Attch 15 DO 02 Stryker SOW.pdf
PDF 1 MB Posted
- Attached to
- Gunnery Training Systems: Solicitation
- Solicitation number
- W900KK-21-R-0055
About this file
This announcement provides a final request for proposal for the Gunnery Training Systems solicitation numbered W900KK-21-R-0055. The U.S. Army Program Executive Office for Simulation, Training, and Instrumentation, Project Manager Soldier Training, and Product Manager Virtual Training Systems have a requirement to implement tech refresh upgrades, current system production, concurrency upgrades, and Risk Management Framework certification for multiple gunnery trainer programs including Abrams, Bradley, Stryker, and LAV-25. Questions regarding the RFP are due by February 12, 2021. The anticipated award date is in the first quarter of fiscal year 2022, though this date is subject to change. A justification and approval for other than full and open competition has been approved for this solicitation. Government-furnished information is available to previously vetted potential offerors and those who follow instructions to request delivery of the information, which includes providing company and point of contact information and certifications regarding foreign ownership status.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for the
Gunnery Training Systems (GTS) – Stryker Tech Refresh and Production
Delivery Order (DO) 0002 Version 1.0
Prepared by
U.S. Army Program Executive Office for Simulation, Training, and Instrumentation
(PEO STRI)
12211 Science Drive
Orlando, FL 32826-3276
Engineering Prepared By: ____________________ Concurrence: ____________________ Trudy Ryan Jeff Meister Lead Systems Engineer Chief Engineer, PdM VTS
Date: _________ Date: __________
Acquisition Logistics Prepared By: ____________________ Concurrence: ____________________ Miguel Carrion Matthew Brothers Logistics Management Specialist Product Support Manager
PM ST
Date: __________ Date: __________
Program Management Submitted By: ___________________ Approved By: ____________________
Scott Turner LTC Edgar Santana Assistant Product Manager Product Manager Gunnery Training Systems Virtual Training Systems
Date: __________ Date: _________
SOW-2019-0022
W900KK-21-R-0055
27 January 2021
Revision Number Date Log of Changes Made and
Description of Reason Changes Approved By
1.0
27 January 2021 Initial Release
Table of Contents
1 SCOPE
1.1 Introduction
1.2 Goals and Objectives
1.3 Background
2 APPLICABLE DOCUMENTS
2.1 Government Documents
2.2 Non-Government Documents
3 REQUIREMENTS
3.1 Program Management
Integrated Master Plan (IMP) Integrated Master Schedule (IMS) Financial Management
Earned Value Management Integrated Baseline Review
Product Line Management and Processes Configuration Management
Configuration Management Planning and Management Configuration Identification Configuration Change Management Configuration Status Accounting Configuration Verification and Audit Contractor Internal Hardware Build-Up Audit Government Sample Audit to Verify Product Baseline Physical Configuration Audit (PCA) Software Configuration Management
Software Configuration Control Board Software Item Database Systems Engineering Interface Engineering Change Proposals (ECP) ECP Review Variances
Technical Performance Measures (TPM) Risk Management Management Reviews and Subcontractor Management
Post Award Conference (PAC) / Start of Work Meeting PAC Entrance Criteria PAC Exit Criteria
Program Management Reviews (PMR) Integrated Product Team (IPT) Meetings Technical Interchange Meetings (TIMs)
Visitor Support Subcontractor Management Obsolescence Management Data Rights Government Furnished Information (GFI) Government Furnished Equipment (GFE) Security
Controlled Unclassified Information (CUI) Security Training
Threat Awareness Reporting Program (TARP) Operations Security (OPSEC) Awareness Training Insider Threat Training DOD Annual Security Awareness Refresher Training CUI Training Unauthorized Disclosure of Classified Information for DOD &
Industry Anti-Terrorism (AT) Awareness Training for Contractor Personnel
Traveling Overseas AT Level I Awareness Training iWATCH Training
Cybersecurity (CS) Information Technology (IT) Training and Certification
Access and General Protection Policy and Procedures for Contractor Requiring Common Access Card (CAC)
3.2 Systems Engineering
System Configuration
System Definition Phase Initial Production Configuration Phase Final Production Configuration Phase Fabrication, Assembly, Integration, and Test Phase
Hardware Engineering Hardware Requirements and Review
Software Engineering Software Requirements and Review Software Configuration and Implementation Software Testing Software Integrity Certification
Hardware and Software Integration Cybersecurity (CS)
Cybersecurity Artifacts CS Control Review/RMF Package Security Control Assessment (SCA) Readiness Review
SCA Event Information Assurance Vulnerability Management Program
(IAVMP)
Information Assurance Contractor Training and Certification
Specialty Engineering Security Engineering Reliability, Availability and Maintainability (RAM) Engineering Safety Engineering Health Hazard Assessment Producibility Engineering Quality Engineering
Test Discrepancies Test Discrepancy Processing Test Discrepancy Severity Quality Control
Human Factors Engineering Electromagnetic Environmental Effects (E3) Contaminate and Corrosion Control
Standardization Integration of Third Party Products
Configuration Reviews System Requirements Review (SRR)
SRR Entrance Criteria SRR Completion/Exit Criteria SRR Products
Initial Integration and Production Review (IIPR) IIPR Entrance Criteria IIPR Completion/Exit Criteria IIPR Products
Final Integration and Production Review (FIPR) FIPR Entrance Criteria FIPR Completion/Exit Criteria FIPR Products
Product Definition Data (PDD) Maintenance Services
3.3 Logistics
Logistics Product Data (LPD)
Initial Spares Technical Manuals
Training System Utilization Handbook (TSUH) System Maintenance Manual (SMM) Commercial Off-The-Shelf (COTS) Manuals
Technical and COTS Manual Validation Technical Manual Verification
Item Unique Identification (IUID) Software Support Environment Training
New Equipment Training (NET) Senior Instructor/Operator Training Instructor/Operator Training Maintenance Training
3.4 Interim Contractor Support (ICS)
3.5 Integrated Testing
Test Readiness Review (TRR) TRR Entrance Criteria TRR Exit Criteria
In-Plant Acceptance Test (IPAT) Cybersecurity Compliance Operational Test Support Production Qualification Test (PQT) Baseline System Test On-Site Acceptance Test (OSAT)
3.6 Site Activation
Site Survey Site Preparation Installation Tools and Test Equipment Installation Spares Removal of Equipment
3.7 System Technical Support
3.8 Outside the Continental United States (OCONUS) Travel
3.9 Specific Requirements
Tech Refresh Visual System Integration Tech Refresh Kits
Stryker MGS Tabletop AGTS (TAGTS) New Production Production Systems Option for Production Systems
Database Review Hardware
1 SCOPE
The U.S. Army Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), Project Manager Soldier Training (PM ST) and Product Manager Virtual Training Systems (PdM VTS) intends to retrofit, procure, integrate, produce, tech, refresh hardware/software, and upgrade capabilities for the Stryker Mobile Gun System (MGS) Advanced Gunnery Training System (AGTS) in accordance with the Prime Item Development Specification (PIDS). This Statement of Work (SOW) defines the scope of tasks that PdM VTS desires to have performed under the Indefinite Delivery/Indefinite Quantity (ID/IQ) Gunnery Training Systems (GTS) contract.
1.1 Introduction
This SOW establishes the responsibilities for performance of tasks related to the production, testing, delivery, and installation of tech refreshes to existing systems and production of additional Tabletop AGTS (TAGTS). There are Contract Line Item Numbers (CLINs) to configure, integrate, test, deliver, and install hardware and software tech refresh upgrades as well as to acquire new TAGTS devices.
1.2 Goals and Objectives
The objective of this DO is to tech refresh all Stryker MGS AGTS devices and produce additional TAGTS devices.
The goals of this DO are to:
a. Tech refresh all Stryker MGS AGTS devices and Pre-Brief/After Action Review (PAAR) systems
b. Replace obsolete legacy hardware components
c. Update software components, including Operating Systems (OSs) to the latest Government approved versions
d. Maximize reuse of current training subsystem components
e. Reduce lifecycle support costs
f. Achieve Risk Management Framework (RMF) certification
g. Produce additional TAGTS that match the upgraded configuration
1.3 Background
PdM VTS has a requirement to update the Stryker MGS AGTS software and hardware baselines with a tech refresh upgrades. This effort includes permanent and mobile full fidelity MGS, TAGTS, and Pre-Brief/After Action Review (PAAR) systems. The level of effort includes software and hardware upgrades for 13 full fidelity systems, 11 TAGTS, and two PAAR systems, with hardware spares to support the updated configuration. This effort will also include the production of 5 additional TAGTS devices. In addition, the system will undergo cybersecurity certification under the Risk Management Framework
(RMF).
2 APPLICABLE DOCUMENTS
The following documents are applicable to this SOW to the extent specified herein. In the event of a conflict between documents referenced herein and the contents of this SOW, the contents of the SOW will be the governing requirement.
2.1 Government Documents
24D-STMGS-A002 Safety Assessment Report (SAR), Rev. D
29 CFR 1910.1200 Occupational Safety and Health Standards Toxic and hazardous Substances
6454966 New Equipment Training (NET) Materials, Rev. C
AGTS 2017-008/009/0010
0011/0018/0019
Advanced Gunnery Training System (AGTS) Instructor Operator Course
Army Directive 2014-05 Policy and Implementation Procedures for CAC
Credentialing and Installation Access for Uncleaned Contractors
AR 25-2 Army Cybersecurity
AR 190-13 The Army Physical Security Program
AR 380-5 Army Information Security Program
AR 380-10 Foreign Disclosure and Contacts with Foreign
Representatives
AR 380-49 Industrial Security Program
AR 381-12 Threat Awareness and Reporting Program
AR 530-1 Operations Security
AR 525-13 Antiterrorism
AR 525-28 Personnel Recovery, dated 5 March 2010
CRISD 6426340 Computer Resources Integrated Support Document
(CRISD), Rev. J
CRISD 6454966 Computer Resources Integrated Support Document
(CRISD) for the Stryker MGS TAGTS, Rev. G
CSPEI 6426341 Computer Software Product End Items (CSPEI), Rev. R
CSPEI 6454967 Computer Software Product End Items (CSPEI) Stryker
MGS TAGTS, Rev. V
DFARS 252.225.7043 Antiterrorism/Force Protection for Defense Contractors outside the US
DOD 4500.54-G DOD Foreign Clearance Guide
DODM 5200.01, Vol. 3 DOD Information Security Program: Protection of
Classified Information
DODI 5200.48 Controlled Unclassified Information (CUI)
DOD 5220.22-M National Industrial Security Program Operating Manual
DODM 5220.22, Vol. 2 National Industrial Security Program: Industrial Security
Procedures for Government Activities
DODI 8500.01 Cybersecurity (CS)
DODI 8510.01 Risk Management Framework for DOD Information
Technology
DOD 8570.01-M Information Assurance Workforce Improvement Program
DODI 8582.01 Security of Unclassified DOD Information on Non-DOD
Info Systems
FAR Clause 52.204-9 Personal Identity Verification of Contractor Personnel
LT2-TRADE-PLAN-2013-
00009
Live Training Transformation (LT2) Product Line Configuration Management Guide (Version AF)
LT2-TRADE-PLN-000384 Live Training Transformation (LT2) Operations Guide
(Version K)
MIL-PRF-32216A Evaluation of Commercial Off-the-Shelf (COTS) Manuals and Preparation of Supplemental Data Performance Specification
MIL-STD-130N Identification Marking of U.S. Military Property
MIL-STD-1472 Department of Defense (DOD) Design Criteria Human
Engineering
MIL-STD-31000B Technical Data Packages
PIDS 74D-STMGS-B001 Prime Item Development Specification (PIDS), Rev. K
SCSL ICD
SEP-2019-011
Stryker Common Software Library (SCSL) Interface Control Document (ICD)
Systems Engineering Plan (SEP) for Gunnery Training Systems (GTS), Version 1.0
SMM 6454402 System Maintenance Manual (SMM), Rev. H
Stryker FOV SCG Stryker Family of Vehicles (FOV) Security Classification
Guide (SCG)
TD 17-6920-721-10-1 MGS AGTS Training System Utilization Handbook
(TSUH), Rev. N
TM 6454959 MGS TAGTS Users’ Guide, Rev. K
2.2 Non-Government Documents
CNSSI 1253F Committee on National Security Systems Instruction
(CNSSI) 1253
GEIA-HB-0007-B Logistics Product Data Handbook
GEIA-STD-0007-B Logistics Product Data
IEEE STD 12207-2017 IEEE Standard Systems and software engineering --
Software life cycle processes
NFPA 70 National Fire Protection Association (NFPA 70 National
Electrical Code, 2017 Edition (Copies of this document are available from (http://www.nfpa.org/Catalog/) or National Fire Protection Association, 11 Tracy Drive, Avon, MA 02322)
NIST SP 800-53 National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53: Security and Privacy Controls for Federal Information Systems and Organizations
NIST SP 800-171 Protecting Controlled Unclassified Information in Nonfederal
Systems and Organizations
TA-HB-0007-1 Tech America Logistics Product Data Reports Handbook
3 REQUIREMENTS
3.1 Program Management
The Contractor shall provide the overall management and administrative effort necessary to ensure the requirements of this contract are accomplished. The Contractor shall track program progress utilizing metrics. The Contractor shall consider life cycle costs while conducting trade studies and evaluating alternatives. The Contractor shall define and monitor metrics and Technical Performance Measures (TPMs) to evaluate each critical technical and management process and the conformance of evolving products with contract, cost requirements, and objectives. The Contractor shall identify progress, issues, and status of the program. The Contractor shall identify problem areas and corrective actions required to eliminate or reduce schedule impacts. The Contractor shall, at a minimum, report the following:
a. Problems and solutions
b. Time-lines and schedules
c. Plan of next month activities
d. Development and fabrication progress
e. Expenditures to date and cost projections
(DI-MGMT-80227) Contractor's Progress, Status, and Management Report
Integrated Master Plan (IMP) The Contractor shall implement, manage to, update, and maintain the contract IMP. The Contractor shall configure the system in accordance with the IMP. The IMP shall be used throughout the contract as a management tool to assess progress and determine success in achieving program requirements. The Contractor shall report on work in progress in accordance with the IMP at each program review, at selected technical reviews and at government discretion. The IMP shall depict the contract work breakdown structure.
Integrated Master Schedule (IMS) The Contractor shall plan, implement, manage to, update, and maintain the contract IMS.
All contract schedule information delivered or presented at program reviews shall originate from the IMS, shall be traceable to the IMP, and shall contain all critical events and exit criteria, accomplishments, predecessors and successors events, and their dependencies. The IMS shall address total program activities including activities performed by major subcontractors. The Contractor shall plan the logic resource loaded network that accurately portrays the sequence and relationship of activities defining the total program. These network activities shall be keyed to the Contract Work Breakdown Structure (CWBS). The network shall be implemented on a computer based program management control system which utilizes critical path method network analysis, accepts parametric data input, and can be utilized to determine a probabilistic estimate of the program schedules and cost for reporting project progress. The network activities time and cost data shall be updated to reflect accomplished activities and any changes in activity time and cost estimates. The Contractor shall conduct critical path analysis of the tasks and identify problem areas and corrective actions required to eliminate or reduce schedule impacts.
(DI-MGMT-81861A) Integrated Program Management Report (IPMR) Integrated Master Schedule (IMS) Format 6
Financial Management The Contractor shall plan, budget, schedule, and control the resources allocated to meet the requirements of the contract. The Contractor shall document and track the status of all appropriated funds associated with the contract to include payments, cancellations and invoices against each contract line item and subline item.
The CWBS shall serve as the framework for contract planning, budgeting, and reporting of cost and schedule status. The Contractor shall identify major elements of subcontracted work in the CWBS. The Contractor may propose changes to the CWBS to enhance its effectiveness in satisfying program objectives. The Contractor shall continually update an integrated database during contract performance with pertinent records and data that underlie and support the cost and schedule data reported.
(DI-MGMT-81651) Contract Invoicing and Payment Report
Earned Value Management Not required
Integrated Baseline Review Not required
Product Line Management and Processes All Stryker MGS GTS devices software, digital information, and documentation will reside on the Live Training Transformation (LT2) portal. The LT2 portal is an Army repository for data and standards for the training community created under the CPMNext contract.
Information uploaded by the Contractor onto the LT2 portal may be available to other Contractors on a need to know basis to perform work for the Army. The Contractor shall provide a plan that documents a path to conformance with the LT2 Product Line Operations and CM Guide. The LT2 portal and guides are located at (https://www.lt2portal.mil/). A Common Access Card (CAC) is required to acces the LT2 CM repositories.
https://www.lt2portal.mil/
Configuration Management The Contractor shall use an automated internal configuration management process to monitor, update, and control all configuration documentation, physical media, and physical parts representing or comprising the system configuration items (CIs). The Contractor shall plan and implement an automated configuration management function to perform configuration control, configuration identification, audits, and status accounting in a system engineering environment. The Contractor shall provide, maintain, and update configuration management procedures and processes for control of all hardware and software baselines. The process shall allow simultaneous access to the common product data model coupled with the ability to coordinate and update immediate changes to the product definition data. The configuration management process must handle all levels of product and process integration to build and support the product as well as manage the sequence of significant events. The Government will maintain control of the functional baseline (FBL) defined by the system performance specification, interface control documents, and software requirement specifications.
Configuration Management Planning and Management The Contractor shall establish processes and tools to establish and maintain consistency between system requirements, system configuration information, and all relevant information about the system. The configuration management process shall include changes made to the Cybersecurity (CS) configuration and associated documentation.
The Contractor shall:
a. Plan implementation of the CM functions for the context and environment in which they are to be performed and manage in accordance with the planning
b. Determine the specific CM value-adding functions and levels of emphasis
c. Document how your organization will implement CM functions to provide the consistency between the systems attributes, system definition information and the system’s configuration information, throughout the applicable phases of the life cycle
d. Identify resources required to implement the CM functions and ensure they are applied throughout the system’s life cycle
e. Assess the effectiveness of CM plan implementation and performance of the configuration management functions with performance measurements
f. Flow down responsibility for CM performance to subcontractors
g. Plan and identify information status levels for managing system configuration information and ensure that transmitted data products are usable
Configuration Identification The Contractor shall identify unique identifiers for selected system attributes, system information and components to be used as the basis for configuration management. The Contractor shall:
a. Define the functional, performance, interface and physical attributes of the system and components
b. Determine the systems composition using its product definition information
c. Assign unique identifiers to configuration items so that they can be distinguished from other items, one configuration of the system can be distinguished from another, the source of a component can be determined, and the correct system definition information can be retrieved
d. Assign unique unit identifiers to individual components of the system
e. Update component identifiers when a system is modified reflecting the new configuration without altering the system identifier and model identifier
f. Uniquely identify information so that it can be correctly associated with the applicable configuration of the system
g. Apply information identification rules to maintain representation and version relationships
h. Maintain relationships between information, information requirements, and the related system configuration to ensure accurate information retrieval
i. Establish complete, valid, and suitable for use agreed-to descriptions of the attributes of the system and components at a point in time and provide a known configuration to which changes can be addressed
j. Identify interfaces and establish mutually agreed-to control of common attributes for system or component boundaries that interface to the system or within the system
Configuration Change Management The Contractor shall establish a systematic and measurable configuration change management process for managing product configuration changes and variances. Once the system requirements have been approved by an authorized management activity, the Contractor shall effect changes to the baseline requirements only after the proposed change has been approved using the change process. The Contractor shall:
a. Document and uniquely identify each change.
b. Classify requested changes to aid in determining the levels of review and approval
c. Clearly and completely document request for change
d. Consider the technical, support, schedule, and cost impacts of a requested change before making a judgment to approve the change for implementation and incorporation in the system and its documentation.
e. Determine potential effects of a change and coordinate impacts with the impacted areas of responsibility
f. Determine the effectivity for each change and identify which units of the system are to be changed, the point of production break-in, and which units will be included in a retrofit
g. Verify implementation of a change to ensure consistency between the system, its documentation, and its support elements
h. Document variances, when authorized by the appropriate level of authority
Configuration Status Accounting The Contractor shall provide access to accurate, timely information about the system and its documentation through the integrated database. The Contractor shall correlate, store, maintain, and provide readily available views and information of system configuration information including pending, current and historical data. The Contractor shall:
a. Systematically record, safeguard, validate, and disseminate system information
b. Establish methods, processes and procedures to provide controlled access to system information
c. Capture configuration information as it evolves
Configuration Verification and Audit The Contractor shall verify and audit the system configuration information to ensure that requirement attributes are met and accurately documented. The Contractor shall;
a. Verify the system attributes through a systematic comparison with the associated results of system tests, analyses, inspections, demonstrations or simulation models
b. Maintain surveillance over the configuration management process to ensure it is being followed and remains in compliance with requirements
Contractor Internal Hardware Build-Up Audit
a. Concurrent with manufacture of piece parts and incoming inspection of procured parts, a 100% audit shall be conducted by personnel approved by the QA Manager to verify the as-built configuration matches the configuration documentation prior to use of each part in production. During this process each product definition document will also be examined for proper format (compliance with American National Standards Institute (ANSI) Y14 series standards), completeness, currency of material references, accuracy of piece part identification, and adequacy of manufacturing instructions and any other information critical to acquire a like part. A record of each product attribute verified shall be maintained and available through the LT2 documentation repository.
Government Sample Audit to Verify Product Baseline After completion of acceptance testing and any required configuration modifications, but prior to formal acceptance, the final product baseline shall be verified by the government by reviewing a representative number of drawings, associated technical manuals, logistics management information and manufacturing instructions to determine their accuracy in accordance with the final product configuration.
Physical Configuration Audit (PCA) The Contractor shall support the Government in conducting the PCA by providing the necessary space, tools, equipment, personnel, and documentation required for the activity. The PCA is the formal technical examination of the system “as-built” configuration against its technical documentation to establish or verify the configuration item’s product baseline. It is used to examine the actual configuration of each item (down to the lowest level of repair) in order to verify that the related configuration documentation matches the physical configuration. The PCA addresses accuracy of the documentation to include inspection of inventory/equipment lists, logistics product data, documentation, drawings, spares and all manuals. The documentation and equipment shall be examined to verify that all applicable safety labels along with incorporating applicable warnings are incorporated.
In addition to the PCA, the Contractor shall provide the necessary space, tools, equipment, personnel, and documentation required for the Government to perform the inspection of the complete system inventory. Each item shall be inspected to ensure Government property sticker affixed in a prominent location.
a. Verification of Serial number and Item Unique Identification (IUID). All items requiring an IUID marking, per contractual guidance, shall be marked with an IUID label that is constructed of a material capable of lasting the life of the item/system in its intended environment and operation. The IUID data shall be entered into the central registry for accountability/visibility
b. Equipment Inventory Records (EIR) for Government property accountability, Government specified format and data elements are accurate. Equipment record shall contain the following data: Complete Item Description, Original Part Number, National Stock Number (NSN), Serial Number, Quantity, Vendor Name, Vendor Point of Contact (POC), and Warranty Period
c. Cable naming, source, destination, and numbering details are on both ends of the wiring
The Contractor shall correct all discrepancies found by the Government during verification of the “as-built” drawings. The drawings shall include complete system level drawings of all equipment, wiring, network topology, and system architecture. Drawings shall either be new or revised with changes incorporated.
(DI-SESS-81022D) Configuration Audit Summary Report and Certification
Software Configuration Management The Contractor shall establish and document a software configuration management process. The Contractor’s software configuration management plan may be incorporated into the software configuration process plans or may be a separate configuration management plan.
Software Configuration Control Board The Contractor shall establish and maintain a software configuration control board or equivalent responsible for configuration control of its software configuration items and related software products. The software configuration control board will be responsible for COTS (including open source) management including product and version identification. The Contractor shall obtain approval from the system Integrated Product Team (IPT) prior to committing to use any version of any COTS product. The Contractor shall ensure that all COTS products included in the system deliverable configuration are commercially supported.
Software Item Database The Contractor shall capture software data in an integrated database. The Contractor shall produce software item data to populate the software database. The software item database shall have the capability to establish, modify, make available, and maintain the integrity of the database. The Contractor shall maintain the system software item database until transition to the Government.
A schema shall be implemented for identification of software items and their versions.
The Contractor shall perform the following: identification and recording of change request, analysis and evaluation of the changes; approval or disapproval of the request, and implementation, verification, and release of the modified software item. The database shall contain an audit trail whereby each modification, the reason for the modification, and authorization of the modification can be traced.
Systems Engineering Interface The process shall allow simultaneous access to the common product data model coupled with the ability to coordinate and update immediate changes to the product definition data. The configuration management system must handle all levels of product and process integration to build and support the product as well as manage the sequence of significant events. The information architecture must permit capture of change information and notify affected team members.
Engineering Change Proposals (ECP) The Contractor shall document and the IPT shall review all changes to established baselines and all changes to the requirements (other than the functional baseline), including changes to the statement of work, contract data requirements list (CDRL), the contract schedule, and the general provisions of the contract.
(DI-SESS-80639D) Engineering Change Proposal (ECP)
ECP Review In coordination with the government, the Contractor shall hold a requirements review on all proposed changes prior to the submittal of the engineering change proposal in order to clarify requirements, format, and content. Depending upon the criticality of the proposed changes, this review may take the form of a teleconference, a video-teleconference, a formal meeting at PEO STRI, or a formal meeting at the Contractor’s facility. All appropriate parties shall be in attendance in order to conduct a thorough, effective review.
The Contractor shall also be responsible for generating minutes of the review and provide them to the Government for approval.
(DI-ADMN-81505) Report, Record of Meeting/Minutes
Variances The Contractor shall document the rationale and the potential impact to the Stryker MGS training systems. The Contractor shall obtain approval before varying from any government-controlled baseline.
(DI-SESS-80640D) Request for Variance (RFV)
Technical Performance Measures (TPM)
The Contractor shall select technical performance parameters that reflect key indicators of program success. TPM parameter inter-relationships shall be depicted through construction of tiered dependency trees similar to the specification tree. Each parameter shall be correlated with a specific CWBS element. Parameters to be reported at each management review shall be selected from the total parameters tracked and shall be identified in the integrated master plan. As the configuration activity progresses, the achievement to data shall be tracked continually for each of the selected technical performance parameters. If the data falls outside the tolerance band a new profile or current estimate shall be established immediately. The current estimate shall be determined from the “achievement to date” and the remaining time and budget. An analysis shall be accomplished on the variation to determine the causes and to assess the impact on higher level parameters, on interface requirements, and on system cost effectiveness. For performance in excess of requirements, opportunities for reallocation of requirements and resources shall be assessed.
Risk Management The Contractor shall establish and maintain a risk management program to identify risks related to the project. The Contractor shall identify and track all risks and corrective actions required to mitigate the risks. The Contractor shall implement a risk assessment methodology that includes not only an understanding of cost, schedule, and performance impacts on risk areas, but also provides a periodic reassessment of these impacts on risk areas. The Contractor shall update, maintain, and execute program metrics to monitor issues and to determine the likelihood of risks occurring. The Contractor shall ensure that the risk management process is utilized to manage risks across all facets of the contract, including subcontractor activities.
(DI-MGMT-81809) Risk Management Status Report
Management Reviews and Subcontractor Management The Contractor shall conduct Management Reviews at the request of the Government with a minimum of one every quarter. The Government and Contractor shall mutually agree upon the review location. The Management Reviews shall provide an accurate program overview and a detailed discussion of pre-selected topics. The Contractor shall manage subcontractors and shall be responsible for the performance of subcontractors.
The Contractor shall establish an IPT structure to address major areas (e.g., systems engineering, hardware configuration, software solutions, integrated logistics support, testing). The Contractor shall establish IPT charters and host regularly scheduled IPT meetings or teleconferences. Management reviews shall use IPT meetings/teleconferences to address systems production, status of activities, questions, and issues in a timely manner. The Contractor shall prepare the meeting agendas, document action items, document due dates, coordinate resolution, and track action items until closure. Action item closure shall require Contractor and Government approval. At a minimum, the Contractor shall conduct the following meetings and reviews:
(DI-ADMN-81505) Report, Record of Meeting/Minutes (DI-MGMT-81605) Briefing Material
Post Award Conference (PAC) / Start of Work Meeting The Contractor shall conduct a combined PAC/Start of Work Meeting held at the Contractor’s facility, at a mutually agreed upon date with the Government, within 20 working days after contract award. The purpose of the conference shall be to establish the framework of the Contractor and Government interaction during the performance period of the contract. The Contractor shall place emphasis on the operating procedures, methodologies, and processes used in the execution of the contract. The meeting shall include the Contractor’s key team members identified in the proposal with emphasis on top level management of the program, agreement on metrics used as management indicators during the program and partnering approach to implement. The Contractor shall present the program IMS, IPT structure, management concept, organizational structure, and the interfaces with the Government that are employed to perform the GTS mission. The Contractor shall document action items, due dates and coordinate resolution and track action items until closure.
PAC Entrance Criteria The PAC entrance criteria shall consist of: Government acceptance of the PAC agenda, presentation materials, and the IMS.
The PAC Agenda shall include the following:
• Introduction and Overview
• Discussion and clarification of requirements
• Program Management Plan including subcontractors
• Risk Management Process and Report
• Quality Control Program
• IMS identifying critical path, milestones, and deliverables
• CWBS
• Configuration Management Plan
• Integrated Logistic Support Overview o Revision of existing technical documentation (COTS & Technical manuals) o Parts provisioning and selection o Obsolescence management o Long lead item identification and status o Spares o Tools and test equipment (if applicable) o Warranty o Inventory (Hardware/Software) Control o Item Unique Identification (IUID) Marking Plan o Disposal of removed GTS components
• Overview of current Management Information System (MIS)
• Contract Management Plan (i.e. invoicing, billing)
PAC Exit Criteria The PAC exit criteria shall consist of the following:
• Government concurrence that all required PAC agenda items have been satisfactorily presented
• Government acceptance of the PAC CDRLs
• Submittal and Government acceptance of the PAC minutes
Program Management Reviews (PMR) The Contractor shall conduct program management reviews on a quarterly basis in accordance with the IMS. The first PMR shall be no more than 90 working days after the combined PAC/ Start of Work Meeting. The Procuring Contracting Officer (PCO) and the Contractor shall mutually agree upon the location of the PMRs. The Contractor shall coordinate and provide all facilities and infrastructure for Government-Contractor meetings and separate breakout rooms for Government only meetings during the PMR.
The PMR shall provide a program overview and shall include as a minimum:
a. Hardware and software configuration status
b. Risk and problem identification
c. Subcontract management/progress
d. Data collection and modeling
e. GTS Government Furnished Equipment (GFE) planning and status
f. Logistics planning
g. Test planning
h. Provisioning for training and technical publications status
i. Schedule status
j. Pre-selected topics of interest
k. CS status and progress (copies of all CS documents in draft format)
l. Human Factors Engineering
Status and information at the review shall reflect currency since the previous review.
When possible, other program reviews such as technical reviews, technical manual reviews, etc. shall combine into the PMR. The Contractor shall also be responsible for generating minutes of the meetings and provide them to the Government for approval.
The Contractor shall document action items, due dates, coordinate resolution, and tracking of action items until closure.
Integrated Product Team (IPT) Meetings The Contractor shall host and participate in bi-weekly IPT meetings with Government representatives which address the full spectrum of the program concerns including system engineering, schedule, financial, integrated logistics support, CS, and testing. The Contractor shall document and timely submit the minutes to the Government team members.
Technical Interchange Meetings (TIMs) The Contractor shall conduct and participate in TIMs to be held at both Contractor and Government facilities. The specific locations, dates, and durations of the meetings shall be as specified in the IMS. The meetings shall be co-chaired by a Government and Contractor representative. The Contractor shall be prepared to explain the reasoning, assumptions, and methodologies in arriving at particular conclusions, recommendations, or alternatives in the accomplishment of the tasks required by the contract. The Contractor shall prepare drawings and other data to aid in the presentations. The Contractor shall have all the required personnel and resources present. The Contractor shall make available facilities for Government-only meetings.
The Contractor shall prepare the meeting agendas and document the meeting results.
Except where noted, meetings shall be considered fulfilled when all of the following items are completed:
• A formal review meeting has been conducted
• All action items requiring Contractor response have been documented and posted
• Submittal of meeting minutes
Visitor Support The Contractor shall host Very Important Person (VIP) visits, arrange for, and provide demonstrations of system performance, program progress, and other system characteristics when notified by the Government as required. The Government will provide no less than 24 hours advance notice for VIP visits.
Subcontractor Management The Contractor shall manage and have agreements with subcontractors and partners as required. The Contractor shall integrate subcontractors and partners into program IPTs.
The Contractor shall ensure the requirements of this contract apply to all subcontracts and associate contracts.
Obsolescence Management The Contractor shall implement an obsolescence management program. The Contractor shall analyze and recommend solutions after identifying any obsolete parts. The recommended solution shall be reviewed and approved by the Government.
Data Rights The Government desires a minimum of Government Purpose Rights for all CDRLs, technical data, metrics, non-commercial software, and hardware, such that the Government can:
a. Use, maintain, modify, reproduce, release, perform, display, or disclose technical data within the Government without restriction
b. Release or disclose technical data outside the Government and authorize persons to whom release or disclosure has been made to use, maintain, modify, reproduce, release, perform, display, or disclose that data for United States Government purposes
c. Maintain, repair, modify, and upgrade Stryker MGS AGTS using Government personnel and other Government Contractors
d. Compete future GTS requirements and upgrades
The Contractor shall disclose any part of their configuration data items that the Government does not have the minimum of Government Purpose Rights.
Government Furnished Information (GFI) The Government will provide available technical data necessary to accomplish the objectives of this contract upon Contractor request, or at the earliest possible opportunity.
The Contractor shall secure alternate data collection or generation methods if the Government is unable to provide the technical data. The Contractor shall be responsible to secure, protect, and maintain the data provided as GFI.
Government Furnished Equipment (GFE) Upon contract award, the Contractor shall inventory all GFE and subsequently, maintain records of all GFE. The Contractor shall submit annual inventory reports to the Government. The Contractor shall be responsible for the maintenance, custody, control, movement, disposal, and storage of all GFE. The Contractor shall maintain the equipment in the same functional and physical state as received except for normal wear and tear. The Contractor shall transport one permanent full fidelity system from a Government location to the Contractor’s facility.
(DI-MGMT-80441C) Government Property Inventory Report
Security The Contractor shall be in compliance with the security regulations and security requirements specified in Contracts Security Classification Specifications, DD Form 254, and addendums sheets.
The Contractor shall have a Secret facility clearance with no storage requirements.
Based on various DOs, the Contractor will require access to Controlled Unclassified Information (CUI), Technical Information/Documents, and Export Controlled Information.
Performance of this contract shall be worldwide as designated by individual DOs. The base ID/IQ DD254 will support the security requirements for this contract. Individual DD254s will not be issued for each DO unless it is outside of the security bounds of the base DD254.
Some positions/duties may not require a clearance but all positions/duties shall require investigation for duties and access to U.S. Government systems and technical information. The Contractor shall ensure that employees performing under this contract have the appropriate clearance.
The Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified "Confidential," "Secret," or "Top Secret". The Contractor shall comply with:
a. The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DOD 5220.22-M)
b. Any revisions to DOD 5220.22-M
c. Contract Security Classification Specification (DD254)
Controlled Unclassified Information (CUI) The contractor shall implement CUI marking requirements in accordance with DODI 5200.48.
Security Training The Contractor shall read and execute the below listed security training for Contractor employees who have security clearances and who are working on DOD contracts.
Threat Awareness Reporting Program (TARP) All Contractors and subcontractors with security clearances shall receive annual Threat Awareness and Reporting Program (TARP) training per AR 381-12. The training shall be provided by a Counterintelligence (CI) agent or other trainer as specified in 2-4b of AR 381-12.
The Contractor shall ensure its employees report threat-related incidents, behavioral indicators, and other matters of CI interest specified in AR 381-12 to their Facilities Security Officer (FSO) and the PEO STRI G2 Office, the nearest military CI office, the Federal Bureau of Investigation, or the Defense Security Service.
Operations Security (OPSEC) Awareness Training Per AR 530-1 Operations Security (OPSEC), the Contractor employees working on this contract shall complete Level I OPSEC Awareness training. New employees shall be trained within 30 calendar days of their start date on this contract and annually thereafter.
OPSEC Awareness training information and materials are available at (https://www.cdse.edu/catalog/elearning/GS130.html)
Insider Threat Training The Contractor and their subcontractors shall designate in writing a U.S. citizen as the Insider Threat Program Official, per paragraph 1-202 of DOD 5220.22-M w/ change 2. All Contractors shall comply with Insider Threat Training requirements, per paragraph 3-103 of DOD 5220.22-M w/ change 2. Insider Threat program information and materials are available at (https://www.cdse.edu/catalog/elearning/INT101.html)
DOD Annual Security Awareness Refresher Training All Contractor employees working on this contract with a security clearance shall complete the annual security awareness refresher training. New employees shall complete the initial security training and the security awareness refresher training annually thereafter. This training refreshes the employee’s basic understanding of initial security training requirements outlined in DODM 5200.01, Vol. 3, Encl. 5, the National Industrial Security Program Operating Manual (NISPOM), and other applicable policies https://www.cdse.edu/catalog/elearning/GS130.html https://www.cdse.edu/catalog/elearning/INT101.html and regulations. This training is available at (https://www.cdse.edu/catalog/elearning/IF142.html)
CUI Training All Contractor employees who handle CUI shall take annual Center for Development of Security Excellence (CDSE) CUI Training, which is required for all DOD and Industrial personnel with access to CUI. New employees shall complete this training 30 days from start date of the contract. No CAC or password is needed to access the training website, which also provides a resource tab that lists regulations, policies and more information on the subject. The training is available at (https://securityhub.usalearning.gov/index.html)
Unauthorized Disclosure of Classified Information for DOD & Industry Contractor employees working on this contract with security clearances shall complete the annual Unauthorized Disclosure of Classified Information for DOD and Industry training. New employees shall complete this training 30 days from start date of the contract. This training provides an overview of what unauthorized disclosure is, specific types of unauthorized disclosure, common misconceptions about unauthorized disclosure, types of damage caused by unauthorized disclosure, and sanctions one could face if caught engaging in unauthorized disclosure. This training is available at (https://jkodirect.jten.mil/html/COI.xhtml?course_prefix=JS&course_number=-US080)
Anti-Terrorism (AT) Awareness Training for Contractor Personnel Traveling Overseas
The Contractor FSOs and associated subcontractor FSOs will brief and make available Government Area of Responsibility (AOR) specific AT Awareness Training and information to employees traveling overseas, as directed by AR 525-13. Specific AOR training content is directed by the Combatant Commander with the unit Anti-Terrorism Officer (ATO) being the local point of contact. AT Level I Awareness Training meets this requirement and is available at the following website:
(https://jkodirect.jten.mil/html/COI.xhtml?course_prefix=JS&course_number=-US007)
AT Level I Awareness Training All Contractor employees, to include subcontractor employees, requiring access to Military installations, Government Agency facilities, or Government-leased facilities and controlled access areas shall complete AT Level I Awareness Training within 30 calendar days after contract start date. The Contractor shall maintain certificates of completion for each affected Contractor and subcontractor employee for inspection or upon request by the COR or Contracting Officer (KO), if a COR is not assigned. AT level I Awareness Training is available at the following website:
(https://jkodirect.jten.mil/html/COI.xhtml?course_prefix=JS&course_number=-US007) https://www.cdse.edu/catalog/elearning/IF142.html https://securityhub.usalearning.gov/index.html iWATCH Training The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally-developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 90 calendar days of contract award and within 30 calendar days of new employees commencing performance on this contract.
Cybersecurity (CS) Information Technology (IT) Training and Certification
All Contractor employees and associated subcontractor employees shall complete the DOD Cybersecurity (CS) awareness training before issuance of network access and must be completed annually thereafter. All Contractor employees working in Cybersecurity Information Technology (CS/IT) functions shall comply with DOD and Army training requirements per the Defense Federal Acquisition Regulation Supplement (DFARS) 252.239.7001, DoDD 8140.01, DoD 8570.01-M and AR 25-2 within…