Attachment V - Geotechnical Report.pdf

PDF 614 KB Posted

Attached to
Cumberland Communications Facility
Solicitation number
BPM057831
Issued by
Allegany County, Maryland

About this file

This is a Geotechnical Investigation Report prepared by Delta Oaks Group for INFINIGY Cumberland regarding the proposed installation of a 185-foot monopole tower and communications facility in Cumberland, Allegany County, Maryland, located at 700 Bishop Walsh Road (coordinates: N 39.6633767°, W 78.7892651°). The investigation was conducted to provide engineering recommendations and subsurface condition data necessary for foundation design of the telecommunications facility. The report documents field investigation results, including one mechanical soil test boring advanced to 2.5 feet below ground surface with subsequent rock coring to 12.5 feet, along with laboratory testing of soil and rock samples in accordance with ASTM standards.

The subsurface investigation revealed residual lean clay soil (soft to hard consistency) from ground surface to 2.5 feet below grade, followed by white, tan, highly fractured, moderately to highly weathered sandstone with interbedded clay seams extending to the boring depth of 12.5 feet. No fill material or subsurface water was encountered at the time of drilling. The frost penetration depth for the region is 40 inches (3.3 feet). Delta Oaks Group recommends either shallow foundation or drilled shaft foundation options, with specific design parameters provided for each method, including ultimate bearing capacities, skin friction values, and passive pressure calculations. The site is classified as Seismic Site Class D with corresponding spectral acceleration parameters for design considerations. Construction recommendations address site development, structural fill placement specifications, and detailed protocols for both shallow and drilled shaft foundation installation, with requirements for geotechnical engineer observation and field density testing during construction.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Delta Oaks Group Project GEO25-25764-08

2724 Discovery Drive▪ Suite 110 & 120▪ Raleigh▪ NC ▪ 27616 919▪342▪8247 www.deltaoaksgroup.com

GEOTECHNICAL INVESTIGATION REPORT

May 19, 2025

Prepared For:

INFINIGY

Cumberland Cumberland MD

Proposed 185-Foot Monopole Tower 700 Bishop Walsh Road, Cumberland (Allegany County), Maryland 21502

Latitude N 39.6633767º Longitude W 78.7892651º

Revision 0 geotech@deltaoaksgroup.com

Performed By: Reviewed By:

Michael Thomas Joseph V. Borrelli, Jr., P.E.

mailto:geotech@deltaoaksgroup.com

919▪342▪8247

INTRODUCTION

This geotechnical investigation report has been completed for the proposed 185-foot monopole tower located at 700 Bishop Walsh Road in Cumberland (Allegany County), Maryland. The purpose of this investigation was to provide engineering recommendations and subsurface condition data at the proposed tower location. A geotechnical engineering interpretation of the collected information was completed and utilized to suggest design parameters regarding the adequacy of the structure’s proposed foundation capacity under various loading conditions. This report provides the scope of the geotechnical investigation;

geologic material identification; results of the geotechnical laboratory testing; and design parameter recommendations for use in the design of the telecommunication facility’s foundation and site development.

SITE CONDITION SUMMARY

The proposed tower and compound are located within a wooded area adjacent to an existing water tower, exhibiting a downward sloping topography from the northeast to southwest across the tower compound and subject property.

REFERENCES

Lease Exhibit, provided by INFINIGY, dated March 6, 2025 NRCS Web Soil Survey, Allegany County MD TIA Standard (TIA-222-H), dated October 2017

SUBSURFACE FIELD INVESTIGATION SUMMARY

The subsurface field investigation was conducted through the advancement of one (1) mechanical soil test boring to the auger refusal depth of 2.5 feet bgs. Samples were obtained at selected intervals in accordance with ASTM D 1586. The sampling was conducted at the coordinates provided for the base of the proposed tower. Upon encountering auger refusal

10.0 feet of rock coring was conducted in accordance with ASTM D 2113. Soil and rock samples were transported to our laboratory and classified by a geotechnical engineer in accordance with ASTM D 2487. A detailed breakdown of the material encountered in our subsurface field investigation can be found in the boring log presented in the Appendix of this report.

Additional testing was performed on selected samples in accordance with ASTM D 7012 (Unconfined Compressive Strength – Rock). Laboratory data can be found in the Appendix of this report.

A boring plan portraying the spatial location of the boring in relation to the proposed tower, tower compound and immediate surrounding area can be found in the Appendix.

919▪342▪8247

SUBSURFACE CONDITION SUMMARY

The following provides a general overview of the site’s subsurface conditions based on the data obtained during our field investigation.

FILL

Fill material was not encountered during the subsurface field investigation.

SOIL

The residual soil encountered in the subsurface field investigation began at the existing ground surface in the boring and consisted of lean clay. The materials ranged from a soft to hard consistency.

Auger advancement refusal was encountered during the subsurface field investigation at a depth of 2.5 feet bgs.

ROCK

Rock was encountered during the subsurface investigation at a depth of 2.5 feet bgs. The rock can be described as white, tan, highly fractured, moderately to highly weathered, moderately hard to hard, sandstone, with interbedded clay seams.

SUBSURFACE WATER

At the time of drilling, subsurface water was not encountered during the subsurface investigation. However, subsurface water elevations can fluctuate throughout the year due to variations in climate, hydraulic parameters, nearby construction activity and other factors.

FROST PENETRATION

The frost penetration depth for Allegany County, Maryland is 40 inches (3.3 feet).

CORROSIVITY

Soil resistivity was performed in accordance with ASTM G57-06. The results from the field testing can be found in the Appendix of this report.

919▪342▪8247

FOUNDATION DESIGN SUMMARY

In consideration of the provided tower parameters and the determined soil characteristics, Delta Oaks Group recommends utilizing a shallow foundation or drilled shaft foundation for the proposed structure. The strength parameters presented in the following sections can be utilized for design of the foundation.

GENERAL SUBSURFACE STRENGTH PARAMETERS

The unit weight provided assumes overburden soil was compacted to a minimum of

95% of the maximum dry density as obtained by the standard Proctor method (ASTM D 698) and maintained a moisture content within 3 percent of optimum.

The values provided for phi angle and cohesion should be considered ultimate.

Boring Depth (bgs) USCS Moist/Buoyant Unit Weight (pcf)

Phi Angle (degrees) Cohesion (psf)

B-1

0.0 - 2.0 CL 105 0 200

2.0 - 2.5 WEATHERED

ROCK 130 0 4,000

2.5 - 12.5 SANDSTONE 150 0 6,000

919▪342▪8247

SUBSURFACE STRENGTH PARAMETERS – SHALLOW FOUNDATION

*Value assumes foundation will bear entirely on bedrock.

Delta Oaks Group recommends the foundation bear a minimum of 3.3 feet bgs or entirely on bedrock.

A sliding friction factor of 0.35 can be utilized along the base of the proposed foundation.

An Ultimate Passive Pressure Table with a reduction due to frost penetration to a depth of 3.3 feet bgs is presented below.

Delta Oaks Group recommends an appropriate factor of safety be utilized for the design of the foundation.

ULTIMATE PASSIVE PRESSURE VS. DEPTH - TOWER FOUNDATION

Boring Dimensions (feet) Depth (feet bgs) Net Ultimate Bearing Capacity (psf)

B-1 5.0 x 5.0 3.3 or Top of Bedrock 30,000*

Soil Layers (feet) Moist Unit Weight Phi Angle Cohesion PV KP Ph

Top 0.0 105 0 200 0.00 1.00 200.00

Bottom 2.0 105 0 200 210.00 1.00 305.00

Top 2.0 130 0 4,000 210.00 1.00 4,105.00

Bottom 2.5 130 0 4,000 275.00 1.00 4,137.50

Top 2.5 150 0 6,000 275.00 1.00 6,137.50

Bottom 3.3 150 0 6,000 395.00 1.00 6,197.50

Top 3.3 150 0 6,000 395.00 1.00 12,395.00

Bottom 10.0 150 0 6,000 1,400.00 1.00 13,400.00

919▪342▪8247

SUBSURFACE STRENGTH PARAMETERS - DRILLED SHAFT FOUNDATION

The top 4.0 feet of soil should be ignored due to the frost penetration and the potential soil disturbance during construction.

The values presented assume the concrete is cast-in-place against earth walls and any casing utilized during construction of the foundation was removed.

Delta Oaks Group recommends an appropriate factor of safety be utilized for the design of the foundation.

SUBSURFACE STRENGTH PARAMETERS – MICROPILES

The micropiles should have an adequate design embedment length to resist the applied loads.

Group effects can contribute to a reduction in resistance for the micropiles and should be taken into consideration during foundation design.

Delta Oaks Group recommends an appropriate factor of safety be utilized and the appropriate manufacturer recommendations be followed for the design of the micropiles.

Boring Depth (bgs) Net Ultimate Bearing Capacity (psf)

Ultimate Skin Friction - Compression (psf)

Ultimate Skin Friction - Uplift (psf)

B-1

0.0 – 4.0 -- -- --

4.0 – 7.5 53,100 2,400 2,400

7.5 – 12.5 54,000 2,400 2,400

Boring Depth (bgs) Ultimate Grout to Ground Bond Strength

Type “A” Compression (psi) Uplift (psi)

B-1

0.0 – 2.5 -- --

2.5 – 12.5 75 75

919▪342▪8247

SEISMIC DESIGN CONSIDERATIONS

The site soils should be characterized as Seismic Site Class D.

Design considerations are based on the 2018 International Building Code and the subgrade conditions encountered during this investigation.

Period (seconds)

Site Coefficients

Mapped Spectral Acceleration Parameters

Adjusted Spectral Acceleration Parameters

Design Spectral Acceleration Parameters

0.2 1.6 (Fa) Ss = 0.100 Sms = 0.160 SDs = 0.106

1.0 2.4 (Fv) S1 = 0.044 Sm1 = 0.105 SD1 = 0.070

919▪342▪8247

CONSTRUCTION

SITE DEVELOPMENT

The proposed access road and tower compound should be evaluated by a Geotechnical Engineer, or their representative, after the removal or “cutting” of the areas to design elevation but prior to the placement of any structural fill material to verify the presence of unsuitable or weak material. Unsuitable or weak materials should be undercut to a suitable base material as determined by a Geotechnical Engineer, or their representative. Backfill of any undercut area(s) should be conducted in accordance with the recommendations provided in the STRUCTURAL FILL PLACEMENT section of this report.

Excavations should be sloped or shored in accordance and compliance with OSHA 29 CFR Part 1926, Excavation Trench Safety Standards as well as any additional local, state and federal regulations.

STRUCTURAL FILL PLACEMENT

Structural fill materials should be verified, prior to utilization, to have a minimum unit weight of 110 pcf (pounds per cubic foot) when compacted to a minimum of 95% of its maximum dry density and within plus or minus 3 percentage points of optimum moisture. Materials utilized should not contain more than 5 percent by weight of organic matter, waste, debris or any otherwise deleterious materials. The Liquid Limit should be no greater than 40 with a Plasticity Index no greater than 20. Structural fill material should contain a maximum particle size of 4 inches with 20 percent or less of the material having a particle size between 2 and 4 inches.

Backfill should be placed in thin horizontal lifts not to exceed 8 inches (loose) in large grading areas and 4 inches (loose) where small handheld or walk-behind compaction equipment will be utilized. The potential suitability of on-site materials to be utilized as fill should be evaluated by a Geotechnical Engineer, or their representative just prior to construction.

During construction structural fill placement should be monitored and tested. This should include at minimum, visual observation as well as a sufficient amount of in-place field density tests by a Geotechnical Engineer, or their representative. Materials should be compacted to a minimum of 95% of the maximum dry density as determined by ASTM D 698 (standard Proctor method). Moisture contents should be maintained to within plus or minus 3 percentage points of the optimum moisture content.

SHALLOW FOUNDATIONS

Foundation excavation(s) should be evaluated by a Geotechnical Engineer, or their representative, prior to reinforcing steel and concrete placement. This evaluation should include visual observation to verify a level bearing surface; vertical side-walls with no protrusions, sloughing or caving; and the exposed bearing surface is free of deleterious material, loose soil and standing water. Excavation dimensions should be verified and testing performed on the exposed bearing surface to verify compliance with design recommendations. Bearing testing should be conducted in accordance with ASTM STP399 (Dynamic Cone Penetrometer). A 6-inch layer of compacted crushed stone should be installed prior to reinforcing steel and concrete placement. If subsurface water is encountered during excavation dewatering methods such as sump pumps or well points may be required.

919▪342▪8247

DRILLED SHAFT FOUNDATIONS

Drilled shaft foundations (caissons) are typically installed utilizing an earth auger to reach the design depth of the foundation. Specialized roller bits or core bits can be utilized to penetrate boulders or rock. The equipment utilized should have cutting teeth to result in an excavation with little or no soil smeared or caked on the excavation sides with spiral-like corrugated walls.

The drilled shaft design diameter should be maintained throughout the excavation with a plumbness tolerance of 2 percent of the length and an eccentricity tolerance of 3 inches from plan location. A removable steel casing can be installed in the shaft to prevent caving of the excavation sides due to soil relaxation. Upon completion of the drilling and casing placement, loose soils and subsurface water greater than 3-inches in depth should be removed from the bottom of the excavation for the “dry” installation method. The drilled shaft installation should be evaluated by a Geotechnical Engineer, or their representative, to verify suitable end bearing conditions, design diameter and bottom cleanliness. The evaluation should be conducted immediately prior to as well as during concrete placement operations.

The drilled shaft should be concreted as soon as reasonably practical after excavation to reduce the deterioration of the supporting soils to prevent potential caving and water intrusion. A concrete mix design with a slump of 6 to 8 inches employed in conjunction with the design concrete compressive strength should be utilized for placement. Super plasticizer may be required to obtain the recommended slump range. During placement, the concrete may fall freely through the open area in the reinforcing steel cage provided it does not strike the reinforcing steel and/or the casing prior to reaching the bottom of the excavation. The removable steel casing should be extracted as concrete is placed. During steel casing removal a head of concrete should be maintained above the bottom of the casing to prevent soil and water intrusion into the concrete below the bottom of the casing.

If subsurface water is anticipated and/or weak soil layers are encountered drilled shafts are typically installed utilizing the “wet” method by excavating beneath a drilling mud slurry. The drilling mud slurry is added to the drilled shaft excavation after groundwater has been encountered and/or the sides of the excavation are observed to be caving or sloughing.

Additional inspection by a Geotechnical Engineer, or their representative, during the “wet” method should consist of verifying maintenance of sufficient slurry head, monitoring the specific gravity, pH and sand content of the drilling slurry, and monitoring any changes in the depth of the excavation between initial approval and just prior to concreting.

Concrete placement utilizing the “wet” method is conducted through a tremie pipe at the bottom of the excavation with the drilling mud slurry level maintained at a minimum of 5 feet or one shaft diameter, whichever is greater, above the ground water elevation. The bottom of the tremie should be set one tremie pipe diameter above the excavation. A closure flap at the bottom of the tremie or a sliding plug introduced into the tremie before the concrete is recommended to reduce the potential contamination of the concrete by the drilling mud slurry. The bottom of the tremie must be maintained in the concrete during placement.

Additional concrete should be placed through the tremie causing the slurry to overflow from the excavation in order to reduce the potential for the development of “slurry pockets” remaining in the drilled shaft.

919▪342▪8247

QUALIFICATIONS

The design parameters and conclusions provided in this report have been determined in accordance with generally accepted geotechnical engineering practices and are considered applicable to a rational degree of engineering certainty based on the data available at the time of report preparation and our practice in this geographic region. All recommendations and supporting calculations were prepared based on the data available at the time of report preparation and knowledge of typical geotechnical parameters in the applicable geographic region.

The subsurface conditions used in the determination of the design recommendations contained in this report are based on interpretation of subsurface data obtained at specific boring locations. Irrespective of the thoroughness of the subsurface investigation, the potential exists that conditions between borings will differ from those at the specific boring locations, that conditions are not as anticipated during the original analysis, or that the construction process has altered the soil conditions. That potential is significantly increased in locations where existing fill materials are encountered. Additionally, the nature and extent of these variations may not be evident until the commencement of construction. Therefore, a geotechnical engineer, or their representative, should observe construction practices to confirm that the site conditions do not differ from those conditions anticipated in design. If such variations are encountered, Delta Oaks Group should be contacted immediately in order to provide revisions and/or additional site exploration, as necessary.

Samples obtained during our subsurface field investigation will be retained by Delta Oaks Group for a period of 30 days unless otherwise instructed by INFINIGY. No warranty, expressed or implied, is presented.

Delta Oaks Group appreciates the opportunity to be of service for this Geotechnical Investigation Report. Please do not hesitate to contact Delta Oaks Group with any questions or should you require additional service on this project.

919▪342▪8247

APPENDIX

919▪342▪8247

BORING PLAN

Tested By: JVB Date: 5/5/2025 Checked By: Date:

Gnd Elevation:

Spacing (feet) Spacing (cm) 20 610 15 457.5 10 305 20 610 15 457.5 20 610E-W 330 1264805

E-W 160 613239 E-W 220 632403

N-S 150 431184 N-S 240 459929

Resistivity (ohm-cm)Resistance (ohms)Direction N-S 96 367943

Location:

GEO25-25764-08

Cumberland

Cumberland MD Cumberland, Maryland

Field Resitivity Data Sheet

ASTM G57-06

DOG Project #:

Site Name:

Site ID:

1 2

50/4"

REC

74.2

REC

87.5

RQD

= 9.2

RQD

= 0.0

CL

CL

Brown, soft, lean CLAY (CL), trace sand, trace gravel, trace silt, trace organics, wet

WEATHERED ROCK: Sampled as brown, grey, red, hard, lean CLAY (CL), with sand, with rock fragments, wet White, tan, highly fractured, moderately to highly weathered, moderately hard to hard, SANDSTONE, with interbedded clay seams *clay seam from 3.2 to 3.8 feet bgs

*Unconfined Compressive Strength at 4.4 feet bgs = 37,059 psi

Refusal at 2.5 feet.

Bottom of borehole at 12.5 feet.

DATE DRILLED : 5/9/2025 GROUND WATER LEVELS:

DRILLING METHOD : Hollow Stem Auger & Rock Coring

GROUND ELEVATION :

BORING DEPTH (ft) : 12.5

AT TIME OF DRILLING : --- Not encountered

AT END OF DRILLING : --- Not encountered

AFTER DRILLING : --- Not measured

B

LO

W S rd

N V

A

LU

E

D E

P T

H (f t)

SPT N VALUE

10 20 30 40 50 60 70 80 90

B

LO

W S st

B

LO

W S nd

M A

T E

R

IA

L C

LA

S

S

IF

IC

A

T

IO

N

MATERIAL DESCRIPTION

S A

M P

LE

T

Y P

E

P oc ke t P en et ro m et er

(t sf

Boring No.: B-1 PAGE 1 OF 1

PROJECT NAME Cumberland (Cumberland MD)

PROJECT LOCATION Cumberland, Maryland

CLIENT Infinigy

PROJECT NUMBER GEO25-25764-08

FieldResistivityData_Cumberland MD.pdf
Sheet1
2025-05-19T22:44:58-0400
Joseph V. Borrelli

File details come from the government source that posted it. Updated .