This document provides details for a federal construction solicitation. The Indian Health Service is seeking a contractor to demolish and replace the existing Inpatient and Outpatient Pharmacy spaces at Pine Ridge Hospital in Pine Ridge, South Dakota. The construction services are required to support continued pharmacy operations throughout the project duration. The solicitation will utilize a 100% Small Business set-aside with preference given to Indian Economic Enterprise firms under NAICS code 2362200. The contract type will be firm fixed price, awarded using lowest price technically acceptable criteria. The period of performance is 365 calendar days from notice to proceed with a project magnitude between $1,000,000 and $5,000,000. Interested parties should monitor the listed solicitation on SAM.gov for any amendments including updated dates and requirements.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
PROJ(D)
PLBG
PLYWD
PREFIN
RAD(R)
RESIL
REINF
REQ'D
SECT
SHWR
SPECS
REFRIG
galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG
CLR
CMU
COL
CLO
clear/clearance column closet
CAB
CJ
CC
CB
BW
CL
BOC
BRZ
BRK
BO
BRG
BUR
BTM
BS
built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet
FE
FEC
FDN
FD
east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer
ELEV
EQUIP
EW
EPDM
EXP
EXIST
EXT
E
EA
EC
EG
EIFS
EJ
ELEC
insulation interior inside diameter
INSUL
IN(")
INT
ID
inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning
HDWR
HM
HORZ
HT
HPDL
HVAC
HW
height
GB
GL
GRD
GYP
GC
HDWD
HB
grade
PART
PLAS
OVHD
partition plaster overhead
SRT
SS
SQ
miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)
NTS
OC
OA
NOM
OFF
OPNG
OD
on center overall nominal not to scale office opening
MISC
N
MO
MULL
MTL
NIC
NA
north mullion metal
SHT
SF
SB
SND
SIM
S
RM
ROW
RO
SAT
SAN
architect/ architectural
AB anchor bolt
APPROX
BLDG
BD
ARCH
BM
BLK
ADJ
AFF
AC
ACCU
ALUM
ANOD
ALT
approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum
A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout
DIA
DR
DS
DN
DO
DIM
DTL
DWG
CRS
CT
CONT
CORR
CPT
DBL
DF
conference concrete
CONF
CONC
finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic
FV
FT(')
FURR
FURN
FTG
G
GA
foot furring gas gauge
FRP
FLR
FLDG
FL
FRT
FS
FLUOR
floor finish grade finish floor
FG
FF
joistJST low volume change masonryMAS
MANUF
MATL
MAX
MECH
MEMB
MH
MIN
MIRR
manufacturer material mechanical membrane maximum minimum manhole mirror
LDR
LF
LAV
LAM
LVC
LOCN
lineal feet ladder lavatory laminate location
REF
R
RAG
RD
PT
PR
QT
PTD
JT
JAN janitor joint
PL
under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications
YD
suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room
WD
WNDW
WH
WNSCT
WC
WT
WWF
WP
VCT
VWC
VEST
VERT
W
W/
W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out
RT
SICU
central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room
FOR MEDICAL
emergency room computed tomography
FACILITIES ONLY
STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair
TLT
TV
TW
TOC
TPH
TO
TYP
UCL
T&B
T
SUSP
STRUCT
TEL
TB
T&G plate/plastic/ property line STL
STD
storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended
ICU
OR
LDRP
MRI
MICU
LTC
PT
PACU
OT
CS
CT
ER
steel standard
DRAWING SYMBOLS
95.00
TOC
98.5
TOC
98.5 E
B
NEW ELEVATION
EXISTING ELEVATION
EXISTING CONTOUR
NEW CONTOUR
TEST BORING (SITE PLANS ONLY)
EXISTING ELEVATION
EXISTING ELEVATION
PROPERTY LINE
/1 A101
/1 A101
MATCHLINE
SHT. REFERENCE
ELEVATION DATUM
(SECTIONS, ELEVATIONS ONLY)
BUILDING SECTION
WALL SECTION
DETAIL DRAWING
A3.1
BUILDING ELEVATION
A6.1 INTERIOR ELEVATION
A100
WINDOW ID TAG
DOOR NUMBER
ROOM
NAME
ROOM NAME & NUMBER
PARTITION SYMBOL
1 REVISION TAG
COLUMN LINE GRID
EQUIPMENT NUMBER
? SITE PLAN NOTES
DEMOLITION PLAN NOTES
VICINITY MAP
NO SCALE
PRECAST CONCRETE
WALL PANEL TAG
XXX
A101
A-4 ALTERNATE TAG
PT-XX PAINT COLOR TAG
# PLAN NOTES
PROJECT LOCATION
X
X.X
X
X.X
CUT STONE
STEEL
PLYWOOD
FINISH WOOD
CONT WD FRAMING
WOOD BLOCKING
MATERIAL SYMBOLS
LVC FILL
GRANULAR FILL
CONCRETE MASONRY
FACE BRICK
CONCRETE
EARTH
EXISTING
CONSTRUCTION
ASPHALT
GLASS
RIGID OR TAPERED
INSULATION, EIFS
BATT INSULATION
GYPSUM BOARD
Contract No.:
Task Order No.:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Phase:
G-001
TITLE SHEET
Pine Ridge, SD
03/25/2022
DESIGN USP 795, 797, 800 PHARMACY RENOVATION
PINE RIDGE COMPREHENSIVE HEALTH CARE FACILITY
Final Construction Documents
DESIGN USP 795, 797, 800 PHARMACY
RENOVATION
Final Construction Documents
Checker Author
PINE RIDGE, SOUTH DAKOTA
H IH PINE 21100
75H70121F30008
HHSI102201800005I
SHEET INDEX
FIRE PROTECTION
F-000 FIRE PROTECTION TITLE SHEET
F-101 OVERALL 2ND FLOOR PLAN - FIRE PROTECTION
F-201 ENLARGED - FIRE PROTECTION
F-202 ENLARGED - FIRE PROTECTION
F-501 DETAILS - FIRE PROTECTION
F-502 DETAILS - FIRE PROTECTION
PLUMBING
P-000 PLUMBING TITLE SHEET
PD-101 OVERALL PLUMBING DEMOLITION PLAN
PD-401 ENLARGED PLUMBING DEMOLITION PLAN
P-101 OVERALL 2ND FLOOR PLAN - PLUMBING
P-401 ENLARGED PLUMBING PLANS
P-402 ENLARGED PLUMBING PLANS
P-501 DETAILS - PLUMBING
P-502 DETAILS - PLUMBING
P-601 PLUMBING SCHEDULES
P-901 WASTE & VENT RISER DIAGRAMS
P-902 DOMESTIC RISER DIAGRAM
MECHANICAL
M-000 HVAC TITLE SHEET
MD-101 OVERALL DEMO PLAN - MECHANICAL
MD-401 ENLARGED MECHANICAL DEMOLITION PLAN
MD-402 ENLARGED MECHANICAL DEMOLITION PLAN
MD-403 ENLARGED MECHANICAL DEMOLITION PLAN
MD-404 ENLARGED MECHANICAL DEMOLITION PLAN
M-101 OVERALL FLOOR PLAN - HVAC
M-102 OVERALL ROOF PLAN - HVAC
M-401 ENLARGED HVAC PLANS
M-402 ENLARGED HVAC PLANS
M-403 ENLARGED HVAC PIPING PLANS
M-404 ENLARGED HVAC PIPING PLANS
M-501 DETAILS - MECHANICAL
M-502 DETAILS - MECHANICAL
M-503 DETAILS - MECHANICAL
M-601 SCHEDULES - MECHANICAL
M-701 HVAC CONTROLS
ELECTRICAL
E-000 ELECTRICAL TITLE SHEET
E-101 OVERALL ELECTRICAL PLAN
E-201 LIGHTING PLANS
E-301 POWER PLANS
E-302 MECHANICAL POWER PLAN
E-400 LOW VOLTAGE DETAILS AND NOTES
E-401 LOW VOLTAGE SYSTEMS PLANS
E-501 RISER DIAGRAM AND PANEL SCHEDULES
E-502 PANEL SCHEDULES
SHEET INDEX
GENERAL
G-001 TITLE SHEET
G-002 ABA ACCESSIBILITY STANDARDS
G-003 ABA ACCESSIBILITY STANDARDS
G-004 CODE PLAN
G-005 ENLARGED PARTIAL CODE PLAN
G-006 PHASING PLAN
G-007 PHASING PLAN
DEMOLITION
AD101 DEMOLITION FLOOR PLAN - AREA A
AD102 DEMOLITION FLOOR PLAN - AREA B
ACD101 DEMOLITION RCP - AREA A
ACD102 DEMOLITION RCP - AREA B
ARCHITECTURAL
A-000 EXISTING PLAN - AREA EX1
A-001 EXISTING PLAN - AREA EX2
A-002 EXISTING PLAN - AREAS A & B
A-101 DIMENSION PLAN - AREA A
A-102 DIMENSION PLAN - AREA B
A-103 TAG PLAN - AREA A
A-104 TAG PLAN - AREA B
A-105 ROOF PLAN
A-301 BUILDING SECTIONS
A-302 WALL SECTIONS
A-303 WALL SECTIONS
A-601 DOOR & WINDOW INFORMATION
AC101 REFLECTED CEILING PLAN
AC102 REFLECTED CEILING PLAN DETAILS
INTERIORS
AI101 FINISH PLAN - AREA A
AI102 FINISH PLAN - AREA B
AI111 WALL PROTECTION PLAN
AI201 INTERIOR ELEVATIONS
AI202 INTERIOR ELEVATIONS
AI203 MILLWORK SECTION DETAILS
AW101 SIGNAGE PLAN
FURNITURE & EQUIPMENT
AQ101 EQUIPMENT PLAN
AQ102 EQUIPMENT SCHEDULE
05/26/2022
LC
LC
LC
60 min m in m in back wall
Note: inside finished dimensions measured at the center points of opposing sides side wall wall side
LC LC
LC
48 min m in control wall back wall seat wall
Note: inside finished dimensions measured at the center points of opposing sides
(a) elevation adult
9 min
6 min partition
6 min
6 min
(c) plan
6 min
(b) elevation children
12 min partition
LC LC
LC
36 min
60 min back wall side wall wall side front wall
Note: inside finished dimensions measured at the center points of opposing sides control wall seat wall back wall m a x m a x
(a) without seat
(b) with seat
6 max
6 max m a x
6 max back wall side wall side wall back wall wall side side wall m a x front wall back wall wall side
6 max
6 max side wall
16-18 405-455 430-485
17-19
(a) wheelchair accessible water closets
(b) ambulatory accessible water closets
LC CL
60 min m in
12 max
42 min
54 min
LC
transfer side
12 min
24 min
36 min
LC
m in
7-9 180-230 m a x m in
60 min
(a) adult wall hung water closet
(b) adult floor mounted water closet and children's water closet
60 min m in
4 max m a x alternate door location m in length of bathtub
12 min m in control end wall head end wall back wall
(a) removable in-tub seat
(b) permanent seat control end wall back wall head end wall m in length of bathtub
15 max head end wall
12 max m in control end wall
(b) plan back wall
205-255
8-10
(a) elevation
-9
-3
6 control end wall head end wall m in m in
12 max
24 max
(b) plan
24 min
8-10 205-255
(a) elevation
-9
-3 back wall
LC27 max m a x m a x
(b) with seat
(elevation)
(a) with seat
(elevation)
(c) without seat
(plan) back wall wall side
(d) with seat
(plan)
15 max side wall side wall front wall side wall back wall wall side back wall front wall
Control Surface, Typ.
back wall
27 max m a x m a x
(b) with seat
(a) without seat can be located on any wall of shower
1½ min
½ m in
1 / 4
LC
m in
15 max m a x side wall
LC
control end wall
T his Dr awing P rod uc ed b y t he U .S. A cc ess B oa rd
X
X
Note: X = tread depth
96 min
132 min
(a) car
(b) van
60 min
LC
18 min
18 min
45° centered on tactile characters
REFUGE
AREA OF
AREA OF
REFUGE
m in m a x
0 1 m in
MEN not in pictogram field
AREA OF
REFUGE
3/8 min
3/8 min
9.5
9.5
LC LC
LC
LC
1.6-2.4 41-61
(a) elevation (enlarged)
(b) plan
0.2 5.1 top diameter of
50%-65% of the base diameter base diameter of
0.9-1.4 (23-36 mm)
0.65 min
1.6-2.4 41-61
-5
LIBRARY
/8 -2
5 max 15 min 380125
(b) stall type
(a) wall hung type
17 max
13½ min 13½ min
35-37 890-940 m in m in
15-16 380-405
2½ max
½ m a x seat wall
15-16 380-405
560-585
22-23
-1
-3
(a) size
2½ max
½ m a x seat wall wall seat
(b) distance from wall
-3
-9
(a) stairs
(b) ramps
-9
-3
(c) walking surfaces
-3
-9
12 min
12 min
12 min
30° max
(c) curved nosing
(d) beveled nosing
(b) angled riser
1½ max 1½ max
(a) radius of tread edge
(typical for all profiles) radius ½ max
Contract No.:
Task Order No.:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Phase:
SEAL:
BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021
FIGURE 502.2 / 502.3
VEHICLE PARKING SPACES
FIGURE 504.5
STAIR NOSINGS
FIGURE 505.10.1
TOP AND BOTTOM HANDRAIL
EXTENSION AT RAMPS
FIGURE 505.10.2
TOP HANDRAIL EXTENSION
AT STAIRS
FIGURE 607.5
BATHTUB CONTROL
LOCATION
FIGURE 608.5.1
TRANSFER TYPE SHOHWER
COMPARTMENT CONTROL LOCATION
FIGURE 608.5.2
STANDARD ROLL-IN TYPE SHOWER
COMPARTMENT CONTROL LOCATION
FIGURE 505.4
HANDRAIL HEIGHT
FIGURE 505.5
HANDRAIL SECTION &
CLEARANCE
FIGURE 608.2.1
TRANSFER TYPE SHOWER
COMPARTMENT SIZE
AND CLEARANCE
FIGURE 608.2.2
STANDARD ROLL-IN TYPE SHOWER
COMPARTMENT SIZE AND CLEARANCE
FIGURE 608.2.3
ALTERNATE ROLL-IN TYPE SHOWER
COMPARTMENT SIZE AND CLEARANCE
FIGURE 608.3.1
GRAB BARS FOR TRANSFER
TYPE SHOWERS
FIGURE 608.3.2
GRAB BARS FOR STANDARD ROLL-IN
TYPE SHOWERS
FIGURE 604.2
WATER CLOSET LOCATION
FIGURE 604.7
DISPENSER OUTLET
LOCATION
FIGURE 604.3.1
SIZE OF CLEARANCE AT
WATER CLOSETS
FIGURE 604.5.1
SIDE WALL GRAB BAR
AT WATER CLOSETS
FIGURE 604.5.2
REAR WALL GRAB BAR
AT WATER CLOSETS
FIGURE 610.3.2
L-SHAPED SHOWER SEAT
FIGURE 610.3.1
RECTANGULAR SHOWER SEAT
FIGURE 608.5.3
ALTERNATE ROLL-IN TYPE SHOWER
COMPARTMENT CONTROL LOCATION
FIGURE 604.8.2
AMBULATORY ACCESSIBLE
TOILET COMPARTMENT
FIGURE 605.2
HEIGHT AND DEPTH OF URINAL
FIGURE 604.8.1.1
SIZE OF WHEELCHAIR ACCESSIBLE
TOILET COMPARTMENT
FIGURE 604.8.1.2
WHEELCHAIR ACCESSIBLE
TOILET COMPARTMENT DOORS
FIGURE 604.8.1.4
WHEELCHAIR ACCESSIBLE TOILET
COMPARTMENT TOE CLEARANCE
FIGURE 602.5
DRINKING FOUNTAIN
SPOUT LOCATION
FIGURE 607.2
CLEARANCE FOR BATHTUBS
FIGURE 607.4.1
GRAB BARS FOR BATHTUBS WITH
PERMANENT SEATS
FIGURE 607.4.2
GRAB BARS FOR BATHTUBS WITH
REMOVABLE IN-TUB SEATS
FIGURE 608.3.3
GRAB BARS FOR ALTERNATE
ROLL-IN TYPE SHOWERS
FIGURE 703.2.5
HEIGHT OF RAISED
CHARACTERS
DETECTABLE WARNING SURFACES AT PLATFORM BOARDING EDGES
SHALL BE 24 INCHES (610 mm) WIDE AND SHALL EXTEND THE FULL LENGTH
OF THE PUBLIC USE AREAS OF THE PLATFORM.
FIGURE 705.1
SIZE AND SPACING OF TRUNCATED DOMES
FIGURE 703.3.2
POSITION OF BRAILLE
FIGURE 703.6
PICTOGRAM FIELD
FIGURE 703.4.1
CHARACTER HEIGHT
FIGURE 703.4.2
LOCATION OF TACTILE SIGNS
AT DOORS
VERIFY STALL & ACCESS
AISLE WIDTH WITH A.H.J.
FIGURE 505.10.3
BOTTOM HANDRAIL
EXTENSION AT STAIRS
4" - 6" PERIMETER
ROUNDED
EDGES
2 1/4" max
NON-CIRCULAR CROSS
SECTION
SELECTED DETAILS FROM ADA/ABA/ANSI ACCESSIBILITY STANDARDS
DETAILS ARE TAKEN FROM THE 2010/2015 STANDARDS
m in
39 - 41
G-002
ABA ACCESSIBILITY STANDARDS
DESIGN USP 795, 797, 800 PHARMACY
RENOVATION
Pine Ridge, SD
03/25/2022
H IH PINE 21100
Final Construction Documents
Checker JWRIGHT
HHSI102201800005I
75H70121F30008 m a x elements <27" above floor flared sides 1:10 max slope slope slope
36 min at least as wide as curb ramp
12 max
12 max
-8
-2 m a x m in
0X > 12
X > 12
(b)(a)
4 max
X
X dominant direction of travel long dimension perpendicular to dominant direction of travel
½ max ramp run landinglanding
60 min 1525 1525
60 min landing ramp run ra m p r u n
60 min m in at least as wide as ramp run
(a) straight
(b) change in direction
48 min
24 min
24 min adjoining surface maximum slope curb ramp slope
12 min
12 min
42 min m in
X < 48
42 min
X < 48
36 min
36 min m in
(a) 180 degree turn
(b) 180 degree turn
(Exception) m in
48 min
24 max m in m in m in
24 max
11 min m in
8 min
9 min
(a) elevation
(b) plan m in
25 max 17-25
430-635
6 max m in
(a) elevation
(b) plan
X < 4
10 max m a x m a x m a x m a x
> 10-24 max 255-610
(a) (b)
10 max m a x m in m a x m a x
>20-25 max 510-635
20 max
(a) (b) m in m a x
36 min
X
(c) folding door
(a) hinged door
(b) sliding door
32 min
32 min
32 min
30 min
48 min m in m in
(a) forward
(b) parallel
48 min
48 min
(a) (b)
48 min
(c)
48 min m in m a x
5 2
X m in12 min
(c) front approach, push side, door provided with both closer and latch m in
(b) push side
X > 8 m in
18 min
X > 8
(a) pull side
(b) side approach m in m in
(a) front approach
24 min m in
(d) stop or latch approach
22 min m in
(c) pocket or hinge approach
60 min
X
(k) latch approach, push side, door provided with closer
24 min m in
24 min m in
(j) latch approach, push side
(i) latch approach, pull side, door provided with closer m in 0 610
24 min
24 min m in
(h) latch approach, pull side
(g) hinge approach, push side, door provided with both closer and latch m in
22 min m in
22 min
(f) hinge approach, push side
42 min 1065 5 m in
(e) hinge approach, pull side
36 min m in
(d) hinge approach, pull side m in12 min
(c) front approach, push side, door provided with both closer and latch m in
(b) front approach, push side m in
18 min
(a) front approach, pull side m in
24 min m in
36 min
12 min
12 min
60 min base a rm a rm
6.4
¼
¼ 6.4
½
6.4 ¼ max
½ max
Contract No.:
Task Order No.:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Phase:
SEAL:
BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021
SELECTED DETAILS FROM ADA/ABA/ANSI ACCESSIBILITY STANDARDS
DETAILS ARE TAKEN FROM THE 2010/2015 STANDARDS
FIGURE 302.3
ELONGATED OPENINGS IN FLOOR
OR GROUND SURFACES
FIGURE 302.2
CARPET PILE HEIGHT
FIGURE 303.2
VERTICAL CHANGE IN LEVEL
FIGURE 303.3
BEVELED CHANGE IN LEVEL AND
THRESHOLDS
FIGURE 304.3.2
T-SHAPED TURNING SPACE
m in
60 min
CIRCULAR TURNING
SPACE
FIGURE 307.4
VERTICAL CLEARANCE
FIGURE 404.2.4.1
MANEUVERING CLEARANCE AT MANUAL
SWINGING DOORS AND GATES
SLOPES AT THE REQUIRED MANEUVERING CLEARANCE EXITS SHALL
NOT EXCEED 2% IN ANY DIRECTION.
FIGURE 404.2.4.2
MANEUVERING CLEARANCES AT DOORWAYS w/o DOORS, SLIDING DOOR, GATES AND FOLDING DOORS
FIGURE 404.2.4.3
MANEUVERING CLEARANCE AT
RECESSED DOORS AND GATES
FIGURE 305.3
CLEAR FLOOR OR
GROUND SPACE
FIGURE 404.2.6
DOORS IN SERIES AND GATES IN SERIES
FIGURE 404.2.3
CLEAR WIDTH OF DOORWAYS
FIGURE 305.7.1
MANEUVERING
CLEARANCE
IN AN ALCOVE,
FORWARD APPROACH
FIGURE 305.5
POSITION OF CLEAR FLOOR
OR GROUND SPACE
FIGURE 308.2.1
UNOBSTRUCTED
FORWARD REACH
FIGURE 308.2.2
UNOBSTRUCTED HIGH
FORWARD REACH
FIGURE 308.3.1
UNOBSTRUCTED
SIDE REACH
FIGURE 308.3.2
UNOBSTRUCTED HIGH
SIDE REACH
FIGURE 307.2
LIMITS OF
PROTRUDING OBJECTS
FIGURE 307.3
POST-MOUNTED PROTRUDING
OBJECTS
M
A X
31 max. for Children's RR
See mech. specs for insulation of exposed piping.
24-27 for Children's RR
LAVATORY
FIGURE 406.4
LANDINGS AT THE
TOP OF CURB RAMPS
FIGURE 406.3
SIDES OF CURB RAMPS
FIGURE 405.9.2
CURB OR BARRIER EDGE
PROTECTION
FIGURE 306.2
TOE CLEARANCE
FIGURE 306.3
KNEE CLEARANCE
FIGURE 403.5.1
CLEAR WIDTH OF AN
ACCESSIBLE ROUTE FIGURE 403.5.2
CLEAR WIDTH AT TURN
FIGURE 405.9.1
EXTENDED FLOOR OR GROUND
SURFACE EDGE PROTECTION
FIGURE 406.2
COUNTER SLOPE OF SURFACES
ADJACENT TO CURB RAMPS
FIGURE 406.6
DIAGONAL OR CORNER
TYPE CURB RAMPS
DETECTABLE WARNING SURFACES SHALL EXTEND 24 INCHES (610 mm)
MINIMUM IN THE DIRECTION OF TRAVEL AND THE FULL WIDTH OF THE
CURB RAMP (EXCLUSIVE OF FLARES), THE LANDING, OR THE BLENDED
TRANSITION.
1:12 (MAX.) RAMP SLOPE
1:50 (MAX.) LANDING SLOPE
FIGURE 405.7
RAMP LANDINGS
FIGURE 305.7.2 MANEUVERING
CLEARANCE IN ALCOVE, PARALLEL
APPROACH
4" max
Fixed elements
RAMP MAY SLOPE 1:20 IF
ACCESSIBLE ROUTE APPROACH
IS PERPENDICULAR
RECESSED OBJECTS
G-003
ABA ACCESSIBILITY STANDARDS
DESIGN USP 795, 797, 800 PHARMACY
RENOVATION
Pine Ridge, SD
03/25/2022
H IH PINE 21100
Final Construction Documents
Checker JWRIGHT
HHSI102201800005I
75H70121F30008
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Copyright 2007
T ectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
S S
RPSRPS
R P
S R
P S
SS
S P
S P
SP SP
S P
S P
S S
S S
S S
S S
SS SS SS
SS
S S
S SS
RPS RPSRPS RPS RPS RPS RPS RPS
R P
S R
P S
R P
S R
P S
R P
S R
P S
RPS RPSRPS
SP
SP
S P
S P
SPSP
RPS RPS
R P
S R
P S
SS
SPSP
RPSRPS RPSRPS
S S
SS
S S
S
S S
SS
SS
SS
SSSS
SS SSSSSS
R P
S R
P S
S P
S P
R P
S R
P S
RPSRPS
SPSP
R P
S R
P S
S S
SS
SS
S S
SS SS
SS
S S
S S
S S
S S
S S
S S
S
S S S S
SS
S S
S S
SPSP
S P
S P
RPSRPS
RPSRPS
R P
S R
P S
R P
S R
P S
SPSP
S P
S P
S P
S P
SPSP
SP SP
S P
S P
SS
S
SSS
S S
SS
S S
SS SSSSS
SPSP
S P
S P
RPSRPS
R P
S R
P
SRPSRPS
S P
S P
SPSP
S P
S P
S P
SS SSSS
S S
S
S P
S P
SPSP SP
RPSRPS
S S
SS
SS
R P
S R
P S
R P
S R
P S
RPSRPS
R P
S R
P S
R P
S R
P S
R P
S R
P S
R P
S R
P S
RPS RPS
RPS RPS
R P
S R
P S
R P
S R
P S
RPS RPS
RPS RPS
R P
S R
P S
R P
S R
P S
R P
S R
P S
R P
S R
P
SRPSRPS
RPSRPS
SS
S S
S S
SS
SS
S S
SS
SS
SS
S S
S S
SS
SS
SS
FEC
F E
C
R P
S R
P S
R P
S R
P S
RPSRPS
R P
S R
P S
R P
S R
P S
RPSRPS
RPSRPS
R P
S R
P S
R P
S R
P S
RPSRPS
RPSRPS
FEC
FEC
FEC
F E
C
F E
C
S P
S P
SPSPSP
SP
S P
S P
SPSP
S P
S P
SP SP
S P
S P
SPSP
S P
S P
S P
S P
SPSP
S P
S P
S P
S P
S P
S P
F B
F B
F B
F B
FB FB
FB FB
S P
S P
S P
S P
SPSP
S P
S P
S P
S P
SPSP
S P
S P
S P
SPSP
S P
S P
SP SP
S P
S P
S P
S P
SPSP
S P
S P
SPSP
SS
SS
S S
S P
S P
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Copyright 2007
T ectonic Copyright 2007
T ectonic Cop yright 2007
T ectonic Cop yright 2007
OCCUPANCY 1 : GROUND FLOOR = 80,882 SF
GROUP I-2 OCCUPANCY
TYPE I-A CONSTRUCTION
FULLY SPRINKLED = Yes
TOTAL OCCUPANTS : 450
OCCUPANCY 2 : UPPER LEVEL = 4,752 SF
GROUP F-1 OCCUPANCY
TYPE II-B CONSTRUCTION
FULLY SPRINKLED = Yes
TOTAL OCCUPANTS : 16
OCCUPANCY 3 : UPPER LEVEL = 18,239 SF
GROUP B OCCUPANCY
TYPE II-B CONSTRUCTION
FULLY SPRINKLED = Yes
TOTAL OCCUPANTS : 183
LEGEND
BUILDING & LIFE SAFETY REQUIREMENTS
DESCRIPTION
WALL
RATING
NEW
PARTITION KEY IBC 2015
NFPA 2012
(NEW HC)
NFPA 2012
(EXIST. HC)
OPENINGS DAMPERS
RATING RFRNC. TYPE RFRNC.
BUILDING SEPARATION:
FIRE WALL (TYPE I)
3 HRIBC 705.4NOT
APPLICABLE
3 HR IBC 705.8
TABLE 715.4
FIRE
3 HR
IBC 705.11
IBC 715.5.1
IBC 716.5.1
NOT
APPLICABLE
BUILDING SEPARATION:
FIRE WALL (TYPE II)
2 HR IBC 705.4NOT
APPLICABLE
90 MIN IBC 705.8
TABLE 715.4
FIRE
90 MIN
IBC 705.11
IBC 715.5.1
iBC 716.5.1
NOT
APPLICABLE
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
2 HR IBC 508.3.2
IBC 508.3.2.3
90 MIN NFPA TABLE 8.3.4.2
IBC 706.7
FIRE
90 MIN
NFPA 18.1.3.3
NFPA 8.3
NFPA 90A 5.3.1.1
IBC 706.10
IBC 716.3.1
IBC 716.5.2
NFPA 19.1.3.3
NFPA 8.3
HORIZONTAL EXIT (& REFUGE AREA)
FIRE BARRIER
2 HR IBC 508.3.2
IBC 508.3.2.3
90 MIN FIRE
90 MIN
NFPA 19.2.2.5
NFPA 8.3
NFPA 18.2.2.5
NFPA 8.3
VERT. OPG. (EXIT ENCLSR/SHAFT)
FIRE BARRIER
(2 HR = 4 OR MORE STORIES)
(1 HR = LESS THAN 4 STORIES)
NFPA 7.1.3.2.1
NFPA 8.6
IBC 1020.1
IBC 707.4
NFPA TABLE 8.3.4.2
IBC 715.4/714.2
NOT
ALLOWED
ENCLOSURES
NFPA 7.1.3.2.1 (10)
SHAFTS
NFPA 90A 5.3.4.6
IBC 715.5.3
IBC 716.5.2
HR
2 HR
60 MIN
90 MIN
HR
2 HR
EXIT PASSAGEWAY (HORIZ.)
FIRE BARRIER
IBC 1021.1 NFPA 7.2.6.3
IBC 715.4/714.2
NFPA 18.2.2.7
NFPA 7.2.6
NOT
ALLOWED
NFPA 7.1.3.2.1 (10)NFPA 19.2.2.7
NFPA 7.2.6
60 MIN
90 MIN
ATRIUM SEPARATION
FIRE BARRIER
1 HR IBC 404.5 45 MIN FIRE
90 MIN
IBC 715.3.1
IBC 716.3.1
IBC 715.5.2
IBC 716.5.2
NFPA 8.6.7NFPA 8.6.7 NFPA 8..6.7 (1)
IBC 715.4/714.2
HAZ./INCIDENTAL USE
FIRE BARRIER
1 HR IBC 508.2
IBC 706.3.6
45 MIN
NFPA 8.7.1.3
IBC 706.7
IBC 715.4
NFPA 19.3.2.1
NFPA 8.7.1.1
FIRE
90 MIN
NFPA 18.3.2.1
NFPA 8.7.1.1
IBC 715.3.1
IBC 716.3.1
IBC 715.5.2
IBC 716.5.2
HAZ./INCIDENTAL USE
SMOKE PARTITIONS (SPRINKLERED)
NR-
RESIST
SMK
IBC 508.2
IBC 706.3.6
NR
SELF OR AUTO
CLOSING
IBC 710.5.3
IBC 715.4.7.3
IBC 508.2.2.1
NFPA 19.3.2.1.2
NFPA 8.4
SEE
NOTE B
SUBDIVIDING SPACES
SMOKE BARRIER (I-2 OCCUPANCY)
IBC 709.3
IBC 407.4
20 MIN NFPA TABLE 8.3.4.2
IBC 709.5
NFPA 18.3.7.1
NFPA 18.3.7.3
SMOKE
90 MIN
SEE NOTE [A]
NFPA 18/19.3.7.3(2)
IBC 709.8
IBC 716.5.5
SEE NOTE [C]
NFPA 19.3.7.1
1/2
HR
1 HR
SUITE SEPARATION
SMOKE PARTITION
NR IBC 1014.2.2NFPA 19.2.5.7 IBC 710.5.3
IBC 715.4.7.3
SEE
NOTE [B]
NR
SELF OR AUTO
CLOSING
NFPA 18.2.5
EXIT ACCESS CORRIDORS (I-2)
SMOKE PARTITIONS (SPRINKLERED)
NR-
RESIST
SMK
IBC 407.3
IBC 710.3
NRNFPA 18.3.6.2 IBC 407.3.1 SEE
NOTE [D]
NFPA 19.3.6.2
EXIT ACCESS CORRIDORS (I-1)
FIRE PARTITION (SPRINKLERED)
IBC 1017.1
IBC 708.1
20 MIN NFPA 18/19.3.6.3
IBC 714.2
IBC 715.4
NFPA 18.3.6.2.2 NONENFPA 19.3.6.2.4NR IBC 715.5.5.4
IBC 716.5.4
EXIT ACCESS CORRIDORS (I-1 OR I-2)
FIRE PARTITION (EXIST CONDITION)
(NON-SPRINKLERED)
NOT
PERMITTED
20 MIN IBC 714.2
IBC 715.4
FIRE (I-1)
SMOKE (I-2)
NFPA 19.3.6.2.2
IBC - NP
1/2 HR IBC
715.5.5.4.1
IBC 716.5.4.1
NFPA
18.3.6.2.2 - NP
IBC - NP
10/1
2"
34"
REQ'D. EXIT WIDTH
NO. OF OCC. EXITING
ACTUAL EXIT
WIDTH
NO. OF OCC./
NO. OF EXITS
NO. OCC. EXITING
(SMALLER ROOMS)
MAXIMUM OCCUPANCY
AREA
OCC. LOAD
FACTOR
1:50
FIRE EXTINGUISHER AND CABINET
FIRE ALARM CONTROL PANEL
FIRE SYSTEM ANNUNCIATOR ALARM
ANNUNCIATOR PANEL
PROPERTY LINE
FEC
FACP
FSA
FAA
STARTING
LOCATION
TP (TRAVEL PATH)
[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS
WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)
[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS
(NFPA 8.4.6) (IBC 710.7)
[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED
TO A SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 716.5.5)
[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED
ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)
NOTES:
SYMBOLS
RPS RPS RPS RPS
FB FB FB
FW FW FW
FB FB FB
FB FB FB
F B
F B
S S S
SP SP SP SP
CP (COMMON PATH)
DE (DEAD END CORRIDOR)
(50) NO.
OCCUPANTS
EXITING
LIFE SAFETY NOTES:
1. FOR GENERAL LIMITS OF WORK SEE SHEET G-004.
2. AT FIRE RATED DOOR LOCATIONS FRAMES AND DOORS SHALL BE LABELED
FOR THE INTENDED USE OR EQUIVALENT AS INDICATED IN THE DOOR SCHEDULE
ON SHEET A-601
3. NON-RATED SMOKE PARTITIONS SHALL BE CONSTRUCTED TO LIMIT THE
TRANSFER OF SMOKE. PARTITIONS SHALL EXTEND FROM FLOOR SLAB TO
UNDERSIDE OF THE FIRE-RESISTANCE RATED HORIZONTAL ASSEMBLY ABOVE.
THE SPACE ADJACENT TO THE DECK AND OTHER SURFACES AND THE SPACES
AROUND PENETRATION ITEMS SHALL BE CAULKED TO LIMIT THE FREE PASSAGE
OF SMOKE.
4. ALL FIRE RATED BARRIERS SHALL EXTEND FROM FLOOR SLAB TO UNDERSIDE
OF THE DECK ABOVE AS NOTED ON THE ARCHITECTURAL DRAWINGS. THE SPACE
ADJACENT TO THE DECK AND OTHER SURFACES, AND THE SPACES AROUND THE
PENETRATING ITEMS SHALL BE FIRESTOPPED. NOT ALL FIRE RATED BARRIERS
ARE DEPICTED. FIRE RATED BARRIERS ARE ONLY SHOWN FOR IN SCOPE AREAS.
RATED BARRIERS THAT EXIST OR MAY BE REQUIRED IN OUT OF SCOPE AREAS
ARE NOT DEPICTED.
DESIGNER OF RECORD CAN NOT VERIFY INTEGRITY OF
EXISTING CONDITIONS OUTSIDE THE SCOPE OF THIS
PROJECT. REVIEW PREVIOUS AS-BUILTS FOR LOCATIONS OF
OTHER RATED PARTITIONS.
EXIT SIGN
NFPA 90A 5.3.1.1
IBC 706.10
IBC 716.3.1
IBC 716.5.2
NFPA TABLE 8.3.4.2
IBC 706.7
NFPA 7.1.3.2.1
NFPA 8.6
FIRE
90 MIN
NFPA 18.3.2.1
NFPA 8.4
SUITE C - 3,793 SF
SUITE F - 722 SF
SUITE B - 4,599 SF
SUITE G - 5,067 SF
SUITE D - 9,038 SF
SUITE E - 2,516 SF
SUITE A - 8,285 SF
SUITE J - 7,971 SF
SUITE K - 7,008 SF
AREA OF
WORK
AREA OF
WORK
SUITE E2 - 910 SF
B OCCUPANCY
F1
OCCUPANCY
I-2 OCCUPANCY
I-2 OCCUPANCY
PROJECT CODES AND STANDARD APPLICABLE
CODE
IBC INTERNATIONAL BUILDING CODE, EXCEPT APPLY 2009 EDITION OF ICC A117.1 IN LIEU OF 2017 EDITION
NAME EDITION
NFPA 101 LIFE SAFETY CODE (LSC),
ABA ARCHITECTURAL BARRIERS ACT STANDARDS
FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS 2018
IPC INTERNATIONAL PLUMBING CODE 2019
IMC INTERNATIONAL MECHANICAL CODE 2021
USP 795 PHARMACEUTICAL COMPOUNDING - NONSTERILE PREPARATIONS
USP 797 PHARMACEUTICAL COMPOUNDING - STERILE PREPARATIONS
USP 800 HAZARDOUS DRUGS - HANDLING IN HEALTHCARE SETTINGS
FOR A FULL LIST OF APPLICABLE CODES SEE SECTION 2.3.2 OF THE IHS ARCHITECT AND ENGINEER DESIGN GUIDE 2019
FOR A FULL LIST OF APPLICABLE CODES SEE SECTION 2.2 OF THE 2012 LSC
CODE INFORMATION:
ANALYSIS FOR RENOVATION OF EXISTING BUILDING
PINE RIDGE COMPREHENSIVE HEALTH CARE FACILITY
GREAT PLAINS INDIAN HEALTH SERVICES
PINE RIDGE, SOUTH DAKOTA
CITY OF PINE RIDGE
DEPARTMENT OF HEALTH & HUMAN SERVICES -
DIVISION OF ENGINEERING SERVICES
HEALTH FACILITIES GROUP, LLC
330 N. MEAD ST. / SUITE 100
WICHITA, KS 67202 316-262-2500
CONTACT: WAYNE BONGARTZ OR MARK CRANE
I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE
SUBMITTED PLANS FOR THE ABOVE-REFERENCED PROJECT
COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:
SEE PROJECT CODES AND STANDARD APPLICABLE TABLE.
INTERNATIONAL BUILDING CODE AND LIFE SAFETY CODE
REQUIREMENTS
ORIGINAL CONSTRUCTION (1993) - I-2, F-1 OCCUPANCY
ADDITION CONSTRUCTION (2008) - B OCCUPANCY
ADDITION CONSTRUCTION (2019) - I-2 OCCUPANCY
NFPA TYPE II-(111) PER ORIGINAL CONSTRUCTION DOCUMENTS.
NFPA 101, CHAPTER 18, NEW HEALTH CARE OCCUPANCIES,
HOSPITAL (I-2) PER ORIGINAL CONSTRUCTION DOCUMENTS.
55 FEET
TWO STORY - 40 FEET
44,000 SF (SPRINKLED)
108,043 SF (PER ORIGINAL DOCUMENTS)
HEIGHT AND AREA COMPLY WITH THE 2018 IBC LIMITATIONS FOR
DESIGNATED OCCUPANCIES AND CONSTRUCTION TYPES, IBC
CHAPTER 5
1 HR REQUIRED, PROVIDED
1 HR REQUIRED, PROVIDED
1 HR REQUIRED, PROVIDED
1 HR REQUIRED, PROVIDED
1 HR REQUIRED, PROVIDED
1 HR REQUIRED, PROVIDED
1 HR REQUIRED, PROVIDED
N/A N/A
COMMON PATH DEAD END EXIT TRAVEL DISTANCE
100 FEET 30 FEET 200 FEET
NR NR NR (NO REQUIREMENT)
SMOKE RESISTANT CONSTRUCTION REQUIRED (LSC 19.3.6.1),
PROVIDED FULL HEIGHT PARTITIONS PER UFC 4-510-01:3-7.1.
FIRE ,SMOKE RATED CONSTRUCTION REQUIRED (IBC 1020.1, LSC
18.3.6.2.3), PROVIDED FULL HEIGHT PARTITIONS PER UFC
4-510-01:3-7.1.
PER NFPA 101 18 / 19.2.3.4
REFERENCE OVERALL LIFE SAFETY PLAN AND EXISTING DRAWING
DOCUMENTS.
SMOKE RESISTANT CONSTRUCTION WITH SELF OR AUTOMATIC
CLOSING AND LATCHING DOORS REQUIRED (LSC 19.3.2.1)
PROVIDED.
1-HOUR RESISTANT CONSTRUCTION WITH SELF OR AUTOMATIC
CLOSING AND LATCHING DOORS REQUIRED (LSC 18.3.2.1)
PROVIDED.
REQUIRED (UFC 3-600-01: 4-2.2), (EXISTING) WET SYSTEM
THROUGHOUT. PER SOW 6.9.3.4 LOA3 AREAS CONTRACTOR MAY
MODIFY FIRE SPRINKLER SYSTEM TO MEET 01 10 11 CRITERIA.
NOT REQUIRED, NOT PROVIDED.
MANUAL SYSTEMS REQUIRED (LSC 18/19.3.4), PROVIDED.
REQUIRED (IMC 606), PROVIDED FOR AIR HANDLER UNIT
SHUTDOWN.
REQUIRED (UFC 4-010-01:2-3.6), PROVIDED.
NOT REQUIRED, NOT PROVIDED.
REQUIRED (LSC 18/19.3.5.12), PROVIDED PER NFPA 10.
REQUIRED (LSC 18/19.2.10.1). PROVIDED WITH EMERGENCY POWER.
REQUIRED (LSC 18/19.2.8). PROVIDED WITH EMERGENCY POWER.
1. PROJECT INFORMATION
CONSTRUCTION PURPOSE:
FACILITY:
OWNER:
LOCATION:
FIRE DEPARTMENT:
REVIEWING AUTHORITY:
ARCHITECT:
CODE REGULATIONS
& CRITERIA:
CODES APPROACH:
2. BASIC BUILDING INFORMATION
YEAR CONSTRUCTED:
OUTPATIENT ADDITION
EMERGENCY DEPT. ADDITION
3. NEW RENOVATION - EXISTING
BUILDING INFORMATION
CONSTRUCTION CLASSIFICATION:
OCCUPANCY CLASSIFICATION:
4. HEIGHT/AREA LIMITATIONS
ANALYSIS
ALLOWABLE HEIGHT ANALYSIS:
ALLOWABLE HEIGHT:
IBC TABLE 504.3 & 504.4
ACTUAL HEIGHT:
ALLOWABLE AREA ANALYSIS:
ALLOWABLE AREA:
IBC TABLE 506.2
ACTUAL AREA:
HEIGHT AND AREA CONCLUSION:
5. FIRE RESISTANT BUILDING
ELEMENTS IBC TABLE 601
STRUCTURAL FIRE PROTECTION:
STRUCTURAL FRAME:
EXTERIOR BEARING WALLS:
INTERIOR BEARING WALLS:
EXTERIOR NONBEARING WALLS:
INTERIOR NON BEARING WALLS:
FLOOR/CEILING ASSEMBLIES:
ROOF/CEILING ASSEMBLIES:
EXTERIOR OPENINGS
PROTECTED:
UNPROTECTED:
6. PASSIVE FIRE SAFETY FEATURES
LIFE SAFETY CODE REQUIREMENTS
FOR A FULLY SPRINKLED BUILDING:
NEW HEALTH CARE:
EXISTING HEALTH CARE:
CORRIDOR CONSTRUCTION
EXISTING:
NEW:
MINIMUM CORRIDOR WIDTH - I-2
SUITE COMPARTMENTATION
INCIDENTAL USE SEPERATION -
EXISTING
STORAGE ROOMS > 100 SF:
INCIDENTAL USE SEPERATION - NEW
STORAGE ROOMS > 100 SF:
6. ACTIVE FIRE SAFETY FEATURES
AUTOMATIC SPRINKLER SYSTEM:
STANDPIPES:
FIRE ALARM SYSTEM:
DETECTION SYSTEM:
MASS NOTIFICATION SYSTEM:
SMOKE CONTROL SYSTEM:
PORTABLE FIRE EXTINGUISHERS:
EXIT IDENTIFICATION:
EXIT ILLUMINATION:
SMOKE
COMPARTMENT #2E
13,786 SF
SMOKE
COMPARTMENT #2D
12,722 SF
2D
2E
2G
2C
2A
2K
2H
2B
2J
2F
SMOKE
COMPARTMENT #2G
5,186 SF
SMOKE
COMPARTMENT #2F
4,680 SF
SMOKE
COMPARTMENT #2B
5,873 SF
SMOKE
COMPARTMENT #2J
17,929 SF
SMOKE
COMPARTMENT #2C
17,036 SF
SMOKE
COMPARTMENT #2A
9,023 SF
SMOKE
COMPARTMENT #2H
8,223 SF
SMOKE
COMPARTMENT #2K
7,397 SF
Contract No.:
Task Order No.:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Phase:
SEAL:
BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021
G-004
CODE PLAN
DESIGN USP 795, 797, 800 PHARMACY
RENOVATION
Pine Ridge, SD
03/25/2022
H IH PINE 21100
Final Construction Documents
Checker Author
HHSI102201800005I
75H70121F30008
1" = 30'-0"
LIFE SAFETY PLAN - OVERALL - LEVEL 1
1" = 80'-0"
KEY PLAN - ADDITION INDEX
N 1" = 30'
15' 30' 60'0'
RPS RPSRPS RPS RPS RPS RPS RPS
R P
S R
P S
R P
S R
P S
R P
S R
P S
RPS RPSRPS
SP
SP
S P
S P
SP SP
RPS RPS
R P
S R
P S
SS
SPSP
RPSRPS RPSRPS
S S
SS
S S
S
S S
SS
SS
SS
SS
SS
SS SSSSSS
R P
S R
P S
R P
S R
P S
RPSRPS
SPSP
R P
S R
P S
SS
SS
S S
S S
SS
S S
S S
S S
S S
S S
S S
S
S S
S S
S S
S S
S S
SPSP
S P
S P
RPSRPS
S P
S P
S
PS
P
SP SP
S P
S P
S S
S SS
S P
S P
SPSP SP
RPSRPS
R P
S R
P S
RPS RPS
RPS RPS
SS
S S
S S
S
SS
SS
SS
S S
S S
SS
T ectonic Cop yright 2007
T ectonic Cop yright 2007
FEC
F E
C
T ectonic Cop yright 2007
T ectonic Cop yright 2007
T ectonic Copyright 2007
T ectonic Copyright 2007
T ectonic Cop yright 2007
S P
S P
SPSP
SP
SP
S P
S P
SPSP
S P
S P
SP SP
S P
S P
SPSP
S P
S P
S P
S P
SPSP
S P
S P
T ectonic Cop yright 2007
F B
F B
F B
F B
FB FB
FB FB
S P
S P
SP
S P
S P
S P
S P
SPSP
SS
SS
S S
S P
S P
S S
RPSRPS
R P
S R
P S
SS
SS
S S
SS
S S
SS
S S
SSS
SPSP
S P
S P
RPSRPS
R P
S R
P S
RPSRPS
S P
S P
SPSP
S P
S
S S
S
S P
S P
S P
SPSP
S P
S P
SP SP
S P
S P
S P
S P
SPSP
S P
S P
SPSP
A
B
SHADED AREA EQUALS - NO ARCHITECTURAL WORK
TO BE DONE IN THIS AREA - REFER TO FIRE
PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING
AND LVS DRAWINGS FOR RELATED SCOPE OF WORK
AND ADDITIONAL NOTES AND DETAILS.
SUITE C - 3,793 SF
SUITE G - 5,067 SF
SUITE D - 9,038 SF
SUITE A - 8,285 SF
CAGE
CONSULT
#1
OUTPATIENT
PHARMACY
RECEIVING/
HAZ. STOR.
HIGH
DENSITY
SHELVINGROI TECH
WORKSPACE
OFFICE #2
OFFICE #1
HAZ. STOR.
BREAK
ROOM &
LOCKERS
WAITING
REGIST
RECEPTION
ADMIN
FUTURE
FUTURE
RECEPTION
WALK-UP
PHARMACY
WALK-UP
DISPENSING
WINDOWS
WORK
AREA
CONSULT
#1
CONSULT
#2
CONSULT
#3
NON-STERILE
COMPOUNDING
142' - 7"
2 2
1:150
1:300
1:300
1:150
CONTRACTOR TO VERIFY
THAT EXISTING WALL
CONSTRUCTION MEETS NEW
CODE WALL REQUIREMENTS
CONTRACTOR TO
VERIFY THAT EXISTING
DOOR MEETS NEW
CODE REQUIREMENTS
SUITE D - 9,038 SF SUITE E - 2,516 SF
INPATIENT
PHARMACY
HD-BUFFER
ANTEROOM
BUFFER
HIGH
DENSITY
SHELVING
1:150
OR-1
OR-2
CENTRAL
STERILE
STORAGE
CLEAN
WORKROOM
ETO
ETO
SUBSTERILE
OFFICE
TOILET
ELEC
BREAK
ROOM
RAD/DIAGRAD/FLUOR
RADIOLOGY
WAITING
SOILED
NURSERY
CORRIDOR
TLT
STORAGE
NURSE
STATION
TOILET
WAITING
CORRIDOR
WAITING
STAFF
LOUNGE
IT CLOSETSTORAGE
STAFF
LOUNGE
STORAGE
OPEN OFC
OFFICE
CORRIDOR
TLT
VENIPUNCTURE
RECEPTION
TLT
URINALYSIS
CHEMISTRY
JANSTORAGESTORAGEMICRO
OFFICE HEM/BLOOD
BLOOD
BANK
CORRIDOR
LAB
WAITING
JAN
ELEC
ENTRY
LOBBY
INFO
VEST
OPER
VEST
MEN
WOMEN
EDF CORRIDOR
CORRIDOR
TEL
CORRIDOR
OFFICE
CORRIDOR
CORRIDOR
IT CLOSET
TLT
CORRIDOR
RECEPTION
NON
STERILE
EQUIPMENT
OFFICE
STORAGE
GENERAL
WAITING
NURSE
STATION
REGISTRATION
MEDICATION STORAGE
TOILET ELEC
RECEPTION
CORRIDOR
CORRIDOR
E FILE OFFICE
OFFICE
CORRIDOR
BEHAVIORAL
HEALTH
TREATMENT
TREATMENT
TRIAGE 4 TREATMENT
TREATMENT
CORRIDOR
ELEC
RADIOLOGY
SUPPLY
TLT DB 5
EXAM 3
CORRIDOR
WOMEN
LOCKER
VEST
ULTRASOUND
CORRIDOR
TLT
DB 3 DB 4
STAFF
LOUNGE
MEN
LOCKER
TLT
IP HOLD
CB 1 VEST CB 2
TOILET
1 BED
PATIENT
TOILET
1 BED
PATIENT
TOILET
1 BED
PATIENT
TOILET
1 BED
PATIENT
TOILET
1 BED
PATIENT
TOILET
1 BED
PATIENT
2 BED
PATIENT
NURSE
STATION
NOUR DICTION
PRE OP ELEC
EQUIPJAN
WAIT/ICU
SOILED
UTILITY
OFFICE
VEST
MEN WOMEN
IT CLOSET
ELEC
1 BED
PATIENT
1 BED
PATIENT
1 BED
PATIENT
LOUNGE
VEST
TLT
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
ELEV
STAIRS
CORRIDOR
CORRIDOR
CORRIDORCORRIDOR
PATIENT
HOLD
TLT
SCREENING
CORRIDOR
1 BED
PATIENT
TEL.
WC
STORAGE
Contract No.:
Task Order No.:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Phase:
SEAL:
BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021
G-005
ENLARGED PARTIAL CODE PLAN
DESIGN USP 795, 797, 800 PHARMACY
RENOVATION
Pine Ridge, SD
03/25/2022
H IH PINE 21100
Final Construction Documents
Checker Author
HHSI102201800005I
75H70121F30008
N
4' 8' 16'
1/8" = 1'-0"
0'
N
4' 8' 16'
1/8" = 1'-0"
0'
1" = 120'-0"
KEY PLAN - A & B
1/8" = 1'-0"
LIFE SAFETY PLAN - AREA A - LEVEL 1
1/8" = 1'-0"
LIFE SAFETY PLAN - AREA B - LEVEL 1
REFER TO SHEET G-004 FOR BUILDING & LIFE SAFETY
REQUIREMENTS LEGEND.
FEC
F E
C
PHASE 1
PHASE 3
T1
T1 T1T1
T1
T1
T1
T1
T1
T1T1
T1
T1
T1
M
IN
4' - 6" MIN.
PHASE 1
PHASE 2
T2
T2
T2
T1 T1 T1T1
PHASING LEGEND
AREA A
1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AND OVERVIEW OF
DEPARTMENT TRANSITIONS AND RENOVATIONS. FINAL PHASING PLANS TO
BE COORDINATED WITH THE FACILITY BEFORE ANY WORK IS IS COMPLETED
AND IS THE RESPONSIBILITY OF THE CONTRACTOR..
2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
PHASE 1
PHASE 2
PHASE 3
PHASE 1
PHASE 2
PHASE 3
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. RELOCATE EXISTING MEDICAL RECORDS DEPARTMENT (C101, C103, AND C104).
RELOCATE ROI OFFICE (C100) TO EXISTING OFFICE (B404). RELOCATE RECEPTION
AREA (C107) TO INFO (A401). VERIFY TEMPORARY ROOM LOCATIONS WITH HOSPITAL
ADMINISTRATION.
2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR
LOCATIONS. VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE
ANY CONSTRUCTION IS TO BEGIN.
3. DEMO AREA- REFER TO DEMOLITION PLANS.
4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. RELOCATE EXISTING OUTPATIENT PHARMACY (C202) TO NEW OUTPATIENT PHARMACY
(C203). OUTPATIENT PHARMACY WILL USE TWO AVAILABLE WINDOWS ON ANGLED WALL
WHILE PHASES 2 AND 3 ARE UNDER CONSTRUCTION.
2. RELOCATE ROI FROM TEMPORARY LOCATION (B404) BACK INTO ORIGINAL SPACE (C100).
3. RELOCATE EXISTING INPATIENT PHARMACY (E101) TO EXISTING OUTPATIENT PHARMACY
(C202).
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. MOVE INPATIENT PHARMACY FROM TEMPORARY LOCATION (C202) BACK TO ORIGINAL
LOCATION (E101) UPON COMPLETION OF AREA B PHASE 2.
2. OUTPATIENT PHARMACY WILL CONTINUE TO USE TWO AVAILABLE WINDOWS ON
ANGLED WALL WHILE PHASES 2 AND 3 ARE UNDER CONSTRUCTION.
3. RELOCATE CONSULT ROOMS (C201 & C209) TO OFFICE B404.
4. INSTALL TEMPORARY WALL PARTITIONS REFER TO PHASING PLANS FOR LOCATIONS.
VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY
CONSTRUCTION IS TO BEGIN.
5. DEMO AREA REFER TO DEMOLITION PLANS.
6. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.
PHASING LEGEND
AREA B
PHASE 1
PHASE 2
PHASE 1
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. RELOCATE EXISTING MED SUPPLY (E272) AND OFFICE (E274). VERIFY LOCATIONS WITH
HOSPITAL ADMINISTRATION.
2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR LOCATIONS.
VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY
CONSTRUCTION IS TO BEGIN. NOTE INPATIENT PHARMACY IS A SECURE AREA AND WILL
NEED TO REMAIN SECURE DURING RENOVATIONS.
3. DEMO AREA- REFER TO DEMOLITION PLANS.
4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.
5. THE EXISTING DOOR IN E273 WILL REMAIN UNTIL THE COMPLETION OF PHASE 2 TO
ALLOW TEMPORARY ACCESS INTO THE HOOD ROOMS. CONTRACTOR TO COORDINATE
WITH FACILITY.
PHASE 2
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. RELOCATE EXISTING INPATIENT PHARMACY (E101) TO EXISTING OUTPATIENT
PHARMACY (C202).
2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR LOCATIONS.
VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY
CONSTRUCTION IS TO BEGIN. NOTE INPATIENT PHARMACY IS A SECURE AREA AND WILL
NEED TO REMAIN SECURE DURING RENOVATIONS.
3. DEMO AREA- REFER TO DEMOLITION PLANS.
4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.
5. MOVE INPATIENT PHARMACY BACK INTO THE SPACE.
1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AND OVERVIEW OF
DEPARTMENT TRANSITIONS AND RENOVATIONS. FINAL PHASING PLANS TO
BE COORDINATED WITH THE FACILITY BEFORE ANY WORK IS IS COMPLETED
AND IS THE RESPONSIBILITY OF THE CONTRACTOR..
2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AN OVERVIEW OF
DEPARTMENT TRANSITIONS AND RENOVATIONS. SEE GENERAL
CONTRACTORS PROJECT SCHEDULE AND TRANSITION PLAN FOR
ADDITIONAL DETAILS AND INFORMATION.
2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
3. MATERIAL PATHS - CONTRACTOR SHALL LIMIT MATERIAL TRAFFIC
THROUGH FACILITY TO OFF-PATIENT CORRIDORS DURING OPERATING
HOURS. VERIFY WITH GOVT. CORRIDORS THAT ARE TO BE DEEMED
ACCEPETABLE.
4. INTERIM LIFE SAFETY MEASURES - PATHS OF EGRESS TO OCCUPIED
AREAS SHALL NOT BE BLOCKED OR ALTERED DURING OPERATING
HOURS. SPRINKLER SYSTEM ZONE SHUT-DOWNS FOR MODIFICATIONS
SHALL BE SCHEDULED OUTSIDE OPERATING HOURS AND WILL NOT
AFFECT THE LIFE SAFTEY OF FACILITY OCCUPANTS.
5. CRAWL SPACE AND PENTHOUSE ARE NOT AFFECTED BY TRANSITION
SPACES OR CONSTRUCTION PHASING.
6. HATCH PATTERNS DIFFER TO SHOW CONTRAST BETWEEN SUB-PHASES.
REF. PHASING LEGEND FOR ADDITIONAL INFORMATION.
PHASING & TRANSITION NOTES
1. SEE ILSM (INTERIM LIFE SAFETY MEASURES) FOR REQUIREMENTS IN TEMPORARY
CONSTRUCTION FACILITES AND CONTROLS SPECIFICATIONS FOR FULL ILSM
INFORMATION.
2. ENSURE EXITS HAVE FREE AND UNOBSTRUCTED EGRESS. IN SUCH INSTANCES
FACILITY PERSONNEL SHALL RECEIVE TRAINING IF ALTERNATE EXITS ARE
DESIGNATED.
3. ENSURE FREE AND UNOBSTRUCTED ACCESS BY EMERGENCY SERVICES FROM
THE OUTSIDE AND FROM WITHIN THE FACILITY.
4. ENSURE FIRE ALARM, DETECTION, AND SUPPRESSION SYSTEMS ARE NOT
CRITICALLY IMPAIRED. A TEMPORARY EQUIVALENT SYSTEM WILL BE PROVIDED
WHEN A FIRE PROTECTION SYSTEM IS CRITICALLY IMPAIRED, AND WILL BE
INSPECTED AND TESTED ON A MONTHLY BASIS.
5. ENSURE TEMPORARY CONSTRUCTION PARTITIONS ARE SMOKE TIGHT AND BUILT
OF NON-COMBUSTIBLE MATERIALS TO PREVENT THE DEVELOPMENT OR SPREAD
OF FIRE.
6. STRICTLY PROHIBIT SMOKING IN OR ADJACENT TO ALL CONSTRUCTION AREAS.
7. DEVELOP AND ENFORCE STORAGE, HOUSEKEEPING, AND DEBRIS REMOVAL
PRACTICES THAT REDUCE THE FLAMMABLE AND COMBUSTIBLE FIRE LOAD OF
THE BUILDING TO THE LOWEST LEVEL NECESSARY FOR DAILY OPERATIONS.
8. CLOSE COORDINATION WITH FACILITY STAFF WILL BE REQUIRED FOR
SCHEDULING ALL WORK WITHIN THE CONTRACT. CONTRACTOR SHALL EXPECT
DELAYS IN WORK OR WORK TO BE OUTSIDE OF NORMAL BUSNISS HOURS AND
SHALL BID THE WORK ACCORDINGLY. THE SUCCESSFUL CONTRACTOR WILL BE
REQUIRED TO COMPLETE ALL PCRA (PRE-CONSTRUCTION RISK ASSESSMENT) /
ICRA (INFECTION CONTROL RISK ASSESSMENT) PAPERWORK BEFORE STARTING
ANY CONSTRUCTION UNDER THIS CONTRACT.
9. THE CONTRACTOR WILL ALSO BE REQUIRED TO WORK CLOSELY WITH INFECTION
CONTROL AND SAFETY STAFF TO OBTAIN AND POST ANY REQUIRED PERMITTING
FOR SPECIFIC WORK UNDER THIS CONTRACT. PROPER CONSTRUCTION
BARRIERS SEPERATING AREAS OF CONSTRUCTION WITH PATIENT CARE AREAS
WILL BE REQUIRED.
10. BUILDING IS OCCUPIED 24/7. SPRINKLER SHUTDOWNS SHALL BE LIMITED TO 10
HOURS WITHIN A 24 HOUR PERIOD OR AN APPROVED FIRE WATCH SHALL BE
ESTABLISHED PER NFPA 25 -2011; 15.5.2 (4).
INTERIM LIFE SAFETY MEASURES NOTES
1. INSTALL PERMANENT DIRECTIONAL SIGNAGE DIRECTORIES AS PHASING
ALLOWS. SEE AW SHEETS FOR PERMANENT SIGNAGE REQUIREMENTS.
SIGNAGE MESSAGE INSERTS SHALL BE UPDATED DURING RENOVATION
PROCESS AS REQUIRED FOR DEPARTMENTAL MOVES AND TEMPORARY
LOCATIONS.
2. G.C. TO BE RESPONSIBLE FOR TEMPORARY SIGNAGE. G.C. TO COORDINATE
WITH HOSPITAL AND STAFF SIGNAGE MESSAGE AND LOCATIONS BEFORE ANY
TEMPORARY SIGNAGE IS PLACED.
TEMPORARY SIGNAGE NOTES
PUBLIC SIDE
3 5/8" MTL. STUDS
(1) LAYER 1/2" VINYL WRAPPED
DWB W/ TRIM STRIPS OVER
SEAMS OR (1) LAYER 1/2" GWB,
TAPED, MUDDED AND PAINTED.
VINYL BASE
FINISHED FLOOR
FINISHED CEILING
DUST BARRIER, ATTACH TO
TOP OF WALL AND ROOF DECK.
UNDERSIDE OF
STRUCTURE ABOVE
CONSTRUCTION SIDE
AT LEVEL 4 INFECTIOUS
CONTROL AREAS PROVIDE
DUST BARRIER ON
CONSTRUCTION SIDE OF
PARTITION FROM FLOOR
TO UNDERSIDE OF DECK
MARKED T1 ON PLANS
OFFICE
D145
TOILET
D144
ELEC
C600
BULK
COMP/SS/STOR
C204
WAITING
A119
IT CLOSET
C301
STORAGE
C300
STAFF
LOUNGE
C302
STORAGE
C303
OPEN OFC
C304
OFFICE
C305
CORRIDOR
C306
TLT
C309
VENIPUNCTURE
C400
TLT
C402
URINALYSIS
C404
CHEMISTRY
C412
ENTRY
LOBBY
A403
INFO
A401
VEST
A402
STORAGE
B126A
JAN
B129
VEST
B130
MEN
B400
WOMEN
B402
EDF
B406
C O
R R
ID
O
R B
C
O R
R
ID
O R
B
TEL
B405
CORRIDOR
B409
STAIRS
B411
ELEV
B412TLT
B500
OFFICE
B404
CORRIDOR
D601A
CORRIDOR
D600
TLT
C403
CORRIDOR
A404
VEST
B410
NON
STERILE
EQUIPMENT
D300
OFFICE
C100
RECORDS
C105
PHARMACY
WAITING
C200
CONSULT 1
C201
OFFICE
C205
CONSULT 3
C207
CONSULT 2
C209
PHARMACY
C202
CAGE
C202A
TOILET
E200 1 BED
PATIENT
E202
TOILET
E204
1 BED
PATIENT
E205
TOILET
E207 1 BED
PATIENT
E208
TOILET
E209
1 BED
PATIENT
E211
TOILET
E213 1 BED
PATIENT
E214
TOILET
E215
1 BED
PATIENT
E217
NURSE
STATION
E275
NOUR
E276
DICTION
E277
PRE OP
D454
ELEC
D605
EQUIP
D509
JAN
D510
WAIT/ICU
D511
SOILED
UTILITY
D512
MEN
E305
WOMEN
E306
IT CLOSET
E271
ELEC
E307
1 BED
PATIENT
E260
1 BED
PATIENT
E261
1 BED
PATIENT
E264
LOUNGE
E267
VEST
E268
TLT
E269
OFFICE
E270
CORRIDOR
E290
CORRIDOR
E291
CORRIDOR
E296
ELEV
H403
STAIRS
H405 CORRIDOR
E303
CORRIDOR
D603
CORRIDOR
D602
TEL.
E303
WC
STORAGE
E297
PUBLIC SIDE
3 5/8" MTL. STUDS
(1) LAYER 1/2" VINYL WRAPPED
DWB W/ TRIM STRIPS OVER
SEAMS OR (1) LAYER 1/2" GWB,
TAPED, MUDDED AND PAINTED.
VINYL BASE
FINISHED FLOOR
FINISHED CEILING
DUST BARRIER, ATTACH TO
TOP OF WALL AND ROOF DECK.
UNDERSIDE OF
STRUCTURE ABOVE
CONSTRUCTION SIDE
MARKED T2 ON PLANS
A
B
Contract No.:
Task Order No.:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Project Phase:
SEAL:
BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021
G-006
PHASING PLAN
DESIGN USP 795, 797, 800 PHARMACY
RENOVATION
Pine Ridge, SD
03/25/2022
H IH PINE 21100
Final Construction Documents
Checker Author
HHSI102201800005I
75H70121F30008
1/8" = 1'-0"
PHASING PLAN - AREA A - PHASE 1 - LEVEL 1
1/8" = 1'-0"
PHASING PLAN - AREA B - PHASE 1 - LEVEL 1
N
4' 8' 16'
1/8" = 1'-0"
0'
N
4' 8' 16'
1/8" = 1'-0"
0'
1 1/2" = 1'-0"
TEMPORARY PHASING PARTITION TYPE 1
1 1/2" = 1'-0"
TEMPORARY PHASING PARTITION TYPE 2
1" = 120'-0"
KEY PLAN - A & B
FEC
E
C
PHASE 3
PHASE 1
COMPLETE
RECEIVING/
HAZ. STOR.
C206
HAZ. STOR.
C207
ROI
C100
NON-STERILE
COMPOUNDING
C205
CAGE
C204
DISPENSING
WINDOWS
C202
OUTPATIENT
PHARMACY
C203
HIGH
DENSITY
SHELVING
C208 TECH
WORKSPACE
C209
OFFICE #2
C210
OFFICE #1
C211
BREAK
ROOM &
LOCKERS
C212
WORK
AREA
C213
CONSULT
#2
C215
CONSULT
#3
C214
CONSULT
#1
C216
FUTURE
C601
WAITING
C200
RECEPTION
A408
REGIST
A409ADMIN
A410
T1
T1
T1
T1
T2 T2
T2
T2T2
FUTURE
A411
PHASE 2
PHASE 1
COMPLETE
PHASING LEGEND
AREA A
1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AND OVERVIEW OF
DEPARTMENT TRANSITIONS AND RENOVATIONS. FINAL PHASING PLANS TO
BE COORDINATED WITH THE FACILITY BEFORE ANY WORK IS IS COMPLETED
AND IS THE RESPONSIBILITY OF THE CONTRACTOR..
2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
PHASE 1
PHASE 2
PHASE 3
PHASE 1
PHASE 2
PHASE 3
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. RELOCATE EXISTING MEDICAL RECORDS DEPARTMENT (C101, C103, AND C104).
RELOCATE ROI OFFICE (C100) TO EXISTING OFFICE (B404). RELOCATE RECEPTION
AREA (C107) TO INFO (A401). VERIFY TEMPORARY ROOM LOCATIONS WITH HOSPITAL
ADMINISTRATION.
2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR
LOCATIONS. VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE
ANY CONSTRUCTION IS TO BEGIN.
3. DEMO AREA- REFER TO DEMOLITION PLANS.
4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. RELOCATE EXISTING OUTPATIENT PHARMACY (C202) TO NEW OUTPATIENT PHARMACY
(C203). OUTPATIENT PHARMACY WILL USE TWO AVAILABLE WINDOWS ON ANGLED WALL
WHILE PHASES 2 AND 3 ARE UNDER CONSTRUCTION.
2. RELOCATE ROI FROM TEMPORARY LOCATION (B404) BACK INTO ORIGINAL SPACE (C100).
3. RELOCATE EXISTING INPATIENT PHARMACY (E101) TO EXISTING OUTPATIENT PHARMACY
(C202).
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. MOVE INPATIENT PHARMACY FROM TEMPORARY LOCATION (C202) BACK TO ORIGINAL
LOCATION (E101) UPON COMPLETION OF AREA B PHASE 2.
2. OUTPATIENT PHARMACY WILL CONTINUE TO USE TWO AVAILABLE WINDOWS ON
ANGLED WALL WHILE PHASES 2 AND 3 ARE UNDER CONSTRUCTION.
3. RELOCATE CONSULT ROOMS (C201 & C209) TO OFFICE B404.
4. INSTALL TEMPORARY WALL PARTITIONS REFER TO PHASING PLANS FOR LOCATIONS.
VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY
CONSTRUCTION IS TO BEGIN.
5. DEMO AREA REFER TO DEMOLITION PLANS.
6. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.
PHASING LEGEND
AREA B
PHASE 1
PHASE 2
PHASE 1
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. RELOCATE EXISTING MED SUPPLY (E272) AND OFFICE (E274). VERIFY LOCATIONS WITH
HOSPITAL ADMINISTRATION.
2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR LOCATIONS.
VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY
CONSTRUCTION IS TO BEGIN. NOTE INPATIENT PHARMACY IS A SECURE AREA AND WILL
NEED TO REMAIN SECURE DURING RENOVATIONS.
3. DEMO AREA- REFER TO DEMOLITION PLANS.
4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.
5. THE EXISTING DOOR IN E273 WILL REMAIN UNTIL THE COMPLETION OF PHASE 2 TO
ALLOW TEMPORARY ACCESS INTO THE HOOD ROOMS. CONTRACTOR TO COORDINATE
WITH FACILITY.
PHASE 2
(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)
1. RELOCATE EXISTING INPATIENT PHARMACY (E101) TO EXISTING OUTPATIENT
PHARMACY (C202).
2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR LOCATIONS.
VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY
CONSTRUCTION IS TO BEGIN. NOTE INPATIENT PHARMACY IS A SECURE AREA AND WILL
NEED TO REMAIN SECURE DURING RENOVATIONS.
3. DEMO AREA- REFER TO DEMOLITION PLANS.
4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.
5. MOVE INPATIENT PHARMACY BACK INTO THE SPACE.
1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AND OVERVIEW OF
DEPARTMENT TRANSITIONS AND RENOVATIONS. FINAL PHASING PLANS TO
BE COORDINATED WITH THE FACILITY BEFORE ANY WORK IS IS COMPLETED
AND IS THE RESPONSIBILITY OF THE CONTRACTOR..
2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AN OVERVIEW OF
DEPARTMENT TRANSITIONS AND RENOVATIONS. SEE GENERAL
CONTRACTORS PROJECT SCHEDULE AND TRANSITION PLAN FOR
ADDITIONAL DETAILS AND INFORMATION.
2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.
3. MATERIAL PATHS - CONTRACTOR SHALL LIMIT MATERIAL TRAFFIC
THROUGH FACILITY TO OFF-PATIENT CORRIDORS DURING OPERATING
HOURS. VERIFY WITH GOVT. CORRIDORS THAT ARE TO BE DEEMED
ACCEPETABLE.
4. INTERIM LIFE SAFETY MEASURES - PATHS OF EGRESS TO OCCUPIED
AREAS SHALL NOT BE BLOCKED OR ALTERED DURING OPERATING
HOURS. SPRINKLER SYSTEM ZONE SHUT-DOWNS FOR MODIFICATIONS
SHALL BE SCHEDULED OUTSIDE OPERATING HOURS AND WILL NOT
AFFECT THE LIFE SAFTEY OF FACILITY OCCUPANTS.
5. CRAWL SPACE AND PENTHOUSE ARE NOT AFFECTED BY TRANSITION
SPACES OR CONSTRUCTION PHASING.
6. HATCH PATTERNS DIFFER TO SHOW CONTRAST BETWEEN SUB-PHASES.
REF. PHASING LEGEND FOR ADDITIONAL INFORMATION.
PHASING & TRANSITION NOTES
1. SEE ILSM (INTERIM LIFE SAFETY MEASURES) FOR REQUIREMENTS IN TEMPORARY
CONSTRUCTION FACILITES AND CONTROLS SPECIFICATIONS FOR FULL ILSM
INFORMATION.
2. ENSURE EXITS HAVE FREE AND UNOBSTRUCTED EGRESS. IN SUCH INSTANCES
FACILITY PERSONNEL SHALL RECEIVE TRAINING IF ALTERNATE EXITS ARE
DESIGNATED.
3. ENSURE FREE AND UNOBSTRUCTED ACCESS BY EMERGENCY SERVICES FROM
THE OUTSIDE AND FROM WITHIN THE FACILITY.
4. ENSURE FIRE ALARM, DETECTION, AND SUPPRESSION SYSTEMS ARE NOT
CRITICALLY IMPAIRED. A TEMPORARY EQUIVALENT SYSTEM WILL BE PROVIDED
WHEN A FIRE PROTECTION SYSTEM IS CRITICALLY IMPAIRED, AND WILL BE
INSPECTED AND TESTED ON A MONTHLY BASIS.
5. ENSURE TEMPORARY CONSTRUCTION…