temporary Facilities and Controls 01 60 00 – Product Requirements 01 70 00 – Execution and Closeout Requirements 01 78 00 – Closeout Submittals
DIVISION 02 – EXISTING CONDITIONS
02 41 00 – Demolition
DIVISION 03 – CONCRETE
03 10 00 – Concrete Forming 03 20 00 – Concrete Reinforcing 03 30 00 – Cast in Place Concrete
DIVISION 04 -- MASONRY
04 73 00 – Manufactured Stone Masonry
DIVISION 05 -- METALS
05 12 00 – Structural Steel Framing 05 31 00 – Steel Decking 05 40 00 – Cold Formed Metal Framing 05 50 00 – Metal Fabrications
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 10 00 – Rough Carpentry 06 15 00 – Wood Decking 06 17 53 – Shop Fabricated Wood Trusses 06 18 00 – Glued-Laminated Construction 06 20 00 – Finish Carpentry 06 41 00 – Architectural Wood Casework 06 82 19 – Fiberglass Reinforced Wall Panels
00 01 10 - 2 TABLE OF CONTENTS
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 11 13 – Bituminous Damproofing 07 21 00 – Thermal Insulation 07 25 00 – Weather Barriers 07 31 13 – Asphalt Shingles 07 41 13 – Metal Roof Panels 07 42 13 – Metal Wall Panels 07 46 26 – Engineered Wood Siding 07 46 46 – Fiber Cement Siding 07 53 00 – Elastomeric Membrane Roofing 07 62 00 – Sheet Metal Flashing and Trim 07 84 00 – Firestopping 07 90 05 – Joint Sealers
DIVISION 08 -- OPENINGS
08 11 13 – Hollow Metal Door and Frames 08 14 16 – Flush Wood Doors 08 31 00 – Access Doors and Panels 08 33 23 – Overhead Coiling Doors 08 42 29 – Automatic Entrance Doors 08 43 13 – Aluminum Framed Storefronts 08 52 13 – Aluminum/Wood Composite Windows 08 71 00 – Door Hardware 08 80 00 – Glazing 08 91 00 - Louvers
DIVISION 09 -- FINISHES
09 21 16 – Gypsum Board Assemblies 09 30 00 - Tiling 09 51 00 – Acoustical Ceilings 09 65 00 – Resilient Flooring 09 68 13 – Tile Carpeting 09 72 00 – Wall Coverings 09 90 00 – Painting and Coating
DIVISION 10 -- SPECIALTIES
10 11 01 – Visual Display Boards 10 21 23 - Cubicles 10 26 01 – Handrails and Wall Protection 10 28 00 – Toilet Accessories 10 44 00 – Fire Protection Specialties 10 51 26 – Plastic Lockers 10 73 13 - Awnings 10 73 16 – Canopies
DIVISION 12 -- FURNISHINGS
12 24 13 – Window Shade Systems 12 48 13 – Entrance Floor Mats and Frames
VOLUME 2 – DIVISIONS 21 - 33
DIVISION 21 -- FIRE SUPPRESSION
21 00 01 – Fire Protection Certification 21 10 00 – Water-Based Fire Protection Systems
00 01 10 - 3 TABLE OF CONTENTS
DIVISION 22 -- PLUMBING
22 00 01 – Plumbing Certification 22 00 10 – General Provisions 22 05 00 – Common Work Results for Plumbing 22 05 13 – Common Motor Requirements for Plumbing Equipment 22 05 19 – Meters and Gages for Plumbing Piping 22 05 23 – General-Duty Valves for Plumbing Piping 22 05 29 – Hangers and Supports for Plumbing Piping and Equipment 22 05 53 – Identification for Plumbing Piping and Equipment 22 07 00 – Plumbing Insulation 22 11 16 – Domestic Water Piping 22 11 19 – Domestic Water Piping Specialties 22 11 23 – Domestic Water Pumps 22 11 23.13 – Domestic Water Packaged Booster Pump System 22 13 16 – Sanitary Waste and Vent Piping 22 13 19 – Sanitary Waste Piping Specialties 22 14 13 – Facility Storm Drainage Piping 22 14 23 – Storm Drainage Piping Specialties 22 34 00 – Liquid Propane, Fuel-Fired Domestic-Water Heaters 22 40 00 – Plumbing Fixtures 22 45 00 – Emergency Plumbing Fixtures 22 47 00 – Drinking Fountains and Water Coolers 22 61 13 – Compressed-Air Piping for Dental Facilities 22 62 13 – Vacuum Piping for Dental Facilities
DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 01 – Mechanical Certification 23 00 10 – General Provisions 23 05 00 – Common Work Results for HVAC 23 05 13 – Common Motor Requirements for HVAC Equipment 23 05 16 – Expansion Fittings and Loops for HVAC Piping 23 05 19 – Meters and Gages for HVAC Piping 23 05 23 – General-Duty Valves for HVAC Piping 23 05 29 – Hangers and Supports for HVAC Piping and Equipment 23 05 48 – Vibration Controls for HVAC Piping and Equipment 23 05 53 – Identification for HVAC Piping and Equipment 23 05 93 – Testing, Adjusting, and Balancing for HVAC 23 07 00 – HVAC Insulation 23 08 00 – Commissioning of HVAC 23 09 00 – Instrumentation and Control for HVAC 23 09 93 – Sequence of Operations for HVAC Controls 23 11 16 – Facility Liquified-Petroleum Gas Piping 23 21 13 – Hydronic Piping and Specialties 23 21 23 – Hydronic Pumps 23 31 13 – Metal Ducts 23 33 00 – Air Duct Accessories 23 34 23 – HVAC Power Ventilators 23 36 00 – Air Terminal Units 23 37 13 – Grilles, Registers and Diffusers 23 51 00 – Breechings, Chimneys, and Stacks 23 52 16 – Fire-Tube Condensing Boilers 23 62 00 – Packaged Compressor and Condenser Units 23 73 13 – Modular Central-Station Air-Handling Units 23 81 26 – Split-System Air-Conditioners 23 82 39 – Unit Heaters 23 83 16 – Radiant-Heating Hydronic Piping
00 01 10 - 4 TABLE OF CONTENTS
DIVISION 26 – ELECTRICAL
26 00 01 – Electrical Certification 26 00 10 – General Provisions for Electrical Work 26 00 11 – Electrical Alternates 26 01 00 – Construction Power and Lighting 26 04 00 – Underground Electrical Service 26 04 45 – Electrical Connections to Equipment 26 05 00 – Common Work Results for Electrical 26 05 19 – Low-Voltage Electrical Power Conductors and Cables 26 05 23 – Control-Voltage Electrical Power Cables 26 05 26 – Grounding and Bonding for Electrical Systems 26 05 29 – Hangers and Support for Electrical Systems 26 05 33 – Raceways and Boxes for Electrical Systems 26 05 53 – Identification for Electrical Systems 26 09 24 – Local Low-voltage Lighting Control System 26 09 26 – Relay Based Lighting Control (Network) 26 24 13 – Switchboards 26 24 16 – Panelboards 26 27 26 – Wiring Devices 26 28 13 – Fuses 26 28 16 – Enclosed Switches and Circuit Breakers 26 29 13 – Enclosed Controllers 26 29 23 – Variable-Frequency Motor Controllers 26 51 19 – LED Interior Lighting 26 52 19 – Emergency and Exit Lighting 26 56 19 – LED Exterior Lighting 26 70 00 – Pathways for Communications and Security Systems 26 71 11 – Digital, Addressable Fire-Alarm System
DIVISION 27 – COMMUNICATIONS
27 00 01 – Communications Certification 27 00 10 – General Provisions 27 01 00 – Operation, Maintenance & Warranty 27 05 00 – Common Work Results for Communications 27 05 26 – Grounding for Communications 27 05 28 – Pathways for Communications 27 05 53 – Identification for Communications Systems 27 06 00 – Schedules for Communications 27 08 00 – Testing of Communications Systems 27 10 00 – Structured Cabling Requirements 27 11 00 – Communications Equipment Room Fittings 27 11 13 – Communications Entrance Protection 27 11 16 – Cabinets, Racks, Frames & Enclosures 27 11 19 – Patch Panels 27 11 23 – Cable Management & Ladder Rack 27 11 26 – Rack Mounted Power Protection & Power Strips 27 13 23 – Optical Fiber Back-Bone Cabling 27 15 13 – Copper Horizontal Cabling 27 15 43 – Faceplates & Connectors 27 16 19 – Patch Cords & Cross Connect Wire
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 00 01 – Security Certification 28 00 10 – General Provisions 28 05 28 – Pathways for Electronic Safety and Security 28 23 13 – Video Surveillance Control and Management Systems 28 61 00 – CCTV Cabling System
00 01 10 - 5 TABLE OF CONTENTS
DIVISION 31 -- EARTHWORK
31 22 00 – Grading 31 23 16 – Excavation 31 23 23 – Fill
DIVISION 33 – UTILITIES
33 41 00 - Subdrainage
END OF SECTION
21-031 - Monacan Health Clinic 21 00 01 - 1 FIRE PROTECTION CERTIFICATION
SECTION 21 00 01 – FIRE PROTECTION CERTIFICATION
PART 1 - GENERAL
1.1 FIRE PROTECTION ENGINEER’S CERTIFICATION
A. I hereby certify that Division 21 of this Specification was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Virginia.
B. Name: Jay S. Hruby, PE
C. License Number: 061057
D. Date June 15, 2021
THIS PAGE LEFT BLANK INTENTIONALLY
21-031 - Monacan Health Clinic 21 10 00 - 1 WATER-BASED FIRE
IHS # NS21MA002H7 PROTECTION SYSTEMS
SECTION 21 10 00 - WATER-BASED FIRE PROTECTION SYSTEMS
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following fire protection piping inside the building
1. Wet pipe fire sprinkler system
2. Fire pump, jockey pump and controllers for fire protection water supply where required to comply with NFPA 13.
3. Dry pipe system for combustible attic spaces and main entry canopy where required by
NFPA 13 and authorities having jurisdiction.
B. Fire Protection System Design:
1. The Contract Documents indicate sprinkler design criteria. Fire Protection Design/Build Contractor shall be responsible for laying out sprinkler heads and designing piping systems in accordance with current NFPA publications, governing codes and authorities having jurisdiction, and Owner's insurance underwriters.
2. Design the wet sprinkler system based on requirements indicated in Contract Documents together with flow and pressure characteristics of the available municipal water system.
C. Scope:
1. The fire protection contractor’s work begins at a 6-inch flanged connection in the Fire Pump Room provided as work of other divisions. Coordinate connection location and configuration with site contractor.
2. Project includes a wet pipe fire protection system for the entire building.
3. Project includes a fire pump, jockey pump and pump controllers where required to comply with NFPA 13.
4. Project includes a dry pipe system for combustible attic spaces and main entry canopy where required by NFPA 13 and authorities having jurisdiction.
5. Provide backflow prevention assembly in accordance with NFPA, local plumbing codes and authorities having jurisdiction.
6. Provide dry type fire protection sprinkler heads for entry vestibules, loading docks and similar areas.
D. Related Sections include the following:
1. Division 07 Sections for materials and methods for sealing pipes penetrations through exterior and foundation walls, and fire and smoke barriers.
2. Division 10 Section for cabinets and fire extinguishers.
3. Division 22 Sections for domestic water piping and piping specialties.
4. Division 26 Sections for power supply wiring including disconnects, motor starters, and required electrical devices.
21-031 - Monacan Health Clinic 21 10 00 - 2 WATER-BASED FIRE
5. Division 26 Sections for fire alarm system connections to water flow indicators, pressure switches, supervisory switches, and alarm devices for fire protection systems.
E. Protection Limits:
1. Provide 100 percent coverage for all building areas and as indicated on plans.
2. Sprinkler coverage shall be provided below obstructions as required.
1.3 SYSTEM DESCRIPTIONS
A. Wet Pipe Sprinkler System: Automatic sprinklers are attached to piping containing water that is connected to an automatic water supply. Water discharges immediately from sprinklers when they are opened. Sprinklers open when heat melts the fusible link or destroys frangible device.
1. From the valve assembly, a wet-pipe fire sprinkler system is provided for all affected areas of the facility.
2. Dry pendant or sidewall sprinklers (supplied by wet-pipe sprinkler system) are provided in entry vestibules and canopies as shown on plans. Dry pendant and sidewall sprinklers shall be listed for application. It is the fire protection contractor’s responsibility to acquire necessary approvals from the Owner, Engineer of Record and the Authority Having Jurisdiction.
B. Dry Pipe Sprinkler System: Automatic sprinklers are attached to piping containing compressed air connected to automatic water supply such that water does not enter the piping until loss of air pressure in the piping occurs. Water discharges from sprinklers when they individually activate due to heat.
1. One dry-type valve is located in the fire pump room. One air compressor for dry pipe sprinkler system is provided in the fire pump room. These components are provided by the fire protection contractor.
2. A slope shall be provided as required for dry systems per NFPA 13. All trapped sections of piping shall be provided with auxiliary drains as required by NFPA 13. All drains shall have minimum 1-inch valves with threaded plugs.
1.4 PERFORMANCE REQUIREMENTS
A. System design, installation and components shall be compliant with the Virginia State Building Code, Virginia State Fire Code, all applicable codes/standards referenced by those documents to the National Fire Protection Association (NFPA), and Amherst County, Virginia requirements.
B. Design and obtain approval from Authority Having Jurisdiction (AHJ) for fire protection systems specified. The AHJ includes but may not be restricted to the Amherst County, Virginia Inspections Department and the Amherst County, Public Safety Department.
C. Obtain all required approvals and permits. Permits shall be obtained from the city, municipality and/or state in which the system will be installed. If permits are not issued by the city or municipality, a permit shall be obtained from the State Fire Marshal or State Building Codes and Standards department as applicable.
D. Minimum Pipe Sizes: Pipes shall not be smaller than sizes allowed by NFPA for connection to water supply piping, standpipes, branch lines, etc. to sprinklers.
E. Hydrant Flow Test:
21-031 - Monacan Health Clinic 21 10 00 - 3 WATER-BASED FIRE
1. A hydrant flow test was conducted in May 2021 by the Amherst County Service Authority.
Static pressure was measured at 28 PSI. A measurement of 750 GPM was made at the flowing hydrant on Dixie Airport Road east of the project site. Residual pressure of 24 PSI was measured at the gauge hydrant near the intersection of Dixie Airport Road and Highway 29.
2. Contractor shall verify with the AHJ the acceptability of using the above hydrant test results in the design of the fire protection system for this project. Contractor shall conduct additional hydrant flow tests if required by the AHJ. The results of all hydrant flow tests shall be submitted to the Engineer of Record for review.
F. Standard piping system component working pressure: listed for at least 175 psig.
G. Fire sprinkler system design shall be approved by AHJ and the Engineer of Record.
1. Minimum cushion between water supply and demand: 10 percent or 5 psi, whichever is greater
a. Including losses through water service piping, valves, backflow preventer (where necessary), etc.
b. Calculate to the test fire hydrant, as indicated above.
c. Meet AHJ requirements.
2. Sprinkler occupancy hazard classifications:
a. Refer to NFPA 13
3. Minimum density for fire sprinkler design:
a. Refer to NFPA 13.
4. Seismic design for fire sprinkler systems:
a. Refer to project Structural Plans and Specifications for seismic design category.
b. Seismic design shall be accomplished in accordance with NFPA 13.
5. Meet all requirements of NFPA 13.
1.5 SYMBOLS AND ABBREVIATIONS
A. Refer to symbols and abbreviations on drawings. Other symbols are in common usage, but if uncertainty exists regarding any plan symbols or abbreviations, it shall be brought to the attention of the Engineer, and he shall clarify same by addendum.
B. Where the phrase "Provide -----" occurs; "provide" shall be construed to mean the same as "furnish and install -----."
C. AHJ – Authority Having Jurisdiction.
1.6 SUBMITTALS
A. This is a performance specification for design/build fire protection system(s). Confirmation of design via shop drawings, hydraulic calculations, product submittals, etc. is the sole responsibility of the fire protection design/build contractor. Fire protection shop drawings shall
21-031 - Monacan Health Clinic 21 10 00 - 4 WATER-BASED FIRE be prepared in accordance with all applicable NFPA standards. Submit three sets (each) to AHJ, Owner, Architect, and Engineer for review, comment, and approval. Include necessary hydraulic calculations.
1. Drawings and hydraulic calculations shall be signed by a registered Professional Engineer (PE) indicating that the work was prepared by him/her or under his/her direct supervision. The engineer shall be proficient in fire protection systems design. Where permitted by state and local jurisdictions, fire protection drawings and hydraulic calculations may be prepared by a NICET Level III or IV-certified technician working under the direct supervision of the Professional Engineer,
2. Determine required capacity for fire pump based on hydraulic analysis of the fire protection systems to be provided.
3. Determine size of domestic water supply serving jockey pump.
B. Working plans, drawn to scale showing all items in accordance with NFPA 13 that pertain to the design of the fire protection system.
C. The results of all hydraulic sprinkler and standpipe system calculations.
D. The results of all hydrant flow tests.
E. Product data for the following:
1. Piping materials, including sprinkler specialty fittings.
2. Valves, including listed fire protection valves and specialty valves.
3. Backflow prevention assemblies.
4. Sprinklers, escutcheons, and guards. Include sprinkler flow characteristics, mounting, finish, and other pertinent data.
5. Fire Department Connection, including type; number, size, and arrangement of inlets;
caps and chains; size and direction of outlet; escutcheon and marking; and finish.
6. Alarm devices, including electrical data.
7. Fire pump and jockey pump, where provided, including pump curves, NPSH curve, control diagrams and wiring diagrams.
8. Dry pipe fire protection system air compressor.
F. Field test reports and certificates: Indicate and interpret test results for compliance with performance requirements and as described in NFPA. Include "Contractor's Material and Test Certificate for Aboveground Piping" and "Contractor's Material and Test Certificate for Underground Piping." The “Contractor’s Material and Test Certificate for Underground Piping” form should be acquired by the fire protection contractor from the underground contractor.
G. Hydrostatic tests and field acceptance tests for automatic fire protection system.
H. Field test reports and certificates for fire pump and jockey pump including fire pump flow test.
I. Operation & Maintenance (O&M) Manuals. Provide two copies of O&M Manuals. The O&M Manuals shall include a title page, a table of contents, inspection/testing/maintenance requirements from the Minnesota State Fire Code, an original complete copy of NFPA 25, product data/cut sheets, and emergency service guidance.
J. Record Drawings. Maintain a set of record drawings at the project site. Provide two copies of record drawings to the Owner upon completion of construction.
21-031 - Monacan Health Clinic 21 10 00 - 5 WATER-BASED FIRE
1.7 QUALITY ASSURANCE
A. Designer Qualifications:
1. This is a performance specification for design/build fire protection system(s).
Confirmation of design via shop drawings, hydraulic calculations, product submittals, etc.
is the sole responsibility of the fire protection design/build contractor. Fire protection design/build contractor shall serve as the Engineer of Record for the fire sprinkler system.
B. Installer Qualifications:
1. Installer's responsibilities include designing, fabricating, and installing fire protection systems to assume design and installation responsibility.
C. Welding: Qualify processes and operators according to NFPA and other necessary certifications.
D. NFPA Standards: Fire protection system equipment, specialties, accessories, installation, and testing shall comply with the following:
1. NFPA 13, "Installation of Sprinkler Systems"
2. NFPA 20, "Installation of Stationary Pumps for Fire Protection"
3. NFPA 25 “Inspection, Testing, and Maintenance of Water-Based Fire Protection
Systems”
4. NFPA 72, “National Fire Alarm Code”
5. NFPA 75, “Protection of Information Technology Equipment”
E. Comply with requirements of NFPA for submittals, approvals, materials, installation, inspections, and testing.
F. Comply with all design, installation and testing requirements of sprinkler, specialty valve, backflow prevention assembly, air compressor, fire pump and jockey pump manufacturers.
G. Warranty
1. Furnish one year manufacturer’s warranty for basic fire suppression materials and methods and automatic sprinkler systems.
2. Furnish one year manufacturer’s warranty for fire pump, jockey pump and control apparatus.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Accept fire pumps and components on-site in factory packing. Inspect for damage. Comply with manufacturer’s installation instructions. Protect fire pumps and components from physical damage including effects of weather, water, and construction debris. Furnish temporary, inlet and outlet caps for fire pump and maintain in place until installation.
1.9 COORDINATION
A. Coordinate design and installation of fire protection pipe, sprinklers, fire detection components, etc. with other construction that penetrates ceilings, including light fixtures, speakers, HVAC equipment, and partition assemblies. Coordinate work with all other trades.
21-031 - Monacan Health Clinic 21 10 00 - 6 WATER-BASED FIRE
B. Obtain reproducible plan drawings from HVAC/Sheet-metal Contractor to initiate the coordination process.
C. The Fire Protection Contractor shall forward the Drawings to the Piping Contractor, Plumbing Contractor, HVAC/sheet-metal Contractor and Electrical Contractor for inclusion of their systems work. The Fire Protection contractor shall be responsible for retrieving all drawings from necessary contractors and developing necessary drawings highlighting conflicting areas.
D. Following the completion of these drawings, an onsite coordination meeting shall be convened, and attended by all the above contractors, and the Mechanical and Electrical design Engineers for the purpose of review and coordination. This meeting allows the opportunity for all contractors to resolve coordination issues prior to the fabrication and installation of material.
Coordination meeting shall take place before any work is started. No additional cost to the project will be accepted for any coordination related items if this process is not adhered to.
E. The fire protection contractor is responsible for coordinating with the Architect of Record in regards to various features of the fire protection design, as depicted throughout this specification. Examples include sprinkler types in various areas of the building, Fire Department Connection, hose connections, exterior alarm bell/horn-strobe, etc.
1. The fire protection contractor is responsible for coordinating the routing and installation of any exposed piping with the Architect of Record, prior to fabrication of such piping.
2. In addition, sprinkler layouts for the building shall be submitted to the Architect of Record for review purposes, prior to fabrication of the fire protection components.
1.10 EXTRA MATERIALS
A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Fire Sprinkler Cabinets: Finished, wall-mounting, steel cabinet with hinged cover, with space for minimum of six spare sprinklers and sprinkler wrench. Include number of sprinklers required by NFPA 13 and sprinkler wrench(es). Include separate or additional cabinets with sprinklers and wrench(es) for each type of sprinkler on project.
2. For projects with concealed sprinklers, sprinkler cabinet shall include six sprinkler covers with custom colors. Provide six custom color ceiling covers for each color selection.
1.11 ALTERNATE PROPOSALS
A. Refer to Division 01 Section "Alternates," for the Description of Alternates.
PART 2 - PRODUCTS
2.1 COMPLIANCE
A. All materials and products shall comply with the requirements of NFPA.
2.2 STEEL PIPE AND FITTINGS
A. All steel pipe and fittings shall comply with the requirements of NFPA.
21-031 - Monacan Health Clinic 21 10 00 - 7 WATER-BASED FIRE
B. Plastic/CPVC piping is not allowed.
C. Dry pipe fire protection sprinkler piping shall be Schedule 40.
2.3 SPRINKLER SPECIALTY FITTINGS
A. Sprinkler specialty fittings shall be UL listed, with 175-psig minimum working-pressure rating, and made of materials compatible with piping.
B. All sprinkler specialty fittings shall comply with the requirements of NFPA.
2.4 LISTED FIRE-PROTECTION VALVES
A. Valves shall be UL listed, with 175-psig minimum pressure rating.
B. All fire protection valves shall comply with NFPA, including control valves, indicating valves, butterfly valves, etc.
C. Wall-mounted or free standing Post Indicator Valve (PIV) shall be provided if required by AHJ.
Coordinate type, design, and location of wall PIV with AHJ and Architect of Record.
2.5 BACKFLOW PREVENTION ASSEMBLIES
A. All backflow prevention assemblies shall comply with local plumbing codes, NFPA and authorities having jurisdiction.
B. Water pressure drop associated with backflow prevention assemblies shall be included in hydraulic calculations.
2.6 SPRINKLERS
A. Sprinklers shall be UL-listed, with 175-psig minimum pressure rating.
B. All sprinklers shall comply with the requirements of NFPA.
C. Sprinkler types, features, and options as follows:
1. Quick response; concealed ceiling sprinkler head, including cover plate.
a. Example (or similar): Tyco Series RFII “Royal Flush”; brass head with painted cover plate, self-adjusting. Coordinate paint color with Architect.
2. Quick-response upright or pendent sprinklers.
a. Example (or similar): Tyco TY-FRB chrome-plated, brass, or white-painted.
3. Quick-response, semi-recessed pendent sprinkler, including escutcheon.
a. Example (or similar): Tyco TY-FRB chrome-plated or white-painted head with chrome-plated or white-painted metal escutcheon, self-adjusting.
21-031 - Monacan Health Clinic 21 10 00 - 8 WATER-BASED FIRE
4. Quick-response sidewall sprinklers.
a. Example (or similar): Tyco TY-FRB natural brass, chrome-plated, or white-painted with brass-plated, chrome-plated or white-painted metal escutcheon, self-adjusting.
5. Quick-response concealed sidewall sprinklers including cover plate.
a. Example (or similar): Viking VK408 brass head with painted cover plate, self-adjusting. Coordinate paint color with Architect.
6. Quick-response, dry pendent concealed ceiling sprinklers, including cover plate.
a. Example (or similar): Tyco DS-C rough bronze head with painted cover plate/retainer assembly, self-adjusting. Coordinate paint color with Architect.
7. Quick-response, dry pendent and sidewall sprinklers, including escutcheon.
a. Example (or similar): Tyco TY-DS-1 natural brass, chrome-plated or white-painted head with brass-plated, chrome-plated or white-painted metal escutcheon.
8. Standard-response, extended coverage dry sidewall sprinklers, including escutcheon.
a. Example (or similar): Tyco TY-DS-3 natural brass, chrome-plated or white-painted head with brass-plated, chrome-plated or white-painted metal escutcheon.
9. Quick-response, dry pendent and sidewall sprinklers with flexible connection, including escutcheon.
a. Example (or similar): Victaulic VS1 natural brass, chrome-plated or white-painted head with brass-plated, chrome-plated or white-painted metal escutcheon and stainless steel flex hose with swivel type branch line threaded connection.
10. Specific application attic sprinklers.
a. Example (or similar): Tyco BB, SD, HIP or AP brass.
11. Specific application interstitial combustible concealed space sprinklers.
a. Example (or similar): Globe IC brass.
12. Escutcheon colors shall match sprinklers.
D. Special Coatings: Wax, lead, and corrosion-resistant paint—where necessary to protect sprinkler heads.
E. Sprinkler escutcheons: Materials, types, and finishes for following sprinkler-mounting applications.
1. Ceiling mounting: White-painted steel or chrome, 1-piece, flat, or recessed. Not more than 3-inch diameter and 1/4-inch deep.
2. Sidewall mounting: White-painted steel or chrome, 1-piece, flat. Not more than 3-inch diameter and 1/4-inch deep.
3. Escutcheons shall not extend beyond the plane of the wall or ceiling more than 1/4-inch.
Two-piece telescoping escutcheons are not acceptable.
21-031 - Monacan Health Clinic 21 10 00 - 9 WATER-BASED FIRE
4. Escutcheon color to match sprinkler.
F. Sprinkler guards: Wire-cage type, including fastening device for attaching to exposed sprinklers in mechanical areas, storage areas, IT/data/server rooms and walk-in coolers.
G. Sprinkler Cabinets: Finished steel cabinet and hinged cover.
2.7 SPRINKLER HEAD FLEXIBLE DROP FITTINGS
A. Where acceptable to the AHJ, flexible drop fittings may be used at Contractor’s option to locate sprinklers as required by final finished ceiling tiles and walls. Drop fittings shall consist of a braided type 304 stainless steel flexible tube, zinc plated steel threaded nipple or groove coupling for connection to branch-line piping and a zinc plated steel reducer with a female thread for connection to the sprinkler head. Union joints shall be provided for ease of installation. Flexible drop shall attach to the ceiling grid using a one-piece bracket. The bracket shall allow installation before the ceiling tile is in place.
B. Flexible drop hose and ceiling bracket shall be furnished by the same manufacturer as a complete assembly. Sprinkler flexible drop fittings and bracket assemblies shall be UL listed and FM Approved with 175-psig minimum working-pressure rating and constructed of materials compatible with piping.
C. Sprinkler flexible drop fittings shall comply with the requirements of NFPA.
D. Flexible drop hoses shall be factory-pressure tested to 400 psi.
E. Sprinkler flexible drop fittings and bracket assemblies shall be installed in accordance with the manufacturer’s installation instructions.
2.8 HOSE CONNECTIONS
A. Unless indicated otherwise by Authorities Having Jurisdiction, hose connections are not required for this building.
2.9 FIRE DEPARTMENT CONNECTIONS
A. Fire Department Connection, with 300-psig minimum pressure rating.
B. Fire Department Connection shall be UL-listed and comply with NFPA requirements.
C. Coordinate type and location of Fire Department Connection with AHJ and Architect of Record.
D. Provide permanent signage at Fire Department Connection regarding areas/systems service, pertinent hydraulic data, etc.
E. Fire-Department Connection Configuration:
1. Type: Exposed, projecting, for wall mounting.
2. Pressure Rating: 300 psig minimum.
3. Body Material: Corrosion-resistant metal.
4. Finish: Polished chrome plated.
21-031 - Monacan Health Clinic 21 10 00 - 10 WATER-BASED FIRE
5. Inlets: Brass with threads according to NFPA 1963 and matching local fire-department sizes and threads. Include extension pipe nipples, brass lugged swivel connections, and check devices or clappers.
6. Number of Inlets: Two.
7. Inlet Caps: Brass, lugged type, with gasket and chain.
8. Escutcheon Plate: Round, brass, wall type.
9. Escutcheon Plate Marking: Similar to "AUTO SPKR."
10. Outlet: Back, with pipe threads.
11. Outlet Size: NPS 4.
2.10 ALARM DEVICES
A. Alarm devices shall be UL-listed.
B. Alarm devices shall comply with the requirements of NFPA and the AHJ.
C. Alarm-device types shall match piping and equipment connections.
D. Electrically-operated alarm: An approved exterior horn-strobe device is required, at the discretion of the AHJ and Architect of Record.
E. Water flow indicators: UL 346, electrical-supervision, paddle-operated-type, and water-flow detector with proper pressure rating and designed for horizontal or vertical installation. Include two single-pole, double-throw circuit switches for isolated alarm and auxiliary contacts, 7 A, 125- V ac and 0.25 A, 24-V dc; complete with factory-set, field-adjustable retard element to prevent false signals and tamperproof cover that sends signal if removed.
F. Valve supervisory switches: UL 753, electrical, single-pole, double-throw, switch with normally closed contacts. Include design that signals controlled valve is in other than fully open position.
2.11 PRESSURE GAGES
A. Description: UL 393, 3-1/2- to 4-1/2-inch-diameter, dial pressure gauge with range of 0 to 250-psig minimum.
1. Water System Piping: Include caption "WATER" or "AIR/WATER" on dial face.
2. Air System Piping: Include retard feature and caption "AIR" or "AIR/WATER" on dial face.
2.12 AIR COMPRESSORS
A. Air compressors shall be provided for dry pipe and preaction systems, sized to fill the piping systems within 30 minutes and maintain air pressure on the systems. Air compressor shall be UL 1450 listed for fire protection service. Basis of Design: General Air Products LT tank mounted compressor series.
B. Furnish and install an air maintenance device to regulate pressure in the piping system. Air maintenance device shall be equipped with field adjustable pressure regulator for setting preaction or dry sprinkler system pressure
21-031 - Monacan Health Clinic 21 10 00 - 11 WATER-BASED FIRE
2.13 BYPASS WATER METER
A. A bypass water meter for the fire protection supply line shall be purchased and installed by the fire protection contractor where required by the local water department. If required, the bypass water meter shall be purchased from the local water department.
2.14 FIRE PUMP
A. Fire pumps, where necessary to meet NFPA requirements for the project, shall conform to the following items:
B. Acceptable manufacturers: A-C Fire Pump, Armstrong, Aurora, Fairbanks Morse, Patterson, Peerless.
C. Fire pump shall be of the centrifugal, in-line or base-mounted type specifically designed and constructed for fire protection applications. Fire pump shall be listed for fire protection service by Underwriter's Laboratories, Inc.
D. Pump impeller shall be cast bronze, statically and dynamically balanced and keyed to shaft.
E. Pump motor shall be open drip-proof type with sufficient horsepower to ensure non-overloading throughout the pump capacity range required to serve the connected sprinkler system.
F. Fire pump shall be furnished with the following accessories:
1. Compound suction gauge
2. Discharge pressure gauge
3. Capacity nameplate
4. Casing relief valve
5. Automatic air release
6. Coupling guard conforming to OSHA specifications
7. Eccentric suction reducer and concentric discharge increaser as appropriate to connect with fire protection system piping
G. Fire pump manufacturer shall assume unit responsibility and shall provide the services of a factory trained technician to supervise installation and conduct final field acceptance tests.
2.15 JOCKEY PUMP
A. Jockey pumps, where necessary to meet NFPA requirements for the project, shall conform to the following items:
B. Acceptable manufacturers: A-C Fire Pump, Armstrong, Aurora, Fairbanks Morse, Patterson, Peerless.
C. Provide pressure maintenance jockey pump to make-up the allowable leakage rate in the system. Jockey pump shall be listed for fire protection service by Underwriter's Laboratories, Inc.
D. Jockey pump shall be of the centrifugal or peripheral turbine base-mounted type especially designed and constructed for fire protection applications.
21-031 - Monacan Health Clinic 21 10 00 - 12 WATER-BASED FIRE
E. Jockey pump shall be bronze fitted with flexible coupling between pump and motor. Pump shall use a mechanical rotating type carbon seal. Impeller shall be bronze or stainless steel, balanced and keyed to stainless steel pump shaft. Jockey pump shall be equipped with grease lubricated ball bearings. Provide pump with factory installed pressure relief valve.
F. Jockey pump motor shall be open drip-proof type with sufficient horsepower to ensure non-overloading throughout the capacity range of the pump.
G. Jockey pump base shall be constructed of welded steel and shall be of a size suitable for the pump, motor and shaft. The pump and drive motor shall be mounted on a common fabricated steel base and shall be directly connected through flexible coupling.
H. Jockey pump shall be controlled by a combination magnetic starter operating in conjunction with a pressure switch. The combination starter shall be overload protected and shall include hand/off/auto switch.
2.16 FIRE PUMP AND JOCKEY PUMP CONTROLLERS
A. Fire pump controllers, where necessary to meet NFPA requirements for the project, shall conform to the following items:
B. Acceptable manufacturers: Eaton, Firetrol, Hubbell, Metron.
C. Controller shall be UL listed as a fire pump controller.
D. Controller shall be of the combined manual and automatic type designed for closed transition reduced voltage starting of the fire pump motor.
E. Controller shall be furnished with the following capabilities:
1. Disconnect switch, externally operable
2. Audible and visual alarm with silence switch.
3. Adjustable setpoint pressure switch
4. Motor starter energized automatically through pressure switch or manually by an externally operable handle.
5. Minimum running period timer
6. Automatic transfer switch from normal to emergency power where required by AHJ.
7. Pilot lamps to indicate the following status:
a. Power available
b. Local start
c. Phase failure
d. Phase reversal
e. Pump running
f. Pump on alternate power source
F. Provide remote panel per NFPA 20 to be installed in the fire command center.
1. Panel shall include a remote pump start switch.
2. Panel shall include the following status indicators:
a. Pump running
b. Phase failure
c. Phase reversal
21-031 - Monacan Health Clinic 21 10 00 - 13 WATER-BASED FIRE
d. Loss of line power
e. Pump failure
f. Pump on alternate power source
PART 3 - EXECUTION
3.1 EARTHWORK
A. Earthwork is accomplished as work of other divisions.
3.2 EXAMINATION
A. Examine walls and partitions for suitable thickness, fire- and smoke-rated construction, protection, and other conditions where piping is to be installed.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.3 PIPING APPLICATIONS, GENERAL
A. Shop-weld pipe joints where welded piping is indicated.
B. Do not use welded joints for galvanized-steel pipe.
C. Flanges, flanged fittings, unions, nipples, and transition and special fittings with finish and pressure ratings same as or higher than the systems pressure rating may be used in aboveground applications, unless otherwise indicated.
D. Provide main drain and auxiliary drains as required by NFPA and AHJ. Coordinate with Owner and Engineer of Record.
3.4 SPRINKLER SYSTEM PIPING APPLICATIONS
A. Wet pipe fire sprinkler system, 175-psig maximum working pressure: comply with the requirements of NFPA 13.
B. Painting of exposed sprinkler pipe is not included in this project. Fire protection contractor is responsible for covering sprinklers during painting as work of other divisions, removing covers after painting, and replacing any painted sprinkler heads.
3.5 STANDPIPE SYSTEM PIPING APPLICATIONS
A. Unless indicated otherwise by Authorities Having Jurisdiction, standpipe systems are not required for this building.
3.6 VALVE APPLICATIONS
A. Listed fire protection valves: UL-listed for applications where required by NFPA 13.
21-031 - Monacan Health Clinic 21 10 00 - 14 WATER-BASED FIRE
1. Shutoff duty: Use ball, butterfly, gate valves, and wall PIV.
B. Unlisted general duty valves: For applications where NFPA 13 does not require UL-listed and approved valves.
1. Shutoff duty: Use ball, butterfly, or gate valves.
3.7 JOINT CONSTRUCTION
A. Joint construction shall comply with the requirements of NFPA.
3.8 PIPING INSTALLATION
A. Locations and arrangements of piping installation shall comply with the requirements of NFPA.
B. Piping in areas with ceilings shall be provided above ceilings. Piping in areas without ceilings shall be installed in an exposed condition. Piping in exposed conditions shall be installed with necessary clearances from building operations, utilities, etc. at the discretion of the Owner and Engineer of Record.
C. Use approved fittings to make changes in direction, branch takeoffs from mains, and reductions in pipe sizes.
D. Install flanges or flange adapters on valves, apparatus, and equipment having NPS 2-1/2 and larger connections.
E. Install "Inspector's Test Connections" in sprinkler system piping, complete with shutoff valve, sized and located according to NFPA 13—at the discretion of the AHJ.
F. Install sprinkler piping with drains for complete system drainage.
1. Coordinate drains with Owner, Engineer of Record, and plumbing contractor.
G. Install ball drip valves to drain piping between Fire Department Connection and check valves.
Drain to floor drain or outside building. Coordinate drains with Owner, Engineer of Record, and plumbing contractor.
H. Install alarm devices in piping systems.
1. All wiring of such devices is by others.
I. Hangers and supports: Comply with NFPA 13 for hanger materials.
1. Install sprinkler system piping according to NFPA 13.
J. Install pressure gauges on riser or feed main, at each sprinkler test connection, and where required by NFPA and AHJ. Include pressure gauges with connection not less than NPS 1/4 and with soft metal seated globe valve, arranged for draining pipe between gauge and valve.
Install gauges to permit removal, and install where they will not be subject to freezing conditions.
K. Clean and flush the fire protection piping system before filling.
21-031 - Monacan Health Clinic 21 10 00 - 15 WATER-BASED FIRE
L. Fill wet pipe sprinkler system piping with water.
M. The fire protection contractor shall acquire “Contractor’s Material and Test Certificate for Underground Piping” form from the underground contractor.
N. Provide maintained pressurized air in dry-pipe sprinkler systems.
1. Provide approved air compressor. Coordinate with Engineer of Record and electrical contractor for power to air compressor. Install air maintenance device.
3.9 VALVE INSTALLATION
A. Install listed fire protection valves, unlisted general-duty valves (where allowed by NFPA 13), specialty valves and trim, controls, and specialties according to NFPA 13 and AHJ.
B. Install listed fire protection shutoff valves supervised-open, located to control sources of water supply except from Fire Department Connection. Install permanent identification signs indicating portion of system controlled by each valve.
C. Install backflow prevention assemblies in accordance with manufacturer’s written instructions, NFPA, local plumbing codes and authorities having jurisdiction.
D. Install required alarm devices for control valves including but not limited to flow switches and tamper switches for control valves, yard valves and post indicating valves. All wiring of such devices is work of other divisions.
E. Provide permanent signage at valve assembly regarding areas/systems service, pertinent hydraulic data, etc.
3.10 SPRINKLER APPLICATIONS
A. Use the following sprinkler types, unless sprinkler types are indicated on drawings:
1. Rooms without ceilings: Upright sprinklers.
2. Acoustical tile suspended ceilings: Semi-recessed sprinklers.
3. Gypsum board and specialty decorative ceilings: Concealed sprinklers.
4. Wall and/or soffit mounting: Concealed sidewall sprinklers.
5. Sprinkler Finishes:
a. Upright sprinklers in unfinished, non-public spaces: natural brass
b. Upright sprinklers in finished, non-public spaces (exposed to view): chrome plated
c. Upright sprinklers in finished, public spaces (exposed to view): chrome plated
d. Pendant sprinklers in finished, public spaces with ceilings: chrome plated
e. Pendant sprinklers in finished, non-public spaces with ceilings: chrome plated
f. Sidewall sprinklers in unfinished, non-public spaces: natural brass
g. Sidewall sprinklers in finished, non-public spaces: chrome plated
h. Sidewall sprinklers in finished, public spaces: chrome plated
i. Concealed sprinklers in finished, public spaces: brass head with painted cover plate. Paint color shall be selected by Architect.
21-031 - Monacan Health Clinic 21 10 00 - 16 WATER-BASED FIRE
3.11 SPRINKLER INSTALLATION
A. Sprinkler zoning and coverage shall comply with the requirements of NFPA 13.
B. Sprinklers shall be located in a regular pattern, perpendicular and parallel with building lines, in alignment with other ceiling components such as lights, air diffusers, grilles, and speakers.
1. Acoustical ceiling tile: Sprinklers shall be located in the center of tile.
2. Sprinklers shall be located no closer than 4 inches from any ceiling edge or from any other ceiling component in public areas.
3. Sprinkler locations and types shall be reviewed and accepted by the Architect of Record before any piping is fabricated or installed.
4. Provide additional sprinklers above and below ceilings as necessary per NFPA 13 and
AHJ, including floating ceilings, wood ceilings, open ceiling grids, etc.
5. Do not install pendent or sidewall, wet-type sprinklers in areas subject to freezing. Meet
NFPA 13 requirements. The fire protection contractor is responsible for notifying the Architect and Engineer of Record of any additional areas that may require dry pendant sprinklers or dry-type sprinklers due to potential for freezing.
C. Additional sprinklers (in excess of NFPA requirements) may be required for aesthetics.
3.12 HOSE-CONNECTION INSTALLATION
A. Unless indicated otherwise by Authorities Having Jurisdiction, standpipe hose connection systems are not required for this building.
3.13 FIRE PROTECTION OF ELECTRICAL AND DATA ROOMS
A. Provide a complete fire protection sprinkler system in electrical switchgear rooms, electrical panel rooms, data rooms and small electrical and communication rooms in accordance with
NFPA 13.
B. Do not install sprinkler piping directly above electrical equipment, motor control centers or data racks.
C. Sprinkler piping serving electrical and data rooms shall serve those areas only. Sprinkler piping serving other areas shall not pass through electrical and data rooms.
3.14 FIRE DEPARTMENT CONNECTION INSTALLATION
A. Coordinate and install wall-type Fire Department Connection at the discretion of the AHJ and Architect of Record.
1. The Fire Department Connection shall be installed on the address side of the building, coordinated with the AHJ and Architect of Record. Fire Department Connection shall be installed approximately waist-high.
B. Install ball drip valve at each check valve for Fire Department Connection.
21-031 - Monacan Health Clinic 21 10 00 - 17 WATER-BASED FIRE
3.15 FIRE PUMP AND JOCKEY PUMP INSTALLATION
A. Furnish all labor, material and equipment, and perform all operations necessary for the installation of fire pump and jockey pump. Fire protection contractor shall be responsible for providing a complete and operating system per NFPA 20.
B. Install fire pump and jockey pump in accordance with NFPA 20 and the requirements of the Authority Having Jurisdiction and pump manufacturer.
C. Install fire pump on cast-in-place concrete base. Support piping and pumps separately so weight of piping does not rest on pumps.
D. Install fire pump and jockey pump with space for service access; no less than minimum recommended by the pump manufacturer.
E. Install piping associated with fire pump and jockey pump, as well as pump casings, valves, flow meters and pressure gauges. Install drains for bases and seals. Install inspector’s test piping to discharge into floor drains.
F. Fire protection contractor shall be responsible for determining the required size of the domestic water supply for the jockey pump that is installed, and coordinating the design and installation of the domestic water supply with the appropriate trades.
G. Install jockey pump and fire pump sensing lines in accordance with NFPA 20 and the Authority Having Jurisdiction. Jockey pump start and stop pressure to be set as per NFPA 20 and the Authority Having Jurisdiction.
H. Align pump and driver shafts after complete unit has been leveled on concrete base, grout has set, and anchor bolts have been tightened. After alignment is correct, tighten anchor bolts evenly. Fill baseplate completely with grout, with metal blocks and shims or wedges in place.
Tighten anchor bolts after grout has hardened. Check alignment and make required corrections.
I. Lubricate fire pump and jockey pump before start-up.
3.16 SPRINKLER ZONING AND CONNECTIONS
A. Sprinkler zoning and coverage shall comply with the requirements of NFPA 13.
1. One or more system/zones shall be provided for wet pipe sprinklers in affected areas of the building.
2. One or more systems/zones shall be provided for dry-pipe sprinklers in the combustible attic spaces and drive-up canopy where required by NFPA 13 and authorities having jurisdiction.
B. Install piping adjacent to equipment to allow service and maintenance.
C. Install ball drip valves at each check valve for Fire Department Connection. Drain to floor drain or outside building.
D. Connect piping to specialty valves, specialties, Fire Department Connection, and accessories.
E. Electrical Connections: Low voltage/fire alarm wiring is specified in Division 26 for monitoring of fire protection systems.
21-031 - Monacan Health Clinic 21 10 00 - 18 WATER-BASED FIRE
3.17 LABELING AND IDENTIFICATION
A. Install labeling and pipe markers on equipment and piping according to requirements in NFPA 13, NFPA 14 and in Division 23 Section "Identification for HVAC Piping and Equipment."
3.18 FIELD QUALITY CONTROL
A. Perform the following field tests and inspections and prepare test reports:
1. Leak Test: After installation, charge system and test for leaks in accordance with NFPA.
Repair leaks and retest until no leaks exist.
2. Test and adjust controls,…