Attachment A: Price Schedule of Services
Base Year: Date of award through March 31, 2027
CLIN
No.
| Supplies/Services |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 0001 |
| Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 150.37 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 0002 |
| String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 150.37 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 0003 |
| Mow and string trim all semi-improved turf areas. Est. 16.84 acres. |
· Inside cemetery: 14.68 ac
· Outside fence: W Kenyon and Lowell to the ECP: 2.17 ac
| 30 |
| Job |
| $ ___________ |
| $ ___________ |
| 0004 |
| String Trim headstones in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. Est. 104,010 headstones. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 0005 |
| Edge flat-markers in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from flat markers. Est. 3,855 markers. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 0006 |
| Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 57,947 linear feet. |
| 8 |
| Job |
| $ ___________ |
| $ ___________ |
| 0007 |
| Broadcast Pre-Emergent Herbicide Application: Kentucky Bluegrass. Est. 150.37 acres |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 0008 |
| Broadcast Post Emergent Herbicide Application: Kentucky Bluegrass. Est. 150.37 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 0009 |
| OPTION: Post Emergent Spot Herbicide Treatment: Kentucky bluegrass. Est. 150.37 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 0010 |
| Turf Fertilizer Delivery. Fourteen (14) tons of granular 24-0-6 with 50% slow-release nitrogen in 50-lb bags (560 bags). |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 0011 |
| Turf Fertilizer Delivery. Fifteen (15) tons of granular 32-0-8 with 50% slow-release nitrogen in 50-lb bags (600 bags). |
| 1 |
| Job |
| $ __________ |
| $ __________ |
| 0012 |
| OPTION: Mow Improved Turf; Est. 18.61 acres - Expansion Area |
| 12 |
| Job |
| $ __________ |
| $ __________ |
| 0013 |
| OPTION: String Trim Improved Turf; Est. 18.61 acres - Expansion Area |
| 12 |
| Job |
| $ __________ |
| $ __________ |
| 0014 |
| OPTION: Blade Edge Improved Turf; Est 5,804 Linear Feet - Expansion Area |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 0015 |
| OPTION: Broadcast Pre-Emergent Herbicide Applications. Est. 18.61 acres - Expansion Area |
| 1 |
| Job |
| $ __________ |
| $ __________ |
| 0016 |
| OPTION: Broadcast Post-Emergent Herbicide Est. 18.61 acres - Expansion Area |
| 1 |
| Job |
| $ __________ |
| $ __________ |
| 0017 |
| OPTION: Post Emergent Spot Herbicide Treatment: Kentucky bluegrass. Est. 18.61 acres – Expansion Area. |
| 1 |
| Job |
| $ __________ |
| $ __________ |
Total Cost For the Base Year:
Option Year 1: April 1, 2027 through March 31, 2028
CLIN
No.
| Supplies/Services |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 1001 |
| Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 168.98 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 1002 |
| String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 168.98 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 1003 |
| Mow and string trim all semi-improved turf areas. Est. 16.84 acres. |
· Inside cemetery: 14.68 ac
· Outside fence: W Kenyon and Lowell to the ECP: 2.17 ac
| 30 |
| Job |
| $ ___________ |
| $ ___________ |
| 1004 |
| String Trim headstones in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. Est. 104,620 headstones. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 1005 |
| Edge flat-markers in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from flat markers. Est. 3,860 markers. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 1006 |
| Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 63,751 linear feet. |
| 8 |
| Job |
| $ ___________ |
| $ ___________ |
| 1007 |
| Broadcast Pre-Emergent Herbicide Application: Kentucky bluegrass. Est. 168.98 acres |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 1008 |
| Broadcast Post-Emergent Herbicide Application: Kentucky bluegrass. Est. 168.98 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 1009 |
| OPTION: Post Emergent Spot Herbicide Application: Kentucky bluegrass. Est. 168.98 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 1010 |
| Turf Fertilizer Delivery. Sixteen (16) tons of granular 24-0-6 with 50% slow-release nitrogen in 50-lb bags (640 bags). |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 1011 |
| Turf Fertilizer Delivery. Seventeen (17) tons of granular 32-0-8 with 50% slow-release nitrogen in 50-lb bags (680 bags). |
| 1 |
| Job |
| $ __________ |
| $ __________ |
| Total Cost for Option Year 1: |
| $ __________ |
Option Year 2: April 1, 2028 through March 31, 2029
CLIN
No.
| Supplies/Services |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 2001 |
| Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 168.98 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 2002 |
| String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 168.98 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 2003 |
| Mow and string trim all semi-improved turf areas. Est. 16.84 acres. |
· Inside cemetery: 14.68 ac
· Outside fence: W Kenyon and Lowell to the ECP: 2.17 ac
| 30 |
| Job |
| $ ___________ |
| $ ___________ |
| 2004 |
| String Trim headstones in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. Est. 105,230 headstones. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 2005 |
| Edge flat-markers in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from flat markers. Est. 3,865 markers. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 2006 |
| Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 63,751 linear feet. |
| 8 |
| Job |
| $ ___________ |
| $ ___________ |
| 2007 |
| Broadcast Pre-Emergent Herbicide Application: Kentucky bluegrass. Est. 168.98 acres |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 2008 |
| Broadcast Post-Emergent Herbicide Application: Kentucky bluegrass. Est. 168.98 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 2009 |
| OPTION: Post Emergent Spot Herbicide Application: Kentucky bluegrass. Est. 168.98 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 2010 |
| Turf Fertilizer Delivery. Sixteen (16) tons of granular 24-0-6 with 50% slow-release nitrogen in 50-lb bags (640 bags). |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 2011 |
| Turf Fertilizer Delivery. Seventeen (17) tons of granular 32-0-8 with 50% slow-release nitrogen in 50-lb bags (680 bags). |
| 1 |
| Job |
| $ __________ |
| $ __________ |
| Total Cost for Option Year 2: |
| $ __________ |
Option Year 3: April 1, 2029 through March 31, 2030
CLIN
No.
| Supplies/Services |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 3001 |
| Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 168.98 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 3002 |
| String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 168.98 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 3003 |
| Mow and string trim all semi-improved turf areas. Est. 16.84 acres. |
· Inside cemetery: 14.68 ac
· Outside fence: W Kenyon and Lowell to the ECP: 2.17 ac
| 30 |
| Job |
| $ ___________ |
| $ ___________ |
| 3004 |
| String Trim headstones in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. Est. 105,840 headstones. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 3005 |
| Edge flat-markers in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from flat markers. Est. 3,870 markers. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 3006 |
| Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 63,751 linear feet. |
| 8 |
| Job |
| $ ___________ |
| $ ___________ |
| 3007 |
| Broadcast Pre-Emergent Herbicide Application: Kentucky bluegrass. Est. 168.98 acres |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 3008 |
| Broadcast Post-Emergent Herbicide Application: Kentucky bluegrass. Est. 168.98 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 309 |
| OPTION: Post Emergent Spot Herbicide Application: Kentucky bluegrass. Est. 168.98 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 3010 |
| Turf Fertilizer Delivery. Sixteen (16) tons of granular 24-0-6 with 50% slow-release nitrogen in 50-lb bags (640 bags). |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 3011 |
| Turf Fertilizer Delivery. Seventeen (17) tons of granular 32-0-8 with 50% slow-release nitrogen in 50-lb bags (680 bags). |
| 1 |
| Job |
| $ __________ |
| $ __________ |
| Total Cost For Option Year 3: |
| $ __________ |
Option Year 4: April 1, 2030 through March 31, 2031
CLIN
No.
| Supplies/Services |
| Est. Qty |
| Unit |
| Unit Cost |
| Total Cost |
| 4001 |
| Mow all improved turf areas. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 168.98 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 4002 |
| String trim grass in improved turf areas inaccessible to mowing equipment to include all sidewalks, curbs, driveways, trees, planting beds, monuments, buildings, walls, fences, signs, other vertical surfaces. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 168.98 acres. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 4003 |
| Mow and string trim all semi-improved turf areas. Est. 16.84 acres. |
· Inside cemetery: 14.68 ac
· Outside fence: W Kenyon and Lowell to the ECP: 2.17 ac
| 30 |
| Job |
| $ ___________ |
| $ ___________ |
| 4004 |
| String Trim headstones in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from headstones. Est. 106,450 headstones. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 4005 |
| Edge flat-markers in conjunction with every mowing. Remove & replace graveside flowers and associated items. Remove grass clippings, debris, and trash from flat markers. Est. 3,875 markers. |
| 30 |
| Week |
| $ ___________ |
| $ ___________ |
| 4006 |
| Blade Edge all curbing, sidewalks, and roads. Remove grass clippings, debris, trash and clean sidewalks, patios, roadways, curbs, and parking areas. Est. 63,751 linear feet. |
| 8 |
| Job |
| $ ___________ |
| $ ___________ |
| 4007 |
| Broadcast Pre-Emergent Herbicide Application: Kentucky bluegrass. Est. 168.98 acres |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 4008 |
| Broadcast Post-Emergent Herbicide Application: Kentucky bluegrass. Est. 168.98 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 4009 |
| OPTION: Post Emergent Spot Herbicide Application: Kentucky bluegrass. Est. 168.98 acres. |
| 3 |
| Job |
| $ __________ |
| $ __________ |
| 4010 |
| Turf Fertilizer Delivery. Sixteen (16) tons of granular 24-0-6 with 50% slow-release nitrogen in 50-lb bags (640 bags). |
| 2 |
| Job |
| $ __________ |
| $ __________ |
| 4011 |
| Turf Fertilizer Delivery. Seventeen (17) tons of granular 32-0-8 with 50% slow-release nitrogen in 50-lb bags (680 bags). |
| 1 |
| Job |
| $ __________ |
| $ __________ |
| Total Cost for Option Year 4: |
| $ __________ |
PRICE SUMMARY TOTALS:
Total Cost
| Base Year – date of award through 3/31/27: |
| $_______________________ |
| OPTION: Year 1 – 4/1/27 – 3/31/28: |
| $ ______________________ |
| OPTION: Year 2 – 4/1/28 – 3/31/29: |
| $ ______________________ |
| OPTION: Year 3 - 4/1/29 – 3/31/30: |
| $ ______________________ |
OPTION: Year 4 – 4/1/30 – 3/31/31:
| Grand Total (Base + all OPTION: Years): |
| $ ______________________ |
PRICE SCHEDULE: Contractor shall provide all labor, supervision, material, equipment, tools and supplies to complete grounds maintenance services to maintain Fort Logan National Cemetery, 4400 W. Kenyon Avenue, Denver, CO 80235, following National Cemetery Administration standards. The contract period will consist of a base period from date of contract award through March 31, 2027, with up to four (4) one-year OPTIONs to extend the term of the contract through March 31, 2031. Units and services to be in accordance with Performance Work Statement, Technical Specifications, Performance Requirements Summary, and terms and conditions contained in this solicitation.
The schedule price shall be all-inclusive, including all labor, equipment, materials, and supplies to complete the Contract Line Item (CLIN(s)). Offerors shall enter unit cost and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.
All quantities indicated in the Price Schedule are estimated and not purchased by this contract. Should extreme weather conditions result in excessive or minimal turf growth, the Government reserves the right to allow mowing, trimming, and/or edging events required by this contract. In addition, the Government may limit the number of acres to be mowed, headstones/markers trimmed, or linear feet of edging during any given event due to other cemetery projects.
Offerors shall enter the Total Cost for each year in the “Summary Totals” where indicated. Offeror shall calculate the Grand Total for all years and enter where indicated.
Offeror is to understand the quantities stated in the schedule are estimates for pricing purposes only. Acreage or linear feet stated in the schedule may not be exact.
POST AWARD CONFERENCE: Prior to commencement of work, a contract awardee is required to make an appointment for a conference with the COR and/or Contracting Officer to assure you that all parties understand all contractual obligations and the role that each party serves.
SITE VISIT: Offerors or quoters are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect the site constitute grounds for a claim after contract award.