B01 Attachment J01 - Final Construction Drawings.pdf

PDF 22 MB Posted

Attached to
Pine Ridge USP 797/800 Pharmacy Remodel Construction Project
Solicitation number
75H70122R00044
Issued by

About this file

This document provides details for a federal construction solicitation. The Indian Health Service is seeking a contractor to demolish and replace the existing Inpatient and Outpatient Pharmacy spaces at Pine Ridge Hospital in Pine Ridge, South Dakota. The construction services are required to support continued pharmacy operations throughout the project duration. The solicitation will utilize a 100% Small Business set-aside with preference given to Indian Economic Enterprise firms under NAICS code 2362200. The contract type will be firm fixed price, awarded using lowest price technically acceptable criteria. The period of performance is 365 calendar days from notice to proceed with a project magnitude between $1,000,000 and $5,000,000. Interested parties should monitor the listed solicitation on SAM.gov for any amendments including updated dates and requirements.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS

PROJ(D)

PLBG

PLYWD

PREFIN

RAD(R)

RESIL

REINF

REQ'D

SECT

SHWR

SPECS

REFRIG

galvanizedGALVBMRK benchmark concrete mansonry unit ceilingCLG

CLR

CMU

COL

CLO

clear/clearance column closet

CAB

CJ

CC

CB

BW

CL

BOC

BRZ

BRK

BO

BRG

BUR

BTM

BS

built-up roof center to center chalkboard bottom of wall center line control joint/ construction joint cabinet back of curb both sides bottom of bronze brick bearing bottom foundation floor drain fire extinguisher fire extinguisher cabinet

FE

FEC

FDN

FD

east each equipment exposed each way existing electrical exterior insulation finish system elevation/elevator expansion joint existing grade electrical contractor exterior ethylene propylene diene terpolymer

ELEV

EQUIP

EW

EPDM

EXP

EXIST

EXT

E

EA

EC

EG

EIFS

EJ

ELEC

insulation interior inside diameter

INSUL

IN(")

INT

ID

inch grab bar general contractor gypsum glass/glazing hollow metal high pressure decorative laminate horizontal hardware hardwood hose bib hot water heating, ventilating & air conditioning

HDWR

HM

HORZ

HT

HPDL

HVAC

HW

height

GB

GL

GRD

GYP

GC

HDWD

HB

grade

PART

PLAS

OVHD

partition plaster overhead

SRT

SS

SQ

miscellaneous masonry opening not in contract not applicable outside diameter numberNO(#)

NTS

OC

OA

NOM

OFF

OPNG

OD

on center overall nominal not to scale office opening

MISC

N

MO

MULL

MTL

NIC

NA

north mullion metal

SHT

SF

SB

SND

SIM

S

RM

ROW

RO

SAT

SAN

architect/ architectural

AB anchor bolt

APPROX

BLDG

BD

ARCH

BM

BLK

ADJ

AFF

AC

ACCU

ALUM

ANOD

ALT

approximate block/blocking at board beam building air cooled condensing unit above finish floor adjustable alternate anodized acoustical aluminum

A/C air conditioning plus or minus constructionCONST course ceramic tile continuous carpet corridor diameter door down ditto dimension double drinking fountain detail drawing downspout

DIA

DR

DS

DN

DO

DIM

DTL

DWG

CRS

CT

CONT

CORR

CPT

DBL

DF

conference concrete

CONF

CONC

finishFIN fluorescent flow line folding field verify furnace footing fire retardant foot scraper fiberglass reinforced plastic

FV

FT(')

FURR

FURN

FTG

G

GA

foot furring gas gauge

FRP

FLR

FLDG

FL

FRT

FS

FLUOR

floor finish grade finish floor

FG

FF

joistJST low volume change masonryMAS

MANUF

MATL

MAX

MECH

MEMB

MH

MIN

MIRR

manufacturer material mechanical membrane maximum minimum manhole mirror

LDR

LF

LAV

LAM

LVC

LOCN

lineal feet ladder lavatory laminate location

REF

R

RAG

RD

PT

PR

QT

PTD

JT

JAN janitor joint

PL

under cabinet lightrequired physical therapy respiratory therapy surgical intensive care unit studded rubber tile stainless steel square specifications

YD

suspended acoustical tile similar sanitary napkin dispenser section shower sheet square feet splash block resilient south sanitary right of way rough opening room

WD

WNDW

WH

WNSCT

WC

WT

WWF

WP

VCT

VWC

VEST

VERT

W

W/

W/O yard waterproofing, waterproof welded wire fabric water heater water closet window wood wainscot weight vinyl composition tile vinyl wall covering vertical vestibule west with with out

RT

SICU

central sterile long term care intensive care unit occupational therapy magnetic resonance imaging post anesthetic care unit medical intensive care unit labor-delivery-recovery-post partum operating room

FOR MEDICAL

emergency room computed tomography

FACILITIES ONLY

STORplumbing project/(projected) refer/reference roof drain radius return air grille reinforcing refrigerator riser pressure treated painted quarry tile plywood prefinished pair

TLT

TV

TW

TOC

TPH

TO

TYP

UCL

T&B

T

SUSP

STRUCT

TEL

TB

T&G plate/plastic/ property line STL

STD

storage toilet paper holder top of curb toilet television top of typical top of wall tongue & groove top & bottom structure/structural tread telephone tackboard suspended

ICU

OR

LDRP

MRI

MICU

LTC

PT

PACU

OT

CS

CT

ER

steel standard

DRAWING SYMBOLS

95.00

TOC

98.5

TOC

98.5 E

B

NEW ELEVATION

EXISTING ELEVATION

EXISTING CONTOUR

NEW CONTOUR

TEST BORING (SITE PLANS ONLY)

EXISTING ELEVATION

EXISTING ELEVATION

PROPERTY LINE

/1 A101

/1 A101

MATCHLINE

SHT. REFERENCE

ELEVATION DATUM

(SECTIONS, ELEVATIONS ONLY)

BUILDING SECTION

WALL SECTION

DETAIL DRAWING

A3.1

BUILDING ELEVATION

A6.1 INTERIOR ELEVATION

A100

WINDOW ID TAG

DOOR NUMBER

ROOM

NAME

ROOM NAME & NUMBER

PARTITION SYMBOL

1 REVISION TAG

COLUMN LINE GRID

EQUIPMENT NUMBER

? SITE PLAN NOTES

DEMOLITION PLAN NOTES

VICINITY MAP

NO SCALE

PRECAST CONCRETE

WALL PANEL TAG

XXX

A101

A-4 ALTERNATE TAG

PT-XX PAINT COLOR TAG

# PLAN NOTES

PROJECT LOCATION

X

X.X

X

X.X

CUT STONE

STEEL

PLYWOOD

FINISH WOOD

CONT WD FRAMING

WOOD BLOCKING

MATERIAL SYMBOLS

LVC FILL

GRANULAR FILL

CONCRETE MASONRY

FACE BRICK

CONCRETE

EARTH

EXISTING

CONSTRUCTION

ASPHALT

GLASS

RIGID OR TAPERED

INSULATION, EIFS

BATT INSULATION

GYPSUM BOARD

Contract No.:

Task Order No.:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Project Phase:

G-001

TITLE SHEET

Pine Ridge, SD

03/25/2022

DESIGN USP 795, 797, 800 PHARMACY RENOVATION

PINE RIDGE COMPREHENSIVE HEALTH CARE FACILITY

Final Construction Documents

DESIGN USP 795, 797, 800 PHARMACY

RENOVATION

Final Construction Documents

Checker Author

PINE RIDGE, SOUTH DAKOTA

H IH PINE 21100

75H70121F30008

HHSI102201800005I

SHEET INDEX

FIRE PROTECTION

F-000 FIRE PROTECTION TITLE SHEET

F-101 OVERALL 2ND FLOOR PLAN - FIRE PROTECTION

F-201 ENLARGED - FIRE PROTECTION

F-202 ENLARGED - FIRE PROTECTION

F-501 DETAILS - FIRE PROTECTION

F-502 DETAILS - FIRE PROTECTION

PLUMBING

P-000 PLUMBING TITLE SHEET

PD-101 OVERALL PLUMBING DEMOLITION PLAN

PD-401 ENLARGED PLUMBING DEMOLITION PLAN

P-101 OVERALL 2ND FLOOR PLAN - PLUMBING

P-401 ENLARGED PLUMBING PLANS

P-402 ENLARGED PLUMBING PLANS

P-501 DETAILS - PLUMBING

P-502 DETAILS - PLUMBING

P-601 PLUMBING SCHEDULES

P-901 WASTE & VENT RISER DIAGRAMS

P-902 DOMESTIC RISER DIAGRAM

MECHANICAL

M-000 HVAC TITLE SHEET

MD-101 OVERALL DEMO PLAN - MECHANICAL

MD-401 ENLARGED MECHANICAL DEMOLITION PLAN

MD-402 ENLARGED MECHANICAL DEMOLITION PLAN

MD-403 ENLARGED MECHANICAL DEMOLITION PLAN

MD-404 ENLARGED MECHANICAL DEMOLITION PLAN

M-101 OVERALL FLOOR PLAN - HVAC

M-102 OVERALL ROOF PLAN - HVAC

M-401 ENLARGED HVAC PLANS

M-402 ENLARGED HVAC PLANS

M-403 ENLARGED HVAC PIPING PLANS

M-404 ENLARGED HVAC PIPING PLANS

M-501 DETAILS - MECHANICAL

M-502 DETAILS - MECHANICAL

M-503 DETAILS - MECHANICAL

M-601 SCHEDULES - MECHANICAL

M-701 HVAC CONTROLS

ELECTRICAL

E-000 ELECTRICAL TITLE SHEET

E-101 OVERALL ELECTRICAL PLAN

E-201 LIGHTING PLANS

E-301 POWER PLANS

E-302 MECHANICAL POWER PLAN

E-400 LOW VOLTAGE DETAILS AND NOTES

E-401 LOW VOLTAGE SYSTEMS PLANS

E-501 RISER DIAGRAM AND PANEL SCHEDULES

E-502 PANEL SCHEDULES

SHEET INDEX

GENERAL

G-001 TITLE SHEET

G-002 ABA ACCESSIBILITY STANDARDS

G-003 ABA ACCESSIBILITY STANDARDS

G-004 CODE PLAN

G-005 ENLARGED PARTIAL CODE PLAN

G-006 PHASING PLAN

G-007 PHASING PLAN

DEMOLITION

AD101 DEMOLITION FLOOR PLAN - AREA A

AD102 DEMOLITION FLOOR PLAN - AREA B

ACD101 DEMOLITION RCP - AREA A

ACD102 DEMOLITION RCP - AREA B

ARCHITECTURAL

A-000 EXISTING PLAN - AREA EX1

A-001 EXISTING PLAN - AREA EX2

A-002 EXISTING PLAN - AREAS A & B

A-101 DIMENSION PLAN - AREA A

A-102 DIMENSION PLAN - AREA B

A-103 TAG PLAN - AREA A

A-104 TAG PLAN - AREA B

A-105 ROOF PLAN

A-301 BUILDING SECTIONS

A-302 WALL SECTIONS

A-303 WALL SECTIONS

A-601 DOOR & WINDOW INFORMATION

AC101 REFLECTED CEILING PLAN

AC102 REFLECTED CEILING PLAN DETAILS

INTERIORS

AI101 FINISH PLAN - AREA A

AI102 FINISH PLAN - AREA B

AI111 WALL PROTECTION PLAN

AI201 INTERIOR ELEVATIONS

AI202 INTERIOR ELEVATIONS

AI203 MILLWORK SECTION DETAILS

AW101 SIGNAGE PLAN

FURNITURE & EQUIPMENT

AQ101 EQUIPMENT PLAN

AQ102 EQUIPMENT SCHEDULE

05/26/2022

LC

LC

LC

60 min m in m in back wall

Note: inside finished dimensions measured at the center points of opposing sides side wall wall side

LC LC

LC

48 min m in control wall back wall seat wall

Note: inside finished dimensions measured at the center points of opposing sides

(a) elevation adult

9 min

6 min partition

6 min

6 min

(c) plan

6 min

(b) elevation children

12 min partition

LC LC

LC

36 min

60 min back wall side wall wall side front wall

Note: inside finished dimensions measured at the center points of opposing sides control wall seat wall back wall m a x m a x

(a) without seat

(b) with seat

6 max

6 max m a x

6 max back wall side wall side wall back wall wall side side wall m a x front wall back wall wall side

6 max

6 max side wall

16-18 405-455 430-485

17-19

(a) wheelchair accessible water closets

(b) ambulatory accessible water closets

LC CL

60 min m in

12 max

42 min

54 min

LC

transfer side

12 min

24 min

36 min

LC

m in

7-9 180-230 m a x m in

60 min

(a) adult wall hung water closet

(b) adult floor mounted water closet and children's water closet

60 min m in

4 max m a x alternate door location m in length of bathtub

12 min m in control end wall head end wall back wall

(a) removable in-tub seat

(b) permanent seat control end wall back wall head end wall m in length of bathtub

15 max head end wall

12 max m in control end wall

(b) plan back wall

205-255

8-10

(a) elevation

-9

-3

6 control end wall head end wall m in m in

12 max

24 max

(b) plan

24 min

8-10 205-255

(a) elevation

-9

-3 back wall

LC27 max m a x m a x

(b) with seat

(elevation)

(a) with seat

(elevation)

(c) without seat

(plan) back wall wall side

(d) with seat

(plan)

15 max side wall side wall front wall side wall back wall wall side back wall front wall

Control Surface, Typ.

back wall

27 max m a x m a x

(b) with seat

(a) without seat can be located on any wall of shower

1½ min

½ m in

1 / 4

LC

m in

15 max m a x side wall

LC

control end wall

T his Dr awing P rod uc ed b y t he U .S. A cc ess B oa rd

X

X

Note: X = tread depth

96 min

132 min

(a) car

(b) van

60 min

LC

18 min

18 min

45° centered on tactile characters

REFUGE

AREA OF

AREA OF

REFUGE

m in m a x

0 1 m in

MEN not in pictogram field

AREA OF

REFUGE

3/8 min

3/8 min

9.5

9.5

LC LC

LC

LC

1.6-2.4 41-61

(a) elevation (enlarged)

(b) plan

0.2 5.1 top diameter of

50%-65% of the base diameter base diameter of

0.9-1.4 (23-36 mm)

0.65 min

1.6-2.4 41-61

-5

LIBRARY

/8 -2

5 max 15 min 380125

(b) stall type

(a) wall hung type

17 max

13½ min 13½ min

35-37 890-940 m in m in

15-16 380-405

2½ max

½ m a x seat wall

15-16 380-405

560-585

22-23

-1

-3

(a) size

2½ max

½ m a x seat wall wall seat

(b) distance from wall

-3

-9

(a) stairs

(b) ramps

-9

-3

(c) walking surfaces

-3

-9

12 min

12 min

12 min

30° max

(c) curved nosing

(d) beveled nosing

(b) angled riser

1½ max 1½ max

(a) radius of tread edge

(typical for all profiles) radius ½ max

Contract No.:

Task Order No.:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Project Phase:

SEAL:

BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021

FIGURE 502.2 / 502.3

VEHICLE PARKING SPACES

FIGURE 504.5

STAIR NOSINGS

FIGURE 505.10.1

TOP AND BOTTOM HANDRAIL

EXTENSION AT RAMPS

FIGURE 505.10.2

TOP HANDRAIL EXTENSION

AT STAIRS

FIGURE 607.5

BATHTUB CONTROL

LOCATION

FIGURE 608.5.1

TRANSFER TYPE SHOHWER

COMPARTMENT CONTROL LOCATION

FIGURE 608.5.2

STANDARD ROLL-IN TYPE SHOWER

COMPARTMENT CONTROL LOCATION

FIGURE 505.4

HANDRAIL HEIGHT

FIGURE 505.5

HANDRAIL SECTION &

CLEARANCE

FIGURE 608.2.1

TRANSFER TYPE SHOWER

COMPARTMENT SIZE

AND CLEARANCE

FIGURE 608.2.2

STANDARD ROLL-IN TYPE SHOWER

COMPARTMENT SIZE AND CLEARANCE

FIGURE 608.2.3

ALTERNATE ROLL-IN TYPE SHOWER

COMPARTMENT SIZE AND CLEARANCE

FIGURE 608.3.1

GRAB BARS FOR TRANSFER

TYPE SHOWERS

FIGURE 608.3.2

GRAB BARS FOR STANDARD ROLL-IN

TYPE SHOWERS

FIGURE 604.2

WATER CLOSET LOCATION

FIGURE 604.7

DISPENSER OUTLET

LOCATION

FIGURE 604.3.1

SIZE OF CLEARANCE AT

WATER CLOSETS

FIGURE 604.5.1

SIDE WALL GRAB BAR

AT WATER CLOSETS

FIGURE 604.5.2

REAR WALL GRAB BAR

AT WATER CLOSETS

FIGURE 610.3.2

L-SHAPED SHOWER SEAT

FIGURE 610.3.1

RECTANGULAR SHOWER SEAT

FIGURE 608.5.3

ALTERNATE ROLL-IN TYPE SHOWER

COMPARTMENT CONTROL LOCATION

FIGURE 604.8.2

AMBULATORY ACCESSIBLE

TOILET COMPARTMENT

FIGURE 605.2

HEIGHT AND DEPTH OF URINAL

FIGURE 604.8.1.1

SIZE OF WHEELCHAIR ACCESSIBLE

TOILET COMPARTMENT

FIGURE 604.8.1.2

WHEELCHAIR ACCESSIBLE

TOILET COMPARTMENT DOORS

FIGURE 604.8.1.4

WHEELCHAIR ACCESSIBLE TOILET

COMPARTMENT TOE CLEARANCE

FIGURE 602.5

DRINKING FOUNTAIN

SPOUT LOCATION

FIGURE 607.2

CLEARANCE FOR BATHTUBS

FIGURE 607.4.1

GRAB BARS FOR BATHTUBS WITH

PERMANENT SEATS

FIGURE 607.4.2

GRAB BARS FOR BATHTUBS WITH

REMOVABLE IN-TUB SEATS

FIGURE 608.3.3

GRAB BARS FOR ALTERNATE

ROLL-IN TYPE SHOWERS

FIGURE 703.2.5

HEIGHT OF RAISED

CHARACTERS

DETECTABLE WARNING SURFACES AT PLATFORM BOARDING EDGES

SHALL BE 24 INCHES (610 mm) WIDE AND SHALL EXTEND THE FULL LENGTH

OF THE PUBLIC USE AREAS OF THE PLATFORM.

FIGURE 705.1

SIZE AND SPACING OF TRUNCATED DOMES

FIGURE 703.3.2

POSITION OF BRAILLE

FIGURE 703.6

PICTOGRAM FIELD

FIGURE 703.4.1

CHARACTER HEIGHT

FIGURE 703.4.2

LOCATION OF TACTILE SIGNS

AT DOORS

VERIFY STALL & ACCESS

AISLE WIDTH WITH A.H.J.

FIGURE 505.10.3

BOTTOM HANDRAIL

EXTENSION AT STAIRS

4" - 6" PERIMETER

ROUNDED

EDGES

2 1/4" max

NON-CIRCULAR CROSS

SECTION

SELECTED DETAILS FROM ADA/ABA/ANSI ACCESSIBILITY STANDARDS

DETAILS ARE TAKEN FROM THE 2010/2015 STANDARDS

m in

39 - 41

G-002

ABA ACCESSIBILITY STANDARDS

DESIGN USP 795, 797, 800 PHARMACY

RENOVATION

Pine Ridge, SD

03/25/2022

H IH PINE 21100

Final Construction Documents

Checker JWRIGHT

HHSI102201800005I

75H70121F30008 m a x elements <27" above floor flared sides 1:10 max slope slope slope

36 min at least as wide as curb ramp

12 max

12 max

-8

-2 m a x m in

0X > 12

X > 12

(b)(a)

4 max

X

X dominant direction of travel long dimension perpendicular to dominant direction of travel

½ max ramp run landinglanding

60 min 1525 1525

60 min landing ramp run ra m p r u n

60 min m in at least as wide as ramp run

(a) straight

(b) change in direction

48 min

24 min

24 min adjoining surface maximum slope curb ramp slope

12 min

12 min

42 min m in

X < 48

42 min

X < 48

36 min

36 min m in

(a) 180 degree turn

(b) 180 degree turn

(Exception) m in

48 min

24 max m in m in m in

24 max

11 min m in

8 min

9 min

(a) elevation

(b) plan m in

25 max 17-25

430-635

6 max m in

(a) elevation

(b) plan

X < 4

10 max m a x m a x m a x m a x

> 10-24 max 255-610

(a) (b)

10 max m a x m in m a x m a x

>20-25 max 510-635

20 max

(a) (b) m in m a x

36 min

X

(c) folding door

(a) hinged door

(b) sliding door

32 min

32 min

32 min

30 min

48 min m in m in

(a) forward

(b) parallel

48 min

48 min

(a) (b)

48 min

(c)

48 min m in m a x

5 2

X m in12 min

(c) front approach, push side, door provided with both closer and latch m in

(b) push side

X > 8 m in

18 min

X > 8

(a) pull side

(b) side approach m in m in

(a) front approach

24 min m in

(d) stop or latch approach

22 min m in

(c) pocket or hinge approach

60 min

X

(k) latch approach, push side, door provided with closer

24 min m in

24 min m in

(j) latch approach, push side

(i) latch approach, pull side, door provided with closer m in 0 610

24 min

24 min m in

(h) latch approach, pull side

(g) hinge approach, push side, door provided with both closer and latch m in

22 min m in

22 min

(f) hinge approach, push side

42 min 1065 5 m in

(e) hinge approach, pull side

36 min m in

(d) hinge approach, pull side m in12 min

(c) front approach, push side, door provided with both closer and latch m in

(b) front approach, push side m in

18 min

(a) front approach, pull side m in

24 min m in

36 min

12 min

12 min

60 min base a rm a rm

6.4

¼

¼ 6.4

½

6.4 ¼ max

½ max

Contract No.:

Task Order No.:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Project Phase:

SEAL:

BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021

SELECTED DETAILS FROM ADA/ABA/ANSI ACCESSIBILITY STANDARDS

DETAILS ARE TAKEN FROM THE 2010/2015 STANDARDS

FIGURE 302.3

ELONGATED OPENINGS IN FLOOR

OR GROUND SURFACES

FIGURE 302.2

CARPET PILE HEIGHT

FIGURE 303.2

VERTICAL CHANGE IN LEVEL

FIGURE 303.3

BEVELED CHANGE IN LEVEL AND

THRESHOLDS

FIGURE 304.3.2

T-SHAPED TURNING SPACE

m in

60 min

CIRCULAR TURNING

SPACE

FIGURE 307.4

VERTICAL CLEARANCE

FIGURE 404.2.4.1

MANEUVERING CLEARANCE AT MANUAL

SWINGING DOORS AND GATES

SLOPES AT THE REQUIRED MANEUVERING CLEARANCE EXITS SHALL

NOT EXCEED 2% IN ANY DIRECTION.

FIGURE 404.2.4.2

MANEUVERING CLEARANCES AT DOORWAYS w/o DOORS, SLIDING DOOR, GATES AND FOLDING DOORS

FIGURE 404.2.4.3

MANEUVERING CLEARANCE AT

RECESSED DOORS AND GATES

FIGURE 305.3

CLEAR FLOOR OR

GROUND SPACE

FIGURE 404.2.6

DOORS IN SERIES AND GATES IN SERIES

FIGURE 404.2.3

CLEAR WIDTH OF DOORWAYS

FIGURE 305.7.1

MANEUVERING

CLEARANCE

IN AN ALCOVE,

FORWARD APPROACH

FIGURE 305.5

POSITION OF CLEAR FLOOR

OR GROUND SPACE

FIGURE 308.2.1

UNOBSTRUCTED

FORWARD REACH

FIGURE 308.2.2

UNOBSTRUCTED HIGH

FORWARD REACH

FIGURE 308.3.1

UNOBSTRUCTED

SIDE REACH

FIGURE 308.3.2

UNOBSTRUCTED HIGH

SIDE REACH

FIGURE 307.2

LIMITS OF

PROTRUDING OBJECTS

FIGURE 307.3

POST-MOUNTED PROTRUDING

OBJECTS

M

A X

31 max. for Children's RR

See mech. specs for insulation of exposed piping.

24-27 for Children's RR

LAVATORY

FIGURE 406.4

LANDINGS AT THE

TOP OF CURB RAMPS

FIGURE 406.3

SIDES OF CURB RAMPS

FIGURE 405.9.2

CURB OR BARRIER EDGE

PROTECTION

FIGURE 306.2

TOE CLEARANCE

FIGURE 306.3

KNEE CLEARANCE

FIGURE 403.5.1

CLEAR WIDTH OF AN

ACCESSIBLE ROUTE FIGURE 403.5.2

CLEAR WIDTH AT TURN

FIGURE 405.9.1

EXTENDED FLOOR OR GROUND

SURFACE EDGE PROTECTION

FIGURE 406.2

COUNTER SLOPE OF SURFACES

ADJACENT TO CURB RAMPS

FIGURE 406.6

DIAGONAL OR CORNER

TYPE CURB RAMPS

DETECTABLE WARNING SURFACES SHALL EXTEND 24 INCHES (610 mm)

MINIMUM IN THE DIRECTION OF TRAVEL AND THE FULL WIDTH OF THE

CURB RAMP (EXCLUSIVE OF FLARES), THE LANDING, OR THE BLENDED

TRANSITION.

1:12 (MAX.) RAMP SLOPE

1:50 (MAX.) LANDING SLOPE

FIGURE 405.7

RAMP LANDINGS

FIGURE 305.7.2 MANEUVERING

CLEARANCE IN ALCOVE, PARALLEL

APPROACH

4" max

Fixed elements

RAMP MAY SLOPE 1:20 IF

ACCESSIBLE ROUTE APPROACH

IS PERPENDICULAR

RECESSED OBJECTS

G-003

ABA ACCESSIBILITY STANDARDS

DESIGN USP 795, 797, 800 PHARMACY

RENOVATION

Pine Ridge, SD

03/25/2022

H IH PINE 21100

Final Construction Documents

Checker JWRIGHT

HHSI102201800005I

75H70121F30008

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Copyright 2007

T ectonic Copyright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

S S

RPSRPS

R P

S R

P S

SS

S P

S P

SP SP

S P

S P

S S

S S

S S

S S

SS SS SS

SS

S S

S SS

RPS RPSRPS RPS RPS RPS RPS RPS

R P

S R

P S

R P

S R

P S

R P

S R

P S

RPS RPSRPS

SP

SP

S P

S P

SPSP

RPS RPS

R P

S R

P S

SS

SPSP

RPSRPS RPSRPS

S S

SS

S S

S

S S

SS

SS

SS

SSSS

SS SSSSSS

R P

S R

P S

S P

S P

R P

S R

P S

RPSRPS

SPSP

R P

S R

P S

S S

SS

SS

S S

SS SS

SS

S S

S S

S S

S S

S S

S S

S

S S S S

SS

S S

S S

SPSP

S P

S P

RPSRPS

RPSRPS

R P

S R

P S

R P

S R

P S

SPSP

S P

S P

S P

S P

SPSP

SP SP

S P

S P

SS

S

SSS

S S

SS

S S

SS SSSSS

SPSP

S P

S P

RPSRPS

R P

S R

P

SRPSRPS

S P

S P

SPSP

S P

S P

S P

SS SSSS

S S

S

S P

S P

SPSP SP

RPSRPS

S S

SS

SS

R P

S R

P S

R P

S R

P S

RPSRPS

R P

S R

P S

R P

S R

P S

R P

S R

P S

R P

S R

P S

RPS RPS

RPS RPS

R P

S R

P S

R P

S R

P S

RPS RPS

RPS RPS

R P

S R

P S

R P

S R

P S

R P

S R

P S

R P

S R

P

SRPSRPS

RPSRPS

SS

S S

S S

SS

SS

S S

SS

SS

SS

S S

S S

SS

SS

SS

FEC

F E

C

R P

S R

P S

R P

S R

P S

RPSRPS

R P

S R

P S

R P

S R

P S

RPSRPS

RPSRPS

R P

S R

P S

R P

S R

P S

RPSRPS

RPSRPS

FEC

FEC

FEC

F E

C

F E

C

S P

S P

SPSPSP

SP

S P

S P

SPSP

S P

S P

SP SP

S P

S P

SPSP

S P

S P

S P

S P

SPSP

S P

S P

S P

S P

S P

S P

F B

F B

F B

F B

FB FB

FB FB

S P

S P

S P

S P

SPSP

S P

S P

S P

S P

SPSP

S P

S P

S P

SPSP

S P

S P

SP SP

S P

S P

S P

S P

SPSP

S P

S P

SPSP

SS

SS

S S

S P

S P

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Copyright 2007

T ectonic Copyright 2007

T ectonic Cop yright 2007

T ectonic Cop yright 2007

OCCUPANCY 1 : GROUND FLOOR = 80,882 SF

GROUP I-2 OCCUPANCY

TYPE I-A CONSTRUCTION

FULLY SPRINKLED = Yes

TOTAL OCCUPANTS : 450

OCCUPANCY 2 : UPPER LEVEL = 4,752 SF

GROUP F-1 OCCUPANCY

TYPE II-B CONSTRUCTION

FULLY SPRINKLED = Yes

TOTAL OCCUPANTS : 16

OCCUPANCY 3 : UPPER LEVEL = 18,239 SF

GROUP B OCCUPANCY

TYPE II-B CONSTRUCTION

FULLY SPRINKLED = Yes

TOTAL OCCUPANTS : 183

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY IBC 2015

NFPA 2012

(NEW HC)

NFPA 2012

(EXIST. HC)

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE WALL (TYPE I)

3 HRIBC 705.4NOT

APPLICABLE

3 HR IBC 705.8

TABLE 715.4

FIRE

3 HR

IBC 705.11

IBC 715.5.1

IBC 716.5.1

NOT

APPLICABLE

BUILDING SEPARATION:

FIRE WALL (TYPE II)

2 HR IBC 705.4NOT

APPLICABLE

90 MIN IBC 705.8

TABLE 715.4

FIRE

90 MIN

IBC 705.11

IBC 715.5.1

iBC 716.5.1

NOT

APPLICABLE

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

2 HR IBC 508.3.2

IBC 508.3.2.3

90 MIN NFPA TABLE 8.3.4.2

IBC 706.7

FIRE

90 MIN

NFPA 18.1.3.3

NFPA 8.3

NFPA 90A 5.3.1.1

IBC 706.10

IBC 716.3.1

IBC 716.5.2

NFPA 19.1.3.3

NFPA 8.3

HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

2 HR IBC 508.3.2

IBC 508.3.2.3

90 MIN FIRE

90 MIN

NFPA 19.2.2.5

NFPA 8.3

NFPA 18.2.2.5

NFPA 8.3

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)

NFPA 7.1.3.2.1

NFPA 8.6

IBC 1020.1

IBC 707.4

NFPA TABLE 8.3.4.2

IBC 715.4/714.2

NOT

ALLOWED

ENCLOSURES

NFPA 7.1.3.2.1 (10)

SHAFTS

NFPA 90A 5.3.4.6

IBC 715.5.3

IBC 716.5.2

HR

2 HR

60 MIN

90 MIN

HR

2 HR

EXIT PASSAGEWAY (HORIZ.)

FIRE BARRIER

IBC 1021.1 NFPA 7.2.6.3

IBC 715.4/714.2

NFPA 18.2.2.7

NFPA 7.2.6

NOT

ALLOWED

NFPA 7.1.3.2.1 (10)NFPA 19.2.2.7

NFPA 7.2.6

60 MIN

90 MIN

ATRIUM SEPARATION

FIRE BARRIER

1 HR IBC 404.5 45 MIN FIRE

90 MIN

IBC 715.3.1

IBC 716.3.1

IBC 715.5.2

IBC 716.5.2

NFPA 8.6.7NFPA 8.6.7 NFPA 8..6.7 (1)

IBC 715.4/714.2

HAZ./INCIDENTAL USE

FIRE BARRIER

1 HR IBC 508.2

IBC 706.3.6

45 MIN

NFPA 8.7.1.3

IBC 706.7

IBC 715.4

NFPA 19.3.2.1

NFPA 8.7.1.1

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.7.1.1

IBC 715.3.1

IBC 716.3.1

IBC 715.5.2

IBC 716.5.2

HAZ./INCIDENTAL USE

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

IBC 508.2

IBC 706.3.6

NR

SELF OR AUTO

CLOSING

IBC 710.5.3

IBC 715.4.7.3

IBC 508.2.2.1

NFPA 19.3.2.1.2

NFPA 8.4

SEE

NOTE B

SUBDIVIDING SPACES

SMOKE BARRIER (I-2 OCCUPANCY)

IBC 709.3

IBC 407.4

20 MIN NFPA TABLE 8.3.4.2

IBC 709.5

NFPA 18.3.7.1

NFPA 18.3.7.3

SMOKE

90 MIN

SEE NOTE [A]

NFPA 18/19.3.7.3(2)

IBC 709.8

IBC 716.5.5

SEE NOTE [C]

NFPA 19.3.7.1

1/2

HR

1 HR

SUITE SEPARATION

SMOKE PARTITION

NR IBC 1014.2.2NFPA 19.2.5.7 IBC 710.5.3

IBC 715.4.7.3

SEE

NOTE [B]

NR

SELF OR AUTO

CLOSING

NFPA 18.2.5

EXIT ACCESS CORRIDORS (I-2)

SMOKE PARTITIONS (SPRINKLERED)

NR-

RESIST

SMK

IBC 407.3

IBC 710.3

NRNFPA 18.3.6.2 IBC 407.3.1 SEE

NOTE [D]

NFPA 19.3.6.2

EXIT ACCESS CORRIDORS (I-1)

FIRE PARTITION (SPRINKLERED)

IBC 1017.1

IBC 708.1

20 MIN NFPA 18/19.3.6.3

IBC 714.2

IBC 715.4

NFPA 18.3.6.2.2 NONENFPA 19.3.6.2.4NR IBC 715.5.5.4

IBC 716.5.4

EXIT ACCESS CORRIDORS (I-1 OR I-2)

FIRE PARTITION (EXIST CONDITION)

(NON-SPRINKLERED)

NOT

PERMITTED

20 MIN IBC 714.2

IBC 715.4

FIRE (I-1)

SMOKE (I-2)

NFPA 19.3.6.2.2

IBC - NP

1/2 HR IBC

715.5.5.4.1

IBC 716.5.4.1

NFPA

18.3.6.2.2 - NP

IBC - NP

10/1

2"

34"

REQ'D. EXIT WIDTH

NO. OF OCC. EXITING

ACTUAL EXIT

WIDTH

NO. OF OCC./

NO. OF EXITS

NO. OCC. EXITING

(SMALLER ROOMS)

MAXIMUM OCCUPANCY

AREA

OCC. LOAD

FACTOR

1:50

FIRE EXTINGUISHER AND CABINET

FIRE ALARM CONTROL PANEL

FIRE SYSTEM ANNUNCIATOR ALARM

ANNUNCIATOR PANEL

PROPERTY LINE

FEC

FACP

FSA

FAA

STARTING

LOCATION

TP (TRAVEL PATH)

[A] DAMPERS ARE NOT REQUIRED IN DUCT PENETRATIONS OF SMOKE BARRIERS

WHERE HVAC SYSTEMS ARE FULLY DUCTED (18.3.7.3x2)

[B] AIR TRANSFER OPENINGS IN SMOKE PARTITIONS SHALL HAVE DAMPERS

(NFPA 8.4.6) (IBC 710.7)

[C] SMOKE DAMPERS ARE NOT REQUIRED WHERE OPENINGS IN DUCT ARE LIMITED

TO A SINGLE SMOKE COMPARTMENT & DUCTS ARE MADE OF STEEL (IBC 716.5.5)

[D] TRANSFER GRILLES REGARDLESS OF WHETHER THEY ARE PROTECTED

ARE NOT ALLOWED IN THESE DOORS OR WALLS (NFPA 18.3.6.4)

NOTES:

SYMBOLS

RPS RPS RPS RPS

FB FB FB

FW FW FW

FB FB FB

FB FB FB

F B

F B

S S S

SP SP SP SP

CP (COMMON PATH)

DE (DEAD END CORRIDOR)

(50) NO.

OCCUPANTS

EXITING

LIFE SAFETY NOTES:

1. FOR GENERAL LIMITS OF WORK SEE SHEET G-004.

2. AT FIRE RATED DOOR LOCATIONS FRAMES AND DOORS SHALL BE LABELED

FOR THE INTENDED USE OR EQUIVALENT AS INDICATED IN THE DOOR SCHEDULE

ON SHEET A-601

3. NON-RATED SMOKE PARTITIONS SHALL BE CONSTRUCTED TO LIMIT THE

TRANSFER OF SMOKE. PARTITIONS SHALL EXTEND FROM FLOOR SLAB TO

UNDERSIDE OF THE FIRE-RESISTANCE RATED HORIZONTAL ASSEMBLY ABOVE.

THE SPACE ADJACENT TO THE DECK AND OTHER SURFACES AND THE SPACES

AROUND PENETRATION ITEMS SHALL BE CAULKED TO LIMIT THE FREE PASSAGE

OF SMOKE.

4. ALL FIRE RATED BARRIERS SHALL EXTEND FROM FLOOR SLAB TO UNDERSIDE

OF THE DECK ABOVE AS NOTED ON THE ARCHITECTURAL DRAWINGS. THE SPACE

ADJACENT TO THE DECK AND OTHER SURFACES, AND THE SPACES AROUND THE

PENETRATING ITEMS SHALL BE FIRESTOPPED. NOT ALL FIRE RATED BARRIERS

ARE DEPICTED. FIRE RATED BARRIERS ARE ONLY SHOWN FOR IN SCOPE AREAS.

RATED BARRIERS THAT EXIST OR MAY BE REQUIRED IN OUT OF SCOPE AREAS

ARE NOT DEPICTED.

DESIGNER OF RECORD CAN NOT VERIFY INTEGRITY OF

EXISTING CONDITIONS OUTSIDE THE SCOPE OF THIS

PROJECT. REVIEW PREVIOUS AS-BUILTS FOR LOCATIONS OF

OTHER RATED PARTITIONS.

EXIT SIGN

NFPA 90A 5.3.1.1

IBC 706.10

IBC 716.3.1

IBC 716.5.2

NFPA TABLE 8.3.4.2

IBC 706.7

NFPA 7.1.3.2.1

NFPA 8.6

FIRE

90 MIN

NFPA 18.3.2.1

NFPA 8.4

SUITE C - 3,793 SF

SUITE F - 722 SF

SUITE B - 4,599 SF

SUITE G - 5,067 SF

SUITE D - 9,038 SF

SUITE E - 2,516 SF

SUITE A - 8,285 SF

SUITE J - 7,971 SF

SUITE K - 7,008 SF

AREA OF

WORK

AREA OF

WORK

SUITE E2 - 910 SF

B OCCUPANCY

F1

OCCUPANCY

I-2 OCCUPANCY

I-2 OCCUPANCY

PROJECT CODES AND STANDARD APPLICABLE

CODE

IBC INTERNATIONAL BUILDING CODE, EXCEPT APPLY 2009 EDITION OF ICC A117.1 IN LIEU OF 2017 EDITION

NAME EDITION

NFPA 101 LIFE SAFETY CODE (LSC),

ABA ARCHITECTURAL BARRIERS ACT STANDARDS

FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS 2018

IPC INTERNATIONAL PLUMBING CODE 2019

IMC INTERNATIONAL MECHANICAL CODE 2021

USP 795 PHARMACEUTICAL COMPOUNDING - NONSTERILE PREPARATIONS

USP 797 PHARMACEUTICAL COMPOUNDING - STERILE PREPARATIONS

USP 800 HAZARDOUS DRUGS - HANDLING IN HEALTHCARE SETTINGS

FOR A FULL LIST OF APPLICABLE CODES SEE SECTION 2.3.2 OF THE IHS ARCHITECT AND ENGINEER DESIGN GUIDE 2019

FOR A FULL LIST OF APPLICABLE CODES SEE SECTION 2.2 OF THE 2012 LSC

CODE INFORMATION:

ANALYSIS FOR RENOVATION OF EXISTING BUILDING

PINE RIDGE COMPREHENSIVE HEALTH CARE FACILITY

GREAT PLAINS INDIAN HEALTH SERVICES

PINE RIDGE, SOUTH DAKOTA

CITY OF PINE RIDGE

DEPARTMENT OF HEALTH & HUMAN SERVICES -

DIVISION OF ENGINEERING SERVICES

HEALTH FACILITIES GROUP, LLC

330 N. MEAD ST. / SUITE 100

WICHITA, KS 67202 316-262-2500

CONTACT: WAYNE BONGARTZ OR MARK CRANE

I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE THE

SUBMITTED PLANS FOR THE ABOVE-REFERENCED PROJECT

COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:

SEE PROJECT CODES AND STANDARD APPLICABLE TABLE.

INTERNATIONAL BUILDING CODE AND LIFE SAFETY CODE

REQUIREMENTS

ORIGINAL CONSTRUCTION (1993) - I-2, F-1 OCCUPANCY

ADDITION CONSTRUCTION (2008) - B OCCUPANCY

ADDITION CONSTRUCTION (2019) - I-2 OCCUPANCY

NFPA TYPE II-(111) PER ORIGINAL CONSTRUCTION DOCUMENTS.

NFPA 101, CHAPTER 18, NEW HEALTH CARE OCCUPANCIES,

HOSPITAL (I-2) PER ORIGINAL CONSTRUCTION DOCUMENTS.

55 FEET

TWO STORY - 40 FEET

44,000 SF (SPRINKLED)

108,043 SF (PER ORIGINAL DOCUMENTS)

HEIGHT AND AREA COMPLY WITH THE 2018 IBC LIMITATIONS FOR

DESIGNATED OCCUPANCIES AND CONSTRUCTION TYPES, IBC

CHAPTER 5

1 HR REQUIRED, PROVIDED

1 HR REQUIRED, PROVIDED

1 HR REQUIRED, PROVIDED

1 HR REQUIRED, PROVIDED

1 HR REQUIRED, PROVIDED

1 HR REQUIRED, PROVIDED

1 HR REQUIRED, PROVIDED

N/A N/A

COMMON PATH DEAD END EXIT TRAVEL DISTANCE

100 FEET 30 FEET 200 FEET

NR NR NR (NO REQUIREMENT)

SMOKE RESISTANT CONSTRUCTION REQUIRED (LSC 19.3.6.1),

PROVIDED FULL HEIGHT PARTITIONS PER UFC 4-510-01:3-7.1.

FIRE ,SMOKE RATED CONSTRUCTION REQUIRED (IBC 1020.1, LSC

18.3.6.2.3), PROVIDED FULL HEIGHT PARTITIONS PER UFC

4-510-01:3-7.1.

PER NFPA 101 18 / 19.2.3.4

REFERENCE OVERALL LIFE SAFETY PLAN AND EXISTING DRAWING

DOCUMENTS.

SMOKE RESISTANT CONSTRUCTION WITH SELF OR AUTOMATIC

CLOSING AND LATCHING DOORS REQUIRED (LSC 19.3.2.1)

PROVIDED.

1-HOUR RESISTANT CONSTRUCTION WITH SELF OR AUTOMATIC

CLOSING AND LATCHING DOORS REQUIRED (LSC 18.3.2.1)

PROVIDED.

REQUIRED (UFC 3-600-01: 4-2.2), (EXISTING) WET SYSTEM

THROUGHOUT. PER SOW 6.9.3.4 LOA3 AREAS CONTRACTOR MAY

MODIFY FIRE SPRINKLER SYSTEM TO MEET 01 10 11 CRITERIA.

NOT REQUIRED, NOT PROVIDED.

MANUAL SYSTEMS REQUIRED (LSC 18/19.3.4), PROVIDED.

REQUIRED (IMC 606), PROVIDED FOR AIR HANDLER UNIT

SHUTDOWN.

REQUIRED (UFC 4-010-01:2-3.6), PROVIDED.

NOT REQUIRED, NOT PROVIDED.

REQUIRED (LSC 18/19.3.5.12), PROVIDED PER NFPA 10.

REQUIRED (LSC 18/19.2.10.1). PROVIDED WITH EMERGENCY POWER.

REQUIRED (LSC 18/19.2.8). PROVIDED WITH EMERGENCY POWER.

1. PROJECT INFORMATION

CONSTRUCTION PURPOSE:

FACILITY:

OWNER:

LOCATION:

FIRE DEPARTMENT:

REVIEWING AUTHORITY:

ARCHITECT:

CODE REGULATIONS

& CRITERIA:

CODES APPROACH:

2. BASIC BUILDING INFORMATION

YEAR CONSTRUCTED:

OUTPATIENT ADDITION

EMERGENCY DEPT. ADDITION

3. NEW RENOVATION - EXISTING

BUILDING INFORMATION

CONSTRUCTION CLASSIFICATION:

OCCUPANCY CLASSIFICATION:

4. HEIGHT/AREA LIMITATIONS

ANALYSIS

ALLOWABLE HEIGHT ANALYSIS:

ALLOWABLE HEIGHT:

IBC TABLE 504.3 & 504.4

ACTUAL HEIGHT:

ALLOWABLE AREA ANALYSIS:

ALLOWABLE AREA:

IBC TABLE 506.2

ACTUAL AREA:

HEIGHT AND AREA CONCLUSION:

5. FIRE RESISTANT BUILDING

ELEMENTS IBC TABLE 601

STRUCTURAL FIRE PROTECTION:

STRUCTURAL FRAME:

EXTERIOR BEARING WALLS:

INTERIOR BEARING WALLS:

EXTERIOR NONBEARING WALLS:

INTERIOR NON BEARING WALLS:

FLOOR/CEILING ASSEMBLIES:

ROOF/CEILING ASSEMBLIES:

EXTERIOR OPENINGS

PROTECTED:

UNPROTECTED:

6. PASSIVE FIRE SAFETY FEATURES

LIFE SAFETY CODE REQUIREMENTS

FOR A FULLY SPRINKLED BUILDING:

NEW HEALTH CARE:

EXISTING HEALTH CARE:

CORRIDOR CONSTRUCTION

EXISTING:

NEW:

MINIMUM CORRIDOR WIDTH - I-2

SUITE COMPARTMENTATION

INCIDENTAL USE SEPERATION -

EXISTING

STORAGE ROOMS > 100 SF:

INCIDENTAL USE SEPERATION - NEW

STORAGE ROOMS > 100 SF:

6. ACTIVE FIRE SAFETY FEATURES

AUTOMATIC SPRINKLER SYSTEM:

STANDPIPES:

FIRE ALARM SYSTEM:

DETECTION SYSTEM:

MASS NOTIFICATION SYSTEM:

SMOKE CONTROL SYSTEM:

PORTABLE FIRE EXTINGUISHERS:

EXIT IDENTIFICATION:

EXIT ILLUMINATION:

SMOKE

COMPARTMENT #2E

13,786 SF

SMOKE

COMPARTMENT #2D

12,722 SF

2D

2E

2G

2C

2A

2K

2H

2B

2J

2F

SMOKE

COMPARTMENT #2G

5,186 SF

SMOKE

COMPARTMENT #2F

4,680 SF

SMOKE

COMPARTMENT #2B

5,873 SF

SMOKE

COMPARTMENT #2J

17,929 SF

SMOKE

COMPARTMENT #2C

17,036 SF

SMOKE

COMPARTMENT #2A

9,023 SF

SMOKE

COMPARTMENT #2H

8,223 SF

SMOKE

COMPARTMENT #2K

7,397 SF

Contract No.:

Task Order No.:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Project Phase:

SEAL:

BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021

G-004

CODE PLAN

DESIGN USP 795, 797, 800 PHARMACY

RENOVATION

Pine Ridge, SD

03/25/2022

H IH PINE 21100

Final Construction Documents

Checker Author

HHSI102201800005I

75H70121F30008

1" = 30'-0"

LIFE SAFETY PLAN - OVERALL - LEVEL 1

1" = 80'-0"

KEY PLAN - ADDITION INDEX

N 1" = 30'

15' 30' 60'0'

RPS RPSRPS RPS RPS RPS RPS RPS

R P

S R

P S

R P

S R

P S

R P

S R

P S

RPS RPSRPS

SP

SP

S P

S P

SP SP

RPS RPS

R P

S R

P S

SS

SPSP

RPSRPS RPSRPS

S S

SS

S S

S

S S

SS

SS

SS

SS

SS

SS SSSSSS

R P

S R

P S

R P

S R

P S

RPSRPS

SPSP

R P

S R

P S

SS

SS

S S

S S

SS

S S

S S

S S

S S

S S

S S

S

S S

S S

S S

S S

S S

SPSP

S P

S P

RPSRPS

S P

S P

S

PS

P

SP SP

S P

S P

S S

S SS

S P

S P

SPSP SP

RPSRPS

R P

S R

P S

RPS RPS

RPS RPS

SS

S S

S S

S

SS

SS

SS

S S

S S

SS

T ectonic Cop yright 2007

T ectonic Cop yright 2007

FEC

F E

C

T ectonic Cop yright 2007

T ectonic Cop yright 2007

T ectonic Copyright 2007

T ectonic Copyright 2007

T ectonic Cop yright 2007

S P

S P

SPSP

SP

SP

S P

S P

SPSP

S P

S P

SP SP

S P

S P

SPSP

S P

S P

S P

S P

SPSP

S P

S P

T ectonic Cop yright 2007

F B

F B

F B

F B

FB FB

FB FB

S P

S P

SP

S P

S P

S P

S P

SPSP

SS

SS

S S

S P

S P

S S

RPSRPS

R P

S R

P S

SS

SS

S S

SS

S S

SS

S S

SSS

SPSP

S P

S P

RPSRPS

R P

S R

P S

RPSRPS

S P

S P

SPSP

S P

S

S S

S

S P

S P

S P

SPSP

S P

S P

SP SP

S P

S P

S P

S P

SPSP

S P

S P

SPSP

A

B

SHADED AREA EQUALS - NO ARCHITECTURAL WORK

TO BE DONE IN THIS AREA - REFER TO FIRE

PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING

AND LVS DRAWINGS FOR RELATED SCOPE OF WORK

AND ADDITIONAL NOTES AND DETAILS.

SUITE C - 3,793 SF

SUITE G - 5,067 SF

SUITE D - 9,038 SF

SUITE A - 8,285 SF

CAGE

CONSULT

#1

OUTPATIENT

PHARMACY

RECEIVING/

HAZ. STOR.

HIGH

DENSITY

SHELVINGROI TECH

WORKSPACE

OFFICE #2

OFFICE #1

HAZ. STOR.

BREAK

ROOM &

LOCKERS

WAITING

REGIST

RECEPTION

ADMIN

FUTURE

FUTURE

RECEPTION

WALK-UP

PHARMACY

WALK-UP

DISPENSING

WINDOWS

WORK

AREA

CONSULT

#1

CONSULT

#2

CONSULT

#3

NON-STERILE

COMPOUNDING

142' - 7"

2 2

1:150

1:300

1:300

1:150

CONTRACTOR TO VERIFY

THAT EXISTING WALL

CONSTRUCTION MEETS NEW

CODE WALL REQUIREMENTS

CONTRACTOR TO

VERIFY THAT EXISTING

DOOR MEETS NEW

CODE REQUIREMENTS

SUITE D - 9,038 SF SUITE E - 2,516 SF

INPATIENT

PHARMACY

HD-BUFFER

ANTEROOM

BUFFER

HIGH

DENSITY

SHELVING

1:150

OR-1

OR-2

CENTRAL

STERILE

STORAGE

CLEAN

WORKROOM

ETO

ETO

SUBSTERILE

OFFICE

TOILET

ELEC

BREAK

ROOM

RAD/DIAGRAD/FLUOR

RADIOLOGY

WAITING

SOILED

NURSERY

CORRIDOR

TLT

STORAGE

NURSE

STATION

TOILET

WAITING

CORRIDOR

WAITING

STAFF

LOUNGE

IT CLOSETSTORAGE

STAFF

LOUNGE

STORAGE

OPEN OFC

OFFICE

CORRIDOR

TLT

VENIPUNCTURE

RECEPTION

TLT

URINALYSIS

CHEMISTRY

JANSTORAGESTORAGEMICRO

OFFICE HEM/BLOOD

BLOOD

BANK

CORRIDOR

LAB

WAITING

JAN

ELEC

ENTRY

LOBBY

INFO

VEST

OPER

VEST

MEN

WOMEN

EDF CORRIDOR

CORRIDOR

TEL

CORRIDOR

OFFICE

CORRIDOR

CORRIDOR

IT CLOSET

TLT

CORRIDOR

RECEPTION

NON

STERILE

EQUIPMENT

OFFICE

STORAGE

GENERAL

WAITING

NURSE

STATION

REGISTRATION

MEDICATION STORAGE

TOILET ELEC

RECEPTION

CORRIDOR

CORRIDOR

E FILE OFFICE

OFFICE

CORRIDOR

BEHAVIORAL

HEALTH

TREATMENT

TREATMENT

TRIAGE 4 TREATMENT

TREATMENT

CORRIDOR

ELEC

RADIOLOGY

SUPPLY

TLT DB 5

EXAM 3

CORRIDOR

WOMEN

LOCKER

VEST

ULTRASOUND

CORRIDOR

TLT

DB 3 DB 4

STAFF

LOUNGE

MEN

LOCKER

TLT

IP HOLD

CB 1 VEST CB 2

TOILET

1 BED

PATIENT

TOILET

1 BED

PATIENT

TOILET

1 BED

PATIENT

TOILET

1 BED

PATIENT

TOILET

1 BED

PATIENT

TOILET

1 BED

PATIENT

2 BED

PATIENT

NURSE

STATION

NOUR DICTION

PRE OP ELEC

EQUIPJAN

WAIT/ICU

SOILED

UTILITY

OFFICE

VEST

MEN WOMEN

IT CLOSET

ELEC

1 BED

PATIENT

1 BED

PATIENT

1 BED

PATIENT

LOUNGE

VEST

TLT

OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

ELEV

STAIRS

CORRIDOR

CORRIDOR

CORRIDORCORRIDOR

PATIENT

HOLD

TLT

SCREENING

CORRIDOR

1 BED

PATIENT

TEL.

WC

STORAGE

Contract No.:

Task Order No.:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Project Phase:

SEAL:

BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021

G-005

ENLARGED PARTIAL CODE PLAN

DESIGN USP 795, 797, 800 PHARMACY

RENOVATION

Pine Ridge, SD

03/25/2022

H IH PINE 21100

Final Construction Documents

Checker Author

HHSI102201800005I

75H70121F30008

N

4' 8' 16'

1/8" = 1'-0"

0'

N

4' 8' 16'

1/8" = 1'-0"

0'

1" = 120'-0"

KEY PLAN - A & B

1/8" = 1'-0"

LIFE SAFETY PLAN - AREA A - LEVEL 1

1/8" = 1'-0"

LIFE SAFETY PLAN - AREA B - LEVEL 1

REFER TO SHEET G-004 FOR BUILDING & LIFE SAFETY

REQUIREMENTS LEGEND.

FEC

F E

C

PHASE 1

PHASE 3

T1

T1 T1T1

T1

T1

T1

T1

T1

T1T1

T1

T1

T1

M

IN

4' - 6" MIN.

PHASE 1

PHASE 2

T2

T2

T2

T1 T1 T1T1

PHASING LEGEND

AREA A

1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AND OVERVIEW OF

DEPARTMENT TRANSITIONS AND RENOVATIONS. FINAL PHASING PLANS TO

BE COORDINATED WITH THE FACILITY BEFORE ANY WORK IS IS COMPLETED

AND IS THE RESPONSIBILITY OF THE CONTRACTOR..

2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.

PHASE 1

PHASE 2

PHASE 3

PHASE 1

PHASE 2

PHASE 3

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. RELOCATE EXISTING MEDICAL RECORDS DEPARTMENT (C101, C103, AND C104).

RELOCATE ROI OFFICE (C100) TO EXISTING OFFICE (B404). RELOCATE RECEPTION

AREA (C107) TO INFO (A401). VERIFY TEMPORARY ROOM LOCATIONS WITH HOSPITAL

ADMINISTRATION.

2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR

LOCATIONS. VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE

ANY CONSTRUCTION IS TO BEGIN.

3. DEMO AREA- REFER TO DEMOLITION PLANS.

4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. RELOCATE EXISTING OUTPATIENT PHARMACY (C202) TO NEW OUTPATIENT PHARMACY

(C203). OUTPATIENT PHARMACY WILL USE TWO AVAILABLE WINDOWS ON ANGLED WALL

WHILE PHASES 2 AND 3 ARE UNDER CONSTRUCTION.

2. RELOCATE ROI FROM TEMPORARY LOCATION (B404) BACK INTO ORIGINAL SPACE (C100).

3. RELOCATE EXISTING INPATIENT PHARMACY (E101) TO EXISTING OUTPATIENT PHARMACY

(C202).

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. MOVE INPATIENT PHARMACY FROM TEMPORARY LOCATION (C202) BACK TO ORIGINAL

LOCATION (E101) UPON COMPLETION OF AREA B PHASE 2.

2. OUTPATIENT PHARMACY WILL CONTINUE TO USE TWO AVAILABLE WINDOWS ON

ANGLED WALL WHILE PHASES 2 AND 3 ARE UNDER CONSTRUCTION.

3. RELOCATE CONSULT ROOMS (C201 & C209) TO OFFICE B404.

4. INSTALL TEMPORARY WALL PARTITIONS REFER TO PHASING PLANS FOR LOCATIONS.

VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY

CONSTRUCTION IS TO BEGIN.

5. DEMO AREA REFER TO DEMOLITION PLANS.

6. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.

PHASING LEGEND

AREA B

PHASE 1

PHASE 2

PHASE 1

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. RELOCATE EXISTING MED SUPPLY (E272) AND OFFICE (E274). VERIFY LOCATIONS WITH

HOSPITAL ADMINISTRATION.

2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR LOCATIONS.

VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY

CONSTRUCTION IS TO BEGIN. NOTE INPATIENT PHARMACY IS A SECURE AREA AND WILL

NEED TO REMAIN SECURE DURING RENOVATIONS.

3. DEMO AREA- REFER TO DEMOLITION PLANS.

4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.

5. THE EXISTING DOOR IN E273 WILL REMAIN UNTIL THE COMPLETION OF PHASE 2 TO

ALLOW TEMPORARY ACCESS INTO THE HOOD ROOMS. CONTRACTOR TO COORDINATE

WITH FACILITY.

PHASE 2

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. RELOCATE EXISTING INPATIENT PHARMACY (E101) TO EXISTING OUTPATIENT

PHARMACY (C202).

2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR LOCATIONS.

VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY

CONSTRUCTION IS TO BEGIN. NOTE INPATIENT PHARMACY IS A SECURE AREA AND WILL

NEED TO REMAIN SECURE DURING RENOVATIONS.

3. DEMO AREA- REFER TO DEMOLITION PLANS.

4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.

5. MOVE INPATIENT PHARMACY BACK INTO THE SPACE.

1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AND OVERVIEW OF

DEPARTMENT TRANSITIONS AND RENOVATIONS. FINAL PHASING PLANS TO

BE COORDINATED WITH THE FACILITY BEFORE ANY WORK IS IS COMPLETED

AND IS THE RESPONSIBILITY OF THE CONTRACTOR..

2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.

1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AN OVERVIEW OF

DEPARTMENT TRANSITIONS AND RENOVATIONS. SEE GENERAL

CONTRACTORS PROJECT SCHEDULE AND TRANSITION PLAN FOR

ADDITIONAL DETAILS AND INFORMATION.

2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.

3. MATERIAL PATHS - CONTRACTOR SHALL LIMIT MATERIAL TRAFFIC

THROUGH FACILITY TO OFF-PATIENT CORRIDORS DURING OPERATING

HOURS. VERIFY WITH GOVT. CORRIDORS THAT ARE TO BE DEEMED

ACCEPETABLE.

4. INTERIM LIFE SAFETY MEASURES - PATHS OF EGRESS TO OCCUPIED

AREAS SHALL NOT BE BLOCKED OR ALTERED DURING OPERATING

HOURS. SPRINKLER SYSTEM ZONE SHUT-DOWNS FOR MODIFICATIONS

SHALL BE SCHEDULED OUTSIDE OPERATING HOURS AND WILL NOT

AFFECT THE LIFE SAFTEY OF FACILITY OCCUPANTS.

5. CRAWL SPACE AND PENTHOUSE ARE NOT AFFECTED BY TRANSITION

SPACES OR CONSTRUCTION PHASING.

6. HATCH PATTERNS DIFFER TO SHOW CONTRAST BETWEEN SUB-PHASES.

REF. PHASING LEGEND FOR ADDITIONAL INFORMATION.

PHASING & TRANSITION NOTES

1. SEE ILSM (INTERIM LIFE SAFETY MEASURES) FOR REQUIREMENTS IN TEMPORARY

CONSTRUCTION FACILITES AND CONTROLS SPECIFICATIONS FOR FULL ILSM

INFORMATION.

2. ENSURE EXITS HAVE FREE AND UNOBSTRUCTED EGRESS. IN SUCH INSTANCES

FACILITY PERSONNEL SHALL RECEIVE TRAINING IF ALTERNATE EXITS ARE

DESIGNATED.

3. ENSURE FREE AND UNOBSTRUCTED ACCESS BY EMERGENCY SERVICES FROM

THE OUTSIDE AND FROM WITHIN THE FACILITY.

4. ENSURE FIRE ALARM, DETECTION, AND SUPPRESSION SYSTEMS ARE NOT

CRITICALLY IMPAIRED. A TEMPORARY EQUIVALENT SYSTEM WILL BE PROVIDED

WHEN A FIRE PROTECTION SYSTEM IS CRITICALLY IMPAIRED, AND WILL BE

INSPECTED AND TESTED ON A MONTHLY BASIS.

5. ENSURE TEMPORARY CONSTRUCTION PARTITIONS ARE SMOKE TIGHT AND BUILT

OF NON-COMBUSTIBLE MATERIALS TO PREVENT THE DEVELOPMENT OR SPREAD

OF FIRE.

6. STRICTLY PROHIBIT SMOKING IN OR ADJACENT TO ALL CONSTRUCTION AREAS.

7. DEVELOP AND ENFORCE STORAGE, HOUSEKEEPING, AND DEBRIS REMOVAL

PRACTICES THAT REDUCE THE FLAMMABLE AND COMBUSTIBLE FIRE LOAD OF

THE BUILDING TO THE LOWEST LEVEL NECESSARY FOR DAILY OPERATIONS.

8. CLOSE COORDINATION WITH FACILITY STAFF WILL BE REQUIRED FOR

SCHEDULING ALL WORK WITHIN THE CONTRACT. CONTRACTOR SHALL EXPECT

DELAYS IN WORK OR WORK TO BE OUTSIDE OF NORMAL BUSNISS HOURS AND

SHALL BID THE WORK ACCORDINGLY. THE SUCCESSFUL CONTRACTOR WILL BE

REQUIRED TO COMPLETE ALL PCRA (PRE-CONSTRUCTION RISK ASSESSMENT) /

ICRA (INFECTION CONTROL RISK ASSESSMENT) PAPERWORK BEFORE STARTING

ANY CONSTRUCTION UNDER THIS CONTRACT.

9. THE CONTRACTOR WILL ALSO BE REQUIRED TO WORK CLOSELY WITH INFECTION

CONTROL AND SAFETY STAFF TO OBTAIN AND POST ANY REQUIRED PERMITTING

FOR SPECIFIC WORK UNDER THIS CONTRACT. PROPER CONSTRUCTION

BARRIERS SEPERATING AREAS OF CONSTRUCTION WITH PATIENT CARE AREAS

WILL BE REQUIRED.

10. BUILDING IS OCCUPIED 24/7. SPRINKLER SHUTDOWNS SHALL BE LIMITED TO 10

HOURS WITHIN A 24 HOUR PERIOD OR AN APPROVED FIRE WATCH SHALL BE

ESTABLISHED PER NFPA 25 -2011; 15.5.2 (4).

INTERIM LIFE SAFETY MEASURES NOTES

1. INSTALL PERMANENT DIRECTIONAL SIGNAGE DIRECTORIES AS PHASING

ALLOWS. SEE AW SHEETS FOR PERMANENT SIGNAGE REQUIREMENTS.

SIGNAGE MESSAGE INSERTS SHALL BE UPDATED DURING RENOVATION

PROCESS AS REQUIRED FOR DEPARTMENTAL MOVES AND TEMPORARY

LOCATIONS.

2. G.C. TO BE RESPONSIBLE FOR TEMPORARY SIGNAGE. G.C. TO COORDINATE

WITH HOSPITAL AND STAFF SIGNAGE MESSAGE AND LOCATIONS BEFORE ANY

TEMPORARY SIGNAGE IS PLACED.

TEMPORARY SIGNAGE NOTES

PUBLIC SIDE

3 5/8" MTL. STUDS

(1) LAYER 1/2" VINYL WRAPPED

DWB W/ TRIM STRIPS OVER

SEAMS OR (1) LAYER 1/2" GWB,

TAPED, MUDDED AND PAINTED.

VINYL BASE

FINISHED FLOOR

FINISHED CEILING

DUST BARRIER, ATTACH TO

TOP OF WALL AND ROOF DECK.

UNDERSIDE OF

STRUCTURE ABOVE

CONSTRUCTION SIDE

AT LEVEL 4 INFECTIOUS

CONTROL AREAS PROVIDE

DUST BARRIER ON

CONSTRUCTION SIDE OF

PARTITION FROM FLOOR

TO UNDERSIDE OF DECK

MARKED T1 ON PLANS

OFFICE

D145

TOILET

D144

ELEC

C600

BULK

COMP/SS/STOR

C204

WAITING

A119

IT CLOSET

C301

STORAGE

C300

STAFF

LOUNGE

C302

STORAGE

C303

OPEN OFC

C304

OFFICE

C305

CORRIDOR

C306

TLT

C309

VENIPUNCTURE

C400

TLT

C402

URINALYSIS

C404

CHEMISTRY

C412

ENTRY

LOBBY

A403

INFO

A401

VEST

A402

STORAGE

B126A

JAN

B129

VEST

B130

MEN

B400

WOMEN

B402

EDF

B406

C O

R R

ID

O

R B

C

O R

R

ID

O R

B

TEL

B405

CORRIDOR

B409

STAIRS

B411

ELEV

B412TLT

B500

OFFICE

B404

CORRIDOR

D601A

CORRIDOR

D600

TLT

C403

CORRIDOR

A404

VEST

B410

NON

STERILE

EQUIPMENT

D300

OFFICE

C100

RECORDS

C105

PHARMACY

WAITING

C200

CONSULT 1

C201

OFFICE

C205

CONSULT 3

C207

CONSULT 2

C209

PHARMACY

C202

CAGE

C202A

TOILET

E200 1 BED

PATIENT

E202

TOILET

E204

1 BED

PATIENT

E205

TOILET

E207 1 BED

PATIENT

E208

TOILET

E209

1 BED

PATIENT

E211

TOILET

E213 1 BED

PATIENT

E214

TOILET

E215

1 BED

PATIENT

E217

NURSE

STATION

E275

NOUR

E276

DICTION

E277

PRE OP

D454

ELEC

D605

EQUIP

D509

JAN

D510

WAIT/ICU

D511

SOILED

UTILITY

D512

MEN

E305

WOMEN

E306

IT CLOSET

E271

ELEC

E307

1 BED

PATIENT

E260

1 BED

PATIENT

E261

1 BED

PATIENT

E264

LOUNGE

E267

VEST

E268

TLT

E269

OFFICE

E270

CORRIDOR

E290

CORRIDOR

E291

CORRIDOR

E296

ELEV

H403

STAIRS

H405 CORRIDOR

E303

CORRIDOR

D603

CORRIDOR

D602

TEL.

E303

WC

STORAGE

E297

PUBLIC SIDE

3 5/8" MTL. STUDS

(1) LAYER 1/2" VINYL WRAPPED

DWB W/ TRIM STRIPS OVER

SEAMS OR (1) LAYER 1/2" GWB,

TAPED, MUDDED AND PAINTED.

VINYL BASE

FINISHED FLOOR

FINISHED CEILING

DUST BARRIER, ATTACH TO

TOP OF WALL AND ROOF DECK.

UNDERSIDE OF

STRUCTURE ABOVE

CONSTRUCTION SIDE

MARKED T2 ON PLANS

A

B

Contract No.:

Task Order No.:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Project Phase:

SEAL:

BASED ON STATEMENT OF WORK DATED JANUARY 2021 AND ON SCHEMATIC DRAWINGS APPROVED OCTOBER 2021

G-006

PHASING PLAN

DESIGN USP 795, 797, 800 PHARMACY

RENOVATION

Pine Ridge, SD

03/25/2022

H IH PINE 21100

Final Construction Documents

Checker Author

HHSI102201800005I

75H70121F30008

1/8" = 1'-0"

PHASING PLAN - AREA A - PHASE 1 - LEVEL 1

1/8" = 1'-0"

PHASING PLAN - AREA B - PHASE 1 - LEVEL 1

N

4' 8' 16'

1/8" = 1'-0"

0'

N

4' 8' 16'

1/8" = 1'-0"

0'

1 1/2" = 1'-0"

TEMPORARY PHASING PARTITION TYPE 1

1 1/2" = 1'-0"

TEMPORARY PHASING PARTITION TYPE 2

1" = 120'-0"

KEY PLAN - A & B

FEC

E

C

PHASE 3

PHASE 1

COMPLETE

RECEIVING/

HAZ. STOR.

C206

HAZ. STOR.

C207

ROI

C100

NON-STERILE

COMPOUNDING

C205

CAGE

C204

DISPENSING

WINDOWS

C202

OUTPATIENT

PHARMACY

C203

HIGH

DENSITY

SHELVING

C208 TECH

WORKSPACE

C209

OFFICE #2

C210

OFFICE #1

C211

BREAK

ROOM &

LOCKERS

C212

WORK

AREA

C213

CONSULT

#2

C215

CONSULT

#3

C214

CONSULT

#1

C216

FUTURE

C601

WAITING

C200

RECEPTION

A408

REGIST

A409ADMIN

A410

T1

T1

T1

T1

T2 T2

T2

T2T2

FUTURE

A411

PHASE 2

PHASE 1

COMPLETE

PHASING LEGEND

AREA A

1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AND OVERVIEW OF

DEPARTMENT TRANSITIONS AND RENOVATIONS. FINAL PHASING PLANS TO

BE COORDINATED WITH THE FACILITY BEFORE ANY WORK IS IS COMPLETED

AND IS THE RESPONSIBILITY OF THE CONTRACTOR..

2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.

PHASE 1

PHASE 2

PHASE 3

PHASE 1

PHASE 2

PHASE 3

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. RELOCATE EXISTING MEDICAL RECORDS DEPARTMENT (C101, C103, AND C104).

RELOCATE ROI OFFICE (C100) TO EXISTING OFFICE (B404). RELOCATE RECEPTION

AREA (C107) TO INFO (A401). VERIFY TEMPORARY ROOM LOCATIONS WITH HOSPITAL

ADMINISTRATION.

2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR

LOCATIONS. VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE

ANY CONSTRUCTION IS TO BEGIN.

3. DEMO AREA- REFER TO DEMOLITION PLANS.

4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. RELOCATE EXISTING OUTPATIENT PHARMACY (C202) TO NEW OUTPATIENT PHARMACY

(C203). OUTPATIENT PHARMACY WILL USE TWO AVAILABLE WINDOWS ON ANGLED WALL

WHILE PHASES 2 AND 3 ARE UNDER CONSTRUCTION.

2. RELOCATE ROI FROM TEMPORARY LOCATION (B404) BACK INTO ORIGINAL SPACE (C100).

3. RELOCATE EXISTING INPATIENT PHARMACY (E101) TO EXISTING OUTPATIENT PHARMACY

(C202).

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. MOVE INPATIENT PHARMACY FROM TEMPORARY LOCATION (C202) BACK TO ORIGINAL

LOCATION (E101) UPON COMPLETION OF AREA B PHASE 2.

2. OUTPATIENT PHARMACY WILL CONTINUE TO USE TWO AVAILABLE WINDOWS ON

ANGLED WALL WHILE PHASES 2 AND 3 ARE UNDER CONSTRUCTION.

3. RELOCATE CONSULT ROOMS (C201 & C209) TO OFFICE B404.

4. INSTALL TEMPORARY WALL PARTITIONS REFER TO PHASING PLANS FOR LOCATIONS.

VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY

CONSTRUCTION IS TO BEGIN.

5. DEMO AREA REFER TO DEMOLITION PLANS.

6. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.

PHASING LEGEND

AREA B

PHASE 1

PHASE 2

PHASE 1

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. RELOCATE EXISTING MED SUPPLY (E272) AND OFFICE (E274). VERIFY LOCATIONS WITH

HOSPITAL ADMINISTRATION.

2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR LOCATIONS.

VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY

CONSTRUCTION IS TO BEGIN. NOTE INPATIENT PHARMACY IS A SECURE AREA AND WILL

NEED TO REMAIN SECURE DURING RENOVATIONS.

3. DEMO AREA- REFER TO DEMOLITION PLANS.

4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.

5. THE EXISTING DOOR IN E273 WILL REMAIN UNTIL THE COMPLETION OF PHASE 2 TO

ALLOW TEMPORARY ACCESS INTO THE HOOD ROOMS. CONTRACTOR TO COORDINATE

WITH FACILITY.

PHASE 2

(REFER TO EXISTING FLOOR PLANS FOR ROOMS NOT SHOWN IN PHASING PLANS.)

1. RELOCATE EXISTING INPATIENT PHARMACY (E101) TO EXISTING OUTPATIENT

PHARMACY (C202).

2. INSTALL TEMPORARY WALL PARTITIONS- REFER TO PHASING PLANS FOR LOCATIONS.

VERIFY LAYOUT WITH IHS, FACILITY, AND DEPARTMENT STAFF BEFORE ANY

CONSTRUCTION IS TO BEGIN. NOTE INPATIENT PHARMACY IS A SECURE AREA AND WILL

NEED TO REMAIN SECURE DURING RENOVATIONS.

3. DEMO AREA- REFER TO DEMOLITION PLANS.

4. RENOVATE AREA PER FINAL CONSTRUCTION DOCUMENTS.

5. MOVE INPATIENT PHARMACY BACK INTO THE SPACE.

1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AND OVERVIEW OF

DEPARTMENT TRANSITIONS AND RENOVATIONS. FINAL PHASING PLANS TO

BE COORDINATED WITH THE FACILITY BEFORE ANY WORK IS IS COMPLETED

AND IS THE RESPONSIBILITY OF THE CONTRACTOR..

2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.

1. INFORMATION ON DRAWINGS IS INTENDED TO GIVE AN OVERVIEW OF

DEPARTMENT TRANSITIONS AND RENOVATIONS. SEE GENERAL

CONTRACTORS PROJECT SCHEDULE AND TRANSITION PLAN FOR

ADDITIONAL DETAILS AND INFORMATION.

2. SEE ALL DISCIPLINE DRAWINGS FOR ADDITIONAL PHASING INFORMATION.

3. MATERIAL PATHS - CONTRACTOR SHALL LIMIT MATERIAL TRAFFIC

THROUGH FACILITY TO OFF-PATIENT CORRIDORS DURING OPERATING

HOURS. VERIFY WITH GOVT. CORRIDORS THAT ARE TO BE DEEMED

ACCEPETABLE.

4. INTERIM LIFE SAFETY MEASURES - PATHS OF EGRESS TO OCCUPIED

AREAS SHALL NOT BE BLOCKED OR ALTERED DURING OPERATING

HOURS. SPRINKLER SYSTEM ZONE SHUT-DOWNS FOR MODIFICATIONS

SHALL BE SCHEDULED OUTSIDE OPERATING HOURS AND WILL NOT

AFFECT THE LIFE SAFTEY OF FACILITY OCCUPANTS.

5. CRAWL SPACE AND PENTHOUSE ARE NOT AFFECTED BY TRANSITION

SPACES OR CONSTRUCTION PHASING.

6. HATCH PATTERNS DIFFER TO SHOW CONTRAST BETWEEN SUB-PHASES.

REF. PHASING LEGEND FOR ADDITIONAL INFORMATION.

PHASING & TRANSITION NOTES

1. SEE ILSM (INTERIM LIFE SAFETY MEASURES) FOR REQUIREMENTS IN TEMPORARY

CONSTRUCTION FACILITES AND CONTROLS SPECIFICATIONS FOR FULL ILSM

INFORMATION.

2. ENSURE EXITS HAVE FREE AND UNOBSTRUCTED EGRESS. IN SUCH INSTANCES

FACILITY PERSONNEL SHALL RECEIVE TRAINING IF ALTERNATE EXITS ARE

DESIGNATED.

3. ENSURE FREE AND UNOBSTRUCTED ACCESS BY EMERGENCY SERVICES FROM

THE OUTSIDE AND FROM WITHIN THE FACILITY.

4. ENSURE FIRE ALARM, DETECTION, AND SUPPRESSION SYSTEMS ARE NOT

CRITICALLY IMPAIRED. A TEMPORARY EQUIVALENT SYSTEM WILL BE PROVIDED

WHEN A FIRE PROTECTION SYSTEM IS CRITICALLY IMPAIRED, AND WILL BE

INSPECTED AND TESTED ON A MONTHLY BASIS.

5. ENSURE TEMPORARY CONSTRUCTION…