Addendum 1 Drawings.pdf

PDF 2 MB Posted

Attached to
Z1DB--603-23-1-2311-0001 - 603-22-602 - Renovate Pathology (VA-23-00009816)
Solicitation number
36C24922R0104
Issued by

About this file

This is a solicitation for a construction project to renovate a pathology laboratory at the Louisville VA Medical Center. The project scope involves renovating laboratory spaces including demolishing walls, installing new casework and finishes, and upgrading mechanical and plumbing systems. The estimated value is between $250,000 to $500,000. The solicitation is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The deadline for proposals is November 21, 2022. Interested contractors must submit pricing and required forms including representations and certifications, and bid and performance bonds may be required depending on final award value. The selected contractor will be required to comply with VA regulations including conducting background checks for employees, taking privacy training, and reporting on veteran hiring.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

H

C O

T

R A M

P

COMPACT

COMPACT

STORAGE

SHED

T1

T3

T20

T22 T27

PROJECT LOCATION

ROBLEY REX VA MEDICAL CENTER

PROJECT NUMBER: 603-22-602

DEPARTMENT OF VETERANS AFFAIRS

800 ZORN AVE, LOUISVILLE, KY 40206

RENOVATE PATHOLOGY LAB

D R A W I N G L I S T

G E N E R A L N O T E S

A. THE CONTRACT DRAWINGS AND SPECIFICATIONS (INDICATED BY THE SAME PROJECT NUMBER) ARE COMPLEMENTARY. THE CONTRACTOR SHALL NOTIFY THE C.O.R. OF ANY DISCREPANCIES FOUND DURING BIDDING AND THROUGH CONSTRUCTION.

B. DO NOT SCALE DRAWINGS; DIMENSIONS SHALL GOVERN.

C. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE CONTRACTING OFFICER

REPRESENTATIVE (COR).

D. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND

CONSTRUCTION.

E. THE CONTRACTOR SHALL MAINTAIN ACCESSIBLE EGRESS FOR THE DURATION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST

BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.

F. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF CONSTRUCTION ACTIVITIES. THE CONTRACTING OFFICER REPRESENTATIVE RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED

SPACES.

G. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE’D TO ACHIEVE

THE REQUIRED FIRE RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.

H. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND FEDERAL AUTHORITIES, RULES AND REGULATIONS.

I. THESE DOCUMENTS SHOW DESIGN INTENT WITH MINIMUM CONSTRUCTION REQUIREMENTS AND MINIMUM QUALITY OF WORK EXPECTED. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION

AND EXPECTED QUALITY.

J. ALL MATERIALS UTILIZED ON THIS PROJECT SHALL BE NEW UNLESS OTHERWISE NOTED TO BE SALVAGED AND REFURBISHED.

MATERIAL QUALITY SHALL MEET OR EXCEED APPLICABLE INDUSTRY STANDARDS.

K. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.

L. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER AND CONTRACTING OFFICER

REPRESENTATIVE PRIOR TO CONSTRUCTION.

M. WHERE EXISTING SURFACES ARE TO BE RE-FINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OF NEW CONSTRUCTION, PREPARE EXISTING SURFACES AS NECESSARY TO RECEIVE THE NEW MATERIALS FOR A LEVEL AND SMOOTH

FINISH.

N. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES APPARATUSES IMPACTING NEW CONSTRUCTION. DETERMINE EXACT SIZE AND LOCATION OF PENETRATION WITHIN NEW CONSTRUCTION, TIGHTLY SEAL AND CAULK.

O. GENERAL CONTRACTOR SHALL HOST SUBMITTAL EXCHANGE SOFTWARE FOR THE DURATION OF THE PROJECT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\J o s h u a

\D o c u m e n ts \R e v it L o c a l F ile s \2

\F F

E

L o u is v ill e

P a th o lo g y L a b

B jo s h u a .f is h e rS

G E

R

.r v t

/2 /2

:2

:5

P M

GI000

COVER SHEET

08/19/2022 ET JF

RENOVATE PATHOLOGY LAB 603-22-602

LOUISVILLE, KY

BID DOCUMENTS FOR

CONSTRUCTION 1

ROBLEY REX VA

MEDICAL

CENTER Approved: Owner

NTS

VICINITY MAP

NTS

CAMPUS MAP

GENERAL

GI000 COVER SHEET

GI001 ABBREVIATIONS AND GENERAL DETAILS

GI002 THIRD FLOOR LIFE SAFETY PLAN

GI003 ICRA PLAN AND NOTES

ARCHITECTURE

AD100 PARTIAL THIRD FLOOR DEMOLITION PLAN

AD101 PARTIAL DEMOLITON REFLECTED CEILING PLAN

AE100 PARTIAL THIRD FLOOR PLAN

AC141 PARTIAL THIRD FLOOR REFLECTED CEILING PLAN

AE601 CASEWORK DETAILS, DOOR AND FINISH SCHEDULES

FIRE PROTECTION

FX101 THIRD FLOOR FIRE SUPPRESSION PLAN

PLUMBING

PL101 THIRD FLOOR PLUMBING PLANS

MECHANICAL

M001 MECHANICAL LEGEND

MD101 THIRD FLOOR DEMOLITION MECHANICAL PLAN

MH101 THIRD FLOOR NEW WORK MECHANICAL PLAN

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES AND CONTROLS

ELECTRICAL

E001 ELECTRICAL LEGEND

ED100 THIRD FLOOR ELECTRICAL DEMOLITION PLANS

EP100 THIRD FLOOR ELECTRICAL POWER AND TECHNOLOGY PLAN

EL100 THIRD FLOOR ELECTRICAL LIGHTING PLAN

N N

No. Revisions: Date:

BID DOCUMENTS FOR CONSTRUCTION 08/19/2022

1 ADDENDUM 1 11/29/2022

DUE TO THE LOCATION OF RENOVATION WORK INDICATED (VAMC PATHOLOGY) CONSTRUCTION IS WITHIN THE

INFECTION RISK CATEGORY FOUR (4) .

THE INFECTION AND DUST CONTROL PLANS SHALL BE DISTRIBUTED AND APPLIED BY

ALL CONTRACTORS PERFORMING WORK ON THIS PROJECT.

A. REFER TO PHASING PLANS AND SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS FOR

ADDITIONAL INFECTION CONTROL INFORMATION.

B. COORDINATE ALL WORK ASSOCIATED WITH PROJECT FOLLOWING THE SITE-SPECIFIC INFECTION

CONTROL RISK ASSESSMENT PUBLISHED BY THE ROBLEY REX VAMC.

C. AREAS ADJACENT TO IMMEDIATE (PHASED) WORK AREAS WILL BE FULLY OCCUPIED AND FUNCTIONING

NORMALLY THROUGHOUT THE CONSTRUCTION PERIOD.

D. THERE WILL BE ZERO TOLERANCE FOR ANY DUST MIGRATION OUTSIDE OF THE IMMEDIATE WORK SITE

AREAS IDENTIFIED BY PHASING PLANS.

E. ALL WORK OCCURRING WITHIN THE SURGERY DEPARTMENT MUST BE PERFORMED OUTSIDE OF

NORMAL VAMC WORKING HOURS.

F. CONTRACTOR SHALL PROVIDE FOR PROFESSIONAL TERMINAL CLEANING OF PHASED WORK AREAS

PRIOR TO TURNING OVER TO THE VAMC FOR OCCUPANCY.

G. EXTERIOR DEMOLITION ACTIVITIES (INCLUDES CUTTING AND PATCHING):

a. EVALUATE EXISTING SITE CONDITIONS TO DETERMINE THE PRESENCE OF ANY OUTSIDE AIR

INTAKES WITHIN 20' OF THE PROPOSED EXTERIOR WORK.

b. IF PRESENT - DETERMINE IF THE IMPACTED EXTERIOR AREAS OF THE FACILITY CAN OPERATE

TEMPORARILY ON RECIRCULATED AIR VS. OUTSIDE AIR.

• IF FEASIBLE - SEAL OFF AIR INTAKES WITHIN 20' OF DUST GENERATING WORK.

• IF NOT FEASIBLE - ROUTINELY CHECK THE LOW-EFFICIENCY FILTER BANKS LOCATED IN

LINE WITH ADJACENT AIR INTAKE(S) AND REPLACE AS NEEDED TO REDUCE PARTICULATE

BUILD-UP.

c. SEAL WINDOWS AND REDUCE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN

STAIRWELLS AND CORRIDORS) THAT MAY BE IMPACTED BY CONSTRUCTION. PAY SPECIAL

ATTENTION TO PROTECTIVE ENVIRONMENT (PE) AREAS.

H. INTERIOR DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL:

a. BARRIER SYSTEMS: PHASED AREAS OF WORK SHALL BE ISOLATED FROM ADJACENT AREAS WITH

1 -HR. RATED DUST PARTITIONS.

b. DUST PARTITIONS TO BE METAL FRAMED WITH GYPSUM WALL BOARD ON EACH SIDE. PARTITION

TO BE CONSTRUCTED EQUAL TO UL DESIGN U465.

• IN LIEU OF SITE BUILT DUST PARTITIONS, CONTRACTOR MAY UTILIZE PRE-ENGINEERED

(MODULAR) TEMPORARY CONSTRUCTION PARTITIONS LIKE THOSE MANUFACTURED BY

EDGE GUARD PRODUCTS, 216 N. PLATT ST., BEMENT, IL 61813, TELE 217-552-5418,

WEBSITE: WWW.EDGE-GUARD.COM OR APPROVED EQUAL.

c. DUST PARTITIONS SHALL BE INSTALLED WITH A TIGHT SEAL AT FLOOR AND CEILING OR

STRUCTURE ABOVE CEILING. WHERE OPERATING ROOM DEMISING WALLS ARE SHOWN TO BE

EXTENDED UP TO STRUCTURE ABOVE - PROVIDE AIR TIGHT SEAL AT BOTH TOP OF EXISTING

DEMISING WALL (TO BE EXTENDED) AND AT STRUCTURE ABOVE.

• WHERE O.R. DEMISING WALL EXTENSIONS IMPACT EXISTING FIRE PROOFED STEEL

STRUCTURE - CONTRACTOR SHALL CAREFULLY REMOVE THE FIREPROOFING (ONLY) IN

AREA WHERE TOP WALL PLATE MEETS EXISTING STEEL. PATCH ANY FIREPROOFING

DISTURBED BY CONSTRUCTION ACTIVITIES WITH NEW FIRE PROOFING MATCHING

EXISTING SYSTEM.

• AN INTERIM PLASTIC DUST BARRIER (MINIMUM 6-MIL THICKNESS) SHALL BE INSTALLED TO

PROTECT ADJACENT AREAS WHILE THE IMPERVIOUS (1-HR. RATED) DUST PARTITION IS

BEING CONSTRUCTED.

d. ANY DUST GENERATED FROM DEMOLITION OR CONSTRUCTION ACTIVITIES SHALL BE

IMMEDIATELY CLEANED IF TRACKED OR FOUND OUTSIDE OF THE CONSTRUCTION PHASE

PERIMETER.

e. CONTRACTOR PERSONNEL SHALL MONITOR DUST PARTITION CONDITION AND PERFORM

MAINTENANCE - DURING PHASED DEMOLITION AND CONSTRUCTION ACTIVITIES.

f. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, DUST PARTITIONS SHALL BE CAREFULLY

REMOVED TO MINIMIZE THE SPREAD OF DUST.

• CONTRACTOR SHALL INSTALL INTERIM PLASTIC DUST BARRIERS (MINIMUM 6-MIL

THICKNESS) PRIOR TO THE REMOVAL OF DUST PARTITIONS.

g. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY PARTITION LAYOUT. LAYOUT SHALL

NOT INTERFERE WITH HOSPITAL OPERATION.

I. TRAFFIC CONTROL:

a. PHASED SITE ACCESS SHALL HAVE DEFINED ENTRY AND EXIT PROCEDURES. EGRESS PATHS

AND BE FREE OF DEBRIS, TOOLS, EQUIPMENT, OR CONTAINERS.

b. DESIGNATED ELEVATORS SHALL ONLY BE USED DURING SCHEDULED TIME PERIODS AND ONLY

AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE.

COORDINATE ELEVATOR ACCESS WITH THE VAMC THROUGH THE COR.

c. INSTALL SIGNAGE TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREAS.

J. DEMOLITION DEBRIS:

a. ALL DEBRIS GENERATED BY PROJECT SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTING COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE THE USE

OF ELEVATORS SHARED BY PATIENTS OR STAFF. PERFORM TRANSPORT OF DEBRIS AT TIMES

DIRECTED BY THE VAMC THROUGH THE COR. IF EXTERIOR TRASH CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED AND THE CHUTE OPENING SEALED WHEN NOT IN USE. USED FILTERS SHALL BE

BAGGED AND SEALED BEFORE TRANSPORTING OUT OF THE CONSTRUCTION AREA. THE

CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE VAMC.

K. VENTILATION AND ENVIRONMENTAL CONTROLS:

a. AIR SYSTEM FLOW: DETERMINE IF CONSTRUCTION AREA USES FRESH/OUTSIDE OR

RECIRCULATED AIR. ADD FILTERS AND/OR COVER RETURN GRILLS WITH FILTER MATERIAL OR

PLASTIC. AIR MUST (ONLY) FLOW IN THE DIRECTION OF CLEAN AREAS TO DIRTY AREAS.

b. NEGATIVE AIR PRESSURE: AIR WITHIN THE CONSTRUCTION AREAS (PHASES) MUST BE

MAINTAINED AT NEGATIVE PRESSURE WITH RESPECT TO SURROUNDING AREAS. NO DISRUPTION

OF AIR SYSTEMS OF ADJACENT AREAS IS ALLOWED DURING PERIODS OF VAMC OCCUPANCY OF

ADJACENT AREAS. THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSED PHASES SHALL

EXHAUST DIRECTLY OUTSIDE.

• DUST PARTITIONS SHALL BE OUTFITTED WITH CONTINUOUS AIR PRESSURE MONITORING

DEVICES WITH 24/7 READ OUT AND LOGGING. BASIS OF DESIGN FOR AIR PRESSURE

MONITORING DEVICE IS PHOENIX CONTROLS APM II, OR EQUAL.

L. WORKSITE CLOTHING AND CLEANING:

a. CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE

ENTERING OR LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.

COVERALLS, FOOTGEAR, AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO

REMOVE DUST FROM CLOTHING BEFORE LEAVING THE PHASED CONSTRUCTION AREA. IF

PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE AS AN

ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT.

b. ALL EQUIPMENT, TOOLS, CARS, MATERIALS, ETC. TRANSPORTED THROUGH NORMALLY

OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET

MOPPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

c. THE CONSTRUCTION ZONE MUST BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS.

SWEEP OR HEPA-VACUUM CONSTRUCTION AREA DAILY - OR MORE FREQUENTLY AS NEEDED TO

MINIMIZE DUST. ADJACENT AREAS IMPACTED BY CONSTRUCTION SHOULD BE DAMP MOPPED

DAILY OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE

SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING OF DIRT AND DUST FROM

CONSTRUCTION AREAS.

GENERAL INFECTION AND DUST CONTROL NOTES

INFECTION AND DUST CONTROL PLAN LEGEND

DUST MAT (2'-0" X 3'-0")

AREA NOT IN CONTRACT

AREA IN DIFFERENT PHASE

PROVIDE TEMPORARY INFECTION CONTROL / DUST CONTROL

BARRIERS AT THIS LOCATION. REMOVE AFTER CONSTRUCTION

IS COMPLETED PER PHASE INDICATED.

TEMPORARY PLASTIC SHEETING ACCORDING TO ICRA REQUIREMENTS.

ROOM ELEVATION

POST ICRA, ILSM, FIRE

INSPECTION SHEETS VISIBLE

TO PUBLIC

SUSPENDED PLASTIC ZIPPER WALL

CURTAIN BARRIER

A P

P R

O X

A

.F .F

INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY

DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,

ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-

FILTER.

INDICATOR (REFER TO PLAN

& ELEVATION)

CONTACT INFO

CONST. SUPERVISOR

NAME AND CELL

PHONE

CHILLER PLANT AFTER HOURS

CONTACT PHONE NUMBER FIRE

EMERGENCY DIAL 911

COMING SOON!!!

- DESCRIPTION OF NEWLY PROPOSED OCCUPANCY -

PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES

AND PROPER I.D.

THIS IS A

RESTRICTED AREA

AREA UNDER CONSTRUCTION

PAPER CADDY

ICRA, ILSM, FIRE WATCH,

MISC. FORMS

FRAMED COPY OF C.O.R.

CERTIFICATION

M

LK

HISTOLOGY

A-348

BIOSAFETY LAB

A-347

SPECIMEN EXAM

A-348a

CYTOLOGY

A-348b

LAB OFFICE

A-348c

OFFICE

A-348e

ELEVATOR LOBBY

A-351

CORRIDOR

PIPE CHASE

A-348d

4' - 10 1/2" 3' - 0"

N

K E Y P L A N

NTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\J o s h u a

\D o c u m e n ts \R e v it L o c a l F ile s \2

\F F

E

L o u is v ill e

P a th o lo g y L a b

B jo s h u a .f is h e rS

G E

R

.r v t

/2 /2

:3

:3

P M

GI003

ICRA PLAN AND NOTES

08/19/2022 Checker Author

RENOVATE PATHOLOGY LAB 603-22-602

LOUISVILLE, KY

BID DOCUMENTS FOR

CONSTRUCTION

ROBLEY REX VA

MEDICAL

CENTER Approved: Owner

D R A W I N G N O T E S

1 SEAL DOOR IN CLOSED POSITION DURING WORK ACTIVITIES.

2 CONTRACTOR TO VERIFY IF DEMISING WALL EXTENDS ABOVE CEILING TO STRUCTURE ABOVE WITH METAL FRAMING

AND GYPSUM BOARD. SEAL AS REQUIRED TO PREVENT AIR INFILTRATION. (TYPICAL)

3 EXTEND FLEXIBLE DUCT FROM HEPA CART TO EXTERIOR WINDOW IN ROOM. VERIFY SEALANT AT DUCT PENETRATIONS THROUGH TEMPORARY WALL CONSTRUCTION AND AT TEMPORARY WINDOW INFILL PANEL MEETS ICRA REQUIREMENTS

4 EXTEND WALL TO STRUCTURE AS NECESSARY TO MEET INFECTION AND DUST CONTROL REQUIREMENTS AS DEFINED IN

THE GENERAL ICRA NOTES.

5 AIR PRESSURE MONITOR LOCATION. NEGATIVE AIR PRESSURE REQUIRED DURING ALL INTERIOR CONSTRUCTION

ACTIVITIES. REFER TO ELEVATION ON GI002 FOR REQUIREMENTS

6 PROVIDE TEMPORARY ICRA RATED VESTIBULE AS NECESSARY TO MAINTAIN NEGATIVE PRESSURE IN SCOPE OF WORK.

7 DISASSEMBLE WINDOW AS NECESSARY FOR TEMPORARY VENT CONSTRUCTION. USE NON-POROUS MATERIAL TO INFILL

WINDOW FOR TEMPORARY CONSTRUCTION.

8 MAINTAIN OPEN DOOR DURING CONSTRUCTION.

9 MAINTAIN ACCESS TO THIS PORTION SPECIMEN EXAM ROOM DURING CONSTRUCTION.

10 PROVIDE TEMPORARY PLASTIC SHEETING AS NECESSARY FOR ICRA BARRIER INSTALLATION.

No. Revisions: Date:

1 ADDENDUM 1 11/29/2022

11/29/2022 eilee Snapshot

E

E

EE

VENTANA

HE 600

U P

S

S-5

P-4

P-3

P-2

P-1

STORAGE

A-366

SPECIMEN EXAM

A-348a CYTOLOGY

A-348b

LAB OFFICE

A-348c

OFFICE

A-348e

ELEVATOR LOBBY

A-351

TELE.

A-349

CORRIDOR

H.A.C

A-351c

DIS. PLAN OFFICE

A-354

CORRIDOR

HISTOLOGY

A-348

PIPE CHASE

A-348d

CORRIDOR

OFFICE

A-347

MLK

16' - 2" 19' - 10"

VENTANA

HE 600

U P

S

V.I.F

± 4' - 2"

V.I.F

± 2' - 6"

7 8 9

G E N E R A L C E I L I N G D E M O L I T I O N N O T E S

A. REFER TO SHEET GI000 FOR GENERAL NOTES.

B. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES.

C. DASHED LINES INDICATE FINISHES, MATERIALS, AND ASSOCIATED FIXTURES TO BE REMOVED. KEYNOTES SHALL

GOVERN OVER LINETYPES.

D. ALL WALLS BEING DEMOLISHED ARE GYPSUM BOARD AND COLD-FORMED STEEL FRAMING UNLESS NOTED

OTHERWISE.

E. HALF-TONED ITEMS INDICATE EXISTING CONSTRUCTION SHALL BE PROTECTED & REMAIN. KEYNOTES SHALL

GOVERN OVER LINEWEIGHTS.

F. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS

REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL CONSTRUCTION.

G. UTILITIES THAT REMAIN, WITHIN WALLS BEING DEMOLISHED, SHALL BE REROUTED AS REQUIRED TO FACILITATE

THE NEW PLAN CONFIGURATION.

H. AT PENETRATIONS, ALL UTILITY SYSTEM AND OTHER COMPONENTS THAT ARE SCHEDULED FOR DISCONNECTION SHALL BE REMOVED IN THEIR ENTIRETY. ANY FIRE RESISTIVE MEMBER OR THROUGH PENETRATIONS RESULTING FROM SUCH DEMOLITION WORK SHALL BE FIRESTOPPED OR SEALED IN ACCORDANCE WITH NFPA FOR THE

NECESSARY RATING PROTECTIONS.

N

K E Y P L A N

NTS

F I R E / S M O K E R A T I N G L E G E N D

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR SMOKE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\J o s h u a

\D o c u m e n ts \R e v it L o c a l F ile s \2

\F F

E

L o u is v ill e

P a th o lo g y L a b

B jo s h u a .f is h e rS

G E

R

.r v t

/2 /2

:2

:4

P M

AD100

PARTIAL THIRD FLOOR

DEMOLITION PLAN

08/19/2022 ET JF

RENOVATE PATHOLOGY LAB 603-22-602

LOUISVILLE, KY

BID DOCUMENTS FOR

CONSTRUCTION 1

ROBLEY REX VA

MEDICAL

CENTER Approved: Owner

N 1/4" = 1'-0"

PARTIAL THIRD FLOOR DEMOLITION PLAN

D R A W I N G N O T E S

1 THIS AREA NOT IN CONTRACT. (NIC)

2 REMOVE INFILL WALL, DOOR FRAME, AND ALL RELATED SUPPORTS.

3 REMOVE EPOXY RESIN COUNTERTOP, BASE CABINETS, WALL CABINETS AND ALL RELATED SUPPORTS.

4 ICRA BARRIER SHALL BE INSTALLED FROM CORNER OF PLAN WEST WALL TO PERPENDICULAR TO PLAN EAST WALL. .

SEE SPECIFICATIONS FOR ADDITIONAL ICRA REQUIREMENTS FOR THIS SPACE.

5 REMOVE CARPET FLOORING FINISH AND MASTICS. CLEAN AND PREPARE SURFACE TO RECEIVE NEW FINISHES.

6 REMOVE PORTION OF EXISTING WALL (SHOWN AS DASHED) AND DOOR FRAME. PREPARE OPENING TO RECEIVE WALL

INFILL, NEW DOOR FRAME AND DOOR. SEE AE100.

7 EXISTING FINISHES TO REMAIN.

8 EXISTING EQUIPMENT IN THIS AREA TO REMAIN AND BE PROTECTED DURING CONSTRUCTED.

9 EXISTING FLOORING IS TO REMAIN IN THIS AREA.

10 NO ARCHITECTURAL SCOPE IN THIS ROOM

11 REMOVE HERMAN-MILLER CABINETS FROM PLAN SOUTH WALL AND TRANSPORT TO THE ENGINEERING SHOPS IN

HOSPITAL BASEMENT, ROOM B-016.

12 EQUIPMENT TO REMAIN; COVER EQUIPMENT DURING CONSTRUCTION

13 RELOCATE METAL CABINET FROM PLAN EAST WALL BUT REMAIN IN ROOM A-348E, OUT OF CONSTRUCTION AREA.

No. Revisions: Date:

BID DOCUMENTS FOR CONSTRUCTION 08/19/2022

1 ADDENDUM 1 11/29/2022

P-1

ER-1

SLOPING METAL TOP

METAL CABINETS

TOP, BACK & ENDS

EXISTING UTILITY CHASE

METAL CABINETS

TOP, BACK & ENDS

2' - 6" 2' - 6" 3' - 0"

2' - 6" 2' - 6" 3' - 0"

FILLER PANEL

FILLER PANEL

" 1' - 1"

V .I .F

5'

0"

T O

F

IN

IS

H

E D

F

LO

O R

SLOPING METAL TOP

METAL CABINETS

(TOP, BACK & ENDS)

ANCHORAGE PER VA

STD. DETAIL 05 50 00-02

SEE DETAIL 6/AE601

EPOXY RESIN COUNTERTOP

AND BACKSPLASH WITH

INTEGRAL EPOXY RESIN

SINK AND SPILL

CONTAINMENT LIP.

ER-1

METAL CABINETS

(TOP, BACK & ENDS)

4"

AE601

AE6012

VENTANA

HE 600

VENTANA

HE 600

U P

S U

P S

NO WORK

NO WORK

BSL II

NO WORK

S-5

P-4

P-3

P-2

P-1

MLK

HISTOLOGY

A-348

CYTOLOGY

A-348b

SPECIMEN EXAM

A-348a

BIOSAFETY LAB

A-347

LAB OFFICE

A-348c

OFFICE

A-348e

PIPE CHASE

A-348d

16' - 2" 19' - 10"

WSF-1

ER-1

P-2

P-1

P-1

P-2

P-1

P-1

P-1

P-1

N

K E Y P L A N

NTS

F I R E / S M O K E R A T I N G L E G E N D

1 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR SMOKE BARRIER

G E N E R A L N O T E S

A. REFER TO SHEET GI000 FOR GENERAL NEW WORK NOTES.

B. REFER TO DEMOLITION DRAWINGS FOR WORK REQUIRED IN ADVANCE OF CONSTRUCTION AND COORDINATE

ACCORDINGLY.

C. PARTITION TYPES INDICATED ARE CONTINUOUS TO A CORNER OR AN INTERSECTING PARTITION, UNLESS INDICATED OTHERWISE. WHERE PARTITIONS OF DIFFERENT THICKNESSES MEET, CONFIRM ALIGNMENT WITH

PLANS.

D. ALL WALL HUNG CASEWORK MUST BE ANCHORED IN ACCORDANCE WITH VA STANDARD 05 500-02.

E. NEW CONSTRUCTION TO ALIGN WITH ADJACENT EXISTING CONSTRUCTION WHERE APPLICABLE. PREPARE

ALIGNED SURFACES TO RECEIVE NEW FINISHES.

F. SOUND ATTENUATION BATTS (SAB) ARE TO BE PLACED IN ALL PARTITIONS WHICH ENCLOSE A ROOM UNLESS

NOTED OTHERWISE.

F

S E

E S

C H

E D

U L E

SEE SCHEDULE

9"

100 IN² MAX.,

TAMPERED GLAZING

TYPE 1

SEE SCHEDULE

S E

E S

C H

E D

U L E

2" 2"

F I N I S H L E G E N D

MARK DESCRIPTION BASIS OF DESIGN STYLE/ COLOR COMMENTS

ACT-1 2X2 ACOUSTICAL CEILING TILE

ARMSTRONG,

CLEAN ROOM FL

WHITE, SQUARE LAY-IN, 2'x2'x3/4"

GWB GYPSUM WALL BOARD TYPE X - -

P-1 PAINT (HIGH BUILD GLAZED COATING) GLIDDEN 9300-0110 / MANUSCRIPT FINISH: EGG SHELL

WSF-1 WELDED SHEET VINYL FLOORING ARMSTRONG MEDINTECH/ COLOR TBD

DIAMOND 10 TECHNOLOGY;

INTEGRAL BASE - 6"

ER-1 EPOXY RESIN TRESPA BLACK COUNTER TOP

-P-2 PAINT (HIGH BUILD GLAZED COATING) GLIDDEN 9200-0300 / CAMEL TAN

FINISH: FLAT

HOLLOW METAL FRAMES; CAULK AT PERIMETER

1 15/16" VARIES VARIES

5/8" DRYWALL

DOUBLE STUDS

BACK TO BACK

CONTINUOUS

SEALANT BOTH SIDES

STANDARD FRAME FOR

DRYWALL

JAMB ANCHORS

/4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\J o s h u a

\D o c u m e n ts \R e v it L o c a l F ile s \2

\F F

E

L o u is v ill e

P a th o lo g y L a b

B jo s h u a .f is h e rS

G E

R

.r v t

/2 /2

:2

:5

P M

AE601

CASEWORK DETAILS, DOOR AND

FINISH SCHEDULES

08/19/2022 ET JF

RENOVATE PATHOLOGY LAB 603-22-602

LOUISVILLE, KY

BID DOCUMENTS FOR

CONSTRUCTION 1

ROBLEY REX VA

MEDICAL

CENTER Approved: Owner

1/2" = 1'-0"

CASEWORK ELEVATION

1/2" = 1'-0"

CASEWORK SECTION

N 1/4" = 1'-0"

PARTIAL THIRD FLOOR EQUIPMENT AND FINISH PLAN

D R A W I N G N O T E S

1 BIO-SAFETY CABINET, CLASS II - (VC) OWNER FURNISHED CONTRACTOR INSTALLED

2 ME-200 GROSSING STATION - (VC) OWNER FURNISHED CONTRACTOR INSTALLED

3 EXISTING EQUIPMENT TO REMAIN - PROTECT DURING ALL PHASES OF CONSTRUCTION.

4 TRANSITION STRIP BETWEEN DIFFERENT FLOORING FINISHES

GROUND FLOOR ROOM FINISH SCHEDULE

ROOM NAME ROOM NUMBER FLOOR FINISH BASE FINISH

WALL FINISH

Ceiling FinishN S E W

BIOSAFETY LAB A-347 WSF-1 INTEGRAL TO

WSF-1

P-1/P-2 P-1/P-2 P-1/P-2 P-1/P-2 ACT-1

HISTOLOGY A-348 - - - - - - ACT-1

SPECIMEN EXAM A-348a -- - P-1/P-2 (AREA OF

NEW WORK)

- - P-1 (AREA OF

NEW WORK)

DOOR SCHEDULE

DOOR #

PANEL FRAME DETAILS

HARDWARE# DOOR TYPE MATERIAL

DIMENSION

TYPE MATERIAL HEAD JAMBW H T

03-Third Floor - ICRA

347 F HW 0' - 1 3/4" 1 HM 4/AE601 4/AE601 HW-1A

DOOR ELEVATIONS FRAME ELEVATIONS

1 3' - 6" 7' - 0"

3" = 1'-0"

HEAD/JAMB DETAIL - HM FRAME

NTS

VA STANDARD 05 50 00-02 - ANCHORAGE FOR CABINETS

No. Revisions: Date:

BID DOCUMENTS FOR CONSTRUCTION 08/19/2022

1 ADDENDUM 1 11/29/2022

MLK

SPECIMEN EXAM

A-348a

BIOSAFETY LAB

A-347

CORRIDOR

HISTOLOGY

A-348

CYTOLOGY

A-348b

HISTOLOGY

A-348

ELEVATOR

S2

ELEVATOR

S3

ELEVATOR

S1

LAB OFFICE

A-348c

OFFICE

A-348e

ELEVATOR LOBBY

A-351

(E) P-530

(E) P-530

(E) P-414

(E) P-708

ML

(E) P-528

(E) P-501

PL101

MLK

SPECIMEN EXAM

A-348a

BIOSAFETY LAB

A-347

CORRIDOR

HISTOLOGY

A-348

CYTOLOGY

A-348b

HISTOLOGY

A-348

ELEVATOR

S2

ELEVATOR

S3

ELEVATOR

S1

LAB OFFICE

A-348c

OFFICE

A-348e

ELEVATOR LOBBY

A-351

1(E) P-530

(E) P-414

(E) P-530

(E) P-708

ML

(E) P-528

(E) P-501

PL101

A. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE ATTENTION OF THE COR IN

WRITING ANY DISCREPANCIES THAT MAY IMPACT THE PROGRESS OF WORK.

G E N E R A L N O T E S :

(E) EXISTING TO REMAIN

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

LA LABORATORY AIR

LV LABORATORY VACUUM

SAN SANITARY

V VENT

A B B R E V I A T I O N S :

N KEY PLAN

K

(E) 1/2" LA (E) 1/2" LV

(E) 1 1/2" SAN DN

SPECIMEN EXAM

A-348a

(E) P-414 1(E) 1/2" DHW DN

(E) 1/2" DCW DN

K

SPECIMEN EXAM

A-348a

1/2" LA

1/2" LV (E) 1/2" LA

(E) 1/2" LV

(E) P-414

BIOSAFETY LAB

A-347

(E) 1 1/2" SAN

(E) 1 1/2" V

THIRD

FLOOR 1 1/2" SAN ROUGH-IN FOR

NEW GROSSING STATION

1 1/2" V

1 1/2" SAN

NEW SINK

(E) P-414

1/2" DCW

1/2" DHW

(E) 1/2" DCW

(E) 1/2" DHW

NEW SINK

1/2" BALL VALVE

1/2" DCW & 1/2" DHW ROUGH-INS

FOR NEW GROSSING STATION

(E) P-414

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\g jp e a \D o c u m e n ts

\F F

E

L o u is v ill e

P a th o lo g y L a b

B

M

E P g re g

.p e a rs o n ff e -s e rv

.c o m

.r v t

/2 /2

:4

:4

A M

PL101

THIRD FLOOR PLUMBING PLANS

08/19/2022 PP GP

RENOVATE PATHOLOGY LAB 603-22-602

LOUISVILLE, KY

BID DOCUMENTS FOR

CONSTRUCTION 1

ROBLEY REX VA

MEDICAL

CENTER Approved: Owner

1/8" = 1'-0"

PLUMBING THIRD FLOOR NEW WORK PLAN

1/8" = 1'-0"

PLUMBING THIRD FLOOR DEMOLITION PLAN

D R A W I N G N O T E S :

1 PLUMBING FIXTURE TO REMAIN.

2 REMOVE LAB GAS OUTLET AND ASSOCIATED PIPING. CAP LAB AIR AND LAB VACUUM PIPING AT POINTS SHOWN ABOVE

CEILING. POINTS OF REMOVAL TO BE POINTS OF CONNECTION FOR NEW LAB GAS OUTLETS.

3 REMOVE SINK AND ASSOCIATED PIPING. CAP SANITARY, VENT, AND DOMESTIC HOT AND COLD WATER PIPING IN WALL.

POINTS OF REMOVAL TO BE POINTS OF CONNECTION FOR NEW PIPING.

4 CONNECT DCW, DHW, SANITARY, AND VENT PIPING TO EXISTING AT POINTS SHOWN.

5 CONNECT LABORATORY VACUUM AND AIR PIPING TO EXISTING AT POINTS SHOWN.

6 NEW SINK. BOWL INTEGRAL TO COUNTERTOP. REFER TO SPECIFICATION 12 36 00 COUNTERTOPS FOR INFORMATION ON SINK BOWL, FAUCET, DRAIN, AND TRAP. INSTALL POINT OF USE THERMOSTATIC MIXING VALVE TO LIMIT HOT WATER

OUTLET TEMPERATURE TO 110 DEGREES F.

7 NEW LAB GAS OUTLET. CONNECT LAB AIR AND LAB VACUUM PIPING TO EXISTING AT POINTS OF REMOVAL. REFER TO

SPECIFICATION 12 36 00 COUNTERTOPS FOR INFORMATION ON LAB GAS OUTLETS.

8 NEW GROSSING STATION PROVIDED BY VA. PROVIDE 1/2" DCW, 1/2" DHW, AND 1 1/2" SANITARY PIPING ROUGH-IN

CONNECTIONS. INSTALL BALL VALVES FOR DOMESTIC WATER PIPING.

1/4" = 1'-0"

PLUMBING THIRD FLOOR DEMOLITION ENLARGED PLAN

1/4" = 1'-0"

PLUMBING THIRD FLOOR NEW WORK ENLARGED PLAN

NTS

SANITARY & VENT ISOMETRIC

NTS

DOMESTIC WATER ISOMETRIC

No. Revisions: Date:

BID DOCUMENTS FOR CONSTRUCTION 08/19/2022

1 ADDENDUM 1 11/23/2022

08/19/2022

1 1

11/28/2022

11/28/202208/19/2022

11/29/2022