This document provides details for a solicitation requesting proposals to renovate the visitor center building at Lewis & Clark National Historical Park. Key work includes constructing a 292 square foot vestibule addition, remodeling public and staff restrooms, replacing theater seating and carpeting, and replacing exterior windows and doors. An optional line item includes upgrading the HVAC system. Proposals are due in response to solicitation number 140P8321R0002. A pre-proposal site visit will be held on August 12, 2021 at 1pm PDT at the visitor center. The project location is at Fort Clatsop Visitor Center in Astoria, Oregon. The contract will be a firm-fixed price construction contract set aside for small businesses with a NAICS code of 236220. The magnitude of work is estimated between $900,000 to $2,000,000 to be completed within 6 months of award. The solicitation and any future amendments are available on SAM.gov. Questions must be submitted in writing by the deadline to the identified contracting officer.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation no. 140P8321R0002, Amendment 02
Attachment 11, Final Q&A (9/7/21)
Renovate Visitor Center, Lewis & Clark National Historical Park (LEWI)
Question 6: Is an HVAC controls operator terminal required?
Answer 6: Yes. Please read the solicitation carefully as there are options which clarify work on the HVAC system.
Question 7: Where can we obtain a copy of the TAB report, we are we supposed to consult for control valve sizing referenced on M6.02 (for control valves for the baseboard heaters)?
Answer 7: The statement “Verify using TAB report” on Sheet M6.02 means that the
Contractor is to verify the equipment operation using a TAB report, which the contractor must perform. TAB is a Testing And Balancing (TAB) report – typically any new HVAC system has components that need to be installed, TAB’ed to make sure they work correctly, and then integrated into the control system so that they work together to heat and cool the building efficiently. This question is confusing as any new equipment installed will need to be
TAB’ed. Older equipment should also be TAB’ed to make sure it is functioning correctly during a remodel – even if we provided previous TAB reports. If the contractor chooses to use anything different than what is in the plans, prudence would dictate that they TAB’ed the components prior to integration into the new system.
Question 8: The specification calls for Automated Logic (product name). If there is an existing Automated Logic HVAC controls system already in place at the Visitor's
Center that can be modified for the purposes of this project, and if so, what version of WebCTRL software is currently installed?
Answer 8: Our team assumed that you may be thinking retro fitting and upgrading existing.
We determined that’s not a good idea because the software is very old (we don’t feel it’s a good idea to try and blend 1996-2005 to now). We will require brand new components and controls.
Software: powered by “Niagra”
Licensed files: Distech Tridium Certificate.
Platform Service: Serial communications.
Distach Controls: EC-67.
We asked one of the staff at LEWI in the visitor center to power up and this is what the screen shows:
The Java message stated: "publisher: Tridum Inc." Other than that, the employee could not find any info about the software within the software itself. The employee also googled Niagara https://www.tridium.cn/en/products-https://www.tridium.cn/en/products-services/niagaraax services/niagaraax which it appears our current system might be some old form of this.
Question 9: Is the current HVAC control system being replaced in its entirety? If not, what is the brand, age, BACnet status, and version of the current system?
Answer 9: Yes. Please read the solicitation carefully as there are options which clarify work on the HVAC system. We can’t shoehorn the old system with a mix of old and new components and expect it will work efficiently.
According to the Specification
Question
Number Specification Division
Specification/Draw ing Location
QUESTIONS ANSWERS
General
Requirements-
012700
General
Requirements
Will an AIA 310 bid bond be acceptable to submit for proposal?
Solicitation requires submitting a bid guarantee using
SF-24 bid bond (refer to Attachment no. 3, Section
L.3, Part II)
Doors-Windows
084113 &
084213& 084213, 1.7
A6.10
Please verify what door construction and stile width for storefront doors?
Both specification sections list several different finishes for the metal. Should it be dark bronze to match the windows per schedule-A6.10
Doors need to meet the ABBAs and ADA requirements, finshes be dark Bronze Brown to
Match other finshes. Double doors, 7' x 80".
Doors-Windows
084213-,1.7
What is the warranty period for the entrances?
one year to lifetime
Ceramic Tile-
093013 A1.20/A1.21
Please confirm the flooring for the vestibule, family rr, women's/mens rr, is to be FloridaTile-per materials key legend. Room finish schedule floor type has as PT1-porcelain tile-wall in all those areas.
confirmed, PT-1 is in the Family RR, and Womens
/Mens RR
Toilet Misc
Accessories-102800 A1.1
Entry floor plan shows new restroom partitions in (135/136)-no specifications and key notes say see schedule (but nothing noted). Please advise?
Please use Partians that meet ABBAS and ADA styandards, cleranable Powder coated and baked enamel bathroom partitions are also an excellent choice for park projects as they are constructed with a high percentage of recycled content and are finished with low VOC paints. We also will accept powder coated steel partitions or stainless steel.
15 Furnishings12 00 00- A1.12
There are no specifications for the theatre seating fabric-Teatro, C-1.
Please verifytype of fabric?
Seating fabric shall be manufactures standard colors unless selected by architect or customer the color to be selected from the standard choice of colors. All upholstery shall be first quality without creases, stretch lines, or wrinkles. Navetta Teatro C-1 fabric comes standard, colors will be selected and verfied as example. Samples for initial selection purposes in the form of manufacturer color charts or samples of materials. Durable cleanable fabric.
https://www.tridium.cn/en/products-services/niagaraax
Question
Number Specification Division
Specification/Draw ing Location
QUESTIONS ANSWERS
16 Electrical- 26 00 00
E4.0, General
Comment-
Electrical
On drawing sheet E4.0 it shows upsized conduit from the utility transformer to the new MDP and re-using CT can. Will PPL allow the re-use of exisitng CT can or will it need to be changed?
PPL will allow for re-use, Electrical engineer has or should have confirmed.