B007 Contract Work Breakdown Structure.pdf

PDF 411 KB Posted

Attached to
ADC MK2
Solicitation number
N0025320R0005
Issued by

About this file

This document package includes a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity.

The CDRL outlines requirements for a Contract Work Breakdown Structure deliverable to be provided by the contractor. It specifies the data item number, title, authority, contract and requiring office references, distribution statement, frequency, submission dates and addressees for one draft and final deliverable. The remarks provide additional instructions regarding approval processes, document marking and media requirements.

The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command for the ADC MK2 system. The requirement is to sustain minimum inventory levels for the USN Fleet and support projected Foreign Military Sales demands for the legacy ACAT III ADC MK2 program. Anticipated incidental services include engineering support. The preponderance of this requirement is for supply and production with further definition of engineering services to be provided through Technical Instructions.

View the file

Other files

File Type Posted
Statement of Work N00253-20-R0005-0002.pdf PDF
SF-30 N0025320R00050002.pdf PDF
QUESTIONS ANSWERS N00253-20-R-00050002.pdf PDF
SF-30 N0025320R005_Amendment_0001.pdf PDF
QUESTIONS ANSWERS REGARDING RFP N00253-20-R-0005_V1.pdf PDF
A009 Explosive Hazard Classification Data Report.pdf PDF
B011 Quality Program Plan.pdf PDF
C003 Item Unique Identification Marking and Verification Report.pdf PDF
C004 Bill of Materials for Logistics and Supply Chain Risk Management.pdf PDF
B001 Contractors Progress and Status Report.pdf PDF
B014 Program Management Plan.pdf PDF
A006 Configuration Audit Plan.pdf PDF
B006 Quality Deficiency Report.pdf PDF
A005 MIL-STD-31000B TDP Option Selection Worksheet.pdf PDF
B017 Integrated Program Management Data and Analysis Report.pdf PDF
A007 Reliability and Maintainability Predictions Report.pdf PDF
B018 Configuration Status Accounting Information.pdf PDF
B012 Programmatic Environmental Health and Safety Evaluation Plan.pdf PDF
A001 Test and Evaluation Program Plan.pdf PDF
Attachment 9 Cost Summary Table.xlsx XLSX spreadsheet
A008 Failure Summary and Analysis Report Signed.pdf PDF
A005 Product Engineering Design Data and Associated Lists.pdf PDF
Attachment 8 ADC MK2 GFI.pdf PDF
B005 Program Protection Implementation Plan.pdf PDF
A003 Test Inspection Report.pdf PDF
A007 Reliability and Maintainability Predictions Report (2).pdf PDF
B004 System Safety Program Plan.pdf PDF
A002 Test Procedure.pdf PDF
A022 Specification Change Notice.pdf PDF
C003 Item Unique Identification Marking and Verification Report (2).pdf PDF
C004 Bill of Materials for Logistics and Supply Chain Risk Management (2).pdf PDF
A004 Engineering Change Proposal.pdf PDF
B015 Hazardous Materials Management Program Report.pdf PDF
B002 Conference Agenda.pdf PDF
C002 Ammunition Data Card.pdf PDF
Attachment 7 Small Business Participation.docx DOCX document
A021 Contractor Configuration Management Plan.pdf PDF
B012 Programmatic Environmental Health and Safety Evaluation Plan (2).pdf PDF
A019 Specification Requirement Verification Matrix.pdf PDF
B017 Integrated Program Management Data and Analysis Report (2).pdf PDF
B003 Conference Minutes.pdf PDF
A005 Product Engineering Design Data and Associated Lists (2).pdf PDF
N0025320R0005.pdf PDF
A010 Systems Engineering Management Plan.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: B007
title: Contract Work Breakdown Structure
sub: N/A
auth: DI-MGMT-81334D
ref: SOW Para. 3.5.1.1
req_ofc: PMS 415
dd250: LT
appcode: A*
dist: D*
freq: ONE/R
asof: N/A
firstsub: 30 DAC
subsub: N/A
addressee1: PMS 415
draft1: 1
reg1: 1
repro1: 0
addressee2: COR
draft2: 1
reg2: 1
repro2: 0
addressee3: NUWC NPT
draft3: 1
reg3: 1
repro3: 0
addressee4: NUWC KPT
draft4: 1
reg4: 1
repro4: 0
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 4
total_reg: 4
total_repro: 0
remarks: Block 8: Approval is for technical content. Allow 30 days for Government review and approval/disapproval. The Contractor has 30 days to incorporate comments and return to the Government for approval.

Block 9: Document marking requirements:

"DISTRIBUTION STATEMENT D - Distribution authorized to the U.S. Department of Defense and U.S. DoD contractors only due to Critical Technology, 03 Aug 2020. Other requests for this document shall be referred to Program Executive Office, Submarine (PEO SUB) (PMS 415)."

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. "

"DESTRUCTION NOTICE – For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11 -19 or DoD 5200.01, DoD Information Security Program. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document."

Block 14: Media Requirement: The report shall be delivered digitally via electronic mail (e-mail) using Microsoft Word or Adobe Portable Document Format (PDF). Files larger than 5 megabytes (MB) shall be delivered on compact disc (CD) or digital versatile disc (DVD). If this CDRL deliverable contains classified information, distribution and submittal shall be in accordance with DOD Industrial Security Manual and the contract DD254.

group:
total_price:
prep_name: Sierra L. Trepanier
line_item: TBD
exhibit: B
xtdp: Off
xtm: Off
othercat: MGMT
system: ADC MK 2
ctr_no: TBD
contr: TBD
remarksb:
Page2:
Reset:
2020-07-21T10:37:52-0700
TREPANIER.SIERRA.L.1460465458
prep_date: 03 AUG 2020
app_by: Jonathan S. King
2020-08-03T13:12:55-0700
KING.JONATHAN.STANTON.1184857347
app_date: 03 AUG 2020
Page: 1
of_pages: 1
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .