This announcement provides a final request for proposal for gunnery training systems. The U.S. Army Program Executive Office for Simulation, Training, and Instrumentation is seeking proposals to implement technology refresh upgrades, current system production, concurrency upgrades, and risk management framework certification for Abrams, Bradley, Stryker, and LAV-25 gunnery trainers. Questions are due by February 12, 2021, with proposals requested. The anticipated award date is in the first quarter of fiscal year 2022. Government-furnished information has been made available and instructions are provided for potential offerors to request access.

View the file

Other files

File Type Posted
Rev 02 GTS RFP_Conformed Copy.docx DOCX document
Rev 2 Attch 19 DO 03 Bradley SOW.pdf PDF
Rev 02 GTS RFP_Modification.docx DOCX document
Rev 01 GTS RFP_Modification.docx DOCX document
Rev 1 Attch 19 DO 03 Bradley SOW.pdf PDF
Rev 1 Attch 08 Cross-Reference Matrix.xlsx XLSX spreadsheet
Rev 1 Attch 16 DO 02 Stryker CDRLs.pdf PDF
Rev 01 GTS RFP_Conformed Copy.docx DOCX document
Rev 1 Attch 10 DO 01 Abrams SOW.pdf PDF
Rev 1 Attch 05 Proposed Prices Spreadsheet Updated 20210225.XLSX XLSX spreadsheet
Rev 1 2. Exhibits A-C CDRLs_IDIQ_.pdf PDF
Rev 1 Attch 01 GTS SOW.pdf PDF
20210225 RFP QnA_Combined_Responses.xlsx XLSX spreadsheet
Rev 1 Attch 20 DO 03 Bradley CDRLs.pdf PDF
Rev 1 Attch 15 DO 02 Stryker SOW.pdf PDF
Rev 1 Attch 24 DO 04 LAV-25 CDRLs.pdf PDF
Rev 01 GTS RFP_Tracked Changes.docx DOCX document
Rev 1 Attch 23 DO 04 LAV-25 SOW.pdf PDF
Rev 1 Attch 11 DO 01 Abrams CDRLs.pdf PDF
FAR-Part6-JandA_GTS20201124_REDACTED.pdf PDF
Attch 29 Bradley GFI.xlsx XLSX spreadsheet
Attch 24 DO 04 LAV-25 CDRLs.pdf PDF
Attch 06 Performance Assessment Questionnaire.docx DOCX document
Attch 11 DO 01 Abrams CDRLs.pdf PDF
Attch 07 Solicitation Question and Comment Form.xlsx XLSX spreadsheet
Attch 03 GTS_GFPAttachment11302020.xlsx XLSX spreadsheet
Attch 12 DO 01 Abrams Section F.docx DOCX document
Attch 22 DO 03 Bradley-COFT System Spec Rev J (PRF-PT-00514).docx DOCX document
20210113_JnA MFR_REDACTED.pdf PDF
Attch 15 DO 02 Stryker SOW.pdf PDF
Attch 17 DO 02 Stryker Section F.docx DOCX document
1. GTS RFP 20210129.docx DOCX document
Attch 19 DO 03 Bradley SOW.pdf PDF
Attch 09 SF1408.pdf PDF
Attch 23 DO 04 LAV-25 SOW.docx DOCX document
Attch 21 DO 03 Bradley Section F.docx DOCX document
Attch 02 DD254 GTS 20210126.pdf PDF
Attch 28 Stryker MGS GFI.xlsx XLSX spreadsheet
Attch 16 DO 02 Stryker CDRLs.pdf PDF
Attch 05 Proposed Prices Spreadsheet Updated 20210114.XLSX XLSX spreadsheet
Attch 20 DO 03 Bradley CDRLs.pdf PDF
Attch 30 LAV-25 GFI.xlsx XLSX spreadsheet
Attch 18 DO 02 PIDS Stryker MGS AGTS Rev K (74D-STMGS-B001).docx DOCX document
Attch 13 DO 01 US Army M1A2 SEP PIDS Rev P (139053-3).docx DOCX document
Attch 26 DO 04 USMC LAV-25 PIDS Rev F.docx DOCX document
Attch 04 QASP_GTS_20210126.docx DOCX document
Attch 01 GTS SOW.pdf PDF
Attch 14 DO 01 US Army M1A1 C-AGTS SS Rev F (80D-CAM1A1-E001).docx DOCX document
Attch 27 Abrams GFI.XLSX XLSX spreadsheet
Attch 10 DO 01 Abrams SOW.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-ST-VTS

6. REQUIRING OFFICE

SOW 3.1 & 3.7

5. CONTRACT REFERENCE

DI-MGMT-80227

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

Block 2: Contractors Progress, Status and Management Report

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

SOW 3.1.2

5. CONTRACT REFERENCE

DI-MGMT-81861A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

INTEGRATED MASTER SCHEDULE FORMAT 6Integrated Program Management Report (IPMR)

2. TITLE OF THE DATA ITEM

A002

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.3

5. CONTRACT REFERENCE

DI-MGMT-81468

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Contract Funds Status Report (CFSR)

2. TITLE OF THE DATA ITEM

A003

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

QRTLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A QUARTERLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. THE GOVERNMENT SHALL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.3

5. CONTRACT REFERENCE

DI-MGMT-81651

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Contract Invoicing and Payment Report

2. TITLE OF THE DATA ITEM

A004

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS

REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.2 & 3.1.3.1

5. CONTRACT REFERENCE

DI-MGMT-81861A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

INTEGRATED MASTER SCHEDULE FORMAT 1Integrated Program Management Report (IPMR)

2. TITLE OF THE DATA ITEM

A005

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5

5. CONTRACT REFERENCE

DI-SESS-80858C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Supplier's Configuration Management Plan

2. TITLE OF THE DATA ITEM

A006

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINA

3. BLOCK 12: SHALL BE DUE AT PRELIMINARY DESIGN REVIEW (PDR).

6. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.

7. BLOCK 14: BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS

REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL

8. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

9. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

10. CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.8 & 3.2.1.4

5. CONTRACT REFERENCE

DI-SESS-81022D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A007

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

Block 2: Configuration Audit Summary Report and Certification

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF THE PHYSICAL

CONFIGURATION AUDIT.

4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS

REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

5. CONTRACTOR FORMAT IS ACCEPTABLE.

6. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.8 & 3.2.1.4

5. CONTRACT REFERENCE

DI-SESS-81646B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Configuration Audit Plan

2. TITLE OF THE DATA ITEM

A008

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: APPROVED FOR PUBLIC RELEASE

3. BLOCK 12: SHALL BE DUE 25 DAYS PRIOR TO A PHYSICAL CONFIGURATION AUDIT.

4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

5. CONTRACTOR FORMAT IS ACCEPTABLE.

6. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.13

5. CONTRACT REFERENCE

DI-SESS-80639D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Engineering Change Proposal (ECP)

2. TITLE OF THE DATA ITEM

A009

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF AN ECP REVIEW.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.13

5. CONTRACT REFERENCE

DI-SESS-80642D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Notice of Revision (NOR)

2. TITLE OF THE DATA ITEM

A00A

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF AN ECP REVIEW.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.13

5. CONTRACT REFERENCE

DI-SESS-80643D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Specification Change Notice (SCN)

2. TITLE OF THE DATA ITEM

A00B

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF AN ECP REVIEW

OR SPECIFICATION CHANGE REVIEW.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.13

5. CONTRACT REFERENCE

DI-SAFT-80103C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A00C

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

Block 2: ENGINEERING CHANGE PROPOSAL SYSTEM SAFETY REPORT (ECPSSR)

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW WAWF) IMMEDIATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

REQUIRED FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT

SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF AN ECP REVIEW.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.14, 3.1.8, 3.2.7 & 3.5.1

5. CONTRACT REFERENCE

DI-ADMN-81505

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Report, Record of Meeting/Minutes

2. TITLE OF THE DATA ITEM

A00D

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: APPROVED FOR PUBLIC RELEASE.

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF A MEETING.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.15

5. CONTRACT REFERENCE

DI-SESS-80640D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Request for Variance (RFV)

2. TITLE OF THE DATA ITEM

A00E

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF

DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE WHEN A REQUEST FOR VARIANCE IS PROPOSED

TO THE ESTABLISHED CONFIGURATION MANAGEMENT BASELINE.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.7

5. CONTRACT REFERENCE

DI-MGMT-81808

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Contractors Risk Management Plan

2. TITLE OF THE DATA ITEM

A00F

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS, AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS

REPRODUCIBLE SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABALE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.7

5. CONTRACT REFERENCE

DI-MGMT-81809

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Risk Management Status Report

2. TITLE OF THE DATA ITEM

A00G

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE

CONTRACTORS ONLY DUE TO OPERATIONAL USE, EFFECTIVE (award date).

OTHER REQUESTS FOR THIS DOCUMENT

SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING

- THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS

AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE

EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.

DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS, AS

REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA

ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABALE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1TRADE VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.8 & 3.2.7

5. CONTRACT REFERENCE

DI-MGMT-81605

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Briefing Material

2. TITLE OF THE DATA ITEM

A00H

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-C-XXXX

E. CONTRACT/PR NO.

SOW GTS - Base

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

27-JAN-2021

J. DATE

Meister, Jeffery

I. APPROVED BY

26-JAN-2021

H. DATEG. PREPARED BY

Ryan, Trudy

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 10 DAYS PRIOR TO MEETINGS.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED MATERIAL TO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .