B.08.02.01 Supplemental Bid Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
ODF-T FY26 Sac River Access Roadwork
Solicitation number
W912DQ26QA009
Issued by

About this file

The file is a Supplemental Bid Schedule for the U.S. Army Corps of Engineers' Sac River Access Roadwork Project (Solicitation No. W912DQ26QA009). The document outlines detailed line item pricing for multiple contract line items (CLINs) covering roadway rehabilitation work, with specific breakdown of quantities and unit prices. The project includes five primary CLINs: CLIN 0001 for pulverization and asphalt pavement work, CLIN 0002 for shoulder installation, CLIN 0003 for aggregate rehabilitation, CLIN 0004 for Osage Bluff crack filling, and CLIN 0005 for bituminous surface treatment.

The associated federal contract opportunity indicates the project is for the Harry S. Truman Lake Project, with an estimated contract value between $100,000 and $250,000. The project has a 270-calendar day performance period, requires bid bonds of 20% of bid price (or $3,000,000 maximum), and will be conducted as a full and open competition under NAICS Code 237310 for Highway, Street, and Bridge Construction. The work involves roadway and parking lot rehabilitation in public use areas, with standard work hours from 7:00 am to 4:30 pm Monday through Friday, excluding federal holidays.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Appendix B
FY25 Sac River Access Roadwork Project

Supplemental Bid Schedule for Solicitation No. W912DQ26QA009

The Contractor shall complete the following Supplemental Bid/Proposal Schedule in addition to the CLIN Schedule. The Supplemental Bid/Proposal Schedule is not contractually binding. The Government will use this Supplemental Bid/Proposal Schedule to assist in the evaluation of the prices. The individual supplemental items should add up to the prices for the CLIN schedule. In the event that CLIN subtotal in the Supplemental Bid/Proposal Schedule does not match the CLIN total in the CLIN schedule, the CLIN schedule, the CLIN schedule shall control and will be the price evaluated by the Government. All dimensions are approximate estimates and shall be verified by the Contractor.

CLIN/ Supp. BidType of WorkQtyUnitUnit PriceExtended
CLIN 0001 - Pulverization for Reclaimed Asphalt for base
Testing of road for reclaiming4EA
Pulverization of Exsting Asphalt2930SY
Placement of Hot Mix Asphalt Pavement2930SY
CLIN 0001 Total:
CLIN 0002 - Installation of Shouldering
(OPTION)Installation of aggregate shoulding115CYD
CLIN 0002 Total:
CLIN 0003 - Aggergate Rehabilitation
(OPTION)Remove and replace all parking curbs65EA
Grading and prep for rock overlay19100SY
Loaction A5100SY
Location B14000SY
CLIN 0003 Total:
CLIN 0004 - Osage Bluff Crack Fill
(OPTION)Preparation for Crack Fill3000LF
Installation of Crack Fill3000LF
CLIN 0004 Total:
CLIN 0005- Osage Bluff Bituminous Surface Treatment
(OPTION)Remove and Re-install all parking curbs105EA
Suface Sealnt60,000SF

CLIN 0005 Total:

Total for all CLINS:

Note: Any work not specifically noted should be priced with the most closely related supllemental item.