Attch 7 Calc of Self Performed Work General Contractor.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C24922R0104
About this file
This document contains details for a federal contract solicitation to renovate the pathology lab at the Louisville VA Medical Center. Key requirements include renovating the pathology lab for approximately $250,000 to $500,000. The project is set aside 100% for service-disabled veteran-owned small businesses. The solicitation number is 36C24922R0104 and proposals are due by November 21, 2022 at 1:00PM Central Time. Offerors must have an active SAM registration and submit forms SF-1442, bid bond, and representations and certifications with their proposal. The contract will require compliance with VA and federal regulations regarding background checks, E-Verify registration, and past performance reporting through CPARS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 Safety Requirements.pdf | ||
| 36C24922R0104 0004.docx | DOCX document | |
| Addendum 1 Drawings.pdf | ||
| Addendum 1 List of Drawings Sheets.pdf | ||
| Addendum 1 General Requirements.pdf | ||
| Attachment 9 Baker BSL hood-Quote 1-24-2021.pdf | ||
| Attachment 10 ME-Series-Manual-2015.pdf | ||
| Attachment 8 Specification ME-200 Grossing Station.docx | DOCX document | |
| 36C24922R0104 0003.docx | DOCX document | |
| 36C24922R0104 0002.docx | DOCX document | |
| 36C24922R0104 0001.docx | DOCX document | |
| Attch 6 Contractor EMR Certification Form.docx | DOCX document | |
| Attch 2 Drawings 603-22-602 Renovate Pathology Lab 08-19-2022.pdf | ||
| Attch 4 WD KY20220093 dated 08-05-2022.pdf | ||
| Attch 3 Spec 603-22-602 Renovate Pathology Lab 100_ BD.pdf | ||
| Attch 5 Past Performance Questionaire.docx | DOCX document | |
| 36C24922R0104_1.docx | DOCX document | |
| Attch 1 SOW 603-22-602 Renovate Pathology Lab Final.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK | ||||||
| Offerors for Contractors (NAICS code 236220) must provide | ||||||
| at least 15 percent of the cost of the contract performance incurred for personnel will be spent on the prime contractor's employees. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead,profit/fee and bond costs shall be added after a subtotal of personnel and material/ Equipment costs has been calculated. Clearly identify the personnel costs you will be performing. Below is a suggested format. | ||||||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs | |||
| Prime | Y | $0.00 | $0.00 | Change SB Vendor to Y or N based on vendor size. Add costs to gray areas only. | ||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | Y | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| Sub | N | $0.00 | $0.00 | |||
| (Add additional lines as necessary for each Division applicable to this project) | $ | $ | ||||
| $ - 0 | $0.00 |
| $ | $ | ||||
| Sub Total (Personnel Costs, Material/Equipment Costs) | $ | 0.00 | Add percentage to gray areas only. | ||
| Percentage | 0 | Profit | $ | 0.00 | |
| Percentage | 0 | Home Office Overhead | $ | 0.00 | |
| Percentage | 0 | Bond | $ | 0.00 | |
| Grand Total | $ | 0.00 | |||
| Calculation of self-performed personnel costs: | |||||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||||
| 2. Subtract all subcontractor personnel costs* companies that will perform work | |||||
| on this contract: | $0.00 | ||||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||||
| Contract’: | $0.00 | ||||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
| I certify the above representations are true and correct to the best of my knowledge. |
(Signature and Typed Name of Authorized Representative) Date
(Title of Authorized Representative)
File details come from the government source that posted it. Updated .