Attachment J02 Renovation Drawings R1.pdf
PDF 1 MB Posted
- Attached to
- Desert Visions Renovations Federal contract opportunity
- Solicitation number
- 75H70123R00007
About this file
This solicitation requests proposals for construction services for the renovation and modification of the Desert Visions Youth Wellness Center in Sacaton, Arizona. Work includes replacing concrete panels and painting basketball and pickleball courts, providing new sidewalks and sealing and resurfacing parking lots. Additional work comprises installing new roofs, replacing flooring, resurfacing the pool area and replacing the pool system. Interior work involves providing cured-in-place pipe and new plumbing fixtures. The performance period is 180 calendar days with a contract value between $500,000 and $1,000,000. The Department of Health and Human Services Indian Health Service will award a firm fixed price contract using lowest price technically acceptable evaluation. The closing date is included in the solicitation to be posted online.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Asbestos Survey Bldg 100.pdf | ||
| Asbestos Survey Bldg 500.pdf | ||
| Asbestos Survey Bldg 600.pdf | ||
| Asbestos Survey Bldg 400.pdf | ||
| Asbestos Survey Bldg 200.pdf | ||
| Asbestos Survey Bldg 300.pdf | ||
| B05 Amend A0003.pdf | ||
| B05 Amend A0002.pdf | ||
| B05 Amend A0001.pdf | ||
| B01 75H70123R00007.pdf | ||
| B01 Attachment J06 - ICRA Permit DV.pdf | ||
| B01 Attachment J05 - 2022 Exemption Letter for a Qualifying Hospital.pdf | ||
| B01 Attachment J04 - PPQ.docx | DOCX document | |
| B01 Attachment J03 - Self Performed Calculation Sheet (Construction).docx | DOCX document | |
| B01 Attachment J02 - Renovation drawing COMP 083022.pdf | ||
| B01 75H70123R00007.pdf | ||
| B01 Attachment J01 - Wage Determination AZ20220033.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I N
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
DESERT VISIONS PARKING LOT MAP
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
4,263 sf 10,087 sf
BUILDING 100/ADMIN
ACTIVITY
CENTER
BUILDING 300
32,550 sf
WEST DRIVE, EAST AND WEST PARKING LOT
DEMO AND REPAVE
1. SAWCUT, REMOVE, AND REPLACE THE EXISTING PAVEMENT IN THE DV
PARKING LOTS. THE PROPOSED PAVEMENT SECTION FOR PASSENGER
PARKING AREAS AS IS 3" AC OVER 6" OF ABC AND THE PROPOSED PAVEMENT
SECTION FOR ACCESS ROADS IS 4" OVER 6" OF ABC. REFER TO MAG
STANDARD 310-2022 FOR NEW ABC
2. LAYOUT AND RESTRIPE PAVEMENT PARMKINGS TO MATCH EXISTING
LAYOUT
3. REFER TO THE STATEMENT OF WORK FOR SPECIFIC REQUIREMENTS
D I
A N
H E A L T H
S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
ADMIN/BUILDING 100 ROOFING
PLAN
NORTH
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
12,180 sf
ROOFING
1. REMOVE THE EXISTING ROOF COVERINGS TO THE DECK AND REPLACE WITH A THERMOPLASTIC POLYOLEFIN (TPO)
MEMBRANE SYSTEM
2. PREPARE ROOF SUBSTRATE PER MANUFACTURER’S RECOMMENDATIONS
3. APPLY POLYISOCYANURATE (POLYISO) INSULATION SYSTEM WITH HD POLYISO COVER BOARD TO ACHIEVE A
MINIMUM R-VALUE OF R38
4. INSTALL A THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ATTACHED TO THE COVER BOARD WITH BONDING
ADHESIVE AND MECHANICALLY FASTENED AROUND THE PERIMETER.
D I
A N
H E A L T H
S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
4,809 sf
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ROOFING
1. REMOVE THE EXISTING ROOF COVERINGS TO THE DECK AND REPLACE WITH A THERMOPLASTIC POLYOLEFIN (TPO)
MEMBRANE SYSTEM
2. PREPARE ROOF SUBSTRATE PER MANUFACTURER’S RECOMMENDATIONS
3. APPLY POLYISOCYANURATE (POLYISO) INSULATION SYSTEM WITH HD POLYISO COVER BOARD TO ACHIEVE A
MINIMUM R-VALUE OF R38
4. INSTALL A THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ATTACHED TO THE COVER BOARD WITH BONDING
ADHESIVE AND MECHANICALLY FASTENED AROUND THE PERIMETER.
RECREATIONAL BUDILING/BLDG 200 ROOF PLAN
ADMIN/BUILDING 100 ROOFING
PLAN
NORTH
D I
A N
H E A L T H
S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
3,943.9 sf
NORTH
DORMS & OFFICES/
BLDG 300 ROOFING PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ROOFING
1. REMOVE THE EXISTING ROOF COVERINGS TO THE DECK AND REPLACE WITH A THERMOPLASTIC POLYOLEFIN (TPO)
MEMBRANE SYSTEM
2. PREPARE ROOF SUBSTRATE PER MANUFACTURER’S RECOMMENDATIONS
3. APPLY POLYISOCYANURATE (POLYISO) INSULATION SYSTEM WITH HD POLYISO COVER BOARD TO ACHIEVE A MINIMUM
R-VALUE OF R38
4. INSTALL A THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ATTACHED TO THE COVER BOARD WITH BONDING
D I
A N
H E A L T H
S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
2,751 sf
2,706 sf
ADMIN/BUILDING 100 ROOFING
PLAN
NORTH
DORM/BUILDING 400 ROOF PLAN
PLAN
NORTH
DORM/BUILDING 600 ROOF PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ROOFING
1. REMOVE THE EXISTING ROOF COVERINGS TO THE DECK AND REPLACE WITH A
THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE SYSTEM
2. PREPARE ROOF SUBSTRATE PER MANUFACTURER’S RECOMMENDATIONS
3. APPLY POLYISOCYANURATE (POLYISO) INSULATION SYSTEM WITH HD POLYISO
COVER BOARD TO ACHIEVE A MINIMUM R-VALUE OF R38
4. INSTALL A THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ATTACHED TO THE
COVER BOARD WITH BONDING ADHESIVE AND MECHANICALLY FASTENED
AROUND THE PERIMETER.
D I
A N
H E A L T H
S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
5,358 sf
PLAN
NORTH
DORM/BUILDING 500 ROOF PLAN
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
ROOFING
1. REMOVE THE EXISTING ROOF COVERINGS TO THE DECK AND REPLACE WITH A THERMOPLASTIC POLYOLEFIN (TPO)
MEMBRANE SYSTEM
2. PREPARE ROOF SUBSTRATE PER MANUFACTURER’S RECOMMENDATIONS
3. APPLY POLYISOCYANURATE (POLYISO) INSULATION SYSTEM WITH HD POLYISO COVER BOARD TO ACHIEVE A MINIMUM
R-VALUE OF R38
4. INSTALL A THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ATTACHED TO THE COVER BOARD WITH BONDING
D I
A N
H E A L T H S E R
V I
C E
1 9 5 5P H S
TWO RENAISSANCE SQUARE
40 NORTH CENTRAL AVE, SUITE 720
PHOENIX, AZ 85004 (602) 364-5083
DIVISION OF FACILITIES ENGINEERING
INDIAN HEALTH SERVICE
OFFICE OF ENVIRIONMENTAL
HEALTH & ENGINEERING
GENERAL NOTES
DATE REVISIONS INIT.
SHEET
OF
FILE NAME:
LAYOUT NAME:
PROJ ENG: SAMUEL DIAZ
DRAWING NO.:
SCALE:
DRAWN BY: SAMUEL DIAZ
DATE:
CHECKED BY:
DATE:
THE SURFACE AREA
OF THE POOL DECK IS
APPROX. 2,290 sf2,292 sf
EQUIPMENT REPLACEMENT AND VALVE REPAIR
1. REPLACE BOTH EXISTING HAYWARD PRO-SERIES HIGH RATE SAND
FILTERS WITH PENTAIR TR-140 COMMERCIAL GRADE SAND FILTERS OR
APPROVED ALTERNATE
2. REPLACE 3 BUTTERFLY VALVES WITH FLANGES
INSTALL DECK MOUNTED BASKETBALL NET ANCHORS
1. TAKE ANCOR AND LOCATE PARTING LINE ON OUTSIDE FRONT OF
ANCHOR AND MARK A LINE ON TOP LIP OF ANCHOR DIRECTLY ABOVE
PARTING
2. THE HOLE IN BOTTOM OF ANCHOR SHOULD DRAIN INTO THE GROUND
3. WHEN INSTALLING ANCHOR IN EXISTING CONCRETE DECKING, A 5"
DIAMTER HOLE MUST BE BORED INTO CONCRETE
4. PUT PVC PIPE IN ANCHOR AND TIGHTEN ANCHOR BOTH
5. POSITION ANCHOR APPROX. 6"-8" FROM POOL EDGE WITH ANCHOR
BOLT FACING AWAY FROM POOL WALL AND PENCIL LINE ON TOP OF
ANCHOR PERPENDICULAR TO POOL EDGE
6. SECURE INTO PLACE USING ANCHOR CEMENT
ADMIN/BUILDING 100 ROOFING
PLAN
NORTH
RECREATIONAL BUILDING/POOL AREA
DESERT VISIONS YOUTH WELLNESS CENTER
DESERT VISIONS RENOVATIONS
PH22DV01Z6
RESURFACE DECK
1. LOWER POOL WATER DOWN TO A WORKABLE LEVEL
2. REMOVE HANDRAILS THEN RE-INSTALL SAME ONES AFTER DECK
COMPLETION
3. CREATE POST HOLE FOR REMOVABLE BASKETBALL GOAL AT THE AREA
INDICATED ON DRAWING
4. SCRUFF OFF ALL LOOSE AND OLD MATERIAL
5. SAWCUT AND REMOVE ALL DEPTH MARKERS AND REPLACE WITH NEW
(ON TOP OF DECK ONLY)
6. REPAIR CRACKS IN THE DECK WITH EPOXY
7. REPAIR AUTO-FILLER
8. APPLY SCRATCH COAT OVER COMPLETE DECK
9. APPLY TEXTURE FINISH
10. APPLY ACRYLIC COLOR (BUFF)
INSTALL FRENCH DRAIN
1. INSTALL FRENCH DRAIN AT WEST WALL AREA UNDER SHOWER
2. DRAIN SHOULD RATED FOR 0.10 GPM
SUGGESTED
BASKETBALL HOOP
PLACEMENT
FRENCH
DRAIN UNDER
SHOWER
NEW FRENCH DRAIN UNDER SHOWER2
| DV Renovation drawing rev 110122 6 |