Attch 2 - Price Proposal Spreadsheet.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Kokee Water Pump Replacement
- Solicitation number
- FA521526Q0045
About this file
This is a Price Proposal Spreadsheet template for RFP FA521526Q0045 issued by the Department of the Air Force Pacific Air Forces for the Kokee Water Pump Replacement project. The solicitation requires the removal and replacement of the potable water pumping system at Koke'e Air Force Station in Hawaii, with the contractor responsible for furnishing all labor, management, supervision, engineering, tools, materials, equipment, transportation, and incidentals necessary to complete the work.
The price proposal consists of two line items under a Fixed Price (FFP) contract structure with a Base Period of Performance from July 2024 through October 15, 2024: CLIN 0001 covers water pump replacement on a per-job basis, and CLIN 0002 covers travel on a per-lot basis. Offerors must complete the Summary tab by entering unit prices rounded to whole dollars for each CLIN and provide supporting cost breakdowns on the Basis of Estimate (BOE) tab, which includes fields for labor categories with hours and fully burdened rates, hardware and equipment costs, and travel expenses broken down by airfare, lodging, transportation, and per diem. The spreadsheet construction and format must not be altered by offerors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| ATTACHMENT 2 PRICE SPREADSHEET |
| TITLE AND DESCRIPTION OF REQUIREMENT: Request for Proposal (RFP) FA521526Q0045 for Kokee Water Pump Replacement |
| INSTRUCTIONS TO OFFERORS: Fill in the Unit Price for each CLIN. The Unit Price must be rounded to whole dollars. Do not alter the construction of this tab of the spreadsheet. On the Basis of Estimate (BOE) tab, enter price element supporting information. |
| CLIN | DESCRIPTION | TYPE | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| Base Period of Performance - XX Jul 2024 - 15 October 2024 | ||||||
| 0001 | Water pump replacement | FFP | 1 | Job | $0.00 | $0.00 |
| 0002 | Travel | FFP | 1 | Lot | $0.00 | $0.00 |
| Total Price | $0.00 |
BOE
| BASIS OF ESTIMATE (BOE) | |||
| Implementation Services Labor Category | Hours | Fully Burdened Rate | Total |
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| Labor Total | $ - 0 | ||
| Equipment | Quantity | Unit Price | Total |
| Hardware Total | $ - 0 | |||||
| Travel Description | # People | Airfare | Lodging | Transportation | Per Diem | Total |
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| $ - 0 | ||||||
| Travel Total | $ - 0 | |||||
| Notes: |
File details come from the government source that posted it. Updated .