Attch 2 Drawings 603-22-602 Renovate Pathology Lab 08-19-2022.pdf
PDF 14 MB Posted
- Solicitation number
- 36C24922R0104
About this file
This solicitation package describes a federal contract opportunity for renovations to a pathology laboratory at the Louisville VA Medical Center. Key details include a 100% set-aside for service-disabled veteran-owned small businesses, a project budget between $250,000 to $500,000, a bid due date of November 21, 2022, and performance and payment bond requirements for awards over $35,000 and $150,000 respectively. The scope of work involves renovations and potential hazardous material abatement. Offerors must register in the System for Award Management and provide past safety records, current experience modification rates from their insurance carrier, and confirmation of E-Verify registration within 30 days of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1 Safety Requirements.pdf | ||
| 36C24922R0104 0004.docx | DOCX document | |
| Addendum 1 Drawings.pdf | ||
| Addendum 1 List of Drawings Sheets.pdf | ||
| Addendum 1 General Requirements.pdf | ||
| Attachment 9 Baker BSL hood-Quote 1-24-2021.pdf | ||
| Attachment 10 ME-Series-Manual-2015.pdf | ||
| Attachment 8 Specification ME-200 Grossing Station.docx | DOCX document | |
| 36C24922R0104 0003.docx | DOCX document | |
| 36C24922R0104 0002.docx | DOCX document | |
| 36C24922R0104 0001.docx | DOCX document | |
| Attch 6 Contractor EMR Certification Form.docx | DOCX document | |
| Attch 4 WD KY20220093 dated 08-05-2022.pdf | ||
| Attch 3 Spec 603-22-602 Renovate Pathology Lab 100_ BD.pdf | ||
| Attch 5 Past Performance Questionaire.docx | DOCX document | |
| 36C24922R0104_1.docx | DOCX document | |
| Attch 1 SOW 603-22-602 Renovate Pathology Lab Final.docx | DOCX document | |
| Attch 7 Calc of Self Performed Work General Contractor.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E
H
C O
T
R A M
P
COMPACT
COMPACT
STORAGE
SHED
T1
T3
T20
T22 T27
PROJECT LOCATION
ROBLEY REX VA MEDICAL CENTER
PROJECT NUMBER: 603-22-602
DEPARTMENT OF VETERANS AFFAIRS
800 ZORN AVE, LOUISVILLE, KY 40206
RENOVATE PATHOLOGY LAB
D R A W I N G L I S T
G E N E R A L N O T E S
A. THE CONTRACT DRAWINGS AND SPECIFICATIONS (INDICATED BY THE SAME PROJECT NUMBER) ARE COMPLEMENTARY. THE CONTRACTOR SHALL NOTIFY THE C.O.R. OF ANY DISCREPANCIES FOUND DURING BIDDING AND THROUGH CONSTRUCTION.
B. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN.
C. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE CONTRACTING OFFICER
REPRESENTATIVE (COR).
D. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND
CONSTRUCTION.
E. THE CONTRACTOR SHALL MAINTAIN ACCESSIBLE EGRESS FOR THE DURATION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST
BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
F. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF CONSTRUCTION ACTIVITIES. THE CONTRACTING OFFICER REPRESENTATIVE RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED
SPACES.
G. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE’D TO ACHIEVE
THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
H. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL AUTHORITIES, RULES AND REGULATIONS.
I. THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND MINIMUM QUALITY OF WORK EXPECTED. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION
AND EXPECTED QUALITY.
J. ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE SALVAGED AND REFURBISHED.
MATERIAL QUALITY SHALL MEET OR EXCEED APPLICABLE INDUSTRY STANDARDS.
K. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
L. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER AND CONTRACTING OFFICER
REPRESENTATIVE PRIOR TO CONSTRUCTION.
M. WHERE EXISTING SURFACES ARE TO BE RE-FINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OF NEW CONSTRUCTION, PREPARE EXISTING SURFACES AS NECESSARY TO RECEIVE THE NEW MATERIALS FOR A LEVEL AND SMOOTH
FINISH.
N. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES APPARATUSES IMPACTING NEW CONSTRUCTION. DETERMINE EXACT SIZE AND LOCATION OF PENETRATION WITHIN NEW CONSTRUCTION, TIGHTLY SEAL AND CAULK.
O. GENERAL CONTRACTOR SHALL HOST SUBMITTAL EXCHANGE SOFTWARE FOR THE DURATION OF THE PROJECT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E
L o u is v ill e
P a th o lo g y L a b
B tj .d u n n
.r v t
/1
/2
:3
:0
P
M
GI000
COVER SHEET
08/19/2022 ET JF
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
NTS
VICINITY MAP
NTS
CAMPUS MAP
GENERAL
GI000 COVER SHEET
GI001 ABBREVIATIONS AND GENERAL DETAILS
GI002 THIRD FLOOR LIFE SAFETY PLAN
ARCHITECTURE
AD100 PARTIAL THIRD FLOOR DEMOLITION PLAN
AD101 PARTIAL DEMOLITON REFLECTED CEILING PLAN
AE100 PARTIAL THIRD FLOOR PLAN
AC141 PARTIAL THIRD FLOOR REFLECTED CEILING PLAN
AE601 CASEWORK DETAILS, DOOR AND FINISH SCHEDULES
FIRE PROTECTION
FX101 THIRD FLOOR FIRE SUPPRESSION PLAN
PLUMBING
PL101 THIRD FLOOR PLUMBING PLANS
MECHANICAL
M001 MECHANICAL LEGEND
MD101 THIRD FLOOR DEMOLITION MECHANICAL PLAN
MH101 THIRD FLOOR NEW WORK MECHANICAL PLAN
M500 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES AND CONTROLS
ELECTRICAL
E001 ELECTRICAL LEGEND
ED100 THIRD FLOOR ELECTRICAL DEMOLITION PLANS
EP100 THIRD FLOOR ELECTRICAL POWER AND TECHNOLOGY PLAN
EL100 THIRD FLOOR ELECTRICAL LIGHTING PLAN
N N
No. Revisions: Date:
BID DOCUMENTS FOR CONSTRUCTION 08/19/2022
P1
A101
SIM
A101
SIM
A101
SIM
A101
SIM
LEVEL NAME W/ ELEVATION
NEW GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER, AREA
& OCCUPANCY
BUILDING SECTION NUMBER W/ SHEET
NUMBER
WALL SECTION NUMBER W/
SHEET NUMBER
DOOR NUMBER
WALL TAG
KEYNOTE
REVISION TAG
FINISH TAG
DETAIL SECTION NUMBER W/
SHEET NUMBER
NORTH ARROW
LEVEL
ELEVATION
150 SF
S Y M B O L S
N
WINDOW TAGA
0 EXISTING GRID HEAD
10'-0" CEILING HEIGHT TAG
ROOM NAME
A B B R E V I A T I O N S
A.B. ANCHOR BOLT
A.C.M. ASBESTOS CONTAINING MATERIALS
A.C.P. ASPHALT CONCRETE PAVING
A/C AIR CONDITIONING
ACOUS. ACOUSTIC
A.C.T. ACOUSTICAL CEILING TILE
A.D. AREA DRAIN
ADJ. ADJUSTABLE
AFF ABOVE FINISH FLOOR
AGG. AGGREGATE
AL. ALUMINUM
ALT. ALTERNATE
APPROX. APPROXIMATE
ARCH. ARCHITECT
ASPH. ASPHALT
BD. BOARD
BITUM. BITUMINOUS
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
BM. BENCH MARK OR BEAM
BOT. BOTTOM
BRG. BEARING
BRK. BRICK
BRZ. BRONZE
BTWN. BETWEEN
B.U.R BUILT-UP ROOFING
CAB. CABINET
CARP. CARPET
C.B. CATCH BASIN
C.B.B. CEMENTITIOUS BACKER BOARD
CEM. CEMENT
CER. CERAMIC
CER.T. CERAMIC TILE
C.HK. COAT HOOK
C.I. CAST IRON
CIR. CIRCLE
C.J. CONSTRUCTION JOINT
CLG. CEILING
CLG.J. CEILING JOINT
CLKG. CAULKING
CLO. CLOSET
CLR. CLEAR
CLS. CLOSURE
CMU CONCRETE MASONRY UNIT
CNTR. COUNTER
C.O. CLEAN OUT
COL. COLUMN
COMB. COMBINATION
COMP. COMPOSITION
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONV.O. CONVECTION OVEN
C.O.R. CONTRACTING OFFICER'S
REPRESENTATIVE
CTR. CENTER
C.W. COLD WATER
CW. CURTAINWALL
DET. DETAIL
DF. DOUGLAS FIR
D.F. DRINKING FOUNTAIN
DIA. DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DISP. DISPOSAL
DIV. DIVISION
DN. DOWN
D.O. DOOR OPENING
DR. DOOR
D.S. DOWN SPOUT
D.T. DRAIN TILE
D.W. DISHWASHER
DWG(S). DRAWING(S)
DWR. DRAWER
(E) EXISTING
EA. EACH
E.C. ELECTRICAL CONTRACTOR
E.E. EACH END
E.F. EXHAUST FAN
E.J. EXPANSION JOINT
ELEC. ELECTRICAL
ELEV. ELEVATION
E.N. EDGE NAIL
ENCL. ENCLOSURE
EQUIV. EQUIVALENT
E.S. EACH SIDE
E.W. EACH WAY
E.W.C. ELECTRICAL WATER CLOSET
EXP. EXPANSION
EXP.B. EXPANSION BOLT
EXPO. EXPOSURE
EXT. EXTERIOR
F. FACE
F.A. FIRE ALARM
F.B. FACE BRICK
F.BD. FIRE BOARD
F.BELL FIRE BELL
F.B.O. FURNISHED BY OTHERS
F.D. FLOOR DRAIN
FDN. FOUNDATION
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
F.G. FINISH GRADE
FGL. FIBERGLASS
F.H. FIRE HYDRANT
FH.M.S. FLAT HEAD MACHINE SCREW
FIN. FINISH
FIXT. FIXTURE
F.J. FLOOR JOIST
F.L. FLOOR LINE
FLASH FLASHING
FLOUR FLUORESCENT
FLR. FLOOR
F.N. FACE NAIL
F.O.B. FACE OF BUILDING
F.O.C. FACE OF CONCRETE
F.O.F. FACE OF FINISH
F.O.M. FACE OF MASONRY
F.O.S. FACE OF STUD
F.R.T.W. FIRE RETARDANT TREATED WOOD
F.S.C. FIRE SUPPRESSION CONTRACTOR
F.S.E.C. FOOD SERVICE EQUIPMENT
CONTRACTOR
FTG. FOOTING
FUT. FUTURE
F.V.C. FIRE VAULT CABINET
GA. GAUGE
GALV. GALVANIZED
G.C. GENERAL CONTRACTOR
G.B. GRAB BAR
G.D. GARBAGE DISPOSAL
G.E. GRATE ELEVATION
G.I. GALVANIZED IRON
GL. GLASS
GLB. GLUE LAMINATED BEAM
GND. GROUND
GR. GRADE
G.S.M. GALVANIZED SHEET METAL
GYP.BD. GYPSUM BOARD
H.B. HOSE BIB
HC. HANDICAPPED
HDR. HEADER
HDWD. HARDWOOD
HDWE. HARDWARE
HGT. HEIGHT
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
H.P. HIGH POINT
HR. HOUR
H.S.S. HOLLOW STRUCTURAL STEEL
HTG. HEATING
H.V.A.C. HEATING, VENTILATION & AIR
CONDITIONING
H.W. HOT WATER
I.D. INSIDE DIAMETER
INSUL. INSULATION
INT. INTERIOR
INV. INVERT
JAN. JANITOR
J.H. JOIST HANGER
JST. JOIST HANGER
JT. JOINT
KIT. KINTCHEN
LAB LABORATORY
LAM. LAMINATE
LAV. LAVATORY
L.B. LAG BOLT
L.H. LEFT HAND
L.L. LIVE LOAD
L.P. LOW POINT
LT. LIGHT
MAT. MATERIAL
MAX. MAXIMUM
M.B. MACHINE BOLT
M.C. MEDICINE CABINET
MECH. MECHANICAL
MED. MEDIUM
MEMB. MEMBRANE
M.E.P. MECHANICAL, ELECTRICAL,
PLUMBING
MFG. MANUFACTURER
MH. MANHOLE
MIN. MINIMUM
MIR. MIRROR
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MOD. MODULAR
MP.H. MOP HOLDER
MR. FRAMED MIRROR
M.R. MOISTURE RESISTANT
M.T. METAL THRESHOLD
MTD. MOUNTED
MTL. METAL
(N) NEW
N. NORTH
NAT. NATURAL
N.I.C. NOT IN CONTRACT
(NOT PART OF OSA APPROVAL)
NO. NUMBER
NOM. NOMINAL
NON/COM NON-COMBUSTIBLE
N.T.S. NOT TO SCALE
O/ OVER
O.A. OVERALL
OBS. OBSCURE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OVERFLOW
OFF. OFFICE
O.F.S. OUTSIDE FACE OF STUD
O.H.W.S. OVAL HEAD WOOD SCREW
OPP. OPPOSITE
P. PAINT
P.C. PLUMBING CONTRACTOR
P.C.F. POUNDS PER CUBIC FOOT
P.E.N. PANEL EDGE NAILING
PERF. PERFORATED
PL. PLATE
P.LAM PLASTIC LAMINATE
PLAS. PLASTER
P.L.F. POUNDS PER LINEAR FOOT
PLYWD. PLYWOOD
P.M.F. PRESSED METAL FRAME
PR. PAIR
PROP. PROPERTY
P.S.F. POUNDS PER SQUARE FOOT
P.S.I. POUNDS PER SQUARE INCH
P.STA. PULL STATION
PTD. PAINTED
P.T.D. PAPER TOWEL DISPENSER
PT. POINT
P.T.D.F. PRESSURE TREATED DOUGLAS
FIR
PTN. PARTITION
P.T.R. PAPER TOWEL RECEPTACLE
P.V.C. POLYVINYL-CHLORIDE
Q.T. QUARRY TILE
RAD. RADIUS
R.B. RUBBER BASE
R.C.P. REFLECTED CEILING PLAN
R.D. ROOF DRAIN
RDWD. REDWOOD
REF. REFERENCE
REFR. REFRIGERATOR
REINF. REINFORCING
REQD. REQUIRED
RESIL. RESILIENT
R.H. ROOF HATCH
R.HK. ROBE HOOK
R.H.M.S. ROUND HEAD METAL SCREW
R.H.W.S. ROUND HEAD WOOD SCREW
RM. ROOM
R.O. ROUGH OPENING
R.W.L. RAIN WATER LEADER
S. SOUTH
S.A.B. SOUND ATTENUATION BATT
S.A.D. SEE ARCHITECTURAL DRAWINGS
S.A.F.F. SELF ADHERED FLEXIBLE FLASHING
S.A.S.M. SELF ADHERED FLEXIBLE MEMBRANE
S.BLKG. SOLID BLOCKING
SCWD. SOLID CORE WOOD DOOR
S.C.D. SEE CIVIL DRAWINGS
S.D. STORM DRAIN
S.DISP. SOAP DISPENSER
SEAL. SEALANT
SECT. SECTION
S.E.D. SEE ELECTRICAL DRAWINGS
SHR. SHOWER
SHT. SHEET
SHTG. SHEATHING
SIM. SIMILAR
SL. SLIDING
S.L.D. SEE LANDSCAPE DRAWINGS
S.M.D. SEE MECHANICAL DRAWINGS
S.N.D. SANITARY NAPKIN DISPOSAL
S.N.V. SANITARY NAPKIN DISPENSER
S.P. SOUNDPROOF
SPEC. SPECIFICATION
SQ. SQUARE
SQ.FT. SQUARE FOOT (FEET)
S.S. SANITARY SEWER
S.S.D. SEE STRUCTURAL DRAWINGS
STA. STATION
STD. STANDARD
STL. STEEL
S.STL. STAINLESS STEEL
STO. STORAGE
STRUC. STRUCTRUAL
SUSP. SUSPENDED
T.B. TACKBOARD
T&B. TOP AND BOTTOM
TEL. TELEPHONE
TEMP. TEMPERED
TER. TERRAZZO
T&G. TOUNGE AND GROOVE
THK. THICK
T.J. TOOL JOINT
T.N. TOE NAIL
T.O.C. TOP OF CURB
T.O.P TOP OF PAVEMENT
T.O.PL. TOP OF PLATE
T.O.S. TOP OF SEAT
T.O.W. TOP OF WALL
T.P.D. TOILET PAPER DISPENSER
T.S. TUBE STEEL
T.V. TELEVISION
TYP. TYPICAL
UNF. UNFINISHED
U.N.O. UNLESS NOTED OTHERWISE
UR. URINAL
U/S. UNDERSIDE
V.C.T. VINYL COMPOSITION TILE
VERT. VERTICAL
VEST. VESTIBULE
V.G. VERTICAL GRAIN
V.I.F. VERIFY IN FIELD
V.T. VINYL TILE
V.T.R. VENT TO ROOF
V.W.C. VINYL WALL COVERING
(VC) V.A. FURNISHED / CONTRACTOR
INSTALLED
(VV) V.A. FURNISHED AND INSTALLED
W. WEST
W/ WITH
W/IN WITHIN
W.C. WATER CLOSET
WD. WOOD
WDW. WINDOW
W.F. WATER COOLER
W.H. WATER HEATER
W/O WITHOUT
W.P. WATER PROOF
W.R. WATER RESISTANT
WT. WEIGHT
W.W.F. WELDED WIRE FABRIC
YD. YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E
L o u is v ill e
P a th o lo g y L a b
B tj .d u n n
.r v t
/1
/2
:3
:0
P
M
GI001
ABBREVIATIONS AND GENERAL
DETAILS
08/19/2022 ET JF
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
N E
W W
A L L
MED SVC
MED SVC
M. HECKMAN
SATWANT SOOCH
BURKS/PETERS/RUSSELL/SMITH
PHYLLIS TAYLOR
DR MAYFIELD P/T
DR RUBEL
DR SHAHEEN
WHITTAKER/JOHNSON/STINE
HOUSE SUPERV MED SVC MED SVC MED MHBS
DR OMAR
MED SVC SURGERY
C. CHAMBERS
C. ARNOLD
SURGERY
NURSING
DR LEVINSON
HARRINGTON/SAMMONS
DR SCIORTINO
R. RANDOLPH
RESIDENTS
CANTELLI
STEPHANIE WALKER
CELSA THOMAS
SHAUGHNESSY
STAFF DENTISTS
DENTAL ASSISTANTS
SUE BASHAM
DN
A-324
ROOM
EXAM
OFFICES
A-329
A-328
OFFICE
A-327
OFFICE
A-326
ROOM
EXAM EXAM
ROOM
A-325
A-330
LOUNGE
STAFF
A-331
CLOSET
ELECTRIC
B-313c
RESTROOM
B-313a
OFFICE
NURSING
B-313b
ROOM
MULTIPURPOSE
B-315a
RESTROOM
B-316a
RESTROOM
B-315
ROOM
ON-CALL
B-316
ROOM
ON-CALL
B-317
#8
STAIRWELL
B-364
H.A.C.
SUPERVISOR
MICROBIOLOGY LAB
B-365
A-343
ROOM
H.V.A.C. EQUIPMENT
A-342
#1
STAIRWELL
A-336b
OFFICE
A-306
ROOM
MULTIPURPOSE
A-322
ROOM
TREATMENT
A-315a
RESTROOM
A-313
ROOM
EXAM
A-314
ROOM
EXAM
A-315
ROOM
EXAM
A-313a
RESTROOM
A-318a
RESTROOM
A-316
ROOM
EXAM
A-317
ROOM
EXAM
A-318
ROOM
EXAM
A-321
OFFICE
CLINIC
A-317a
RESTROOM
A-319
ROOM
MULTIPURPOSE
A-320
UTILITY
SOILED
A-335
#2
STAIRWELL
A-320a
STORAGE
A-336a
PHARMACY
F.A.C.
A-336
STATION
NURSE'S
A-309a
RESTROOM
A-311a
RESTROOM
A-312
ROOM
EXAM
A-311
ROOM
EXAM
A-310
ROOM
RESIDENTS'
SUPPLY
AND
ELECTRICAL
CLOSET
A-305
A-308a
RESTROOM
A-307
ROOM
EXAM
A-308
ROOM
EXAM
A-309
ROOM
EXAM
A-303a
RESTROOM
A-304
H.A.C.
A-302
PHLEBOTOMY
WAITING
ROOM
A-338
A-336c
RESTROOM
STAFF
A-337
OFFICE
MECHANICAL
EQUIPMENT
PENTHOUSE
M301-1
A-348
LAB
HISTOLOGY
A-348d
CHASE
PIPE
A-390
AREA
WAITING
A-301a
AREA
WAITING ANTICOAG
OFFICE
A-391
A-350
CLOSET
ELECTRIC
F.A.C.
A-340
CLOSET
ELECTRIC
A-341
CLOSET
COMM.
A-349
CLOSET
TELEPHONE
S-5
S-6
P-4
P-3
A-351
LOBBY
ELEVATOR
P-2
P-1
A-348a
EXAM ROOM
SPECIMEN
A-389
STORAGE
RECORD
A-382a
RESTROOM
A-380
PATIENT 5
A-380a
RESTROOM
A-381
PATIENT 4
A-382
PATIENT 3
A-385a
RESTROOM
A-388
H.A.C.
A-384a
RESTROOM
A-383
PATIENT 2
A-384
PATIENT 1
A-387
LINEN
CLEAN
A-385
LOUNGE
A-386
CENTER
NOURISHMENT
A-353
RESTROOM
STAFF
A-348e
OFFICE
A-352
RESTROOM
WOMEN'S
A-351a
H.A.C.
A-348c
OFFICE
LAB
A-354
OFFICE
DIS. PLAN
A-348b
CYTOLOGY
A-355
OFFICE
DIS. PLAN
B-302
TECHNOLOGIST
CHIEF MEDICAL
B-307
SERVICE
PATHOLOGY
NURSING
OFFICE
B-312a
B-313
OFFICE
NURSING
B-307b
PATHOLOGIST
STAFF
B-307d
PATHOLOGIST
STAFF
B-307c
PATHOLOGIST
STAFF
B-309
OFFICE
A&MM
B-328
CLOSET
TELEPHONE
B-312
OFFICE
NURSING
B-329
CLOSET
COMM
NURSING
OFFICE
B-312b
B-330
PROCEDURE ROOM
DEMONSTRATION
B-318
OFFICE
NURSING
PENTHOUSE
ELEVATOR
B-319
ROOM
ON-CALL
B-327
CLOSET
ELECTRIC
NURSE
OFFICE
B-311
B-331
CONFERENCE ROOM
NURSING
B-320
ROOM
ON-CALL
B-319a
RESTROOM
B-321
ROOM
ON-CALL
CHIEF,
LABORATORY
OFFICE
B-307a
MEN'S
LOCKER
ROOM
B-308
WOMEN'S
LOCKER
ROOM
B-306
B-332
ROOM
MULTIPURPOSE
B-310
OFFICE
A&MM
B-322
ROOM
ON-CALL
B-321a
RESTROOM
B-323
ROOM
ON-CALL
B-325a
RESTROOM
B-335
OFFICE
A&MM
B-334
H.A.C.
B-333
OFFICE
PATH & LAB
B-326
LINEN
CLEAN
B-324
ROOM
ON-CALL
B-323a
RESTROOM
D-302
PENTHOUSE
MECHANICAL
B-325
ROOM
STORAGE
D-303
EQUIPMENT
ELEVATOR
C-302a
REFRIGERATOR
P-7
B-353b
ROOM
EXAM
B-366a
STORAGE
LABORATORY
B-303
& BREAK ROOM
LAB CONFERENCE
B-340
CHUTE
LINEN
F.A.C.
B-366
STORAGE
B-352
CLOSET
ELECTRIC
B-351
#3
STAIRWELL
B-358
STAFF LOUNGE
B-355
RESTROOM
B-354
CLOSET
UNIFORM
LAB
B-353a
B-353c
RESTROOM
B-356
RESTROOM
C-302
LABORATORY
DEVELOPMENTAL
C-301
CLOSET
ELECTRIC
P-8 P-9
C-305
LABORATORY
DENTAL
D-301
#9
STAIRWELL
A-361
LOUNGE
A-374a
RESTROOM
SURGERY
STORAGE
A-370
A-377a
RESTROOM
A-378a
RESTROOM
A-379
PATIENT 6
A-377
PATIENT 8
A-378
PATIENT 7
A-375
MED ROOM
A-373
CLOSET
SUPPLY
A-376
STATION
NURSE
A-374
OFFICE
A-372
UTILITY
SOILED
A-369
OFFICE
A-356
OFFICE
DIS. PLAN
A-357
ROOM
MULTIPURPOSE
A-358
UTILITY
CLEAN
A-371
STORAGE
F.A.C.
A-359
#6
STAIRWELL
A-360
UTILITY
SOILED
A-368b
CONSTULT
A-362
RESTROOM
PATIENT
A-363
CLOSET
ELECTRIC
A-364
OFFICE
B-363c
REFRIGERATOR
B-363d
REFRIGERATOR
MOLECULAR
PATHOLOGY
LABORATORY
B-359
B-363
LABORATORY
MICROBIOLOGY
B-360
LABORATORY
BACTERIOLOGY
C-306
LABORATORY
HEMOTOLOGY
B-363b
LABORATORY
TUBERCULOSIS
MOLECULAR
MICROBIOLOGY
LABORATORY
B-361
B-363a
LABORATORY
PARASITOLGY
B-362
#5
STAIRWELL
C-306b
CLINICAL CHEMISTRY
CHIEF
C-306c
REFRIGERATOR
C-306e
CLOSET
COMPUTER
C-306d
CLOSET
ELECTRIC
C-306a
OFFICE
LABORATORY
A-365
ROOM
TREATMENT
CHIEF OF
MICROBIOLOGY &
ASSISTANT DIRECTOR OF
MOLECULAR PATHOLOGY
A-347
LABORATORY
COMPUTER
COORDINATOR
OFFICE
B-305
A-365a
PROCEDURE
PRE / POST
A-365b
ROOM
CONSULT
A-367a
OFFICE
A-344
RESTROOM
MEN'S
A-345
RESTROOM
WOMEN'S
A-346
ROOM
CONFERENCE
A&MM
OFFICE
B-314
B-353d
PHLEBOTOMY
SUPERVISOR
B-357
STORAGE
B-301
HISTOLOGY/CYTOLOGY LAB
SUPERVISOR
A-392
OFFICE
ANTICOAG
B-338f
OPERATORY #6
B-338e
OPERATORY #5
B-338d
OPERATORY #4
B-338c
OPERATORY #3
B-338b
OPERATORY #2
B-338g
OPERATORY #7
B-338a
OPERATORY #1
B-337d
BREAK ROOM
B-337c
OFFICE
CHIEF, DENTAL SVC
B-337b
OFFICE
DENTIST
CLOSET B-337
WORK RM.
COPY/
B-337a
ADMINISTRATION
B-338p
CLOSET
B-338m
X-RAY B-338n
OMFS-1
B-338o
OMFS-2
B-338m1
ROOM
DARK
B-338l
OPERATORY #8
B-338k
PERIO
B-338j
HYGIENE
B-338i
STORAGE
B-338h
DECONTAM
A-303
PHLEBOTOMY
B-353
ROOM
WAITING
B-338q
STORAGE
B-338
DENTAL SUITE
A-330a
KITCHEN
STAFF
B-353e
OFFICE
A-323
ROOM
EXAM
A-368a
WAITING
CHECK IN/OUT
A-367b
OFFICE
A-332
LAB
A-333c
ROOM
CLEAN
A-333b
ROOM
ANTI
A-333a
STORAGE
A-333
PHARMACY A-334
ROOM
MULTIPURPOSE
A-369a
OFFICE
A-301
AREA
WAITING
B-359a
P A
T H
O F
T R
A V
E L
PROJECT LOCATION
L I F E S A F E T Y L E G E N D
1 HOUR FIRE BARRIER
HORIZONTAL EXIT PASSAGEWAYHE
EX EXIT
EP EXIT PASSAGEWAY
HAZARDOUS ROOM
PROJECT SCOPE
DIRECTIONAL EXIT SIGN
FIRE EXTINGUISHER
PATH OF TRAVEL
2 HOUR FIRE BARRIER
FAC FIRE ALARM CONTROL
1 HOUR SMOKE BARRIER
WALL MOUNTED
DIRECTIONAL EXIT SIGN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E
L o u is v ill e
P a th o lo g y L a b
B tj .d u n n
.r v t
/1
/2
:3
:1
P
M
GI002
THIRD FLOOR LIFE SAFETY PLAN
08/19/2022 ET JF
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
1/16" = 1'-0"
THIRD FLOOR LIFE SAFETY PLAN
N
CODE REVIEW:
Project: Renovate Pathology
Location: Robley Rex VA Medical Center
Project Number: 603-22-602
PROJECT SUMMARY:
LOCATED IN LOUISVILLE KY ROBLEY REX VAMC, THIS PROJECT CONSISTS OF THE RENOVATION OF AN EXISTING PATHOLOGY LAB ON THE THIRD FLOOR OF BUILDING 1. THE PROJECT IS ANTICIPATED TO RENOVATE APPROXIMATELY 1,500 DGSF AND INCLUDES IMPROVED SPACE LAYOUT, ARCHITECTURAL, FINISH UPGRADES AND MODERNIZATION OF THE MECHANICAL DEVICES, ELECTRICAL LIGHTING FIXTURES, PLUMBING. THE AREA IS TO REMAIN OPERATIONAL THROUGH CONSTRUCTION AND MULTI PHASED
DURING CONSTRUCTION AS NEEDED TO REMAIN OPERATIONAL.
BUILDING 1 IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA AND REMAINS UNCHANGED.
ASCE7-2016 SEISMIC DESIGN CATEGORY – C (RISK CATEGORY IV, SITE CLASS D)
2021 NFPA 5000
TABLE 7.2.1.1 CONSTRUCTION TYPE II (222):
EXTERIOR BEARING WALLS: 2-HOUR
INTERIOR BEARING WALLS: 2-HOUR
COLUMNS: 2-HOUR
BEAMS, GIRDERS, TRUSSES, AND ARCHES: 2-HOUR
FLOOR-CEILING ASSEMBLIES: 2-HOUR
ROOF-CEILING ASSEMBLIES: 1-HOUR
INTERIOR NONBEARING WALLS: 0-HOUR
EXTERIOR NONBEARING WALLS: 0-HOUR
NOTE: ACCEPTABLE CONSTRUCTION TYPES BASED ON OBSERVATIONS OF CONSTRUCTION MATERIALS INCLUDE TYPE I (443), I (332) AND II (222). THIS REPORT WILL USE THE LEAST RESTRICTIVE TYPE II (222).
2021 NFPA 101 LIFE SAFETY CODE REVIEW
AREA OF WORK:
BUILDING 1 – THIRD FLOOR (AREA OF WORK ONLY): 1,500 DGSF
CHAPTER 3 DEFINITIONS
3.3.32.2 SMOKE BARRIER. A CONTINUOUS MEMBRANE, OR A MEMBRANE WITH DISCONTINUITIES CREATED BY PROTECTED OPENINGS, WHERE SUCH MEMBRANE IS DESIGNED AND CONSTRUCTED TO RESTRICT THE
MOVEMENT OF SMOKE.
CHAPTER 6 - CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENT
6.1.11 EXISTING BUSINESS OCCUPANCY (CHAPTER 39)
6.2.2 HAZARD CLASSIFICATION: ORDINARY - NO CHANGE
CHAPTER 7 - MEANS OF EGRESS:
7.1.3.1 EXIT ACCESS CORRIDORS: CORRIDORS USED AS EXIT ACCESS AND SERVING AN AREA HAVING AN OCCUPANT LOAD EXCEEDING 30 SHALL BE SEPARATED FROM OTHER PARTS OF THE BUILDING BY WALLS HAVING NOT LESS THAN A 1-HOUR FIRE RESISTANCE RATING IN ACCORDANCE WITH SECTION 8.3, UNLESS OTHERWISE PERMITTED BY ONE OF THE FOLLOWING: (1) THIS REQUIREMENT SHALL NOT APPLY TO EXISTING BUILDINGS, PROVIDED THAT THE OCCUPANCY CLASSIFICATION DOES NOT CHANGE. (2) THIS
REQUIREMENT SHALL NOT APPLY WHERE OTHERWISE PROVIDED IN CHAPTERS 11 THROUGH 43.
7.2.4.1.1 WHERE HORIZONTAL EXISTS ARE USED IN THE MEANS OF EGRESS, THEY SHALL CONFORM TO THE
GENERAL REQUIREMENTS OF SECTION 7.1 AND SPECIAL REQUIREMENTS OF 7.2.4.
7.2.6.3 STAIR DISCHARGE – AN EXIT PASSAGEWAY THAT SERVES AS A DISCHARGE FROM A STAIR
ENCLOSURE SHALL HAVE NOT LESS THAN THE SAME FIRE RESISTANCE RATING AND OPENING
PROTECTIVE RATING AS THOSE REQUIRED FOR THE STAIR ENCLOSURE.
7.2.6.4.1 THE WIDTH OF AN EXIT PASSAGEWAY SHALL BE SIZED TO ACCOMMODATE THE AGGREGATE REQUIRED CAPACITY OF ALL EXITS THAT DISCHARGE THROUGHT IT, UNLESS ONE OF THE FOLLOWING
CONDITIONS APPLIES:
WHERE AN EXIT PASSAGEWAY SERVES OCCUPANTS OF THE LEVEL OF EXIT DISCHARGE AS WELL AS
OTHER STORIES THE CAPACITY SHALL NOT BE REQUIRED TO BE AGGREGATED.
7.3.1.2 OCCUPANT LOAD OF SPACE (PROJECT AREA ONLY):
BUILDING 1 –LEVEL 3: 1,500 SF AT 150 SF / OCCUPANT = 10 OCCUPANTS
CHAPTER 8 - FEATURES OF FIRE PROTECTION: NO CHANGE
8.4. SMOKE PARTITIONS
8.4.2. SMOKE PARTITIONS SHALL EXTEND FROM THE FLOOR TO THE UNDERSIDE OF THE FLOOR OR ROOF
DECK ABOVE
8.5.3. FIRE BARRIERS AS SMOKE BARRIERS
A FIRE BARRIER SHALL BE PERMITTED TO BE USED AS A SMOKE BARRIER, PROVIDED THAT IT MEETS THE
REQUIREMENTS OF SECTION 8.5.
8.7. SPECIAL HAZARD PROTECTIONS
8.7.1.1 PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE SHALL BE PROVIDED BY ONE OF THE
FOLLOWING MEANS:
(1) SEPARATING THE AREA FROM OTHER PARTS OF THE BUILDING WITH A FIRE BARRIER HAVING A FIRE RESISTANCE RATING OF NOT LESS THAN 1 HOUR IN ACCORDANCE WITH SECTION 8.3 AND WITHOUT
WINDOWS.
(2) PROTECTING THE AREA WITH AUTOMATIC EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7.
(3) APPLYING BOTH 8.7.1.1(1) AND 8.7.1.1.(2) WHERE THE HAZARD IS SEVERE OR WHERE OTHERWISE
SPECIFIED IN CHAPTERS 11 THROUGH 43.
CHAPTER 9 - BUILDING SERVICE AND FIRE PROTECTION EQUIPMENT: NO CHANGE
CHAPTER 10 - INTERIOR FINISH, CONTENTS, AND FURNISHES
10.2.3.1
INTERIOR WALL AND CEILING FINISH MATERIALS TESTED IN ACCORDANCE WITH NFPA 286.
10.2.3.1.1
INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE CLASSIFIED IN ACCORDANCE WITH NFPA 286
AND COMPLY WITH 10.2.3.2.
10.2.3.1.2
MATERIALS TESTED IN ACCORDANCE WITH 10.2.3.1.1 AND COMPLYING WITH 10.2.3.2 SHALL BE CONSIDERED ALSO TO COMPLY WITH THE REQUIREMENTS OF CLASS A, CLASS B, OR CLASS C IN ACCORDANCE WITH 10.2.3.3
10.2.3.2.
(1) DURING THE 40 KW EXPOSURE, FLAMES SHALL NOT SPREAD TO THE CEILING.
(2) THE FLAME SHALL NOT SPREAD TO THE OUTER EXTREMITY OF THE SAMPLE ON ANY WALL OR CEILING.
(3) FLASHOVER, AS DESCRIBED IN NFPA 286, SHALL NOT OCCUR.
(4) THE PEAK HEAT RELEASE RATE THROUGHOUT THE TEST SHALL NOT EXCEED 800 KW.
(5) FOR NEW INSTALLATIONS, THE TOTAL SMOKE RELEASED THROUGH-OUT THE TEST SHALL NOT EXCEED 1000 M2.
10.2.3.3
WALL AND CEILING- CLASSIFICATIONS CHARACTERISTICS.
(1) CLASS A: FLAME SPREAD: 0-25; SMOKE DEV. : 0-450.
(2) CLASS B: FLAME SPREAD: 26-75; SMOKE DEV. : 0-450
(3) CLASS C: FLAME SPREAD: 76-200; SMOKE DEV. : 0-450
10.2.8.1
WALL AND CEILING FINISHES, WHERE SPRINKLED:
CLASS C PERMITTED IN ANY LOCATION WHERE CLASS B IS REQ’D.
CLASS B PERMITTED IN ANY LOCATION WHERE CLASS A IS REQ’D.
-MAINTAIN ACCESSIBILITY TO EXISTING FIRE EXTINGUISHERS DURING CONSTRUCTION
39.1.5 CLASSIFICATION OF HAZARDS OF CONTENTS – THE CONTENTS OF BUSINESS OCCUPANCIES SHALL
BE CLASSIFIED AS ORDINARY HAZARD IN ACCORDANCE WITH SECTION 6.2.
39.2.2.2.2 DOOR LOCKING TO PREVENT UNWANTED ENTRY – WHERE APPROVED DOORS OTHER THAN THOSE COMPLYING WITH 39.2.11.2 SHALL BE PERMITTED TO BE LOCKED TO PREVENT UNWANTED ENTRY
PROVIDED THAT ALL THE FOLLOWING CONDITIONS ARE MET:
THE LOCKING MEANS SHALL BE CAPABLE OF BEING ENGAGED WITHOUT OPENING THE DOOR.
THE UNLOCKING AND UNLATCHING OPERATION FROM THE EGRESS SIDE OF THE DOOR SHALL BE
ACCOMPLISHED WITHOUT THE USE OF A KEY, TOOL, OR SPECIAL KNOWLEDGE OR EFFORT.
EGRESS SHALL REQUIRE NOT MORE THAN ONE RELEASING OPERATION.
THE RELEASING MECHANISM FOR UNLOCKING AND UNLATCHING SHALL BE LOCATED AT A HEIGHT OF NOT
LESS THAN 34” AND NOT EXCEEDING 48” ABOVE THE FINISHED FLOOR.
LOCKS, IF REMOTELY ENGAGED, SHALL BE UNLOCKABLE FROM THE EGRESS SIDE OF THE DOOR WITHOUT
THE USE OF A KEY, TOOL OR SPECIAL KNOWLEDGE OR EFFORT.
THE DOOR SHALL BE CAPABLE OF BEING UNLOCKED AND OPENEDED FROM OUTSIDE THE ROOM WITH THE
NECESSARY KEY OR OTHER CREDENTIAL.
THE LOCKING MEANS SHALL NOT MODIFY THE DOOR CLOSER, PANIC HARDWARE OR FIRE EXIT
HARDWARE.
MODIFICATIONS TO REQUIRED FIRE DOOR ASSEMBLIES, INCLUDING DOOR HARDWARE, SHALL BE IN
ACCORDANCE WITH NFPA 80.
39.2.5. ARRANGEMENT OF MEANS OF EGRESS
39.2.2.5 HORIZONTAL EXITS COMPLYING WITH 7.2.4 SHALL BE PERMITTED.
39.2.5.2 DEAD END CORRIDORS SHALL NOT EXCEED 50 FT.
39.2.5.2.1 COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FT ON A STORY PROTECTED THROUGHOUT
BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH 9.7.1.(1).
39.2.6. TRAVEL DISTANCE TO EXITS
39.2.6.3. TRAVEL DISTANCE TO AN EXIT SHALL NOT EXCEED 300 FT IN BUSINESS OCCUPANCIES
PROTECTED THOUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN
ACCORDANCE WITH SECTION 9.7.
39.2.11.3 HAZARDOUS MATERIALS – WHERE HAZARDOUS MATERIALS ARE PRESENT THE PROVISIONS OF
7.12.2 SHALL APPLY.
39.3.2. PROTECTION FROM HAZARDS
39.3.2.1 GENERAL HAZARDOUS AREAS INCLUDING, BUT NOT LIMITED TO, AREAS USED FOR GENERAL STORAGE, BOILER OR FURNACE ROOMS, AND MAINTENANCE SHOPS THAT INCLUDE WOODWORKING AND
PAINTING AREAS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7.
39.3.2.2 HIGH HAZARD CONTENTS AREAS – HIGH HAZARDOUS CONTENT AREAS AS CLASSIFIED IN SECTION
6.2 SHALL MEET ALL OF THE FOLLOWING CRITERIA:
THE AREA SHALL BE SEPARATED FROM OTHER PARTS OF THE BUILDING BY FIRE BARRIERS HAVING A MINIMUM 1 HOUR FIRE RESISTANCE RATING, WITH ALL OPENINGS THEREHEIN PROTECTED BY SELF
CLOSING FIRE DOOR ASSEMBLIES HAVING A MIN. ¾ HOUR FIRE PROTECTION RATING.
THE AREA SHALL BE PROTECTED BY AN AUTOMATIC EXTINGUISHING SYSTEM IN ACCORDANCE WITH
9.7.1.1(1) OR 9.7.1.2.
39.3.2.3 HAZARDOUS MATERIALS. WHERE HAZARDOUS MATERIALS ARE STORED OR HANDLED, THE
PROVISIONS OF 8.7.3.1 SHALL APPLY.
39.3.2.5 MEDICAL GAS. MEDICAL GAS STORAGE AREAS AND THE OPERATION, MANAGEMENT AND
MAINTENANCE OF MEDICAL GASES SHALL BE IN ACCORDANCE WITH NFPA 99.
39.3.3 INTERIOR FINISHES.
39.3.3.1. GENERAL. INTERIOR FINISHES SHALL BE IN ACCORDANCE WITH SECTION 10.2.
39.3.3.2.2 INTERIOR WALL AND CEILING FINISHES SHALL BE CLASS A, CLASS B, OR CLASS C IN AREAS
OTHER THAN EXITS AND EXIT ACCESS CORRIDORS.
39.3.3.3 INTERIOR FLOOR FINISH – NO REQUIREMENTS.
39.3.5 EXTINGUISHMENT REQUIREMENTS – PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN EVERY
BUSINESS OCCUPANCY IN ACCORDANCE WITH SECTION 9.9.
39.3.6 CORRIDORS (NO REQUIREMENTS)
E
E
EE
VENTANA
HE 600
U P
S
S-5
P-4
P-3
P-2
P-1
STORAGE
A-366
SPECIMEN EXAM
A-348a
CYTOLOGY
A-348b
LAB OFFICE
A-348c
OFFICE
A-348e
ELEVATOR LOBBY
A-351
TELE.
A-349
CORRIDOR
H.A.C
A-351c
DIS. PLAN OFFICE
A-354
CORRIDOR
HISTOLOGY
A-348
PIPE CHASE
A-348d
CORRIDOR
OFFICE
A-347
MLK
16' - 2" 19' - 10"
VENTANA
HE 600
U P
S
V.I.F
± 4' - 2"
V.I.F
± 2' - 6"
7 8 9
G E N E R A L C E I L I N G D E M O L I T I O N N O T E S
A. REFER TO SHEET GI000 FOR GENERAL NOTES.
B. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES.
C. DASHED LINES INDICATE FINISHES, MATERIALS, AND ASSOCIATED FIXTURES TO BE REMOVED. KEYNOTES SHALL
GOVERN OVER LINETYPES.
D. ALL WALLS BEING DEMOLISHED ARE GYPSUM BOARD AND COLD-FORMED STEEL FRAMING UNLESS NOTED
OTHERWISE.
E. HALF-TONED ITEMS INDICATE EXISTING CONSTRUCTION SHALL BE PROTECTED & REMAIN. KEYNOTES SHALL
GOVERN OVER LINEWEIGHTS.
F. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS
REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.
G. UTILITIES THAT REMAIN, WITHIN WALLS BEING DEMOLISHED, SHALL BE REROUTED AS REQUIRED TO FACILITATE
THE NEW PLAN CONFIGURATION.
H. AT PENETRATIONS, ALL UTILITY SYSTEM AND OTHER COMPONENTS THAT ARE SCHEDULED FOR DISCONNECTION SHALL BE REMOVED IN THEIR ENTIRETY. ANY FIRE RESISTIVE MEMBER OR THROUGH PENETRATIONS RESULTING FROM SUCH DEMOLITION WORK SHALL BE FIRESTOPPED OR SEALED IN ACCORDANCE WITH NFPA FOR THE
NECESSARY RATING PROTECTIONS.
N
K E Y P L A N
NTS
F I R E / S M O K E R A T I N G L E G E N D
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR SMOKE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E
L o u is v ill e
P a th o lo g y L a b
B tj .d u n n
.r v t
/1
/2
:3
:5
P
M
AD100
PARTIAL THIRD FLOOR
DEMOLITION PLAN
08/19/2022 ET JF
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
N 1/4" = 1'-0"
PARTIAL THIRD FLOOR DEMOLITION PLAN
D R A W I N G N O T E S
1 THIS AREA NOT IN CONTRACT. (NIC)
2 REMOVE INFILL WALL, DOOR FRAME, AND ALL RELATED SUPPORTS.
3 REMOVE EPOXY RESIN COUNTERTOP, BASE CABINETS, WALL CABINETS AND ALL RELATED SUPPORTS.
4 INSTALL 6 MIL PLASTIC SHEET BARRIER IN THIS LOCATION. SEAL TO BE AIR TIGHT AT TOP AND BOTTOM OF WALL. LAB MUST BE KEPT OPERATIONAL DURING CONSTRUCTION. SEE SPECIFICATIONS FOR ADDITIONAL ICRA REQUIREMENTS
FOR THIS SPACE.
5 REMOVE CARPET FLOORING FINISH AND MASTICS. CLEAN AND PREPARE SURFACE TO RECEIVE NEW FINISHES.
6 REMOVE PORTION OF EXISTING WALL (SHOWN AS DASHED) AND DOOR FRAME. PREPARE OPENING TO RECEIVE WALL
INFILL, NEW DOOR FRAME AND DOOR. SEE AE100.
7 EXISTING FINISHES TO REMAIN.
8 EXISTING EQUIPMENT IN THIS AREA TO REMAIN AND BE PROTECTED DURING CONSTRUCTED.
9 EXISTING FLOORING IS TO REMAIN IN THIS AREA.
10 NO ARCHITECTURAL SCOPE IN THIS ROOM
N
K E Y P L A N
NTS
G E N E R A L C E I L I N G D E M O L I T I O N N O T E S
A. REFER TO SHEET GI000 FOR GENERAL NOTES.
B. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES.
C. DASHED LINES INDICATE FINISHES, MATERIALS, AND ASSOCIATED FIXTURES TO BE REMOVED. KEYNOTES SHALL
GOVERN OVER LINETYPES.
D. ALL WALLS BEING DEMOLISHED ARE GYPSUM BOARD AND COLD-FORMED STEEL FRAMING UNLESS NOTED
OTHERWISE.
E. HALF-TONED ITEMS INDICATE EXISTING CONSTRUCTION SHALL BE PROTECTED & REMAIN. KEYNOTES SHALL
GOVERN OVER LINEWEIGHTS.
F. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS
REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.
G. UTILITIES THAT REMAIN, WITHIN WALLS BEING DEMOLISHED, SHALL BE REROUTED AS REQUIRED TO FACILITATE
THE NEW PLAN CONFIGURATION.
H. AT PENETRATIONS, ALL UTILITY SYSTEM AND OTHER COMPONENTS THAT ARE SCHEDULED FOR DISCONNECTION SHALL BE REMOVED IN THEIR ENTIRETY. ANY FIRE RESISTIVE MEMBER OR THROUGH PENETRATIONS RESULTING FROM SUCH DEMOLITION WORK SHALL BE FIRESTOPPED OR SEALED IN ACCORDANCE WITH NFPA FOR THE
NECESSARY RATING PROTECTIONS.
S-5
S-6
P-4
P-3
P-2
P-1
CORRIDOR
STORAGE
A-366
CORRIDOR
SPECIMEN EXAM
A-348a
CYTOLOGY
A-348b
HISTOLOGY
A-348
LAB OFFICE
A-348c
OFFICE
A-348e
DIS. PLAN OFFICE
A-354
H.A.C
A-351c
ELEVATOR LOBBY
A-351
TELE.
A-349
PIPE CHASE
A-348d
C E
IL
IN
G H
T . C
H A
N G
E
CORRIDOR
OFFICE
A-347
MLK
16' - 2" 19' - 10"
R E F L E C T E D C E I L I N G P L A N L E G E N D
1' x 4' FIXTURE.
2' x 4' FIXTURE.
EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED
2' x 2' FIXTURE.
DEMO LIGHT FIXTURE.
EXISTING EXHAUST DUCT (UP & DOWN)
EXISTING RETURN DUCT (UP & DOWN)
EXISTING SUPPLY DUCT (UP & DOWN)
LINEAR SLOT DIFFUSER
(REFER TO MEP DRAWINGS)
NEW SUPPLY DUCT (UP & DOWN)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E
L o u is v ill e
P a th o lo g y L a b
B tj .d u n n
.r v t
/1
/2
:3
:5
P
M
AD101
PARTIAL DEMOLITON REFLECTED
CEILING PLAN
08/19/2022 ET JF
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
D R A W I N G N O T E S
1 THIS AREA NOT IN CONTRACT. (NIC)
2 REMOVE CEILING TILE, CEILING DEVICES AND CEILING GRID.
3 EXISTING GRID AND CEILING TILES TO REMAIN.
4 EXISTING EMERGENCY SHOWER TO REMAIN.
5 REMOVE 24" X 48" CEILING TILES, CEILING GRID TO REMAIN. CEILING WORK TO BE PERFORMED IN PHASES IN THIS AREA
TO ALLOW FOR LAB TO REMAIN OPERATIONAL DURING CONSTRUCTION.
6 REMOVE LINEAR DIFFUSERS WHERE INDICATED. REFER TO MECHANICAL DRAWINGS.
7 MECHANICAL DEVICES TO REMAIN. REFER TO MECHANICAL DRAWINGS.
N 1/4" = 1'-0"
REFLECTED CEILING PLAN - DEMOLITION
BSL II
S-5
P-4
P-3
P-2
P-1
AE601
AE6012
HISTOLOGY
A-348
BIOSAFETY LAB
A-347
MLK
STORAGE
A-366
SPECIMEN EXAM
A-348a
CYTOLOGY
A-348b
LAB OFFICE
A-348c
OFFICE
A-348e
ELEVATOR LOBBY
A-351
TELE.
A-349 H.A.C
A-351c
DIS. PLAN OFFICE
A-354
PIPE CHASE
A-348d
CORRIDOR
CORRIDOR
4 5
16' - 2" 19' - 10"
5"
V.I.F
± 2' - 6"
10 V.I.F
± 4' - 2"
N
K E Y P L A N
NTS
G E N E R A L N O T E S
A. REFER TO SHEET GI000 FOR GENERAL NEW WORK NOTES.
B. REFER TO DEMOLITION DRAWINGS FOR WORK REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
C. PARTITION TYPES INDICATED ARE CONTINUOUS TO A CORNER OR AN INTERSECTING PARTITION, UNLESS INDICATED OTHERWISE. WHERE PARTITIONS OF DIFFERENT THICKNESSES MEET, CONFIRM ALIGNMENT WITH
PLANS.
D. ALL WALL HUNG CASEWORK MUST BE ANCHORED IN ACCORDANCE WITH VA STANDARD 05 500-02.
E. NEW CONSTRUCTION TO ALIGN WITH ADJACENT EXISTING CONSTRUCTION WHERE APPLICABLE. PREPARE
ALIGNED SURFACES TO RECEIVE NEW FINISHES.
F. SOUND ATTENUATION BATTS (SAB) ARE TO BE PLACED IN ALL PARTITIONS WHICH ENCLOSE A ROOM UNLESS
NOTED OTHERWISE.
F I R E / S M O K E R A T I N G L E G E N D
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR SMOKE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E
L o u is v ill e
P a th o lo g y L a b
B tj .d u n n
.r v t
/1
/2
:3
:0
P
M
AE100
PARTIAL THIRD FLOOR PLAN
08/19/2022 ET JF
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
N 1/4" = 1'-0"
PARTIAL THIRD FLOOR PLAN - NEW WORK
D R A W I N G N O T E S
1 EQUIPMENT (VC) OWNER FURNISHED CONTRACTOR INSTALLED - SEE EQUIPMENT/FINISH PLAN ON AE601
2 INSTALL NEW DOOR - SEE DOOR SCHEDULE ON AE601
3 THIS AREA NOT IN CONTRACT. (NIC)
4 EXISTING FLOORING FINISH TO REMAIN IN THIS ROOM.
5 EXISTING WALL FINISH TO REMAIN IN THIS ROOM.
6 INSTALL METAL BASE AND WALL CABINETS AND ALL RELATED SUPPORTS AND FIRE RATED BLOCKING. REFER TO
SECTIONS AND ELEVATIONS.
7 PROVIDE AND INSTALL CHEMICAL RESISTANT EPOXY RESIN COUNTERTOP WITH BACKSPLASH AND INTEGRAL SINK. 1"
OVERHANG BEYOND FRONT AND SIDE FACES OF CABINET PRODUCT .
8 INSTALL NEW SHEET VINYL FLOORING WITH VINYL BASE.
9 NEW DOUBLE STUD JAMB WITH 5/8" TYPE X GYPSUM BOARD ON BOTH SIDES OF WALL. ALIGN WITH ADJACENT
CONSTRUCTION.
10 WALL AND BASE CABINET FILLER SHALL COVER EXISTING UTILITY CHASE; COUNTERTOP SHALL BE CUT TO FIT AROUND
CHASE. BACKSPLASH TO WRAP CHASE.
R E F L E C T E D C E I L I N G P L A N L E G E N D
1' x 4' FIXTURE.
2' x 4' FIXTURE.
EXIT SIGN WITH DIRECTIONAL ARROWS AS INDICATED
2' x 2' FIXTURE.
DEMO LIGHT FIXTURE.
EXISTING EXHAUST DUCT (UP & DOWN)
EXISTING RETURN DUCT (UP & DOWN)
EXISTING SUPPLY DUCT (UP & DOWN)
LINEAR SLOT DIFFUSER
(REFER TO MEP DRAWINGS)
NEW SUPPLY DUCT (UP & DOWN)
N
K E Y P L A N
NTS
L
S-5
P-4
P-3
P-2
P-1
STORAGE
A-366
BIOSAFETY LAB
A-347
SPECIMEN EXAM
A-348a
LAB OFFICE
A-348c
OFFICE
A-348e
ELEVATOR LOBBY
A-351
TELE.
A-349
CORRIDOR
H.A.C
A-351c
DIS. PLAN OFFICE
A-354
CORRIDOR
HISTOLOGY
A-348
PIPE CHASE
A-348d
CYTOLOGY
A-348b
CORRIDOR
MLK
16' - 2" 19' - 10"
8' - 1"
8' - 1"
8' - 1"
G E N E R A L C E I L I N G N O T E S
A. REFER TO CEILING PLAN AND FINISH LEGEND FOR CEILING FINISH INFORMATION
B. REFER TO MECHANICAL DRAWINGS FOR QUANTITY AND TYPE OF DIFFUSERS, RETURN AIR GRILLES, AND
EXHAUST GRILLES. SCRIBE CEILING MATERIALS CAREFULLY FOR A TIGHT FIT.
C. REFER TO ELECTRICAL DRAWINGS FOR QUANTITY AND TYPES OF LIGHTS, SPEAKERS, DETECTORS, POWER
OUTLETS, ETC.
D. VERIFY CEILING HEIGHTS WITH STRUCTURE AND DUCTWORK.
E. REFER TO FINISH LEGEND FOR CEILING TYPES.
F. ALL LAY-IN CEILING GRID MUST BE CENTERED IN ROOM UNLESS OTHERWISE NOTED. AVOID CUT SIZES SMALLER
THAN 6". SCRIBE CEILING MATERIALS FOR A TIGHT FIT.
G. CENTER SPRINKLER HEADS WITHIN CEILING TILES. COORDINATE WITH OTHER CEILING MOUNTED ACCESSORIES.
H. ALL VERTICAL FACES OF SOFFITS OR BULKHEADS SHALL BE FINISHED TO MATCH ADJACENT SURFACES.
F I R E / S M O K E R A T I N G L E G E N D
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR SMOKE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E
L o u is v ill e
P a th o lo g y L a b
B tj .d u n n
.r v t
/1
/2
:3
:5
P
M
AC141
PARTIAL THIRD FLOOR
REFLECTED CEILING PLAN
08/19/2022 ET JF
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
D R A W I N G N O T E S
1 24" X 24" SOIL-RESISTANT FILM FACED CEILING TILE PRODUCT WITH GASKETED CEILING GRID.
2 REPLACE EXISTING CEILING TILES WITH 24" X 24" SOIL-RESISTANT FILM FACED CEILING TILE, SEE SPECS FOR BASIS OF DESIGN. EXISTING GRID TO REMAIN. PROVIDE INTERMEDIATE METAL GRID PIECES TO EXISTING 2’-0” X 4’-0” METAL GRID TO ACCOMMODATE 2’-0” X 2’-0” ACOUSTICAL TILES AND CEILING DEVICES. CLEAN AND/OR PAINT EXISTING METAL GRID TO MATCH NEW INTERMEDIATE GRID PIECES. CEILING WORK TO BE PERFORMED IN PHASES IN THIS AREA TO ALLOW
FOR LAB TO REMAIN OPERATIONAL DURING CONSTRUCTION.
3 THIS AREA NOT IN CONTRACT. (NIC)
4 EXISTING GRID AND CEILING TILES TO REMAIN.
5 COORDINATE TILE PENETRATION WITH EXISTING EMERGENCY SHOWER PIPING AND EXISTING EMERGENCY EXIT
SIGNAGE/LIGHTING.
N 1/4" = 1'-0"
PARTIAL THIRD FLOOR REFLECTED CEILING PLAN
P-1
ER-1
SLOPING METAL TOP
METAL CABINETS
TOP, BACK & ENDS
EXISTING UTILITY CHASE
METAL CABINETS
TOP, BACK & ENDS
2' - 6" 2' - 6" 3' - 0"
2' - 6" 2' - 6" 3' - 0"
FILLER PANEL
FILLER PANEL
" 1' - 1"
V .I .F
5'
0"
T O
F
IN
IS
H
E D
F
LO
O R
SLOPING METAL TOP
METAL CABINETS
(TOP, BACK & ENDS)
ANCHORAGE PER VA
STD. DETAIL 05 50 00-02
SEE DETAIL 6/AE601
EPOXY RESIN COUNTERTOP
AND BACKSPLASH WITH
INTEGRAL EPOXY RESIN
SINK AND SPILL
CONTAINMENT LIP.
ER-1
METAL CABINETS
(TOP, BACK & ENDS)
4"
AE601
AE6012
VENTANA
HE 600
VENTANA
HE 600
U P
S U
P S
NO WORK
NO WORK
BSL II
NO WORK
S-5
P-4
P-3
P-2
P-1
MLK
HISTOLOGY
A-348
CYTOLOGY
A-348b
SPECIMEN EXAM
A-348a
BIOSAFETY LAB
A-347
LAB OFFICE
A-348c
OFFICE
A-348e
PIPE CHASE
A-348d
16' - 2" 19' - 10"
WSF-1
ER-1
P-2
P-1
P-1
P-2
P-1
P-1
P-1
P-1
N
K E Y P L A N
NTS
F I R E / S M O K E R A T I N G L E G E N D
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR SMOKE BARRIER
G E N E R A L N O T E S
A. REFER TO SHEET GI000 FOR GENERAL NEW WORK NOTES.
B. REFER TO DEMOLITION DRAWINGS FOR WORK REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE
ACCORDINGLY.
C. PARTITION TYPES INDICATED ARE CONTINUOUS TO A CORNER OR AN INTERSECTING PARTITION, UNLESS INDICATED OTHERWISE. WHERE PARTITIONS OF DIFFERENT THICKNESSES MEET, CONFIRM ALIGNMENT WITH
PLANS.
D. ALL WALL HUNG CASEWORK MUST BE ANCHORED IN ACCORDANCE WITH VA STANDARD 05 500-02.
E. NEW CONSTRUCTION TO ALIGN WITH ADJACENT EXISTING CONSTRUCTION WHERE APPLICABLE. PREPARE
ALIGNED SURFACES TO RECEIVE NEW FINISHES.
F. SOUND ATTENUATION BATTS (SAB) ARE TO BE PLACED IN ALL PARTITIONS WHICH ENCLOSE A ROOM UNLESS
NOTED OTHERWISE.
F
S E
E S
C H
E D
U L E
SEE SCHEDULE
9"
100 IN² MAX.,
TAMPERED GLAZING
TYPE 1
SEE SCHEDULE
S E
E S
C H
E D
U L E
2" 2"
F I N I S H L E G E N D
MARK DESCRIPTION BASIS OF DESIGN STYLE/ COLOR COMMENTS
ACT-1 2X2 ACOUSTICAL CEILING TILE
ARMSTRONG,
CLEAN ROOM FL
WHITE, SQUARE LAY-IN, 2'x2'x3/4"
GWB GYPSUM WALL BOARD TYPE X - -
P-1 PAINT GLIDDEN 9300-0110 / MANUSCRIPT FINISH: EGG SHELL
WSF-1 WELDED SHEET VINYL FLOORING ARMSTRONG MEDINTECH/ COLOR TBD
DIAMOND 10 TECHNOLOGY;
INTEGRAL BASE - 6"
ER-1 EPOXY RESIN TRESPA BLACK COUNTER TOP
-P-2 PAINT GLIDDEN 9200-0300 / CAMEL TAN
FINISH: FLAT
HOLLOW METAL FRAMES; CAULK AT PERIMETER
1 15/16" VARIES VARIES
5/8" DRYWALL
DOUBLE STUDS
BACK TO BACK
CONTINUOUS
SEALANT BOTH SIDES
STANDARD FRAME FOR
DRYWALL
JAMB ANCHORS
/4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\d u n n t\ D o c u m e n ts
\R e v it \2
\F F
E
L o u is v ill e
P a th o lo g y L a b
B tj .d u n n
.r v t
/1
/2
:3
:0
P
M
AE601
CASEWORK DETAILS, DOOR AND
FINISH SCHEDULES
08/19/2022 ET JF
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
1/2" = 1'-0"
CASEWORK ELEVATION
1/2" = 1'-0"
CASEWORK SECTION
N 1/4" = 1'-0"
PARTIAL THIRD FLOOR EQUIPMENT AND FINISH PLAN
D R A W I N G N O T E S
1 BIO-SAFETY CABINET, CLASS II - (VC) OWNER FURNISHED CONTRACTOR INSTALLED
2 ME-200 GROSSING STATION - (VC) OWNER FURNISHED CONTRACTOR INSTALLED
3 EXISTING EQUIPMENT TO REMAIN - PROTECT DURING ALL PHASES OF CONSTRUCTION.
4 TRANSITION STRIP BETWEEN DIFFERENT FLOORING FINISHES
GROUND FLOOR ROOM FINISH SCHEDULE
ROOM NAME ROOM NUMBER FLOOR FINISH BASE FINISH
WALL FINISH
Ceiling FinishN S E W
BIOSAFETY LAB A-347 WSF-1 INTEGRAL TO
WSF-1
P-1/P-2 P-1/P-2 P-1/P-2 P-1/P-2 ACT-1
HISTOLOGY A-348 - - - - - - ACT-1
SPECIMEN EXAM A-348a -- - P-1/P-2 (AREA OF
NEW WORK)
- - P-1 (AREA OF
NEW WORK)
DOOR SCHEDULE
DOOR #
PANEL FRAME DETAILS
HARDWARE# DOOR TYPE MATERIAL
DIMENSION
TYPE MATERIAL HEAD JAMBW H T
03-Third Floor
347 F HW 0' - 1 3/4" 1 HM 4/AE601 4/AE601 HW-1A
DOOR ELEVATIONS FRAME ELEVATIONS
1 3' - 6" 7' - 0"
3" = 1'-0"
HEAD/JAMB DETAIL - HM FRAME
NTS
VA STANDARD 05 50 00-02 - ANCHORAGE FOR CABINETS
MLK
SPECIMEN EXAM
A-348a
BIOSAFETY LAB
A-347
CORRIDOR
HISTOLOGY
A-348
CYTOLOGY
A-348b
HISTOLOGY
A-348
ELEVATOR
S2
ELEVATOR
S3
ELEVATOR
S1
LAB OFFICE
A-348c
OFFICE
A-348e
ELEVATOR LOBBY
A-351
F I R E H A Z A R D C L A S S I F I C A T I O N :
ORDINARY HAZARD I
ML
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
ORDINARY HAZARD
GROUP I
0.15 GPM/SF OVER 1500
SF
250 GPM 60 MIN QR; K = 5.6 OR K = 8.0 BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER 130 SF
A. PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS IN ACCORDANCE WITH NFPA 13 AND VA FIRE
PROTECTION MANUAL. THE AREA RENOVATED IS CURRENTLY PROTECTED WITH AUTOMATIC FIRE
SPRINKLERS. REWORK SPRINKLER HEADS AND PIPING AS NECESSARY TO ACCOMMODATE NEW FLOOR PLAN.
B. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE ATTENTION OF THE COR IN
WRITING ANY DISCREPANCIES THAT MAY IMPACT THE PROGRESS OF WORK.
C. INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS, PIPING, AND PLATFORMS WHEN SUCH EQUIPMENT
CAN NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER DISCHARGE PATTERN AND COVERAGE.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATE INTERFERENCE WITH OTHER CONSTRUCTION.
E. PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC CALCULATION.
F. COMPLETELY COORDINATE WITH STRUCTURAL, ARCHITECTURAL, AND ALL OTHER TRADES. EQUIPMENT, SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO CONVEY DESIGN INTENT AND DOES NOT DICTATE
THE MEANS AND METHODS OF IMPLEMETATION. ADHERE TO ALL HAZARD CLASSIFICATIONS SHOWN.
G. REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR FIRE RATED WALLS, SMOKE PARTITIONS, AND
FIRE EXTINGUISHER CABINETS.
H. CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND SUBMIT RESULTS AND SPRINKLER DESIGN.
G E N E R A L N O T E S :
GPM GALLONS PER MINUTE
MIN MINUTES
QR QUICK RESPONSE
SF SQUARE FEET
A B B R E V I A T I O N S :
N KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\g jp e a \D o c u m e n ts
\F F
E
L o u is v ill e
P a th o lo g y L a b
B
M
E P g re g
.p e a rs o n ff e -s e rv
.c o m
.r v t
/1
/2
:1
:1
P
M
FX101
THIRD FLOOR FIRE SUPPRESSION
PLAN
08/19/2022 PP GP
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
FIRE SUPPRESSION THIRD FLOOR PLAN
No. Revisions: Date:
08/19/2022
MLK
SPECIMEN EXAM
A-348a
BIOSAFETY LAB
A-347
CORRIDOR
HISTOLOGY
A-348
CYTOLOGY
A-348b
HISTOLOGY
A-348
ELEVATOR
S2
ELEVATOR
S3
ELEVATOR
S1
LAB OFFICE
A-348c
OFFICE
A-348e
ELEVATOR LOBBY
A-351
(E) P-530
(E) P-530
(E) P-414
(E) P-708
ML
(E) P-528
(E) P-501
PL101
MLK
SPECIMEN EXAM
A-348a
BIOSAFETY LAB
A-347
CORRIDOR
HISTOLOGY
A-348
CYTOLOGY
A-348b
HISTOLOGY
A-348
ELEVATOR
S2
ELEVATOR
S3
ELEVATOR
S1
LAB OFFICE
A-348c
OFFICE
A-348e
ELEVATOR LOBBY
A-351
1(E) P-530
(E) P-414
(E) P-530
(E) P-708
ML
(E) P-528
(E) P-501
PL101
A. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE ATTENTION OF THE COR IN
WRITING ANY DISCREPANCIES THAT MAY IMPACT THE PROGRESS OF WORK.
G E N E R A L N O T E S :
(E) EXISTING TO REMAIN
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
LA LABORATORY AIR
LV LABORATORY VACUUM
SAN SANITARY
V VENT
A B B R E V I A T I O N S :
N KEY PLAN
K
(E) 1/2" LA (E) 1/2" LV
(E) 1 1/2" SAN DN
SPECIMEN EXAM
A-348a
K
(E) 1 1/2" SAN DN
SPECIMEN EXAM
A-348a
1/2" LA
1/2" LV (E) 1/2" LA
(E) 1/2" LV
(E) 1 1/2" SAN
(E) 1 1/2" V
THIRD
FLOOR 1 1/2" SAN ROUGH-IN FOR
NEW GROSSING STATION
1 1/2" V
1 1/2" SAN
NEW SINK
1/2" DCW
1/2" DHW
(E) 1/2" DCW
(E) 1/2" DHW
NEW SINK
1/2" BALL VALVE
1/2" DCW & 1/2" DHW ROUGH-INS
FOR NEW GROSSING STATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\g jp e a \D o c u m e n ts
\F F
E
L o u is v ill e
P a th o lo g y L a b
B
M
E P g re g
.p e a rs o n ff e -s e rv
.c o m
.r v t
/1
/2
:1
:1
P
M
PL101
THIRD FLOOR PLUMBING PLANS
08/19/2022 PP GP
RENOVATE PATHOLOGY LAB 603-22-602
LOUISVILLE, KY
BID DOCUMENTS FOR
CONSTRUCTION 1
ROBLEY REX VA
MEDICAL
CENTER Approved: Owner
1/8" = 1'-0"
PLUMBING THIRD FLOOR NEW WORK PLAN
1/8" = 1'-0"
PLUMBING THIRD FLOOR DEMOLITION PLAN
D R A W I N G N O T E S :
1 PLUMBING FIXTURE TO REMAIN.
2 REMOVE LAB GAS OUTLET AND ASSOCIATED PIPING. CAP LAB AIR AND LAB VACUUM PIPING AT POINTS SHOWN ABOVE
CEILING. POINTS OF REMOVAL TO BE POINTS OF CONNECTION FOR NEW LAB GAS OUTLETS.
3 REMOVE SINK AND ASSOCIATED PIPING. CAP SANITARY PIPING ABOVE FLOOR AND VENT AND DOMESTIC HOT AND COLD WATER PIPING IN WALL. POINTS OF REMOVAL TO BE POINTS OF CONNECTION FOR NEW PIPING.
4 CONNECT DCW, DHW, SANITARY, AND VENT PIPING TO EXISTING AT POINTS SHOWN.
5 CONNECT LABORATORY VACUUM AND AIR PIPING TO EXISTING AT POINTS SHOWN.
6 NEW SINK. BOWL INTEGRAL TO COUNTERTOP. REFER TO SPECIFICATION 12 36 00 COUNTERTOPS FOR INFORMATION ON SINK BOWL, FAUCET, DRAIN, AND TRAP. INSTALL POINT OF USE THERMOSTATIC MIXING VALVE TO LIMIT HOT WATER
OUTLET TEMPERATURE TO 110 DEGREES F.
7 NEW LAB GAS OUTLET. CONNECT LAB AIR AND LAB VACUUM PIPING TO EXISTING AT POINTS OF REMOVAL. REFER TO
SPECIFICATION 12 36 00 COUNTERTOPS FOR INFORMATION ON LAB GAS OUTLETS.
8 NEW GROSSING STATION PROVIDED BY VA. PROVIDE 1/2" DCW, 1/2" DHW, AND 1 1/2" SANITARY PIPING ROUGH-IN
CONNECTIONS. INSTALL BALL VALVES FOR DOMESTIC WATER PIPING.
1/4" = 1'-0"
PLUMBING THIRD FLOOR DEMOLITION ENLARGED PLAN
1/4" = 1'-0"
PLUMBING THIRD FLOOR NEW WORK ENLARGED PLAN
NTS
SANITARY & VENT ISOMETRIC
NTS
DOMESTIC WATER ISOMETRIC
No. Revisions: Date:
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
ACD AUTOMATIC CONTROL DAMPER, MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BG BOTTOM GRILLE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
CR CEILING REGISTER
CS CONDENSATE STORAGE TANK
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPERATURE
EX EXISTING
ABBREVIATIONS
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HOOD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
J INTENTIALLY LEFT BLANK
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
kPa KILOPASCAL
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW…