Addendum 1 List of Drawings Sheets.pdf

PDF 14 KB Posted

Attached to
Z1DB--603-23-1-2311-0001 - 603-22-602 - Renovate Pathology (VA-23-00009816)
Solicitation number
36C24922R0104
Issued by

About this file

This document provides details for a federal contract solicitation to renovate the pathology laboratory at the Robley Rex VA Medical Center in Louisville, Kentucky. The solicitation is for construction services with an estimated value between $250,000 to $500,000. It is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The deadline for proposals is November 21, 2022.

The solicitation includes drawings and specifications for the renovation work. Requirements include demolition, new construction, casework, fire suppression systems, plumbing, HVAC, and electrical work. The contractor must comply with all applicable regulations regarding environmental compliance, safety records, debarment checks, and security background investigations for employees. Additional requirements include taking VA privacy training, using E-Verify for new hires, and registering in the Contractor Performance Assessment Reporting System.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robley Rex VA Medical Center

Renovate Pathology 3rd Floor Laboratory

VA Project #603 22 602

05-01-20

00 01 15 - 1

LIST OF DRAWING SHEETS

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

DRAWING NO. SHEET TITLE

GENERAL

GI000 COVER SHEET

GI001 ABBREVIATIONS AND GENERAL DETAILS

GI002 THIRD FLOOR LIFE SAFETY PLAN

GI003 ICRA PLAN AND NOTES

ARCHITECTURAL

AD100 PARTIAL THIRD FLOOR DEMOLITION PLAN

AD101 PARTIAL DEMOLITION REFLECTED CEILING PLAN

AE100 PARTIAL THIRD FLOOR PLAN

AC141 PARTIAL THIRD FLOOR REFLECTED CEILING PLAN

AE601 CASEWORK DETAILS, DOOR, AND FINISH SCHEDULES

FIRE PROTECTION

FX101 THIRD FLOOR FIRE SUPPRESSION PLAN

PLUMBING

PL101 THIRD FLOOR PLUMBING PLANS

MECHANICAL

M001 MECHANICAL LEGEND

MD101 THIRD FLOOR DEMOLITION MECHANICAL PLAN

MH101 THIRD FLOOR NEW WORK MECHANCIAL PLAN

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES AND CONTROLS

ELECTRICAL

E001 ELECTRICAL LEGEND

ED100 THIRD FLOOR ELECTRICAL DEMOLITION PLANS

EP100 THIRD FLOOR ELECTRICAL POWER AND TECHNOLOGY PLAN

EL100 THIRD FLOOR ELECTRICAL LIGTHING PLAN

- - - END - - -

File details come from the government source that posted it. Updated .