attch. 4 - Requirements Matrix.pdf
PDF 104 KB Posted
- Solicitation number
- 18CONS-CATM-26-002
About this file
This is a Requirements Matrix for CATM Range Lead Cleaning and Servicing that identifies mandatory sampling and hazardous waste disposal requirements for contractor performance.
The matrix specifies four distinct scopes of work with corresponding sampling, engineering control, and disposal requirements. SOW Section 2 (Filter Cleaning/Replacement) requires no hazardous material work or sampling, with non-hazardous waste disposal per 18WG 01 57 19.18 30. SOW Section 3 (Range Exhaust Filter Replacement) requires the Certified Industrial Hygienist/Qualified Person (CIH/QP) to collect four wipe samples total—one before and one after work at each of two filter box doorway locations—with hazardous waste disposal per Section 02 83 18.00 30. SOW Section 4 (Bullet/Debris Bucket Cleaning) requires eight samples during bucket emptying (two samples each from four buckets spaced 6-8 buckets apart) plus three additional wipe samples from the asphalt work area after completion; bullet debris must be returned to the Government in GFM drums per Section 02 83 18.00 30. SOW Section 5 (Range Floor and Firing Position Cleaning) requires ten total wipe samples—three before and three after cleaning from the firing position slab, and two before and two after from the range pad—with all laboratory analysis results submitted to the Government; hazardous waste disposal follows Section 02 83 18.00 30, and all liquids must be disposed of at a GOJ-permitted facility regardless of TCLP characterization. All scopes note that the Contractor's Competent Person shall determine engineering control levels required for 29 CFR 1926.62 compliance based on actual site conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions-Answers1.pdf | ||
| Solicitation Amendment - FA527026QB0210002.pdf | ||
| Solicitation - FA527026QB021.pdf | ||
| Questions-Answers.pdf | ||
| Price Exhibit.xlsx | XLSX spreadsheet | |
| SOW.pdf | ||
| attch. 2 - Technical Specification.pdf | ||
| Solicitation - FA527026QB021.pdf | ||
| attch. 3 - Diagrams.pdf | ||
| attch. 5 - Hazardous Waste Profile Sheet.pdf | ||
| Statement of Work.pdf | ||
| attch. 1 - Enviromental Specification.pdf | ||
| attch. 6 - Servicing Guidelines.pdf | ||
| attch. 7 - Submittal Register.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 4: REQUIREMENTS MATRIX
CATM RANGE LEAD CLEANING AND SERVICING
This matrix iden.fies the sampling and disposal requirements. All clearance sampling must be performed by the CIH/QP
A"achment 4 Table 1. Requirements Matrix
SCOPE OF WORK
NEGATIVE
PRESSURE
ENCLOSURE (NPE)
/ ENGINEERING
CONTROLS
MANDATORY SAMPLING HAZARDOUS WASTE DISPOSAL
NON-HAZARDOUS
(SOLID) WASTE
DISPOSAL
| SOW SECTION | 2. |
| FILTER | CLEANING/ |
REPLACEMENT
Note 1 N/A (No hazardous material work involved or material sampling required. )
N/A Dispose of non-hazardous waste per
18WG 01 57 19.18 30
| SOW SECTION | 3. | |
| RANGE | EXHAUST | FILTER |
REPLACEMENT
Note 1 The CIH/QP shall take one (1) wipe sample on the concrete pad in front of each filter box doorway (2 loca.ons) before work, and one (1) sample at each loca.on aVer the work. (4 total)
Dispose of Hazardous Waste per Sec.on 02 83 18.00 30.
Dispose of non-hazardous waste per
18WG 01 57 19.18 30.
| SOW | SECTION | 4: |
| BULLET/DEBRIS | BUCKET |
CLEANING
Note 1
A) During bullet bucket emptying, the CP shall collect 2 samples (one from the top of each bucket and one from the boYom) for 4 buckets. (8 samples total) Sample from buckets spaced 6-8 buckets apart.
B) AVer the bullet bucket work and cleanup is completed, the CIH/QP shall take three (3) wipe samples from asphalt where bullet bucket emptying work was performed. See Figure 1 of AYachment 3 Drawings for sample loca.ons.
Contractor must return bullet debris in GFM drums to the Government as described in Sec.on 02 83 18.00 30.
Dispose of non-hazardous waste per
18WG 01 57 19.18 30.
| SOW | SECTION | 5: | |
| RANGE | FLOOR | AND | FIRING |
| POSITION | CLEANING |
Note 1
For each subsequent service call for work described in Sec.on 5, the CIH/QP shall take three (3) wipe samples from the firing posi.on slab prior to cleaning, and three (3) samples from the same loca.ons aVer cleaning. For the range slab, take two (2) wipe samples from range pad prior to cleaning, and two (2) samples of the same loca.ons aVer cleaning. (5 prior to work and 5 aVer the work: 10 total). See AYachment 3, Figure 5 for sampling loca.ons. Submit all laboratory analysis results to the Government for review.
Dispose of Hazardous Waste per Sec.on 02 83 18.00 30. Dispose of all liquids at a GOJ-permiYed disposal facility regardless of TCLP or other characteriza.on results.
Dispose of non-hazardous waste per
18WG 01 57 19.18 30.
NOTE 1: The Contractor’s CP shall determine the level of engineering controls needed for compliance with 29 CFR 1926.62 based on actual site condi.ons.