AV Refresh Statement of Work.pdf

PDF 157 KB Posted

Attached to
14 WPS Audio/Visual Refresh
Solicitation number
FA441726Q0118
Issued by

About this file

This is a Statement of Work (SOW) for visual and sound system renovations at the 14th Weapons Squadron auditorium and four classrooms (rooms 118, 119, 120, and 133) in Building 91048 at Hurlburt Field, Florida. The contractor must provide all management tools, equipment, supplies, technical data, and labor necessary to test, tear down, quote, and complete the renovations within a four-week timeframe (Monday-Friday, 0830-1630), excluding weekends, holidays, and family days listed in the document.

For both the auditorium and classrooms, the contractor shall replace or remove current visual and sound overhead wiring, install a unified control box/panel to switch between all audio and video capabilities with single-button functionality, and ensure all equipment complies with DISA RME Vendor Security Technical Implementation Guides (STIG) and handles both NIPRnet and SIPRNet systems. The contractor must provide servicing within three business days of notification. In the auditorium specifically, the contractor will install a new media cabinet (similar to Middle Atlantic Sota C5 Credenza) to house video and audio equipment, integrate wiring for a 14-speaker system to accept input from 9 hard-wired microphones, install video telecommunications equipment capable of 1080p resolution with motorized camera functions (rotate, tilt, auto-focus), replace or upgrade projectors to 1080p minimum resolution, and replace both projection screens (West and East walls) with motorized 16:9 aspect ratio screens. In the four classrooms, the contractor will install new wiring for speaker systems, integrate current Ideum Pro tables with podium computers and AV systems, condense and install media equipment into credenza-style furniture, replace speakers with 4-6 inch models controlled via the one-touch system, install an uninterruptible power supply for the podium computer (5-minute minimum backup), and ensure two projectors per room can display different or duplicate images. All equipment must be tested and fully operational before completion, with operation checks performed in front of the 14 Weapons Squadron point of contact (POC). The contractor must provide written documentation of all removed and newly installed equipment, owner's manuals, manufacturer specifications, and applicable warranties before leaving the jobsite, and must clean/remove all debris to an offsite location with removed equipment turned over to the POC. The contractor is responsible for repair or replacement of any government property damaged during the work at no expense to the government, and a government employee will supervise contractor visits to ensure operational security (OPSEC).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

2026 14 Weapons Squadron Auditorium/Classroom Visual & Sound Renovations

1. DESCRIPTION OF SERVICES. The contractor shall provide all management tools, equipment, supplies, technical data, and labor necessary to test, tear down, quote (TD&Q), and complete required and authorized renovations on the 14th Weapons Sq, Hurlburt Field, FL - Building 91048 as well as installment of new microphone and sound systems, commercial visual displays, and electrical wiring in 1 auditorium and 4 classrooms. All work shall be accomplished within building 91048. All work shall be in accordance with required sound and visual specifications and all Hurlburt Field Air Force base guidelines and current Government contracting regulations. All equipment and devices to be used or installed must abide by the DISA RME Vendor Security Technical Implementation Guides (STIG) or any restrictions/extensions of this list set by the appropriate authority for Hurlburt Field. The contractor shall accomplish all tasks to meet the requirements of the Statement of Work (SOW).

1.1. In both the Auditorium and Classrooms, the contractor shall install the following in accordance with manufacturer specifications and Hurlburt Field guidelines:

1.1.1 The contractor will replace or remove all current visual and sound overhead wiring as needed.

1.1.2 The contractor will update all required wiring to fullest extent possible to integrate the new media cabinet to use the currently installed projectors in each space. If use of the current projectors is not possible, the contractor will inform a designated 14 Weapons Squadron point of contact (14 WPS POC) in writing of the limitations.

1.1.3 The contractor will install a control box/panel to control the entire system and can switch between all audio and video capabilities. Control box should have the functionality to change all required inputs and outputs with the touch of one button.

1.1.4 The contractor will ensure that all media cabinet equipment and associated systems are able to handle Non-classified Internet Protocol Router Network (NIPRnet) and Secret Internet Protocol Router Network (SIPRNet) in accordance with all applicable Department of War, Air Force, and Hurlburt Field regulations and guidelines.

1.1.5 The contractor will ensure that all equipment installed and repurposed can be serviced and will provide servicing within 3 business days of notification.

1.2 In the Auditorium the contractor shall install the following in accordance with manufacturer specifications and Hurlburt Field guidelines:

1.2.1 The contractor will install a new media cabinet to house all required video and audio equipment to remove the existing Audio/Visual rack currently installed.

The new rack must look like the current podium, with a furniture finish and provide proper ventilation. A good example would be the Middle Atlantic Sota C5 Credenza.

1.2.2 The contractor will update/install new wiring required to send sound to the currently installed 14-speaker system to ensure integration with the renovated or new media cabinet that will be installed. This will also need to be able to take input from 9 hard-wired microphones. The number of speakers needing to be operable will only be lowered at the written agreement of the 14 WPS POC.

1.2.3 The contractor will install or renovate existing equipment to enable video telecommunications with video resolutions no lower than 1080p. Camera must have motorized functions to rotate, tilt, and auto-focus. Equipment must function on the same one-touch solution previously mentioned.

1.2.4 Projectors, if they must be replaced, must display video resolutions no lower than 1080p. If any currently installed projectors display a maximum video resolution lower than 1080p, they must be replaced.

1.2.5 The contractor will replace the existing motorized projection screen on the West wall of the auditorium with a motorized screen with a 16:9 aspect ratio.

1.2.6 The contractor will remove and replace the existing projection screen on the East wall of the auditorium with a motorized screen with a 16:9 aspect ratio.

1.3. In the Classrooms (rooms 118, 119, 120 and 133)

1.3.1 The contractor will update/install new wiring required to send sound to the currently installed speaker systems in the classroom from the applicable podium/AV rack.

1.3.2 The contractor will enable the integration of our current Ideum Pro tables with the applicable podium computer and AV system.

1.3.3 The contractor will install a new, or renovate/repurpose the existing, media equipment and condense the equipment from the existing podium and existing AV rack into similarly styled and functioning as a Middle Atlantic Sota C5 Credenza or smaller to house all required video and audio equipment.

HOOK, LAUREN C CIV USAF AFSOC 1 SOCONS/PKA

Tablets?

ADAMS, ALEXANDER X TSgt USAF ACC 14 WPS/RA These are actually tables

1.3.4 The contractor will remove the current speakers and replace them with 4-6 6in speakers that can be controlled via the one-touch system previously requested.

1.3.5 The contractor will install an Uninterruptible Power Supply that can maintain power to the podium computer for at least 5 mins. This does not include installed AV equipment.

1.3.6 The contractor will ensure that the two projectors in each room can display different and duplicate images from the podium computer.

1.4 Guidelines. The contractor shall perform the following:

1.4.1 The contractor shall provide all parts, equipment, tools and associated labor to remove and replace all components listed in this Statement of Work. The contractor shall provide their own electrical bodies and labor to install/remove any electrical component as needed.

1.4.2 The contractor shall perform operation checks on all components of the install before declaring all tasks complete. This check will be performed in front of and with the designated 14 WPS POC. The building electrical, audio, and visual components will be 100% fully functional in accordance with manufacture’s operators’ manuals for all newly installed equipment

1.4.3 The contractor shall not install, replace or remove any equipment not listed in this Statement of Work unless necessary for the install of new audio-visual equipment.

This will not be done unless given agreement in writing by the 14 WPS POC. If removed, it will be replaced to its original state.

2. DELIVERABLES.

2.1. The Contactor will provide written documentation identifying all removed and newly installed equipment

2.1.1 The contractor will give the renovations POC all owner’s manuals, manufacturer specifications and applicable warranties of the new equipment before leaving the job site.

2.2. Upon completion of the installation, the contractor shall clean/remove all debris created from site to an offsite location.

2.2.1 Any equipment that was removed will be turned into the 14 WPS POC.

2.2.2 Upon arrival, the 14 WPS POC, or an approved designee, will escort contractors on base and assign one government employee to supervise during contractor visit to ensure operational security (OPSEC).

3. GENERAL INFORMATION

3.1. Physical Security. The contractor shall ensure no government-owned or controlled real or personal property is damaged during any service provided under the contract. The contractor will be responsible for the repair or replacement of any government property damaged by the contractor at no expense to the government.

3.2. Time Constraints. The complete renovation should take no more than 4 weeks, working M- F 0830-1630, not including weekends, holidays or family days as listed unless coordinated ahead of time with the 14 WPS POC.

2026 Holidays/Family Days:

- Family Day – 22 May 2026

- Memorial Day - 25 May 2026

- Independence Day (Observed) – 3 July 2026

- Family Day – 6 July 2026

- Thanksgiving – 26 November 2026

- Family Day – 27 November 2026

- Family Day – 24 December 2026

- Christmas – 25 December 2026

- Family Day – 31 December 2026

- New Year’s Day – 1 January 2027