Attchmt_3_Terms_Provisions_Clauses.pdf

PDF 371 KB Posted

Attached to
Renovate Visitor Center Building, LEWI
Solicitation number
140P8321R0002
Issued by

About this file

This is a request for proposals from the National Park Service for renovation of the Lewis & Clark National Historical Park's 12,200 square foot visitor center building. Work includes constructing a 292 square foot vestibule addition, restroom remodeling, collections space remodeling, theater seating and carpet replacement, and window and door replacement. An optional HVAC replacement/upgrade line item is included.

The project is located at the Fort Clatsop Visitor Center in Astoria, Oregon. A group site visit will be held on August 12, 2021. Proposals are due by September 15, 2021. Award will be a single firm-fixed price construction contract for approximately $900,000 to $2,000,000. A payment bond, performance bond, and liability insurance are required. The project completion period is approximately 6 months from award. This is a small business set-aside solicited under NAICS 236220 with a size standard of $39.5M.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation no. 140P8321R0002 – Attachment 3, Terms-Clauses (7/28/21)

Renovate Visitor Center, LEWI

SECTION A: Standard Form 1442 (Pages 1-3)

SECTION B: Contract Price Schedule

This document serves as a general template. The contractor shall factor the lump sum price to include all materials, equipment, installation and management labor, transportation, mobilization-in/mobilization-out, insurance, bonds, administrative and other services, to complete the proposed project. All work shall be performed in accordance with these terms and conditions, including the attached Specifications, Plans/Drawings, Dept. of Labor construction wage rates, and all other associated attachments to this solicitation.

Submit a price for all line items below. If no line item exists for a portion of the work, include the cost in a relative line item. In case of error in summation, the total of the corrected line item amount governs.

Round totals and extended prices to the nearest whole dollar (no cents). Refer to H.8, below. Line Items are defined in Attachment no. 6-Specifications, Volume 1 of 2, Section 01 27 00.

The Government anticipates being able to evaluate solely based upon the prices proposed without discussions. However, for the purpose of evaluation, please also provide a price breakdown that supports the supporting the price of each line item in the Price Schedule, showing amounts for labor, materials, subcontractors, and equipment.

Complete this page as part of the Business Proposal and return with other documents described in

Section L.

Business name: _________________________________________ Phone number: ____________________

DUNS number: _________________________________________

Point of contact name: ____________________________________ E-mail: ________________________

The representations and certifications in SAM apply to this proposal (see FAR provision 52.204-8(b)(2)): __yes __no.

Line Item

Number Line Item Title Quantity Unit of Measure Total Price

1 Vestibule Entry Addition & Remodel 1 Lump Sum

A OPTION A - HVAC Replacement/Updgrade 1 Lump Sum

TOTAL PRICE (Sum of Base Line plus Option A):

The Government reserves the right to unilaterally award the option listed belwo at or after time of award.

See Attachment no. 3, Item H.8)

SECTION C: Description/Specifications

Renovate the Lewis & Clark National Historical Park’s 12,200 square foot visitor center building that includes the visitor center area, museum area, movie theater, a multi-purpose room, administrative offices, a bookstore, other offices, curatorial storage, and a library. Work of the contract, base requirement, includes:

• VESTIBULE ADDITION (construct approx. 292 square foot addition attached to the existing building as an expansion of the Vestibule;

• RESTROOM REMODEL that includes reconfiguring/upgrading the entry public restrooms, replacing source water heater for the public restrooms, and reconfiguring/converting storage closet to construction unisex family restroom;

• COLLECTIONS/LIBRARY/EMPLOYEE RESTROOM REMODEL that includes relocating the wall between the curatorial storage area into the library, replacing existing vinyl flooring in curatorial storage, and upgrading fixtures and finished in staff restrooms;

• THEATER CARPET AND SEATING REPLACEMENT that includes removing and replacing seating in the 1,000 square foot theater to accommodate accessibility requirements; and

• WINDOW AND DOOR REPLACEMENT that includes replacing exterior single pain windows, removing four interior windows and frame, removing four windows and doors, removing and replacing door and window glazing, and replacing interior and exterior door related hardware.

• OPTIONAL HAVAC REPLACMENT/UPGRADE that will be incorporated into the solicitation as an optional line item, includes upgrading indoor air handlers and associated heat pumps, reuse galvanized duct system with minor modifications and cleaning, upgrading an cleaning hydronic heating system, and upgrading the building HVAC control systems. Full details will be provided in the project specifications and plans posted with the solicitation. A payment bond (100%), performance bond (100%), and certificate of liability insurance will be required prior to contractor performance.

Attachment Number Attachment Title

6 Specifications – Volume 1 of 2

7 Specifications – Volume 2 of 2

8 Plans / Drawings

Project Location: Fort Clatsop Visitor Center within Lewis & Clark National Historical Site, 92345 Fort

Clatsop Road, Astoria, Oregon 97102. The Visitor Center is located at Fort Clatsop Road approximately 2 miles south of Warrenton, Oregon. Driving directions are available at this website address:

https://www.nps.gov/lewi/planyourvisit/directions.htm.

The contractor shall perform all work in accordance with the documents listed in Section J, which are attached and incorporated into this solicitation/contract.

SECTION D: Packaging and Marking (not used) https://www.nps.gov/lewi/planyourvisit/directions.htm.

SECTION E: Inspection and Acceptance

52.246-12 Inspection of Construction. (AUG 1996)

52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (Aug 1996)

SECTION F: Deliveries or Performance

52.236-15 Schedules for Construction Contracts (APR 1984)

52.242-14 Suspension of Work. (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work, Alternate I. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work within approx. 180 calendar days after notice of award (anticipating mid to late October 2021 through mid to late April

2022). The time stated for completion shall include final cleanup of the premises.

Period of Performance Dates and Seasonal Conditions

Generally, NPS does not intend to suspend work during contract performance, seasonal weather conditions and availability of local construction materials may restrict or prohibit the contractor’s construction activities. The

Contractor’s construction schedule should take into account historic weather patterns when planning the work sequence.

LEWI has planned for work to begin Fall 2021 and total time is estimated to be 180 calendar days from issuance of

Notice to Proceed.

52.252-2 FAR Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more Federal Acquisition Regulation (FAR) and Department of the Interior

Acquisition Regulation (DIAR) clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

FAR - https://www.acquisition.gov/?q=browsefar

DIAR - http://www.ecfr.gov/cgi-bin/text-idx?SID=e3fdab2f32e71039c0f3823dcff65823&tpl=/ecfrbrowse/Title48/48chapter14.tpl

Clauses that are from the DIAR begin with “14”.

https://www.acquisition.gov/?q=browsefar

SECTION G: Contract Administration Data

1452.201-70 Authorities and Delegations (SEPT 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The

COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum.

The Contractor need not proceed with direction that it considers to have been issued without proper authority. The

Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

1452.204-70 Release of Claims—Department of the Interior (JUL 1996)

After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.

G.1 Appointment of Contractor Representative / Superintendent

Prior to commencement of work on this contract, the contractor shall provide to the Contracting Officer and COR the name and telephone number of at least one responsible individual who will serve to respond to operational problems and/or emergencies on a daily basis. The contractor agrees that notice to the designated representative shall constitute notice to the contractor and agrees to be bound by any commitments or representations made by the representative.

G.2 Electronic Invoicing and Payment Requirements - Internet Payment Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment

Platform System (IPP; https://www.ipp.gov).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable

Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-

Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice

(upload your business invoice as an attachment to the IPP invoice before you click “submit” in IPP):

1. Contractor’s standard business invoice,

2. Signed certification required by FAR clause 52.232-5,

3. Schedule of values for work being invoiced, and

4. If submitting a final invoice, also attach a signed copy of the Release of Claims form.

Contractor’s failure to attach the required documentation as specified above will result in the IPP invoice being rejected, and cause a delay in payment.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The

Contractor Government Business Point of Contact (as listed in www.SAM.gov record) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) prior to contract award or within 3 - 5 business days after the contract award date. Contractor assistance with enrollment can be obtained by contacting the

IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the

Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

G.3 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The

Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting

System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2. In accordance with NPS Acquisition Policy and Procedures Memorandum 1443.42-01, the Contracting

Officer may enter a formal evaluation of the contractor’s performance in the Contractor Performance

Assessment Reporting System (CPARS). The Contractor will have the opportunity to review and comment on the Government’s performance ratings before they are finalized and used in future government source selections.

G.4 NPS Team – Contact Information

Contracting Officer (CO): Phaedra Fuller, Olympic National Park, Port Angeles, WA

Office: 360-565-3009 Email: Phaedra_Fuller@nps.gov

Contracting Officer’s Representative (COR):

Mark Kerr, Architect, NPS Pacific West Region, Seattle, WA

Office: 206-640-7342 Email: Mark_Kerr@nps.gov

COR’s Project Inspector (onsite day-to-day point of contact):

Colby Mackley, Chief of Facility Management, Lewis&ClarkNHP, Astoria, OR

Office: 503-861-4431 Email: Colby_Mackley@nps.gov

Procurement Tech (will be assisting CO with some post-award contract administration):

Quinn Rankin, Olympic National Park, Port Angeles, WA

Office: 360-565-3021 Email: Quinn_Rankin@nps.gov

Procurement Tech (will be responsible for receipt of invoices submitted in IPP, routing for approval of payment, processing receiving documentation in NPS finance system):

Alice Defries, North Cascades National Park, Sedro-Woolley, WA

Office: 360-854-7223 Email: Alice_Defries@nps.gov https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html mailto:Mark_Kerr@nps.gov mailto:Quinn_Rankin@nps.gov

SECTION H: SPECIAL CONTRACT REQUIREMENTS

H.1 Wage Determination

U.S. Department of Labor General Wage Decision no. OR20210033 dated 5/28/21 (Clatsop County, OR), is incorporated into this solicitation/contract, as shown in Section J.

H.2 Progress Meetings

The Contracting Officer will convene periodic meetings described in Attachment 6; the contractor will be required to attend in person or by phone. The Contracting Officer will provide specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

H.3 Interpretations of Contract: Notice of Ambiguities

This written contract and any and all identified writings or documents incorporated by reference herein or physically attached hereto constitute the parties' complete agreement and no other prior or contemporaneous agreements either written or oral shall be considered to change, modify, or contradict it. Any ambiguity in the contract will not be strictly construed against the drafter of the contract language but shall be resolved by applying the most reasonable interpretation under the circumstances, giving full consideration to the intentions of the parties at the time of contracting.

It shall be the obligation of the Contractor to exercise due diligence to discover and to bring to the attention of the

Contracting Officer at the earliest possible time any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated. Failure to comply with such obligation shall be deemed a waiver and release of any and all claims for extra costs or delay arising out of such ambiguities, discrepancies, inconsistencies, and conflicts.

H.4 Worker’s Compensation Insurance Requirements

The Contractor shall maintain compensation insurance for employees engaged in the work complying with the worker's compensation laws of the State in which the work is to be performed and shall maintain liability insurance protecting the Contractor from claims because of bodily injury (including death) and property damage arising under this Contract.

H.5 Limitations on Subcontracting Requirements

In accordance with FAR clause 52.219-14, Limitations on Subcontracting, small business prime contractor is required to perform a minimum percentage of the cost of contract performance incurred for personnel/labor. In

August, 2019, a deviation to this clause was published by CAAC Letter; the full text is available at https://acquisition.gov/content/caac-letters; scroll down to 2019-01). Department of the Interior Acquisition, Assistance, and Asset Policy #67 (DOI-AAAP-0067) requires the Contracting Officer to oversee compliance with this clause. Therefore, as part of contract close-out and prior to submitting the final invoice, the contractor shall complete and submit a report showing their and their subcontractors' labor costs, identifying which subcontractors were “similarly situated” (i.e. small businesses). Non-compliance with the limitations on subcontracting requirements will be noted in the CPARS evaluation (see G.3).The report template will be provided after award.

H.6 Designation and Substitutions of Key Personnel

(a) In connection with this contract, the key personnel position of Job/Site Superintendent is limited to the individual that was specifically named in the Contractor's accepted proposal.

(b) During the first 45 days after issuance of the Notice to Proceed, the Contractor shall not substitute key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 45-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to implementing any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer.

(d) Proposed substitutes should have comparable or better qualifications to those of the persons being replaced.

https://acquisition.gov/content/caac-letters

(e) The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. If the proposed substitutes are not determined acceptable based on the criteria above, the Contractor shall not proceed with the substitution and may propose an alternative person.

(f) The Contracting Officer may relax or waive these requirements if a proposed substitution is demonstrably to the

Government’s benefit.

H.7 Archeological Findings

Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed only by the Government. Should Contractor's operations uncover or his employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify Contracting Officer immediately of the findings;

and continue operations in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for Contractor, s/he will be compensated by an equitable adjustment under the General Provisions of the Contract.

H.8 Option for Additional Services—Separately Priced Line Items (applicable to OPTION A – HVAC

Replacement/Upgrade)

The Government may, at its sole discretion, require the performance of any or all of the numbered line items identified in the Schedule as option items at the price negotiated in the contract Schedule. The Contracting Officer may unilaterally exercise the option by written notice to the Contractor any time within the performance period of the contract but prior to substantial completion.

H.9 Conduct of Operations

At all times the Contractor shall conduct their organization in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and with such appropriate regulations as the Superintendent may prescribe. Work on Saturdays, Sundays, Federal holidays or at night may be performed only with the prior consent of the Contracting Officer. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park except with prior approval of the Contracting Officer. Rowdy, disruptive behavior and/or sexual harassment will not be tolerated and the offending individual(s) will be removed from the site. Amplified playing of music or talk programs is prohibited on site or in buildings.

H.10 Infectious Disease Preparedness and Response – Coronavirus Pandemic (COVID-19)

a) Contractors are responsible for their employees’ safety and the safety of job site visitors during the performance of this contract. We encourage contractors to follow guidance from the Department of Labor, Occupational

Safety and Health Administration (OSHA), the Centers for Disease Control and Prevention (CDC), and all other applicable NPS, local, city, and state mandates. We encourage contractors to develop policies for infection prevention and an Infectious Disease Preparedness and Response Plan.

b) To the extent appropriate, Contractors should include the protective health and safety measures they intend to implement related to COVID-19 in any accident prevention or safety submittals required under this contract.

These plans should contain preventive measures the contractor intends to follow while performing work on government property as well as responsive and corrective actions to be taken if an employee exhibits symptoms or tests positive for COVID-19.

c) Upon contract award, contractors should communicate with the Contracting Officer regarding contractor decisions and actions to protect the health and safety of workers for the duration of contract performance under which pandemic conditions exist.

d) The following websites provide additional guidance and information:

a. https://www.coronavirus.gov/

b. https://www.osha.gov/SLTC/covid-19/

c. https://www.cdc.gov/coronavirus/2019-ncov/index.html

d. https://www.cdc.gov/coronavirus/2019-ncov/community/organizations/construction workers.html

e. https://www.fema.gov/coronavirus

f. https://www.nps.gov/aboutus/news/public-health-update.htm https://www.coronavirus.gov/ https://www.osha.gov/SLTC/covid-19/ https://www.cdc.gov/coronavirus/2019-ncov/index.html https://www.cdc.gov/coronavirus/2019-ncov/community/organizations/construction%20workers.html https://www.fema.gov/coronavirus

SECTION I: Federal Acquisition Regulation (FAR) Contract Clauses

52.202-1 Definitions. (JUN 2020)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (MAY 2014)

52.203-6 Restrictions on Subcontractor Sales to the Government. (JUN 2020)

52.203-7 Anti-Kickback Procedures. (JUN 2020)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)

52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower

Rights (JUN 2020)

52.203-19 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or

Statements (JAN 2017)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN 2020)

52.204-13 System for Award Management Maintenance. (OCT 2018)

52.204-14 Service Contract Reporting Requirements (OCT 2016)

52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020)

52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014)

52.204-21 Basic Safeguarding of Covered Contractor Information Systems (JUN 2016)

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky

Lab and Other Covered Entities (JUL 2018)

52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment (AUG 2020)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or

Proposed for Debarment. (JUN 2020)

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)

52.215-2 Audit and Records—Negotiation (JUN 2020)

52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2020)

52.219-8 Utilization of Small Business Concerns. (OCT 2018)

52.219-14 Limitations on Subcontracting (March 2020)[(DEVIATION JUN 2020)]. The full text of the deviation may be viewed here.

52.219-28 Post-Award Small Business Program Representation. (NOV 2020)

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAR 2018)

52.222-6 Construction Wage Rate Requirements (AUG 2018)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (JUL 2021)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014) https://www.acquisition.gov/sites/default/files/page_file_uploads/CAAC-Letter-2019-01-Suppl-1_July_02_2020.pdf

52.222-12 Contract Termination - Debarment. (MAY 2014)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-21 Prohibition of Segregated Facilities. (APR 2015)

52.222-26 Equal Opportunity. (SEP 2016)

52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)

52.222-35 Equal Opportunity for Veterans. (JUN 2020)

52.222-36 Affirmative Action for Workers with Disabilities. (JUN 2020)

52.222-37 Employment Reports on Veterans. (JUN 2020)

52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (DEC 2010)

52.222-50 Combating Trafficking in Persons. (OCT 2020)

52.222-54 Employment Eligibility Verification. (OCT 2015)

52.222-55 Minimum Wages Under Executive Order 13658 (NOV 2020)

52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)

52.223-3, Alt. 1 Hazardous Material Identification and Material Safety Data (FEB 2021), Alternate 1 (JUL 1995)

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008)

52.223-15 Energy Efficiency in Energy-Consuming Products (MAY 2020)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (JUN 2020)

52.223-20 Aerosols. (JUN 2016)

52.223-21 Foams (JUN 2016)

52.225-13 Restrictions on Certain Foreign Purchases. (FEB 2021)

52.227-1 Authorization and Consent (JUN 2020)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

52.228-11 Individual Surety Pledges of Assets. (FEB 2021) (DEVIATION APR 2020)

52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014)

52.228-14 Irrevocable Letter of Credit (NOV 2014)

52.228-15 Performance and Payment Bonds - Construction. (JUN 2020) (DEVIATION APR 2020)

52.229-3 Federal, State, and Local Taxes. (FEB 2013)

52.232-5 Payments under Fixed-Price Construction Contracts. (JUN 2020)

52.232-17 Interest (MAY 2014)

52.232-23 Assignment of Claims. (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)

52.232-33 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018)

52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)

52.233-1 Disputes, Alt. 1. (MAY 2014, DEC 1991)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13

52.236-14 Availability and Use of Utility Services. (APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.242-13 Bankruptcy. (JUL 1995)

52.243-4 Changes. (JUN 2007)

52.244-6 Subcontracts for Commercial Items. (JUL 2021)

52.245-1 Government Property (JAN 2017)

52.245-9 Use and Charges (APR 2012)

52.246-21 Warranty of Construction. (MAR 1994) - Alternate I (APR 1984)

52.248-3 Value Engineering - Construction. (OCT 2020)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.252-6 Authorized Deviations in Clauses (NOV 2020)

52.253-1 Computer Generated Forms. (JAN 1991)

1452.215-70 Examination of Records by the Department of the Interior (APR 1984)

52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items. (MAY 2008)

(a) Definitions. As used in this clause -

"Postconsumer material" means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of "recovered material."

"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

(b) The Contractor, on completion of this contract, shall -

(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and

(2) Submit this estimate to Contracting Officer.

52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (AUG

2018)

(a) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired—

(1) Competitively within a timeframe providing for compliance with the contract performance schedule;

(2) Meeting contract performance requirements; or

(3) At a reasonable price.

(b) Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. The list of EPA-designated items is available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.

52.225-9 Buy American - Construction Materials. (FEB 2021)

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation

(FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program https://www.acquisition.gov/far/part-2#FAR_2_101

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United

States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds

50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The

Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

________________________________________________[Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the

Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-12#FAR_12_505

Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the

Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of

Measure

Quantity Price

(dollars)*

Item1:

Foreign construction material

Domestic construction material

Item2:

Foreign construction material

Domestic construction material

52.236-13 Accident Prevention. (NOV 1991) - Alternate I

(a) The Contractor shall provide and maintain work environments and procedures which will -

(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;

(2) Avoid interruptions of Government operations and delays in project completion dates; and

(3) Control costs in the performance of this contract.

(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the

Contractor shall -

(1) Provide appropriate safety barricades, signs, and signal lights;

(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part

1910; and

(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.

(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of

U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.

(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor's representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.

(f) Before commencing the work, the Contractor shall -

(1) Submit a written proposed plan for implementing this clause. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards; and

(2) Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.

Addendum to 52.236-13:

As work proceeds, the Accident Prevention Plan (APP) shall be adapted to new situations and new conditions.

Changes and modifications to the accepted APP shall be made with the knowledge and concurrence of the safety office, site superintendent and Contracting Officer's Representative (COR). Should any unforeseen hazards become evident during the performance of work, the contractor shall bring such hazard to the attention of the COR, both verbally and in writing for resolution as soon as possible. In the interim necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard on-site personnel, visitors, the public, and the environment. See also paragraph H.9.

1452.203-70 Restriction on Endorsements—Department of the Interior (JUL 1996)

The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The

Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.

1452.228-70 Liability Insurance - Department of the Interior (JUL 1996)

(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the

Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of

America. The amounts of the insurance shall be not less than as follows:

Employer's liability $100,000

General liability $3,000,000

Construction

Per person $500,000

Per occurrence $1,000,000

Property damage $3,000,000

Architect-Engineer

Per person $200,000

Per occurrence $500,000

Property damage $ 20,000

Automobile liability

Per person $200,000

Per occurrence for bodily injury $500,000 (other than passenger liability)

Per occurrence for property damage $20,000

(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the

Government in such insurance. The certificate shall identify the contract number, the name and address of the

Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.

1452.236-70 Prohibition Against Use of Lead-based Paint—Department of the Interior (JUL 1996)

Paint containing more than .06 percent by weight of lead in paint, or the equivalent measure of lead in the dried film of paint already applied, shall not be used in the construction or rehabilitation of residential structures under this contract or any resulting subcontracts.

SECTION J: List of Documents, Exhibits and Other Att achments

Attachment Attachment Title Number

Number of Pages

1 “READ THIS FIRST” (FAQ’s for RFP) 3

2 SF-1442 Solicitation Form 4

3 Terms Provisions Clauses (7/28/21) 30

4 Wage Rates (DOL Davis-Bacon Act General 8

Decision no. OR20210033 dated 5/28/21) for

“Building” in Clatsop County, Oregon

5 Forms to Return with Proposal 8

6 Specifications – Volume 1 of 2 210

7 Specifications – Volume 2 of 2 645

8 Plans/Drawings 88

Information and requirements stated in Sections A through J and the attachments noted in section J apply to this solicitation and the subsequent contract.

Sections K through M apply to the solicitation only.

SECTION K: Representations, Certifications, and Other Statements of Offerors

52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .