B01 Attachment J02 - Renovation drawing COMP 083022.pdf
PDF 2 MB Posted
- Attached to
- Desert Visions Renovations Federal contract opportunity
- Solicitation number
- 75H70123R00007
About this file
This document summarizes a federal solicitation for construction services to renovate the Desert Visions Youth Wellness Center in Sacaton, Arizona. Key work includes landscaping and irrigation, replacing basketball and pickleball court surfaces, adding concrete sidewalks, sealing and resurfacing parking lots, providing new roofs, replacing flooring and plumbing fixtures, resurfacing the pool area, and installing cured-in-place piping. The period of performance is 180 calendar days with an anticipated contract value between $500,000 and $1,000,000. A pre-bid site visit will be scheduled and the contract will be awarded on a firm fixed price basis using lowest price technically acceptable criteria. The solicitation is targeted for small businesses and registration in SAM is required to be considered for award. The soliciting agency is the Department of Health and Human Services Indian Health Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B05 Amend A0003.pdf | ||
| Asbestos Survey Bldg 200.pdf | ||
| Asbestos Survey Bldg 300.pdf | ||
| Asbestos Survey Bldg 100.pdf | ||
| Asbestos Survey Bldg 500.pdf | ||
| Asbestos Survey Bldg 600.pdf | ||
| Asbestos Survey Bldg 400.pdf | ||
| Attachment J02 Renovation Drawings R1.pdf | ||
| B05 Amend A0002.pdf | ||
| B01 75H70123R00007.pdf | ||
| B05 Amend A0001.pdf | ||
| B01 Attachment J01 - Wage Determination AZ20220033.pdf | ||
| B01 Attachment J06 - ICRA Permit DV.pdf | ||
| B01 Attachment J05 - 2022 Exemption Letter for a Qualifying Hospital.pdf | ||
| B01 Attachment J04 - PPQ.docx | DOCX document | |
| B01 Attachment J03 - Self Performed Calculation Sheet (Construction).docx | DOCX document | |
| B01 75H70123R00007.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I N
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
PROJECT MANAGEMENT
Phoenix Area Indian Health Service Department of Facilities Engineering 40 North Central Avenue, Suite 729 Phoenix, Arizona 85004
PROJECT SITE
Desert Visions Youth Wellness Center 198 S. Skill Center Road Sacaton, Arizona 85147
PROJECT DRAWINGS
IHS PROJECT NO.: PH22DV01Z6
Sacaton, Arizona
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
INDEX
Cover Desert Visions Landscaping Map Landscaping Softball Diamond Basketball Court Renovation Dorm Courtyard Sidewalks Parking Map Building 100 Roofing Building 200 Roofing Building 300 Roofing Buildings 400 & 600 Roofing Building 500 Roofing Kitchen Floor - Walk-in Freezer Dining Room Tile Pool Resurfacing Pool Equipment Building 100 Exterior Plumbing Building 100 Interior Plumbing Kitchen Plumbing Building 200 Plumbing Building 400 Plumbing Building 500 Plumbing Building 600 Plumbing
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
Legend Description Quantity Unit
Baseball Diamond 10,806 sf Landscape Area 91,400 sf
72,588 sf
10,238 sf 8,573 sf
10,806 sf
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
LANDSCAPING
1. REGRADE AREA SHOWN TO A DEPTH OF .5-1"
AND FILL IN GOPHER HOLES
2. PROVIDE SOIL AMENDMENTS PER LANDSCAPE
TESTING
IRRIGATION
1. PROVIDE IRRIGATION DESIGN FOR
LANDSCAPING
2. IRRIGATION PLAN WILL PROVIDE FOR SEED/SOD
OPTIONS APPROPRIATE TO LANDSCAPING
TESTING
3. NEW SEED/SOD OPTIONS WILL REQUIRE
COR/OWNER APPROVAL BEFORE PLANTING OR
LAYING SOD
DESERT VISIONS LANDSCAPING MAP
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
SOFTBALL DIAMOND
AS-BUILTS PROVIDED
AS REFERENCE
PROVIDE MAINLINE
GATE VALVE &
CODE APPROVED
BACKFLOW DEVICE
NOTE: THE INFIELD SHALL
BE GRADED SO THAT THE
BASELINES AND HOME
PLATE ARE LEVEL
SPRINKLER HEADS USE
TORO 640 CHECK-O-MATIC
SPINKLERS OR APPROVED
EQUAL-TYPICAL
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
PROVIDE 6" LONG
WATERSTOP CONT. AT
ALL CONSTRUCTION
JOINTS, (C.J'S)
CONST. KEYED JOINT TYP.
WHERE SHOWN ON PLAN
WIRE MESH REINFORCING
5" CONC. SLAB
5" CONC. SLAB W7
6x6 2.4/2.4 WIRE
MESH ON
ENGINEERED FILL
#4 CONT. T&B
TOOL
EDGE
FIN. GRADE - SLOPE
AWAY FROM COURT
6"
REPLACE ALL EIGHT CONCRETE PANELS
INNER CIRCLE HAS A 2' RADIUS
CIRCLE TO HAVE A 6' RADIUS
SLOPE MAX 1/2%
USE PICKELBALL DIAGRAM FOR DETAILS
BASKETBALL COURT NOTES
CONSTRUCTION JOINT
E Q
E Q
EQ. EQ.EQ. EQ.
'-0
94' - 0" 84' - 0"
5' - 0"5' - 0"
5'
5'
4' - 0"
Concrete Joint
5 5
'-9
'-9
1 1
CONCRETE BASKETBALL COURT
NORTH
10' - 0" 20' - 0"
7'
MID-LINE AT
CONCRETE
JOINT
NOTE: PROVIDE 5" CONCRETE SLAB W7 6x6 2.4/2.4 WIRE MESH
REINFORCING & HEAVY BROOM FINISH
REUSE EXISITING POLES, BACKBOARD & RIM. TOP OF RIM TO BE
INSTALLED 10' - 0" ABOVE FINISHED SURFACE
ALL STRIPING TO BE 2" WIDE. BASKETBALL LINES WILL BE
WHITE. PICKELBALL WILL BE YELLOW
PICKELBALL COURT
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
BASKETBALL COURT SLAB EDGE
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
DORM COURTYARD WALKWAY
THE DRAWING IS NOT TO
SCALE. THE CONTRACTOR
WILL FIELD VERIFY ALL
MEASUREMENTS.
WALKWAY
1. CONCRETE SIDEWALK WILL BE INSTALLED PER MARICOPA ASSOCIATION OF GOVERNMENTS SEC. 340
2. PREPARE THE SUBGRADE PER MAG SPECS 301. ALL SOFT OR UNSUITABLE MATERIAL WILL BE REMOVED TO A DEPTH OF NOT LESS THAN 6"
BELOW SUBRADE ELEVATION AND REPLACED WITH MATERIAL SATISFACTORY TO THE ENGINEER
3. CONCRETE SIDEWALKS SHALL BE CONSTRUCTED BY THE CONVENTIONAL USE OF FORMS OR MAY BE CONSTRUCTED BY MEANS OF AN
APPROPRIATE MACHINE WHEN APPROVED BY ENGINEER
4. THE CONCRETE SHALL BE THOROUGHLY SPADED AWAY FROM THE FORMS SO THAT THERE WILL BE NO ROCK POCKETS NEXT TO THE FORMS.
5. THE CONCRETE MAY BE COMPACTED BY MECHANICAL VIBRATORS APPROVED BY THE ENGINEER. TAMPING OR VIBRATING SHALL CONTINUE UNTIL THE MORTA FLUSHES TO THE SURFACE AND THE COARSE AGGREGATE IS BELOW THE CONCRETE SURFACE. THE SURFACE WILL THEN BE
STRUCK OFF AND WORKED TO GRADE AND CROSS-SECTION WITH FLOAT
6. SIDEWALK THAT ABUTS TO EXISTING PATH WILL MATCH EXISTING JOINTS. THE SPACE BETWEEN
7. JOINTS WILL BE CONSTRUCTED IN A STRAIGHT LINE, VERTICAL PLANE AND PERPENDICULAR TO THE LONGITUDINAL LINE OF THE SIDEWALK EXCEPT IN CASES OF CURGED ALIGNMENT, WHERE THEY SHALL BE CONSTRUCTED ALONG THE RADIAL LINES OF THE CURVE
8. SURFACE SHALL BE LIGHT BROOM FINISHED; FLOW LINES SHALL BE TRWOWELED FOR SMOOTH FINISH
4' WIDE X 77' LENGTH
CONCRETE
WALKWAY
TO BE ADDED
4' WIDE X 58' LENGTH
CONCRETE WALKWAY
TO BE ADDED
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
Legend
Description Quantity Unit
East Parking Lot 32,541 sf
West Parking Lot 13,488 sf
13,488 sf
32,541 sf
WEST PARKING LOT
EAST PARKING LOT
DESERT VISIONS PARKING LOT MAP
WEST PARKING LOT
SEAL COATING
1. THOROUGHLY CLEAN ASPHALT TO BE SEALED FREE OF DIRT AND LOOSE DEBRIS
2. TREAT OIL SATURATED AREAS WITH AN OIL SPOT PRIMER
3. BLOW OUT AND SEAL ALL CRACKS PER THE MARICOPA ASSOCIATION OF
GOVERNMENTS (MAG) UNIFORM STANDARD SPECIFICATIONS AND DETAILS FOR
PUBLIC WORKS CONSTRUCTION SECTION 337 PER CATEGORIES 1 THRU 3
a. CATEGORY 1: CRACKS WITH A CLEAR OPENING RANGING FROM ONE-QUARTER
INCH (¼”) TO ONE-HALF INCHES (1.5”). REFER TO MAG SEC. 337.2.1.
b. CATEGORY 2: CRACKS ONE-HALF INCHES (1.5”) TO THREE INCHES (3”). REFER TO
MAG SEC 337.2.2.
c. CCATEGORY 3: CRACKS GREATER THAN 3 INCHES (3”). REFER TO MAG SEC 337.2.3.
4. LAYOUT AND RESTRIPE PAVEMENT MARKINGS TO MATCH EXISTING LAYOUT
5. REFER TO THE STATEMENT OF WORK FOR SPECIFIC REQUIREMENTS
EAST PARKING LOT
DEMO AND REPAVE
1. SAWCUT, REMOVE, AND REPLACE THE EXISTING PAVEMENT IN THE DV
PARKING LOT AND ACCESS ROADS. THE PROPOSED PAVEMENT SECTION
FOR PASSENGER PARKING AREAS AS IS 3” AC OVER 6” OF ABC AND THE
PROPOSED PAVEMENT SECTION FOR ACCESS ROADS IS 4” OVER 6” OF
ABC. REFER TO MAG STANDARD 310-2020 FOR NEW ABC
2. LAYOUT AND RESTRIPE PAVEMENT MARKINGS TO MATCH EXISTING
LAYOUT
3. REFER TO THE STATEMENT OF WORK FOR SPECIFIC REQUIREMENTS
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
ADMIN/BUILDING 100 ROOFING
PLAN
NORTH
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
12,180 sf
ROOFING
1. EXISTING ROOF IS THERMOPLASTIC ROOF SYSTEM
2. PREPARE ROOF FOR NEW SPRAY POLYURETHANE FOAM (SPF) OR ALTERNATIVE METHOD THAT WILL EQUAL OR
EXCEED THE WORK AS STATED
3. APPLY 1" FOAM OVER EXISTING ROOF AND COMPLETE WITH 2 COATS OF ELASTOMERIC COATING. INCLUDES
PARAPETS AND SCUPPER AREAS, DUCTWORK WRAPS, HATCHES AND CAPS
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
4,809 sf
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ROOFING
1. EXISTING ROOF IS THERMOPLASTIC ROOF
SYSTEM
2. PREPARE ROOF FOR NEW SPRAY POLYURETHANE
FOAM (SPF) OR ALTERNATIVE METHOD THAT WILL
EQUAL OR EXCEED THE WORK AS STATED
3. APPLY 1" FOAM OVER EXISTING ROOF AND
COMPLETE WITH 2 COATS OF ELASTOMERIC
COATING. INCLUDES PARAPETS AND SCUPPER
AREAS, DUCTWORK WRAPS, HATCHES AND CAPS
RECREATIONAL BUDILING/BLDG 200 ROOF PLAN
ADMIN/BUILDING 100 ROOFING
PLAN
NORTH
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
3,943.9 sf
NORTH
DORMS & OFFICES/
BLDG 300 ROOFING PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ROOFING
1. EXISTING ROOF IS THERMOPLASTIC ROOF SYSTEM
2. PREPARE ROOF FOR NEW SPRAY POLYURETHANE FOAM
(SPF) OR ALTERNATIVE METHOD THAT WILL EQUAL OR
EXCEED THE WORK AS STATED
3. APPLY 1" FOAM OVER EXISTING ROOF AND COMPLETE
WITH 2 COATS OF ELASTOMERIC COATING. INCLUDES
PARAPETS AND SCUPPER AREAS, DUCTWORK WRAPS,
HATCHES AND CAPS
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
2,751 sf
2,706 sf
ADMIN/BUILDING 100 ROOFING
PLAN
NORTH
DORM/BUILDING 400 ROOF PLAN
PLAN
NORTH
DORM/BUILDING 600 ROOF PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ROOFING
1. EXISTING ROOF IS THERMOPLASTIC ROOF
SYSTEM
2. PREPARE ROOF FOR NEW SPRAY
POLYURETHANE FOAM (SPF) OR
ALTERNATIVE METHOD THAT WILL EQUAL OR
EXCEED THE WORK AS STATED
3. APPLY 1" FOAM OVER EXISTING ROOF AND
COMPLETE WITH 2 COATS OF ELASTOMERIC
COATING. INCLUDES PARAPETS AND
SCUPPER AREAS, DUCTWORK WRAPS,
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
5,358 sf
PLAN
NORTH
DORM/BUILDING 500 ROOF PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ROOFING
1. EXISTING ROOF IS THERMOPLASTIC ROOF SYSTEM
2. PREPARE ROOF FOR NEW SPRAY POLYURETHANE FOAM
(SPF) OR ALTERNATIVE METHOD THAT WILL EQUAL OR
EXCEED THE WORK AS STATED
3. APPLY 1" FOAM OVER EXISTING ROOF AND COMPLETE
WITH 2 COATS OF ELASTOMERIC COATING. INCLUDES
PARAPETS AND SCUPPER AREAS, DUCTWORK WRAPS,
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
1,381 sf
108 sf
Legend
Description Quantity Unit
Dining Room Floor 1,381 sf
Walk In Freezer 108 sf
KITCHEN/BUILDING 100 FLOORING
PLAN - WALK-IN FREEZER EPOXY
NORTH
EPOXY WALK-IN FREEZER
1. AREA WILL BE CLEARED OF ALL FOOD AND MOVABLE STORAGE BY FACILITY STAFF
2. COMPLETELY REMOVE EXISTING FLOORING COATING BY SANDING OR OTHER APPROVED
METHODS
3. PREP SUBFLOOR PER MANUFACTURER RECOMMENDATION OF APPROVED FLOOR COATING
4. APPLY ECO-CRETE OR EQUIVALENT APPROVED PRODUCT, APPROVED PRODUCT WILL BE
SLIP RESISTANT AND DURABLE
A. APPLY FLOOR COATING PER MANUFACTURER INSTRUCTION
B. ENSURE SLURRY SEAL IS APPLIED TO ENTIRE WALK-IN FREEZER FLOOR AREA AT A
COVERAGE RATE OF 23 FT2/GAL
C. APPLY LAYER OF SILICA SAND FOR TRACTION, AT A COVERAGE RATE OF 1 FT2/GAL
D. APPLY TOPCOAT LAYER AT A COVERAGE RATE OF 120 FT2/GAL
5. PROJECT WILL NOT BE CONSIDERED COMPLETE UNTIL ACCEPTED BY COR
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
DRAWING IS NOT TO
SCALE
IT IS THE
RESPONSIBILITY OF
THE CONTRACTOR
TO FIELD VERIFY
SITE
MEASUREMENTS
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
LVT REMOVAL
1. CONTRACTOR WILL DEMOLISH/REMOVE ALL LVT FLOORING
2. CONTRACTOR WILL REMOVE ANY AND ALL LVT ASSOCIATED
MATERIALS,
INCLUDING BUT NOT LIMITED TO ADHESIVE
3. THE SUBFLOOR WILL BE PREPPED AND READIED BY SANDING
DOWN ANY
REMAINING LVT MATERIALS OR BY APPROVED ALTERNATE
METHOD
FLOORING INSTALLATION
1. CONTRACTOR SHALL INSTALL NEW 2'X2' APPROVED TILE
2. ADHESIVE WILL BE APPROPRIATE TO THE APPROVED TILE,
PER
MANUFACTURER RECOMMENDATIONS
3. CONTRACTOR SHALL USE TROWELS PER MANUFACTURER'S
RECOMMENDATION
4. SRPEAD A 1/4" COAT ON THE SURFACE OF SUBFLOOR
5. REMOVE EXCESS ADHESIVE, LEAVING A UNIFORM, RIDGED
SETTING BED
6. INSERT TILE SPACERS AS EACH TILE IS SET
7. WHEN TILE IS COMPLETELY INSTALLED, TAP IN ALL TILES WITH
RUBBER
MALLET AND WOOD BLOCK TO ENSURE GOOD BOND AND LEVEL
PLANE
8. SPACES BETWEEN TILE SHOULD HAVE GROUTING
APPROPRIATE FOR TILE
KITCHEN/BUILDING 100 FLOORING
PLAN - DINING ROOM TILE
NORTH
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
THE SURFACE AREA
OF THE POOL DECK IS
APPROX. 2,290 sf2,292 sf
SUGGESTED
BASKETBALL HOOP
PLACEMENT
RESURFACE DECK
1. LOWER POOL WATER DOWN TO A WORKABLE LEVEL
2. REMOVE HANDRAILS THEN RE-INSTALL SAME ONES AFTER DECK
COMPLETION
3. CREATE POST HOLE FOR REMOVABLE BASKETBALL GOAL AT THE AREA
INDICATED ON DRAWING
4. SCRUFF OFF ALL LOOSE AND OLD MATERIAL
5. SAWCUT AND REMOVE ALL DEPTH MARKERS AND REPLACE WITH NEW
(ON TOP OF DECK ONLY)
6. REPAIR CRACKS IN THE DECK WITH EPOXY
7. REPAIR AUTO-FILLER
8. APPLY SCRATCH COAT OVER COMPLETE DECK
9. APPLY TEXTURE FINISH
10. APPLY ACRYLIC COLOR (BUFF)
INSTALL FRENCH DRAIN
1. INSTALL FRENCH DRAIN AT WEST WALL AREA UNDER SHOWER
EQUIPMENT REPLACEMENT AND VALVE REPAIR
1. REPLACE BOTH EXISTING HAYWARD PRO-SERIES HIGH RATE SAND
FILTERS WITH PENTAIR TR-140 COMMERCIAL GRADE SAND FILTERS OR
APPROVED ALTERNATE
2. REPLACE 3 BUTTERFLY VALVES WITH FLANGES
INSTALL DECK MOUNTED BASKETBALL NET ANCHORS
1. TAKE ANCOR AND LOCATE PARTING LINE ON OUTSIDE FRONT OF
ANCHOR AND MARK A LINE ON TOP LIP OF ANCHOR DIRECTLY ABOVE
PARTING
2. THE HOLE IN BOTTOM OF ANCHOR SHOULD DRAIN INTO THE GROUND
3. WHEN INSTALLING ANCHOR IN EXISTING CONCRETE DECKING, A 5"
DIAMTER HOLE MUST BE BORED INTO CONCRETE
4. PUT PVC PIPE IN ANCHOR AND TIGHTEN ANCHOR BOTH
5. POSITION ANCHOR APPROX. 6"-8" FROM POOL EDGE WITH ANCHOR
BOLT FACING AWAY FROM POOL WALL AND PENCIL LINE ON TOP OF
ANCHOR PERPENDICULAR TO POOL EDGE
6. SECURE INTO PLACE USING ANCHOR CEMENT
ADMIN/BUILDING 100 ROOFING
PLAN
NORTH
RECREATIONAL BUILDING/POOL AREA
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
DRAWING PROVIDED
FOR REFERENCE
FOR POOL SYSTEM
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
P1
CURED-IN-PLACE PIPE
ADMIN
1. TWO (2) PIPES LEADING FROM
BATHROOMS TO THE GRASS AREA WHERE
THERE ARE CLEANOUTS INSTALLED
ALREADY. (ADMIN LINE 1 & ADMIN LINE 2)
2. ADDITIONAL ACCESS WILL NEED TO BE
CREATED IN BATHROOMS BY REMOVING
TOILETS OR CUTTING INTO WALLS
3. AFTER COMPLETION OF PROJECT,
TOILETS WILL BE RE-SEATED WITH NEW WAX
RINGS AND/OR HOLES IN DRYWALL WILL BE
REPAIRED AND RESTORED TO PAINT-READY
CONDITION
4. BRANCH LINES WILL BE GAPPED
5. ACCESS WILL BE FROM ROOF VENTS,
PULLED TOILETS, ACCESS HOLES IN
DRYWALL, AND CLEAN-OUTS
OUTSIDE
1. TWO (2) MAIN PIPES CUTTING ACROSS THE
GRASS COURTYARD OUTSIDE OF THE
BUILDING (OUTSIDE LINE 1 & OUTSIDE LINE 2)
2. THREE (3) MAIN PIPES DRAINING THE
BATHROOMS AND KITCHEN (OUTSIDE LINE 3,
OUTSIDE LINE 4, OUTSIDE LINE 5)
ADDITIONAL ACCESS
1. TWO (2) SETS OF DOUBLE SWEEPING
CLEANOUTS TO BE INSTALLED. ONE WILL BE
DOWNSTREAM FROM WHERE OUTSIDE LINE
1 AND OUTSIDE LINE 2 TIE IN TO THE
PROPERTY MAIN.
2. ONE (1) WILL BE INSTALLED ON THE
DOWNSTREAM END OF KITCHEN LINE 1.•
3. TWO (2) SINGLE SWEEPING CLEAN-OUTS
TO BE INSTALLED. ONE ON THE UPSTREAM
END OF OUTSIDE LINE 5. ONE ON THE
DOWNSTREAM END OF BATHROOM LINE 5
WHERE IT TIES IN TO THE PROPERTY MAIN.
BLDG 100/EXTERIOR PLUMBING
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ADMIN/BUILDING 100 PLUMBING
PLAN
NORTH
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
CURED-IN-PLACE PIPE
BATHROOMS
1. ONE (1) PIPE DRAINING THE
GIRLS TOILETS (BATHROOM LINE
1)
2. ONE (1) PIPE DRAINING THE
BOYS TOILETS/URINALS
(BATHROOM LINE 2)
3. TWO (2) PIPES DRAINING THE
SINKS IN BOTH BATHROOMS
(BATHROOM LINE 3 & BATHROOM
LINE 4)
4. ONE (1) MAIN PIPE WHERE THE
OTHER 4 PIPES ARE DRAINING
(BATHROOM LINE 5)
5. ACCESS WILL BE FROM ROOF
VENTS, PULLED TOILETS, AND
CLEAN-OUTS.
ADMIN BATHROOMS
1. REPLACE TANKLESS
BRADFORD WHITE CORP MODEL
NO. EFC-6500-4-S-10 WATER
HEATER
2. REPLACE FAUCETS IN BOTH
ADMIN AND VISITOR
BATHROOMS
ADMIN/BUILDING 100 PLUMBING
PLAN
NORTH
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
KITCHEN EQUIPMENT
1. REPLACE 1 FISHER MODEL 2985-0000 SERIAL
F2237 HOSE REEL
2. REPLACE BRADFORD WHITE CORP: MODEL
NO. EFC-6500-4-S-10 TANKLESS WATER HEATER
3. REPLACE 3 COMPARTMENT SINK AND
FIXTURE
4. REPLACE 100 SALVAJOR COMMERCIAL FOOD
WASTE DISPOSER
5. REPLACE 300 SALVAJOR COMMERCIAL FOOD
WASTE DISPOSER
6. PULL AND RESET EXISTING WATER CLOSET
IN MENS RESTROOM WITH NEW WAX RING AND
CAULK
CURED-IN-PLACE PIPE
KITCHEN
1. TWO (2) MAIN PIPES THAT DRAIN THE MAJORITY OF THE SINKS
AND FLOOR DRAINS/SINKS (KITCHEN LINE 1 & KITCHEN LINE 2)
2. FOUR (4) BRANCH LINES DRAINING SINKS AND FLOOR
DRAINS/SINKS (KITCHEN LINE 3, KITCHEN LINE 4, KITCHEN LINE 5,
KITCHEN LINE 6) FOR KITCHEN LINE 5 A HOLE WILL NEED TO BE
DUG IN ORDER TO ACCESS THE UPSTREAM END OF THE PIPE.
3. AFTER COMPLETION OF PROJECT HOLE WILL BE BACKFILLED,
COMPACTED, AND BROUGHT BACK TO SMOOTH CEMENT FINISH.
4. ADDITIONAL ACCESS WILL NEED TO BE CREATED IN WALLS TO
BETTER ACCESS LINES 2, 4, AND 6)
5. AFTER COMPLETION OF PROJECT, HOLES IN WALLS WILL BE
REPAIRED AND RESTORED TO PAINT-READY CONDITION.
KITCHEN/BUILDING 100 PLUMBING
PLAN
NORTH
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
NORTH
DG 400 PLUMBING PLANActivity/Building 200 Plumbing Plan
Building 200 Plumbing Rebuild Women's Water Closet
Sheet of
EXISTING HIGH PRESSURE GAS
SERVICE LINE BY SOUTHWEST
GAS CORP
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
REPLACE SHOWER CARTRIDGES
REPLACE THREE (3) MOEN 1224 SHOWER
CARTRIDGES IN ROOMS 421, 425 AND 435
NORTH
DORM/BLDG 400 PLUMBING PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
Sheet of
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
SHOWER EQUIPMENT ROOM 525
REPLACE MOEN 1225 SHOWER CARTIDGE IN ROOM 525
NORTH
DORM/BLDG 500 PLUMBING PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
Sheet
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
SHOWER EQUIPMENT ROOM 605
REPLACE MOEN 1225 SHOWER CARTRIDGE IN ROOM 605
PLAN
NORTH
DORM/BUILDING 600 ROOF PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
Sheet
File details come from the government source that posted it. Updated .