Attahment B - Performance Work Statement.docx
DOCX document 836 KB Posted
- Solicitation number
- 36C78626Q50042
About this file
Performance Work Statement Summary
This is a Performance Work Statement (PWS) for cemetery grounds maintenance services at Fort Logan National Cemetery in Denver, Colorado. The contract is performance-based, requiring the contractor to plan, coordinate, organize, manage, and perform mowing, trimming, edging, and associated maintenance activities to maintain healthy turf and an aesthetic appearance reflective of the cemetery's status as a National Shrine. The base contract period is one year with up to four optional one-year extensions at the VA's discretion. The cemetery encompasses improved turf areas (burial sections and specialty high-visibility areas), semi-improved areas, and unimproved native areas, with an expected expansion adding 18.61 improved acres by Summer 2026.
Key service requirements include: (1) Improved Grounds Mowing (CLIN 001) requiring weekly complete mow/trim cycles during the growing season (April-November) with grass maintained within one inch of the professionally recommended height for Kentucky Bluegrass (3-3.25 inches); (2) String Trimming (CLINs 002, 004) around all vertical surfaces and headstones to match mowed height; (3) Semi-Improved Grounds Mowing and Trimming (CLIN 003) at approximately four-inch height on one-to-two-week cycles; (4) Flat Marker Blade Edging (CLIN 005) creating clean 1-2 inch deep vertical cuts around marker perimeters; (5) Feature Edging (CLINs 006, 014) of streets, curbs, and walkways at specified depths, with four edging cycles annually; (6) Fertilizer Delivery (CLINs 010-011) in three discrete shipments (spring, summer, fall) meeting specific 4-0-1 N-P-K analysis with 50% slow-release nitrogen; and (7) Pre- and Post-Emergent Herbicide Applications (CLINs 007-008, 009, 015-017) requiring a Colorado Department of Agriculture-licensed Commercial Pesticide Applicator with Category 206 Turf Pest Control qualification and minimum three years' commercial experience. All herbicide applications must follow label directions, rotate active ingredients to prevent resistance, and include broadcast and spot treatments for dandelion, spurge, mallow, kochia, annual bluegrass, Canada thistle, and bindweed, with a minimum of five business days' notice to the Contracting Officer's Representative (COR) prior to application.
Performance standards are outlined in the Service Delivery Summary (Attachment 1), establishing acceptable quality levels (AQLs) of 95-100% compliance across service categories, with payment reductions for unsatisfactory performance and re-performance required within one to two workdays of notification. The contractor must provide a full-time Quality Control person, submit a Quality Control Plan within 14 calendar days of award, maintain daily and weekly work schedules, conduct daily check-ins with the COR, and provide weekly written reports documenting all work performed. A competent supervisor with minimum five years' grounds maintenance experience must be on-site at least four hours daily when work is being performed. The contractor is responsible for all labor, equipment, vehicles, tools, materials, supplies, and disposal of waste generated by contract work, including provision of temporary toilets, portable generators, water tanks as needed, and a fenced staging area. All contractor personnel must wear identification badges, uniform shirts, and appropriate safety equipment; maintain professional conduct and decorum befitting a National Shrine; and comply with all OSHA, federal, state, and local regulations. The contract prohibits work during ceremonies, funerals, and Memorial Day weekend activities, with the COR providing schedules of interments and ceremonial events. Equipment cleaning before cemetery use is mandatory to prevent pest introduction, and the contractor is liable for all damage to cemetery infrastructure, including turf, irrigation systems, headstones, and markers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QSE_36C78626Q50042_0001 Questions and Answers.pdf | ||
| Attachment A - Price Schedule.docx | DOCX document | |
| Attachment D - Dignity Clause.docx | DOCX document | |
| Attachment C - Wage Determenation 2015-5419.pdf | ||
| 36C78626Q50042.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B : PERFORMANCE WORK STATEMENT
1. GENERAL INFORMATION
1.1. This is a performance-based contract for cemetery grounds maintenance services at Fort Logan National Cemetery, Denver, Colorado and hereafter referred to as Fort Logan or “Cemetery.” The overall responsibility of the Contractor is to plan, coordinate, organize, manage, and perform the activities of mowing and trimming; trimming around headstones, edging around flat markers; curb/sidewalk edging; and associated services described herein required to maintain a healthy and aesthetic appearance of the Cemetery grounds. The Cemetery is located at 4400 W. Kenyon Avenue, Denver, CO 80235.
1.2. This Performance Work Statement describes the basic objectives of the Fort Logan National Cemetery Grounds Maintenance Program. The Performance Based Service Contract provides potential Offerors the flexibility to develop cost effective solutions and the opportunity to propose innovative alternatives to meet the stated objectives. It also presents the Government with an opportunity to assess the Offeror’s understanding of all aspects of the effort to be performed by eliminating the "how to" instructions to accomplish the required effort normally contained on the Statement of Work that the Government traditionally provides to prospective Offerors. Minimum acceptable levels of performance to meet the minimum requirements are outlined in the “Services Delivery Summary” contained in Attachment 1.
1.3. The National Cemetery Administration Mission.
1.3.1. The National Cemetery Administration honors veterans with a final resting place and lasting memorial that commemorate their service to our Nation. National Cemeteries are National Shrines. Therefore, the standards for management, maintenance, appearance and operational procedures performed by the Contractor have been established by the National Cemetery Administration to reflect this Nations’ concern and respect for those interred there. For this reason, the Contractor’s strict adherence to the Performance Work Statement, Performance Work Requirements Summary and Guidance Specifications shall be required and shall be essential.
1.4. Background.
1.4.1. In 1999 Congress passed legislation requiring VA to ensure that National Cemeteries serve as a dignified and respectful setting. Each Cemetery is to be an expression of appreciation and respect of a grateful Nation for the service and sacrifice of her veterans.
1.4.2. Further, each National Cemetery is to be maintained as a National Shrine. A National Shrine is defined as a place of honor and memory that declares to the visitor/family who views it as a majestic setting, offering a sense of serenity, historic sacrifice and nobility of purpose. The National Cemetery is a beautiful and awe-inspiring tribute to those who gave much to preserve our Nation’s freedom and way of life.
2. DESCRIPTION OF CONTRACT OBJECTIVES
2.1. The Contractor shall furnish all labor, supervision, professional expertise, vehicles, tools, equipment, materials, and services necessary to ensure that grounds maintenance is performed in a manner that shall meet or exceed the requirements to maintain healthy turf grass and that presents a clean, neat, professional and aesthetic grounds appearance throughout the Cemetery. The Contractor’s performance will be based on the Contracting Officer’s (CO) and Contracting Officer’s Representative (COR) evaluation and of the results required by the Service Delivery Summary (SDS) and not the method of performance. It is at the Contractor’s discretion to determine the methods to attain the level of service at the best value. The evaluation of results will be based on COR performance assessment, tenant satisfaction, and customer complaints. The final results of the evaluations will be the determining factor for the success or failure of this contract. The Contractor shall comply with applicable federal, regional, state, local laws, and commercial standards.
2.2. Services include, but are not limited to, mowing, trimming (features and headstones), edging (features and flat markers), pesticide applications, fertilizer delivery, and removal of trash (generated by the Contractor), as well as sweeping or blowing off grass from sidewalks, roads and headstones. Scheduling of services shall be coordinated with the COR to avoid disruption of ongoing Cemetery operations. All work shall be done during normal Federal workdays during Cemetery workday hours. The exception is Memorial Day, which may be a workday for Federal employees, but not for the Contractor. No work shall be allowed during special weekend activities.
2.3. The Contractor shall be responsible for full management of the facility’s grounds maintenance services described herein. The Government’s objectives are described in the NCA’s “Operational Standards and Measures” (given upon request of the Contracting Officer), the Performance Work Statement (PWS), and other requirements identified herein, as they are applicable to the services required in the Pricing Schedule. The Contractor shall develop a “Performance Work Plan” that contains solutions to accomplish the Government’s objectives. The Contractor may use whatever method it chooses to meet the objectives, as-long-as the results satisfies the minimum acceptable levels of performance as defined in Services Delivery Summary (SDS).
2.4. Contract Objectives.
2.4.1. To use an innovative and creative technical approach to manage the Cemetery grounds maintenance operation at the Fort Logan National Cemetery in order to maintain the highest standards of appearance as a National Shrine, in accordance with best commercial practices and the requirements identified in this solicitation.
2.4.2. To have the Contractor perform to its Technical Performance Approach focused on criteria designed to maintain healthy grass and a clean, neat and professional grounds appearance overall.
2.4.3. The minimum life of the contract is planned for one (1) base period with up to four (4) one- year options individually exercised at the VA’s discretion and dependent on the availability of funds.
3. DESCRIPTION OF SERVICES:
3.1. Improved Grounds Mowing, CLIN 001 and Optional CLIN 0013. The Contractor shall mow all Improved Grounds to look well-manicured, with a neat and professional appearance at all times. Improved Grounds are visually prominent and medium visual impact areas requiring more frequent maintenance, such as burial areas, high visibility specialty areas, and non-burial areas (see Attachment 6, Definitions). All Improved Grounds shall be maintained in the same manner as a high quality residential lawn under contract from a professional lawn maintenance service. This generally requires a complete mow/trim cycle every week during the growing season (April through November). Mowed areas shall be uniform in appearance, free of skips, gaps, scalping, rutting, bruising, and uneven and rough cutting.
3.1.1. The Contractor shall maintain grass height at a height within one (1) inch (+/-) of that which is professionally recommended for the predominant grass type at the cemetery and as directed by the COR. Optimally, the height should be no more than one-half an inch (½”) above the recommended range for the type of turf at the Cemetery as directed by the COR. The resulting height of grass is measured to determine correct cutting height. Mowing should be performed with sufficient frequency that no more than one-third of leafage is removed during any single mowing. The Contractor’s Performance Work Plan shall address any adjustments required depending on weather conditions and approved by the COR.
3.1.1.1. The predominant turf type is Kentucky Bluegrass with a recommended cutting range of 3 to 3.25 inches.
3.1.2. The Contractor shall be required to pick up, collect and dispose of debris and trash (see Attachment 6, Definitions), natural and manmade, prior to and after mowing/trimming any area.
3.1.3. The Contractor shall identify, move and replace all floral or commemorative items, etc. to their original locations as necessary while performing mowing/trimming services.
3.1.4. The Contractor shall keep all headstones, flat markers, monuments, roadways, walkways (inside and out), flagpole bases, public visitor areas including at the Committal Shelter, or other non-turf areas free of clipping or edging deposits. Clippings shall be mechanically blown or swept onto nearby turf areas when possible or collected and disposed of on the same day as the mowing, trimming, or edging event that produced them. At no time is freshly mowed grass to be blown onto headstones
3.1.5. The Contractor shall immediately remove and dispose of, or mulch clearly visible clumps of grass clippings on top of the turf to prevent the appearance of windrows.
3.1.6. The Contractor shall use commercial grade rear-discharge mowers or commercial grade mowers with mulching decks only. The Contractor shall use properly maintained and adjusted cutting equipment to prevent streaks or irregularities, uneven cutting, plowing, or gouging of the soil. Cutting blades on mowing and trimming equipment must be kept sharp so that grass tips are cleanly cut and not torn or damaged. Riding mowers may be used if they are not operated within six (6) inches of markers, monuments, tree trunks or other vertical surfaces.
3.1.7. All mowing equipment shall be cleaned before unloading or mowing at the Cemetery to reduce the risk of introducing weeds, diseases, insects or other pests into the Cemetery turf. If specific cemetery sections have been identified to have a pest issue, cleaning of mowing equipment may be required before using equipment in additional sections to prevent pest spread. No equipment shall be cleaned on Cemetery property, unless a specific area is approved and designated by the COR.
3.1.8. The Contractor shall hand mow new seed/sod areas (present at all newly buried gravesites, second interment gravesites, and repaired gravesite locations) until they are fully established to the point where they will not be damaged by riding mowers.
3.1.9. The Contractor shall be familiar with and utilize different mowing patterns and shall change direction, change patterns, and vary mower wheel width patterns after each mowing thereby reducing turf wear, prevent wheel rutting, and provide a neater appearance. All mowing around trees will be accomplished in a manner that prevents a “ringing pattern” around the tree and associated damage to turf.
3.1.9.1. The change in direction and change in patterns also may be referred as cross cutting, diagonally, or behind man-made and/or natural objects.
3.1.10. There may be periods of excessive rainfall when the Contractor cannot access areas for mowing due to excessive wetness. The COR has the authority to stop work if weather conditions are such that work that day will do more damage than good to the Cemetery grounds. During these periods, the Contractor shall be expected to ensure the grass is cut in less than a week’s time once grass is suitable for mowing.
3.1.11. The contractor shall be responsible for replacing sprinkler heads (in-kind) damaged during mowing operations whether due to improper mowing techniques, improper cut height, or neglect.
3.1.12. The contractor shall notify the COR if malfunctioning sprinkler heads (ie fail to retract or set at improper height) interfere with mowing operations.
3.2. String Trimming, CLIN’s 002, 004 and Optional CLIN 0013. The Contractor shall trim grass and vegetation around vertical surfaces or any other structure or area that cannot be maintained by traditional mowing equipment to match surrounding area grass height within Improved Grounds. Streaks or irregularities, uneven cutting, plowing, or gouging of the soil is unacceptable. The vertical surfaces to be trimmed include headstones, flat markers, section markers, monuments, trees, planting beds, shrubs, buildings, curbs/curbing, fences, walls, poles, signs, fire hydrants, parking lot bumper blocks, boulders, utility/valve boxes and covers.
3.2.1. The Contractor shall trim turfgrass surrounding headstones and flat markers to match mow height after each mowing cycle.
3.2.2. The Contractor shall trim all areas concurrent with mowing. Trimming operations of all non-mowed turf areas shall be considered a part of mowing. The Contractor shall mow first, followed by trimming.
3.2.3. The Contractor shall remove or mulch grass clippings when visible after trimming, before leaving work area.
3.2.4. The Contractor shall exercise caution to avoid contact with headstones, markers, monuments, building walls, trees, shrubs, flowers, any other desirable plant materials, etc. or any other structure than can be damaged by contact with the trimming device’s cutting instrument.
3.2.5. The Contractor shall use commercial grade power trimmers and power edgers to trim grass from around headstones, flat markers, monuments, section markers, etc. The Contractor shall use trimmers with a plastic blade attachment to cleanly trim edges around all headstones and flat markers, monuments, section markers, etc. or as otherwise approved by the COR.
3.3. Semi-Improved Grounds Mowing and Trimming, CLIN 003. The Contractor shall mow and trim all Semi-Improved Grounds to look neat and professional. The Semi-Improved Grounds at Fort Logan National Cemetery are medium visual impact, grassed areas near the Assembly Area, around the irrigation pond, and along the streets exterior to the Cemetery (indicated on Grounds Map) that are generally viewed at a distance and/or meant to be maintained in an aesthetically pleasing state. The Contractor shall maintain grass height at approximately 4 inches. This generally requires a complete mow/trim cycle every one to two weeks during the growing season (April through November). Mowed areas shall be uniform in appearance, free of skips, gaps, scalping, rutting, bruising, and uneven and rough cutting. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing. Fences in Semi-improved areas shall be free of vines/vegetation. The Contractor shall mulch or remove grass clippings when visible after trimming, before leaving work area.
3.4. The Contractor Shall Blade Flat Markers and Edge Features:
3.4.1. Flat Marker Blade Edging, CLIN 005. The Contractor shall edge turf perpendicular to the outside perimeter (edge) of flat grave markers to remove all grass/vegetation that is growing around or over the entire outside perimeter of the flat grave markers during each mow/trim cycle. The depth of the vertical cut at the edge of the flat markers shall be 1” to 2” deep and the width of the cut shall not exceed ½”. There shall be a clean and neat vertical edge left around each flat marker. No metal blades shall be used to edge around flat markers. The Contractor shall exercise caution not to chip flat markers with blades. Flat markers are present in the following burial sections: D, N, P, T-1, and U.
3.4.2. Feature Edging, CLIN 006 and Optional CLIN 0014. The Contractor shall blade edge all streets, curbs, walkways, tree wells, permanent building/structure lines, and planting beds. Edging shall provide a clear zone ½” to 1” wide by 2” to 3” deep with all vegetation removed from joints and cracks. Damage to asphalt/concrete shall be avoided. Edging events shall be completed as ordered by the COR. The first edging cycle shall be completed approximately at the start of the mowing season, the second cycle one week prior to Memorial Day, the third during the month of July, and a fourth edging during the month of September. Additional edging events may be scheduled by the COR. The exact dates will be provided by the COR.
3.5. Fertilizer Delivery, CLIN 010 and 011. The Contractor shall be responsible for all labor, supervision, materials, and equipment to deliver turf fertilizer to the Cemetery.
NOTE: The cemetery is currently undergoing a grounds area expansion that is expected to be completed in Summer 2026. This expansion will add an additional 18.61 Improved Acres. The base year CLINS for fertilizer contain different delivery amounts than option year CLINS.
3.5.1. The fertilizer shall be delivered in three (3) discrete deliveries in spring (March/April), summer (June/July), and fall (August/September).
3.5.2. The fertilizer shall be a free flowing, granular form with the following analysis: 4-0-1 (N-P-K). The spring and summer deliveries shall have an analysis of 24-0-6, and the fall delivery shall have an analysis of 32-0-8.
Table 3.6. Fort Logan fertilizer delivery schedule and analysis.
| Delivery # |
| Time Frame |
| Approx Month |
| Analysis |
| N Application Rate |
| 1 |
| Spring |
| March/April |
| 24-0-6 |
| 1 lb N per 1000 sq ft |
| 2 |
| Summer |
| June/July |
| 24-0-6 |
| 1 lb N per 1000 sq ft |
| 3 |
| Fall |
| August/September |
| 32-0-8 |
| 1.5 lb N per 1000 sq ft |
3.5.3. The fertilizer blend shall meet the following specifications:
3.5.3.1. Nitrogen (N): The product must contain a nitrogen (N) source with 50% slow-release N. The N source must be derived from urea or ammonium sulfate. To meet the 50% slow-release N, the blend must contain urea form, IBDU, polymer-coated sulfur coated urea, or polymer-coated urea.
3.5.3.2. Phosphorus (P): No P is required in this product.
3.5.3.3. Potassium (K): K source must be derived from sulfate of potash. Muriate of potash may be substituted if ammonium sulfate is used as an N source.
3.5.3.4. The fertilizer must contain 2% elemental sulfur.
3.5.3.5. Less than 20% of the blend shall be composed of filler material.
3.5.3.6. The fertilizer product size guide number (SGN) shall range between 200 and 250.
3.5.3.7. Similar analyses may be proposed for consideration. All proposed fertilizer product blends must be able to spread at a rate of 200 to 250 pounds product per acre and supply N at the desired rates in Table 3.6.2.
3.5.4. Delivery shall occur within ten (10) business days of the order, unless an alternate timeframe is agreed to in writing by the COR. Within three (3) business days of receiving the order, the delivery date and time shall be coordinated with the COR. Contractor must provide the fertilizer blending sheet a minimum of five (5) business days prior to delivery.
3.5.5. Upon delivery, the Contractor shall provide the COR, in writing, a list of all fertilizer chemicals with their Safety Data Sheet(s) (SDS), a copy of the label for any and all fertilizer chemicals and the recommended application rate per 1,000 square feet (and/or per acre, and delivery weight tickets. Granular fertilizer shall have the manufacturer’s label composition, to include product name, guaranteed analysis, directions for use, and other essential information required by Colorado Department of Agriculture.
3.5.6. The Contractor shall be responsible for unloading and neatly stacking the bags. The Contractor shall be responsible for immediate clean-up of any spills with their own emergency spill kit and shall notify the COR or Cemetery Director immediately following.
3.6. Pre- and Post Emergent Herbicide Applications CLINS 007, 008, and Optional CLINS 009, 015, 016, and 017.
NOTE: The cemetery is currently undergoing a grounds area expansion that is expected to be completed in Summer 2026. This expansion will add an additional 18.61 Improved Acres. The base year CLINS have three (3) optional CLINS; in option year 1 thru 4 the additional acreage is added to the respective CLINS.
3.6.1. A “Licensed Applicator” shall serve as the “site manager” for this contract and will be provided by the Contractor on-site when work is being performed; all herbicide applications shall be applied directly by or under the supervision of a current commercially licensed pesticide applicator.
3.6.1.1. The licensed applicator must be licensed by the Colorado Department of Agriculture as a Commercial Pesticide Applicator; the license must be active and include Qualified Supervisor (QS) in Category 206: Turf Pest Control. All applications shall be performed as per the Rules and Regulations of the Colorado Department of Agriculture. The Contractor shall submit the license to the COR prior to commencing work.
3.6.1.2. The Licensed Applicator must have at least three (3) years’ experience performing herbicide applications in commercial (non-residential) turf and ornamental landscapes. The Licensed Applicator will ensure all specifications are being met, ensure contract work does not conflict with ceremonies and funerals, and ensure employees are adequately supervised and proper conduct is maintained.
3.6.1.3. Any proposed personnel change for the Licensed Applicator shall be approved a minimum of ten (10) business days prior to a pesticide application.
3.6.2. Herbicide applications shall be mixed and applied in such a manner as to bring about the optimal control of all broadleaf and grassy weeds in the improved turf areas of the cemetery, according to label direction. The contractor shall be responsible for the proper timing and method of each application so that the highest resulting weed control for that application shall be attained.
3.6.3. In accordance with the submitted Pesticide and Fertilizer Application Plan (Attachment 9), the contractor shall schedule the pesticide application date with the COR and only apply once given approval by the COR. The contractor shall give the COR a minimum of five (5) business days’ notice prior to application. Any changes to application date must be approved by the COR.
3.6.4. A minimum of five (5) business days in advance of each fertilizer or pesticide application, the contractor shall provide the MSDS and Label for all chemical products (pesticides and adjuvants) as well as the completed Pesticide or Fertilizer Application Proposal (Attachment 10). Required information on the proposal includes the company name, company contact information; names, titles, and license information of the company’s staff that will perform the application; proposed date of application; application type (broadcast or spot); size of area to be treated; restricted entry, follow-up instructions and/or control symptoms; application area; the chemicals proposed (trade name, EPA registration number, active ingredient, total amount to be applied, proposed application rate); and targeted weed(s).
3.6.5. The contractor shall provide the completed Pesticide Application Record (Attachment 11) by 5:00 pm the day of application. Required information on the log includes the company name, company contact information; names, titles, and license information of the company’s staff that performed the application; date and time of application; application type (broadcast or spot); size of area treated; restricted entry, follow-up instructions and/or control symptoms; application area; the chemicals used (trade name, EPA registration number, active ingredient, total amount applied, application rate); targeted weed(s); and weather conditions (including the temperature and the average wind speed) during the time of application.
3.6.6. The herbicide product shall meet the following requirements:
3.6.6.1. Follow industry best practices and label instructions to rotate chemical chemistry / Mode of Action (MOA) to mitigate herbicide resistance. If a specific active ingredient is failing to provide control, it shall be rotated out.
3.6.6.2. No pre-emergent herbicide family may be used over a consistent twelve (12) month period; herbicide family rotation shall either be within year or between years. During 2025, the active ingredient pethoxamid was used from MOA group 15.
3.6.6.3. Be labeled for control of weeds in ornamental turfgrass – specifically for Kentucky bluegrass.
3.6.6.4. Include the weeds of concern at the cemetery on the label. Weeds within the turf areas at the cemetery include dandelion, spurge, mallow, kochia, annual bluegrass, Canada thistle, and bindweed. Emerging updates or changes to this list will be provided by the COR ten (10) business days ahead of applications proposed on the Contractor-submitted Pesticide and Fertilizer Application Plan (Attachment 9). If the Contractor identifies additional weeds within the Kentucky bluegrass turf areas while on site, the Contractor shall provide this information to the COR in writing.
3.6.7. The herbicide application rates shall meet the following requirements:
3.6.7.1. Not be less than the minimum rate needed for control of the weeds of concern.
3.6.7.2. According to turf type, not be more than the maximum rate permitted per application nor total to more than the maximum annual use rate, according to label restrictions.
3.6.7.3. Split applications shall be used when identified as a best management practice for specific weeds of concern.
3.6.8. Following the Grounds Management Plan, see the herbicide program for Kentucky Bluegrass at the cemetery with example product and rate.
3.6.8.1. Spring Pre-emergent Broadcast: The exact timing of application is based on soil temperatures (55°F) and weather conditions.
3.6.8.2. Fall Pre-emergent Broadcast: The exact timing of application is based on soil temperatures (70°F) and weather conditions.
3.6.8.3. Spring Post Emergent Broadcast: The exact timing based on weed development.
3.6.8.4. Summer Post Emergent Broadcast: The exact timing based on weed development and residual period of Spring Post Emergent.
3.6.8.5. Fall Post Emergent Broadcast: The exact timing based on weed development and residual period of Summer Post Emergent.
3.6.8.6. Spot applications occur as needed based on weed species, weed development, weather conditions, and order of the COR. The Contractor shall schedule spot applications within five (5) business days of written request from the COR. Spot application size will not exceed label restrictions.
Table 3.7. Example herbicide program for Kentucky bluegrass.
| Month |
| Pre-emergent |
| Post Emergent |
January
February
| March |
| Spring Application – split |
April
Spring Application
May
June
July
Summer Application
August
| September |
| Fall Application |
| Fall Application |
October
November
December
| Example Products |
| · Ronstar (oxadiazon, MOA 14) |
· Barricade (prodiamine, MOA 3)
· Dimension (dithiopyr, MOA 3)
· Betasan (bensulide, MOA 8)
· Pendulum (pendimethalin, MOA 3)
· Gallery (isoxaben; MOA 21)
· 3-Way Product (2,4-D, mecoprop, dicamba; MOA 4)
· Quicksilver (carfentrazone; MOA 14)
· Escalade 2 (2,4-D, fluroxypyr, dicamba; MOA 4)
· Tenacity (mesotrione; MOA 27)
· Drive (quinclorac; MOA 4)
· Confront (triclopyr, clopyralid; MOA 4)
3.6.9. All application methods of herbicides shall be in strict accordance with manufacturer instructions, Department of Environmental Protection, and all applicable federal, state, and local laws. The Contractor is responsible for specifically the herbicide label at all times. This includes, but is not limited to, all safety, mixing, weather conditions, and application directions, and information.
3.6.10. All contractor personnel shall be properly clothed and wearing proper safety equipment during any and all applications.
3.6.11. All mixing of chemicals and filling of tanks shall be performed off site or only in an appropriate area of the cemetery as determined and directed by the COR.
3.6.12. The herbicide application equipment shall be correctly calibrated (if granular, to the specific product) and the application made to achieve a uniform distribution of the herbicide(s) throughout the application area.
3.6.13. The Contractor shall be responsible for maintaining adequate signage in all areas where pesticides have been applied. As needed, chemical application signs shall be placed on all sides and no less than 25 feet apart for visibility from all entry points. The Contractor shall also be responsible for removal of the chemical application signs no less than 24 hours after application.
3.6.14. The Contractor shall provide written instructions to the COR concerning the expected control timeline and symptoms.
3.6.15. The Contractor shall provide written recommendations to the COR concerning any watering requirements to activate chemicals, as needed. The Cemetery shall schedule and perform this watering requirement.
3.6.16. The contractor shall be responsible for any and all repeat, follow-up, and/or spot spray herbicide applications, due to ineffective (based upon provided control symptom timeline and product label), uncalibrated, or inaccurate applications. These repeat, follow-up, and spot spray treatments shall be provided at no additional charge to the government within five (5) business days of notification.
4. SERVICE DELIVERY SUMMARY (SDS). The contract service requirements are summarized in performance objectives that relate directly to requirements. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The SDS and the Contractor’s Quality Control Plan provide information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. During the initial 30 days of the contract, two additional errors on each performance objective shall be allowed in an effort to identify normal “phase-in” problems.
4.1. Quality Control. The Contractor shall develop, submit for Contracting Officer and COR acceptance, and maintain a Quality Control program to ensure grounds maintenance services are performed in accordance with the requirements of this contract.
4.1.1. The Contractor shall submit a Quality Control Plan (QCP) for Contracting Officer and COR acceptance within fourteen (14) calendar days after contract award. Any changes thereafter must also be provided to Contracting Officer and COR for acceptance.
4.1.2. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the Contractor shall develop Quality Control procedures addressing the areas identified in Paragraph 3, Description of Services. The Contractor shall provide at least one (1) full time person dedicated to Quality Control.
4.1.3. The Contractor’s QCP shall include the following or have incorporated into during performance of contract, at a minimum:
4.1.3.1. An inspection plan covering all services required by this contract. The inspection plan must specify the areas to be inspected on either a scheduled or unscheduled basis; how often inspections will be accomplished and documented; and the title of the individual(s) who will perform the inspections.
4.1.3.2. On-site records of all inspections conducted by the Contractor noting necessary corrective action taken. The Government reserves the right to request copies of any and/or each inspection.
4.1.3.3. Incorporation of either active or established internal policy and procedures for updating equipment and procedures that may affect performance of contract.
4.1.3.4. The methods for identifying and preventing deficiencies in the quality of service performed, before the level of performance becomes unacceptable and organizational functions noting intermediate supervisory responsibilities and overall management responsibilities for ensuring total acceptable performance.
4.1.3.5. On-site records identifying the character, physical capabilities, certifications and ongoing training of each employee performing services under this contract.
4.1.3.6. A log to account for all requests for immediate service. The log shall indicate the date and time of services, and description of results and completion of these services.
4.1.3.7. On-site records of any complaints or problems, with procedures taken to allow for corrections and/or elimination before effects caused interruption of performance of contract.
4.2. Quality Assurance. The COR will evaluate the Contractor’s performance through on-site inspections, evaluation of the Contractor's quality control program and receipt of complaints from Cemetery personnel in accordance with the attached Quality Assurance Surveillance Plan (QASP), Attachment 7.
4.2.1. The COR may inspect each task as completed or increase the number of Quality Assurance inspections if called for by repeated failures discovered during inspections or repeated customer complaints. Likewise, the COR may decrease the number of Quality Assurance inspections if performance dictates.
4.2.2. The COR will also receive and investigate complaints from various customers visiting the Cemetery. The Contractor shall be responsible for initialing validated visitor complaints. The COR will make final determination of the validity of visitor complaint(s).
4.3. Supervision.
4.3.1. Contractor Superintendent: The Contractor shall provide a competent and experienced supervisor who speaks and writes fluent English on site for at least four (4) hours a day whenever work is being performed, other than trash and debris pick-up.
4.3.2. The Contractor Superintendent must have not less than five (5) years’ experience as a direct supervisor of grounds maintenance operations that included mowing, trimming, edging, and cleanup in industrial, commercial or public sites.
4.3.3. The Contractor Superintendent shall ensure all specifications are being met, ensure contract work does not conflict with ceremonies and funerals, and ensure employees are adequately supervised and proper conduct is maintained.
4.3.4. The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The Contractor is expected to remove any employees from the Cemetery for cause, to include, but not limited to, safety violations, other misconduct in performance of duty under these specifications and/or conduct contrary to the best interests of the Government. If the Contractor fails to act in this regard, or the reason for a removal is immediately required to protect the interests of the Government, the COR may direct the removal of an employee from the premises. Contractor objections to any such action shall be referred to the Contacting Officer (CO) for final resolution; however, the Contractor will first immediately comply with COR direction pending any CO final resolution at a later time or date. The Contractor shall not be due any type of compensation for their costs incurred as a result of an employee being removed for cause; unless the removal is directed by the COR, and is later found invalid and/or unreasonable by the CO.
4.3.5. In the absence of the Superintendent, the Contractor shall appoint an English-speaking crew foreman or an employee who shall be responsible to insure that the work is being accomplished in an expeditious manner, is performed in accordance with the contract specifications and that the work will progress without undue delay.
4.4. Inspection and Cleaning of Cemetery Facilities.
4.4.1. The Contractor shall perform a weekly inspection. During this inspection the appearance of the Cemetery shall be observed, and any deficiencies noted within the scope of the contract shall be corrected as soon as practicable. Items that need correcting outside the scope of the contract shall be reported to the COR or his/her representative.
4.4.2. The Contractor shall be required to submit inspection reports and work accomplished to the COR weekly. The inspection forms will be provided to the Contractor. (See “Work Summary and Progress Report”, Attachment 3)
4.5. Reporting and Record Keeping.
4.5.1. The Contractor Superintendent shall report on a daily basis to the COR at the Maintenance Building of the Cemetery and log in on days when work is being performed. This DAILY check-in is mandatory and shall be at a time agreed upon by the COR and the Contractor Superintendent. The purpose of the DAILY meeting is to coordinate and establish the daily work schedule to ensure that no work is being performed at the immediate site of a scheduled interment or ceremony, and to submit the required written reports to the COR. These Daily meetings are for the Contractor Superintendent to ask questions and ensure he/she understands the off-limit areas, which may vary depending on the event. The Contractor Superintendent can thus assign tasks accordingly throughout the rest of the Cemetery so that productive use of labor and equipment is assured, and downtime is avoided. If the Contractor Superintendent fails to re-direct employees away from an event in a timely fashion, the COR may then assist in doing so.
4.5.2. The Contractor Superintendent shall provide WEEKLY and DAILY work schedules to the COR. The Contractor is required to schedule all required services and is further required to comply with his schedule except for delays beyond his control. Such delays shall be coordinated through the COR. The work schedule shall include deficient work identified by Contractor's quality control inspections and not yet corrected.
4.5.3. The Contractor shall submit the WEEKLY schedule every Friday by 3:00 P.M. indicating the work to be performed during the following week and the DAILY schedule shall be submitted on a daily basis by 8:00 A.M. indicating work being performed on that day.
4.5.4. The Contractor Superintendent shall provide WEEKLY an accurate written report identifying all work that took place within the previous seven (7) calendar days. The Contractor shall document services performed, indicate the location where work was to be performed, and provide information to the COR as required.
4.5.5. The Contractor shall submit the Colorado Commercial Pesticide Applicator’s license with their proposal. Staff serving as the Licensed Applicator must have their license on their person when applications are conducted.
4.5.6. The Contractor shall complete and submit a detailed Pesticide and Fertilizer Application Plan to the COR no later than 30 days following the award (Attachment 9). The Contractor submitted plan shall directly correspond to the specifications in this Performance Work Statement.
4.5.7. The contractor shall provide the completed Pesticide Application Record by 5:00 pm the day of application. (Attachment 11). A different format that includes all reporting requirements may be proposed by the contractor within thirty (30) days of award for government approval.
4.5.8. A list of scheduled ceremonies will be provided to the Contractor Superintendent the week prior to the scheduled events, and a list of scheduled funerals will be provided daily. The Contractor Superintendent shall be solely responsible for ensuring that no contract work causes any funeral, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity or security of the event is compromised. The Contractor shall be solely responsible for staying abreast of all such upcoming events and when in doubt, he/she must ask the COR.
4.5.9. The Contractor’s performance and progress on this contract shall be measured weekly based on how timely, accurately, and adequately he/she accomplishes and completes the weekly work scheduled and as needed to systematically accomplish the contract work over the duration of the project. In instances where the COR determines that the work is behind schedule, he will notify the Contracting Officer, and the Contractor shall increase workforce and/or hours of operation at no additional cost to the Government in order to achieve completion of the contract work within the specified timeframe.
4.5.10. SUBMITTALS - The Contractor shall submit the following documents or information in accordance with the table below.
Table 4.5. Submittal Schedule
| Submittal |
| Frequency |
| Submittal Schedule |
| Work Plan/Staffing Plan |
| As Revised |
| With Proposal |
| Quality Control Plan |
| As Revised |
| Within 14 calendar days after award |
| Fire Safety Plan |
| As Revised |
| Within 14 calendar days after award |
| Emergency Contacts |
| As Revised |
| Within 14 calendar days after award |
| Licenses, Permits, Insurance on Vehicles, Liability, Workman’s Compensation Insurance, etc. |
| As Revised |
| Per Contracting Officer direction |
| Pesticide Applicator Certification(s) |
| Initial and as revised |
| With proposal submission or per Contracting Officer direction |
| Equipment List |
| Initial and as revised |
| With proposal submission |
| Pesticide and Fertilizer Application Plan |
| Initial and each OY |
| Within 30 days of award |
| Pesticide or Fertilizer Application Proposal |
| As Needed |
| A minimum of five (5) business days prior to use |
| Herbicides information sheets/labels |
| As Needed |
| A minimum of five (5) business days prior to use |
| Fertilizer Blend/Information Sheet and Safety Data Sheets |
| With each new product |
| A minimum of five (5) business days prior to delivery |
| Fertilizer delivery weight ticket and label |
| With delivery |
| With delivery |
| Fertilizer and/or Pesticide Record |
| As needed |
| Day of application by 5:00 PM |
| Proposed Weekly Work Schedule |
| Weekly |
| Preceding Friday by 3:00 p.m. |
| Daily Work Schedule |
| Daily |
| By 8:00 a.m. |
| Weekly Report and Rework List |
| Weekly |
| Following Monday or next business day |
4.6. Performance Evaluation Meeting.
4.6.1. The issuance of a Contract Discrepancy Report (CDR) found at Attachment 4 may be cause for the scheduling of a meeting among the Contractor, CO, and the COR. A mutual effort will be made to resolve all problems identified. The Government will prepare written minutes of the meeting. The Contractor, CO, and the COR will sign minutes of the meeting(s).
4.6.2. Should the Contractor not concur with the minutes, they shall so state their objections in writing to the Contracting Officer, within ten (10) calendar days, and also explain the reasons for non-concurrence. The Contracting Officer will review and consider the reasons submitted for the Contractor's non-concurrence and make a decision to revise or uphold the comments as written. The Contracting Officer will notify the Contractor of the decision in writing within ten (10) calendar days of submission of any objections.
4.7. Actions.
4.7.1. Normally, the COR will verbally advise or give a written inspection report to the Contractor of discrepancies the first time they occur and ask the Contractor to correct the problem. A notation will be made on the COR checklist of the date and the time the deficiency was discovered and the date and time the Contractor was notified.
4.7.2. If the Government created any of the discrepancies, these will not be counted against the Contractor's performance. When the Government has caused the Contractor to perform in an unsatisfactory manner, the COR will forward a written notice to the responsible organizational element requesting corrective action be taken.
4.7.3. When the Contractor is not meeting the acceptable limits of satisfactory performance, a CDR will be issued to the Contractor. The seriousness of the failures should govern whether to issue CDR at the end of the period, or as soon as work performance is less than satisfactory.
4.7.4. When a CDR is issued for a service, the CO and/or the COR may exercise any contractual remedy available for non-performance, in accordance with FAR 52.212-4, “Inspection and Acceptance”.
4.7.5. If the Contractor does not achieve satisfactory performance by the end of the next period or agreed suspense date, further actions may be considered, to include a determination on whether continued performance by the Contractor is feasible.
SECTION A - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Attachment 1 through Attachment 11
Attachment 1 Services Delivery Summary
Attachment 2 Cemetery Maps
Attachment 3 Work Summary & Progress Report
Attachment 4 Contract Discrepancy Report (CDR)
Attachment 5 General Conditions
Attachment 6 Definitions
Attachment 7 Quality Assurance Surveillance Plan (QASP)
Attachment 8 Floral Policy
Attachment 9 Pesticide and Fertilizer Application Plan
Attachment 10 Pesticide or Fertilizer Application Proposal
Attachment 11 Pesticide Application Record
ATTACHMENT 1
SERVICES DELIVERY SUMMARY (SDS)
1. The purpose of this exhibit is to:
a. List the contract requirements considered most critical to acceptable contract performance.
b. Show, where applicable, the maximum allowable degree of deviation from perfect performance for each requirement that shall be allowed by the Government before contract performance is considered unsatisfactory.
c. Define the procedure the Government shall use in reducing the Contractor’s monthly payment if satisfactory performance is not rendered.
2. The Government's quality assurance procedures are based on actual performance of the contract, and all areas will be reviewed periodically, (e.g. weekly, monthly, quarterly, and semi-annually).
3. The criteria for acceptable and unacceptable performance are as follows:
a. Contract requirements. The criteria for requirements are the level of performance deemed acceptable to the Government.
b. If the quality of work does not comply with the contract requirements the COR will initiate, and the Contractor shall be required to complete a Contract Discrepancy Report (CDR).
c. The CDR will require the Contractor to explain in writing why performance was unacceptable, how performance will be returned to an acceptable level, and how recurrence of the problem will be prevented in the future. The Contractor will not be paid for services not rendered in accordance with the standards set forth in this contract.
d. If the level of performance is deemed unacceptable to the Government, payment may be reduced for unsatisfactory performance by the percentage as shown in the chart below:
GROUNDS MAINTENANCE FOR FORT LOGAN NATIONAL CEMETERY
| Required Services |
| PWS REF |
| Acceptable Quality Level, AQL (Performance Standard) |
| Surveillance Method |
| Remedies and Incentives (Positive or Negative) |
| 1) Mowing of Improved Turfgrass |
| Para 3.1 |
| 95% of the turfgrass area is maintained to the following requirements: |
Turf is maintained within one inch (1”) of the recommended mowing height.
| Periodic surveillance and verified customer complaints |
| Re-performance |
within 1 work day of notification. Document performance in CPARS. 100% of the turfgrass area is maintained to the following requirements:
Turf is maintained within one-half inch (½”) of the recommended mowing height.
2) Trimming of Headstones, Trimming/Edging of Flat Markers, and other vertical surfaces within gravesite sections.
| Para 3.2 and 3.4 |
| 98% of all un-mowed grass around upright headstones, flat markers, monuments, section markers, and other vertical surfaces within the gravesite sections are trimmed to match the exact height of adjacent mowed turfgrass. Flat Markers are vertically edged correctly. |
| Periodic surveillance and verified customer complaints |
| Re-performance |
within 1 work day of notification. Document performance in CPARS. 100% of all un-mowed grass around upright headstones, flat markers, monuments, section markers, and other vertical surfaces within the gravesite sections are trimmed to match the exact height of adjacent mowed turfgrass. Flat Markers are vertically edged correctly.
3) Trimming of all other areas inaccessible to lawn mowers
| Para 3.2 |
| 98% of all un-mowed turfgrass in all other areas of the Cemetery inaccessible to lawn mowers are trimmed to match the exact height of adjacent mowed turfgrass. Turfgrass does not extend over the edge of walks, drives, curbs, site structures, and site fixtures. |
| Periodic surveillance and verified customer complaints |
| Re-performance |
within 1 work day of notification. Document performance in CPARS. 100% of all un-mowed turfgrass in all other areas of the Cemetery inaccessible to lawn mowers are trimmed to match the exact height of adjacent mowed turfgrass. Turfgrass does not extend over the edge of walks, drives, curbs, site structures, and site fixtures.
| 4) Mowing in Semi-improved Areas |
| Para 3.3 |
| 95% of the semi-improved, area is maintained to the following requirements: |
Grass height cut within one inch (1”) of the recommended mowing height.
| Periodic surveillance and verified customer complaints |
| Re-performance |
within 1 work day of notification. Document performance in CPARS. 100% of the semi-improved, native, or reforested area is maintained to the following requirements:
Grass height is cut within one-half inch (½”) of the recommended mowing height.
| 5) Blade Edging of Curbs and Sidewalks |
| Para 3.4 |
| 98% of the curb and sidewalk edges are free of turfgrass and are approximately 1/2” to 1” wide and 2” to 3” deep. |
| Periodic surveillance and verified customer complaints |
| Re-performance |
within 2 work days of notification. Document performance in CPARS. 100% of the curb and sidewalk edges are free of turfgrass and are approximately 1/2” to 1” wide and 2” to 3” deep.
| 7) Fertilizer Delivery |
| Para 3.5 |
| Fertilizer is delivered on time and adheres to contract specifications. |
| 100% Inspection |
| Reperformance of nonconforming work within 5 workdays of the notification from the COR at no increase in contract price. If reperformance is not possible or still does not meet the AQL within the CLIN Period the percentage of the nonconforming work for that period’s payment will be deducted. Document performance (positive or negative) in CPARS. |
| 8) Pre and Post Emergent Herbicide Applications |
| Para 3.6 |
| The Cemetery is generally weed free and weed population does not distract from the overall appearance of the Cemetery. Proper herbicide is applied in such a manner as to bring about the total control of all broadleaf and grassy weeds in the improved turf areas of the Cemetery. Repeat, follow-up, and/or spot spray herbicide applications, as needed, have been applied. |
| Periodic sampling and verified customer complaints |
| Repeat, follow up and/or spot spray herbicide applications, as needed within 2 work days of the notification from the COR at no increase in contract price. If repeat follow on and/or spot applications are not completed within the remedy timeframe, the percentage of the nonconforming work for this CLIN’s payment will be deducted. Document performance (positive or negative) in CPARS. |
| 9) Trash Cleanup and Disposal |
| General Conditions Para 8 |
| 95% of turfgrass area, roads, walkways, and other Cemetery grounds are free of clippings, dirt, leaves, fallen branches, trash, and debris after one attempt to correct any deficiencies. Trash generated by other Contractors and VA maintenance activities is excluded. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .