This solicitation requests proposals for a pharmacy remodel construction project. The project scope involves demolishing and replacing existing inpatient and outpatient pharmacy spaces at Pine Ridge Hospital in Pine Ridge, South Dakota. The construction period of performance is 365 calendar days with a project magnitude between $1,000,000 and $5,000,000. The Indian Health Service will award a firm fixed price contract and procurement is a request for proposal evaluated using lowest price technically acceptable criteria. The solicitation is set aside for small businesses with a preference for Indian Economic Enterprise firms. The closing date for proposals is August 9, 2022.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A0003

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1) Extend the proposal due date to 9 August 2022 at 2:00pm (2 pages)

2) Answer questions from prospective offerors (6 pages)

***Note questions 7, 20, 23, and 29 are outstanding questions to be answered

NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and all amendments by number and date on their cover letter in their offeror or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Indian Health Service (IHS) Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1650 Seattle, WA 98104

See item 6

75H70122R00044

1 9

07/29/2022

06/22/2022

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

75H70122R00044

Indian Health Service Division of Engineering Services - DES Seattle 701 5th Ave, Suite 1650 Seattle, WA 98104

This is a total small business set-aside competition with a preference given to Indian Economic Enterprises (IEE).

TITLE: USP 797/800 Pine Ridge Pharmacy Remodel Construction Project

ESTIMATED MAGNITUDE OF CONSTRUCTION (APR 1985) (FAR 36.204): The estimated magnitude of the proposed construction is between $1,000,000 and $5,000,000.

PERFORMANCE PERIOD: The performance period for this contract is 365 calendar days from issuance of the Notice to Proceed (NTP).

See Section L for Proposal Submittal Instructions and Site Visit Information.

Same as Block 7.

Taylor Kanthack taylor.kanthack@ihs.gov 206-615-2805

GP20PR074H6

2 6606/21/2022 local time 08/09/2022

2:00PM PST

52.211-10

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

B.4

Same as Block 7.

Jennifer J. Scroggins

LUMP SUM TOTAL $________________.

Questions and Answers #1

75H70122R00044

Pine Ridge Pharmacy Remodel

Item # Section and Page # Question Response

1 The solicitation for this project states preference will be given to Indian Economic Enterprises. Can you tell me what the preference is? Typically the preference is 5% on the total bid. Is that correct for this project?

For this solicitation, preference would be given to an IEE firm in accordance with Factor 4 – Indian Preference and in accordance with HHSAR 326.603-1(h).

2 The plans include a section 105626 for Mobile Storage Shelving. I am requesting adding Spacesaver as a manufacturer for the high-density mobile storage.

Any manufacture that meets the plans and specifications shall be acceptable.

3 This is regarding C204 - For the WireCrafters Wire Mesh Partition that is going the full height, what is the height of the room?

Per plan sheet a-101 the cage 204 space shall have diamond meta mesh to deck (full height) on all 4 walls as stated in new partition definition s4m and note # 4 on plan.

Hollow Metal Door Frames 4 Spec calls for terminated stops -looking back at some older pictures I do not see that the hospital has ever used frames with terminated stops

Correct, the hospital does not use many terminated stops at this point, but they are easier for the housekeeping staff to clean around and the service unit would like to transition to terminated stops for future projects.

5 section 2.04 subsection B. #2 calls for 16 gauge material at the frames but section 2.04 subsection C.

#3 calls for 18 gauge material at the frames.

Make all door frames 16-gauge thickness

18-gauge reference removed from subsection C #3

6 The stainless steel manufacturer specified is not someone we can order product from at this time . I am looking into the possibility of working with Terra Universal but not sure it is a product we can supply.

Due to the fact they are the only specified supplier this may become an issue. not to mention the stainless steel should have its own spec section.

In section 2.03 Hollow Metal Doors Stainless Steel Interior Doors. Specifications are given.

Ceco, Curries, and Steelcraft will be added in section 2.01.B

7 The automatic operator provided with Terra Universal products has very little information on the web site.

The specs call for 12 programmable options. Not sure if the operator will meet spec & if we can install this

Waiting on a response particular operator without factory training or certification

8 We have provided Horton Operators for most of the operators currently in use at the hospital. Providing a different manufactured operator might require training for the maintenance staff to operate & service.

If they have hand wave sensors on both sides, they would be considered equal.

Wood Doors:

9 VT Industries is not a specified manufacturer. VT doors have been used exclusively at the hospital. Marshfield wood doors are specified & Marshfield is owned by VT industries. The lead times for their wood doors is 3 to 4 months right now.

VT Industry Doors to match the existing in the facility would be considered equal.

10 The spec calls for “a replaceable Lock Stile” this particular type of construction is typical in a high impact door not typical in standard wood doors.

Acrovyn doors would have this type construction. I do not believe there are any Acrovyn doors currently at the hospital.

The intent would be to have the same style of mechanism currently used by the hospital.

This is a door type, not a hardware item. It refers to the edge which gets most abuse.

Coiling Doors:

11 for the most part this specification is possible. the one contradiction being the spec calls for electronically operated & locked doors yet later calls for “Steel pipe & torsion steel spring system” not sure both can be accomplished in the same door with a manual override which is also specified the electrified locking is the questionable point here. From what I have learned in the past the electric motor locks the door so the “Steel pipe & torsion steel spring system” may not be possible.

Both apply. Pipe and torsion spring used in both manual & electric operation.

Door Hardware:

12 Specified door hardware is not even near the same as what the hospital actually has on the current doors.

A) The locks now are mortise Corbin

Russwin locks but the specification calls for Best 9K series the 9K series is a cylindrical lock.

Again, the intent would be to keep the hardware the same as the existing hardware in the Hospital.

Armor plating is required on all wood doors in the hospital.

B) The hospital has exclusively used Corbin Russwin DC6200 series closers The specification calls for Dorma or Sargent closers. Sargent closers are a quality product but one product we can have difficulty acquiring. The Dorma product I would not recommend to anyone.

C) one thing they did not address in the spec is armor plates & edge guards. for the last 3 years any new wood door provided has been completely protected on all 4 sides up to 36” in stainless steel. I was told this would be required at all wood doors in the hospital.

MEP

13 Mechanical and plumbing both have numerous details for seismic restraints and supports. There is also spec section 22 05 48 & 23 05 48 relating to seismic-restraint. Is this needed on this project located in Pine Ridge, SD? Seismic is not typically used on projects in our area.

The hospital is in a seismic zone. If local and state code does not enforce the requirement and the owner does not require it, then the contractor may choose not to install it, so long they obtain in writing that this is acceptable for owner and inspectors.

14 Will duct cleaning be required for any of the existing ductwork the new system connects to?

No, a duct cleaning project is already being planned for the hospital.

15 Do the hydronic branch piping that is to be removed have isolation valves at the main?

There were shown isolation valves on the existing drawings but there is no guarantee that they were installed.

16 Will he heating water system need to be drained for connection of new piping? Does the existing system have glycol?

No the existing system does not have glycol on the heating side. It does on the cooling.

Note that the Boiler Plant is to be replaced next spring/summer and glycol will be added.

17 Spec section 23 25 00 HVAC Water Treatment is in the specs but the plans do not indicate adding chemical feed equipment anywhere? What is this section in the specs for?

This specification section can be ignored as no chemical feed equipment is being added. The existing chemical feed equipment and water quality is to be used.

18 Spec section 23 38 16 Fume Hoods for Laboratory Use is in the specs but the hood on the project is owner provided?

Hood is to be connected and routed to exhaust system. Hood is to be 100% operation and to code when final turn over is given to owner. Refer to specification for additional information that may not be covered by owner supplied hood.

19 On sheet E-501 the Riser diagram shows that panel NEDB is fed from the existing generator and panel EDB is fed from Panel MDB, but according to the attached one line Panel EDB is fed from the generator and panel NEDB is fed from panel MDB. Please verify the labeling.

Yes that is correct.

20 On Sheet E-401 Note Key Note F and Key Note K ask to verify the low voltage scope of work and also which low voltage systems will be provided by others. Please verify what systems are the responsibility of the bidding electrical contractor

Waiting on response

21 Is there an existing Arc Flash Study for the existing switchgear that can be used for the Arc Flash Study of the new equipment.

There is no existing Arc Flash Study Available.

22 The Cx plan indicates that fire and smoke dampers are included in the Cx scope, but we do not see any identified on the mechanical plans. Are these included in the project?

There are no smoke/fire dampers on the projects.

23 The Cx plan indicates that nurse call, security, public address, UPS, and telecommunication/television cable systems are included in the Cx scope, but we do not see any specifications for these systems. Are these included in the project?

Waiting on response

24 Section 019100 refers to section 210800 (Cx of fire fire suppression systems), however this section does not exist. There are fire suppression systems listed in the Cx plan. Confirm if section 210800 will be included in the specifications.

Yes. Attached is seps section 210800.

25 Section 019100 refers to section 220800 (Cx of plumbing systems), however there are no plumbing systems listed as systems to be Cx'd and section 220800 does not exist. Confirm references to Cx of plumbing systems do not apply.

Confirmed.

Disregard reference to section 22 08 00

26 Eyewash stations may want to be considered? Refer to plans: Sheet P-401 L-1 in room C206 & C203 has an Eye-Pod eye wash device on the gooseneck of the faucet, refer to Lavatory plumbing fixture schedule on sheet P-601. Refer to plans: Sheet P-401 S-1 in room C205 has a deck mounted eye-wash device, refer to Miscellaneous plumbing fixture schedule on sheet P-601

27 Sections 017900-3.01-D-1, 3.02-D, and 3.02-G indicate that training must be complete 2 weeks prior to substantial completion, but may not begin until functional performance testing is completed. What are the expectations in terms of the timing of substantial completion for each phase of work? Also, does functional testing being complete include any required retesting?

We foresee minimal training will be required for this project.

Any required training will be coordinated during construction and during or after each phase has been substantially completed depending on what training is required.

28 Spec calls for terminated stops -looking back at some older pictures I do not see that the hospital has ever used frames with terminated stops section 2.04 subsection B. #2 calls for 16 gauge material at the frames but section 2.04 subsection C. #3 calls for 18 gauge material at the frames. Should the stainless steel doors and frames should have its own spec section.

Duplicate question – refer to questions 4-7

29 The automatic operator provided with Terra Universal products has very little information on the web site.

The specs call for 12 programmable options. Not sure if the operator will meet spec & if we can install this particular operator without factory training or certification

Duplicate question (7)

30 Would be acceptable to bid Mechanical Sales SD’s Critical Room Control valves & pressure monitors in lieu of the Phoenix equipment? CRC valves and monitors on this project would tie in well with the CRC equipment already installed in other areas of the building.

Mechanical Sales SD’s control valves is approved in manufacturer only and as long as it meets Buy America Act requirements and are equal to specifications. Final approval will be given during the submittal phase when selections have been made and they are reviewed to be technically equal.

31 It is required to provide spare circuit breakers other than what is on the panel schedules?

See specification 262416 for spare circuit breaker requirements.

32 Division 23 Is it approved to bid the following equipment see below?

Product Description Manufacturer

Requested manufacturers are approved for bidding purposes only as long as they meet Buy America Act requirements and are equal to specifications. Equipment shall not be approve for purchase until submitted for approval to be technically equal.

Venturi Valves Accutrol Fan Filter Unit Camfil, Krueger

33 Spec 233600 Is it approved to bid the following equipment?

Product Description Manufacturer Air Terminal Units Price Industries (this includes VAV Units, HEPA Fan Filter Units and Venturi Valves)

Requested manufacturers are approved for bidding only as long as they meet Buy America Act requirements and are equal to specifications. Equipment shall not be approve for purchase until submitted for approval to be technically equal.

34 Section 10 51 13 Is it approved to bid the following equipment for the metal lockers found in section 10 51 13, page 1?

Proposed substitution: Duralife Lockers manufactured by Scranton Products.

Acceptable substitution as long as they meet Buy America Act requirements.

DIVS 21/22/23,

MEP DWG SHTS

Will seismic restraints be required for ducting and piping on divisions 21, 22, & 23? Matt Pfister added 7- 25-2022

Where required by code for medical facilities seismic restraints shall be used for ducting and piping.

Attachment(s):

E7.2 One-Line Diagram Emergency System

01 91 00 USER-General Commissioning Requirements

08 11 13 BSD-Hollow Metal Doors and Frames