B 26075 Pricing Attachment.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- DHS RFP- OBS Industrial Shredder/ Baler
- Solicitation number
- 22-444DHS-BUSSE-B-26075
- Issued by
- St. Clair County, Illinois
About this file
This document is a Pricing Attachment for a Request for Proposal (RFP) issued by the Illinois Department of Human Services (DHS) for an industrial high-capacity shredder with an automatic feeder and baler. The RFP requires the purchase, installation, training, and minimum manufacturer's warranties for the new industrial shredder/baler solution, as well as preventative maintenance and break/fix services for the first 36 months, with optional services for months 48 through 60. The contract also includes a parts allowance estimated at $5,000 for the first 36 months and $15,000 for months 37 through 60. Responses must be submitted electronically in accordance with CPO Notice 2020.06.
The Pricing Attachment provides instructions for vendors to enter the total price for the shredder/baler solution, the monthly charges for preventative maintenance and break/fix services, and the parts allowance amounts. The pricing is divided into required and optional items, with the optional items not used in the award determination. Vendors must complete the worksheet and include it in their Packet 2 submission, clearly indicating that it pertains to pricing to avoid disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Shredder Baler RFP Amendment 6.docx | DOCX document | |
| Attachment 3. RFP B 26075 Question and Answers.docx | DOCX document | |
| DHS OBS Shredder.Baler REVISED RFP.docx | DOCX document | |
| Attachment 2. RFP B 26075 Modifications to the Request for Proposal.docx | DOCX document | |
| Forms B Section V.20.1__.docx | DOCX document | |
| B-26075 - SPO Signed NOA - DHS-OBS - Allegheny - Shredder.Baler operation - 3.30.22.pdf | ||
| Attachment 1. RFP B 26075 Notification of the change in Questions deadline and the Bid opening. Extension of both dates.docx | DOCX document | |
| Vendor Instruction for RFPs v22.1 Published 09.21.21~1.docx | DOCX document | |
| Attachment - Notice of Electronic Submission Only v.22.1~1.pdf | ||
| Forms A Section V.18.1.docx | DOCX document | |
| Commitment to Diversity Attachment~2.docx | DOCX document | |
| DHS OBS Shredder.Baler RFP 12.1.21~1.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 (2)
| Revised RFP Pricing Attachment | ||
| Instructions to Vendors: Each Box below corresponds to an Item in BidBuy. Enter the amount in the yellow cell into BidBuy for each item number. Complete this worksheet and include in Packet 2 Submission. WHEN ATTACHING THIS WORKSHEET IN BIDBUY, BE CERTAIN TO INDICATE PERTAINS TO PRICING. FAILURE TO DO SO COULD RESULT IN DISQUALIFICATION. | ||
| BidBuy | ||
| Item Number | Item Description | |
| Item 1 | PURCHASE PRICE | |
| Total price for purchase, installation, training and minimum all manufacturers’ warranties of a new industrial shredder/baler solution as described in Section D.2. | $ ________ |
| Item 2 | PREVENTATIVE MAINTENANCE AND BREAK/FIX SERVICES Months 1 through 36 | |||
| Monthly Charge | # of months | Total | ||
| Preventative Maintenance | $_______ | 36 | $_______ | |
| Hourly Rate | estimated hours | Total | ||
| Break/Fix Services | $_______ | 45 | $_______ |
| TOTAL PREVENTATIVE MAINTENANCE AND BREAK/FIX SERVICES Months 1 through 36 | $ ________ | |||
| Item 3 | PARTS ALLOWANCE Months 1 through 36 | |||
| **Parts Allowance at Cost for 36 months, estimated at $5,000. | $5,000.00 | |||
| OPTIONAL PRICING NOT USED IN AWARD DETERMINATION | ||||
| Item 4 | PREVENTATIVE MAINTENANCE AND BREAK/FIX SERVICES Months 48 through 60 | |||
| Monthly Charge | # of months | Total | ||
| Preventative Maintenance | $_______ | 24 | $_______ | |
| Hourly Rate | estimated hours | Total | ||
| Break/Fix Services | $_______ | 60 | $_______ |
| TOTAL PREVENTATIVE MAINTENANCE AND BREAK/FIX SERVICES Months 48 through 60 | $ ________ | |
| OPTIONAL PRICING NOT USED IN AWARD DETERMINATION | ||
| Item 5 | PARTS ALLOWANCE Months 37 through 60 | |
| **Parts Allowance at Cost for 24 months, estimated at $15,000. | $15,000.00 | |
| OPTIONAL PRICING NOT USED IN AWARD DETERMINATION | ||
| No BidBuy Item # | In-line filtration/ventilation system | $_______ |
| *The State reserves the right to decrease the number of years of warranty services preventative maintenance and Break/Fix services procured pursuant to this contract based on pricing and availability of funding. | ||
| ** Parts allowance estimate. Actual costs of parts will be determined based on need. |
Sheet1
| BidBuy | Revised RFP Pricing Attachment | |
| Item Number | ||
| Total price for purchase, installation, training and minimum all manufacturers’ warranties of a new industrial shredder/baler solution as described in Section D.2. | ||
| Preventative Maintenance for first 36 months as described in Section D.2; Plus Estimated 45 hours for as needed Break/Fix Services. | $___________________________ |
| Item 2 | Services for months 1 through 36 |
| Preventative Maintenance for 36 months |
| Warranty services for year three (3) as described in Section D.2. (optional) **Parts Allowance at Cost for 36 months, estimated at $5,000. | $____**5,000.00_______________________ |
| Warranty services for year four (4) as described in Section D.2. (Optional) *Preventative Maintenance for months 48 through 60 as described in Section D.2; | $___________________________ |
| And, | |
| *Estimated 60 hours for as needed Break/Fix Services. | |
| Warranty services for year five (5) as described in Section D.2. (Optional) **Parts Allowance at Cost for months 48-60, estimated at $15,000.00. | $_____**15,000.00______________________ |
File details come from the government source that posted it. Updated .